DAFTAR HARGA SATUAN PEKERJAAN

KEGIATAN
: PROYEK PEMBANGUNAN RUMAH
PEKERJAAN
: KONSTRUKSI RUMAH
LOKASI
: JAKARTA
TAHUN ANGGARAN : 2008
NO
I

URAIAN PEKERJAAN

WINNER T. F
20307046
3 TB 01

SATUAN

INDEKS

BAHAN DAN UPAH (Rp)

JUMLAH (Rp)

PEKERJAAN PERSIAPAN

1 PEMBERSIHAN LAHAN
Pekerja
Mandor
TOTAL

10m
10m

0.75
0.025

55,798.00
85,607.00

41,848.50
2,140.18
43,988.68

m
m
m
m
m
m

0.01
0.1
0.8
0.08
0.28
0.014

8,050,000.00
15,000.00
65,734.00
75,671.00
55,798.00
85,607.00

80,500.00
1,500.00
52,587.20
6,053.68
15,623.44
1,198.50
157,462.82

m
m

0.75
0.025

55,798.00
85,607.00

41,848.50
2,140.18
43,988.68

m
m
m

1.2
0.3
0.01

180,000.00
55,798.00
85,607.00

216,000.00
16,739.40
856.07
233,595.47

2 PEMASANGAN BOUWPLANK
Papan dan Pancang
Paku
Tukang Kayu
Kepala Tukang Kayu
Pekerja
Mandor
TOTAL

3 GALIAN TANAH U/ PONDASI


Pekerja
Mandor
TOTAL

4 URUGAN PASIR BWH PONDASI


Pasir
Pekerja
Mandor
TOTAL

5 URUGAN PASIR BWH LANTAI


Pasir
Pekerja
Mandor
TOTAL

m
m
m

1.2
0.3
0.01

180,000.00
55,798.00
85,607.00

216,000.00
16,739.40
856.07
233,595.47

m
m

0.75
0.025

55,798.00
85,607.00

41,848.50
2,140.18
43,988.68

m
m

0.75
0.025

55,798.00
85,607.00

41,848.50
2,140.18
43,988.68

6 URUGAN TANAH KEMBALI SISI PONDASI


Pekerja
Mandor
TOTAL

7 URUGAN TANAH PENINGGIAN LANTAI


Pekerja
Mandor
TOTAL

NO
II
1

III
1

URAIAN PEKERJAAN
PEKERJAAN PONDASI
PONDASI BATU KALI
Batu Kali
Semen
Pasir Pasang
Tukang Batu
Kepala Tukang Batu
Pekerja
Mandor
TOTAL
PEKERJAAN BETON
SLOOF BETON

SATUAN

m
m
m
m
m
m
m

INDEKS

1.2
4.26
0.34
0.6
0.06
1.5
0.015

BAHAN DAN UPAH (Rp)

160,000.00
52,000.00
160,000.00
65,734.00
75,671.00
55,798.00
85,607.00

JUMLAH (Rp)

192,000.00
221,520.00
54,400.00
39,440.40
4,540.26
83,697.00
1,284.11
596,881.77

Upah Pembesian
Kepala tukang batu
Pekerja
Mandor
TOTAL

m
m
m
m

0.75
0.039
0.781
0.078

1,095,000.00
75,671.00
55,798.00
85,607.00

821,250.00
2,951.17
43,578.24
6,677.35
874,456.75

m
m
m
m

0.75
0.039
0.781
0.078

1,095,000.00
75,671.00
55,798.00
85,607.00

821,250.00
2,951.17
43,578.24
6,677.35
874,456.75

m
m
m
m

0.75
0.039
0.781
0.078

1,095,000.00
75,671.00
55,798.00
85,607.00

821,250.00
2,951.17
43,578.24
6,677.35
874,456.75

m
m
m
m
m
m

8.5
0.54
0.82
1
3
0.1

52,000.00
160,000.00
260,000.00
65,734.00
55,798.00
85,607.00

442,000.00
86,400.00
213,200.00
65,734.00
167,394.00
8,560.70
983,288.70

m
m
m
m

8.5
0.54
0.82
1

52,000.00
160,000.00
260,000.00
65,734.00

442,000.00
86,400.00
213,200.00
65,734.00

2 KOLOM BETON
Upah Pembesian
Kepala tukang batu
Pekerja
Mandor
TOTAL

3 RING BALK BETON


Upah Pembesian
Kepala tukang batu
Pekerja
Mandor
TOTAL

4 MEJA DAPUR
Semen
Pasir beton
Kerikil
Tukang batu
Pekerja
Mandor
TOTAL

5 LIST PLANK
Semen
Pasir beton
Kerikil
Tukang batu

Pekerja
Mandor
TOTAL

NO

m
m

URAIAN PEKERJAAN

SATUAN

3
0.1

INDEKS

55,798.00
85,607.00

BAHAN DAN UPAH (Rp)

167,394.00
8,560.70
983,288.70
JUMLAH (Rp)

6 TOPI TERAS
Semen
Pasir beton
Kerikil
Tukang batu
Pekerja
Mandor
TOTAL

m
m
m
m
m
m

8.5
0.54
0.82
1
3
0.1

52,000.00
160,000.00
260,000.00
65,734.00
55,798.00
85,607.00

442,000.00
86,400.00
213,200.00
65,734.00
167,394.00
8,560.70
983,288.70

m
m
m
m
m
m

8.5
0.54
0.82
1
3
0.1

52,000.00
160,000.00
260,000.00
65,734.00
55,798.00
85,607.00

442,000.00
86,400.00
213,200.00
65,734.00
167,394.00
8,560.70
983,288.70

m
m
m
m
m
m
m

80
0.52
0.042
0.16
0.016
0.48
0.048

260.00
35,100.00
169,000.00
65,734.00
75,671.00
55,798.00
85,607.00

20,800.00
18,252.00
7,098.00
10,517.44
1,210.74
26,783.04
4,109.14

7 LANTAI KERJA
Semen
Pasir beton
Kerikil
Tukang batu
Pekerja
Mandor
TOTAL

IV
1

PEKERJAAN PASANGAN DINDING DAN PLESTERAN


PASANGAN DINDING BATA MERAH ( 1:2 )
Batu bata merah
Semen
Pasir pasang
Tukang batu
Kepala T. Batu
Pekerja
Mandor

TOTAL

88,770.35

2 PASANGAN BATU ROLLAG ( 1:4 )


Batu bata merah
Semen
Pasir pasang
Tukang batu
Kepala T. Batu
Pekerja
Mandor
TOTAL

m
m
m
m
m
m
m

475
2.4
0.416
1.5
0.15
3
0.15

260.00
35,100.00
169,000.00
65,734.00
75,671.00
55,798.00
85,607.00

123,500.00
84,240.00
70,304.00
98,601.00
11,350.65
167,394.00
12,841.05
568,230.70

m
m
m
m
m
m

0.2368
0.019
0.214
0.021
0.4
0.02

35,100.00
169,000.00
65,734.00
75,671.00
55,798.00
85,607.00

8,311.68
3,211.00
14,067.08
1,589.09
22,319.20
1,712.14
51,210.19

BAHAN DAN UPAH (Rp)

JUMLAH (Rp)

150,000.00
169,000.00
35,100.00
2,210.00
65,734.00
75,671.00
55,798.00

157,500.00
5,070.00
7,020.00
154.70
26,293.60
5,675.33
11,159.60

3 PLESTERAN DAN ACI ( 1:2, TEBAL 15 mm )


Semen
Pasir pasang
Tukang batu
Kepala T. Batu
Pekerja
Mandor
TOTAL

NO
V
1

URAIAN PEKERJAAN
PEKERJAAN LANTAI DAN DINDING
LANTAI KERAMIK ( 30X30 CM )
Ubin keramik 30x30
Pasir pasang
Semen
Semen warna
Tukang batu
Kepala T. Batu
Pekerja

SATUAN

m
m
m
m
m
m
m

INDEKS

1.05
0.03
0.2
0.07
0.4
0.075
0.2

Mandor
TOTAL
LANTAI KERAMIK ( 20X20 CM)
Ubin keramik 20x20
Pasir pasang
Semen
Semen warna
Tukang batu
Kepala T. Batu
Pekerja
Mandor
TOTAL

0.02

85,607.00

1,712.14
214,585.37

m
m
m
m
m
m
m
m

1.05
0.03
0.2
0.1
0.4
0.075
0.2
0.02

70,000.00
169,000.00
35,100.00
2,210.00
65,734.00
75,671.00
55,798.00
85,607.00

73,500.00
5,070.00
7,020.00
221.00
26,293.60
5,675.33
11,159.60
1,712.14
130,651.67

m
m
m
m
m
m
m
m

1.05
0.03
0.2
1
0.5
0.1
0.25
0.025

70,000.00
169,000.00
35,100.00
2,210.00
65,734.00
75,671.00
55,798.00
85,607.00

73,500.00
5,070.00
7,020.00
2,210.00
32,867.00
7,567.10
13,949.50
2,140.18
144,323.78

m
m
m
m
m
m
m

1.01
0.025
0.03
0.1
0.01
0.15
0.01

17,500.00
35,100.00
169,000.00
65,374.00
75,671.00
55,798.00
85,607.00

17,675.00
877.50
5,070.00
6,537.40
756.71
8,369.70
856.07
40,142.38

2 DINDING KERAMIK ( 20X25 CM )


Ubin keramik 20x25
Pasir pasang
Semen
Semen warna
Tukang batu
Kepala T. Batu
Pekerja
Mandor
TOTAL

3 PLIN KERAMIK
Plin keramik
Semen
Pasir pasang
Tukang batu
Kepala T. Batu
Pekerja
Mandor
TOTAL

VI

PEKERJAAN ATAP

1 KUDA-KUDA ATAP RUMAH


Balok kayu bengkirai

1.100

8,050,000.00

8,855,000.00

Paku

kg

3.000

8,000.00

24,000.00

Besi strip

kg

15.000

8,900.00

133,500.00

Tukang Kayu

org/hr

15.000

65,374.00

980,610.00

Kepala Tukang Kayu

org/hr

1.500

75,671.00

113,506.50

Pekerja

org/hr

5.000

55,798.00

278,990.00

Mandor

org/hr

0.250

85,607.00

21,401.75
10,407,008.25

Balok kayu bengkirai

1.1000

Paku

kg

2.900

8,000.00

23,200.00

Tukang Kayu

org/hr

4.5000

65,374.00

294,183.00

Kepala Tukang Kayu

org/hr

0.4500

75,671.00

34,051.95

Pekerja

org/hr

1.5000

55,798.00

83,697.00

Mandor

org/hr

0.0750

85,607.00

6,420.53
9,296,552.48

Kaso

0.0120

6,900,000.00

82,800.00

Reng

0.0053

6,900,000.00

36,570.00

2 GORDING KAYU
8,050,000.00

8,855,000.00

3 KASO DAN RENG

Paku Rata-rata

kg

0.1500

8,000.00

1,200.00

Tukang Kayu

org/hr

0.1000

65,374.00

6,537.40

Kepala Tukang Kayu

org/hr

0.0100

75,671.00

756.71

Pekerja

org/hr

0.1000

55,798.00

5,579.80

Mandor

org/hr

0.0050

85,607.00

428.04
133,871.95

Papan kayu Samarinda

0.0070

Paku Rata-rata

kg

0.0500

8,000.00

400.00

Tukang Kayu

org/hr

0.2000

65,374.00

13,074.80

Kepala Tukang Kayu

org/hr

0.0200

75,671.00

1,513.42

Pekerja

org/hr

0.1000

55,798.00

5,579.80

Mandor

org/hr

0.0050

85,607.00

428.04
87,006.06

Genteng Press Beton

bh

11.100

3,300.00

36,630.00

Tukang Batu

org/hr

0.100

65,374.00

6,537.40

Kepala Tukang Batu

org/hr

0.010

75,671.00

756.71

Pekerja

org/hr

0.200

55,798.00

11,159.60

Mandor

org/hr

0.010

85,607.00

856.07
55,939.78

4 LISTPLANK KAYU 3/20

9,430,000.00

66,010.00

PASANG ATAP GENTENG PRESS BETON

PASANG NOK GENTENG PRESS BETON


Nok Genteng Press Beton

bh

4.040

4,000.00

16,160.00

Semen

zak

0.216

35,100.00

7,581.60

Pasir Beton

0.032

130,000.00

4,160.00

Papan Ruiter Kamper

0.003

Tukang Batu

org/hr

0.200

65,374.00

13,074.80

Kepala Tukang Batu

org/hr

0.020

75,671.00

1,513.42

Pekerja

org/hr

0.400

55,798.00

22,319.20

Mandor

org/hr

0.020

85,607.00

1,712.14
87,221.16

Papan Kamper 2/20

0.008

6,900,000.00

55,200.00

Kaso

0.002

6,900,000.00

16,560.00

Seng plat tebal 0,3 mm

m'

1.050

20,000.00

21,000.00

Paku Rata-rata

kg

0.150

8,000.00

1,200.00

Paku Seng

kg

0.150

10,000.00

1,500.00

Timah

kg

0.100

1,500.00

150.00

Tukang Besi

org/hr

0.200

65,374.00

13,074.80

Tukang Kayu

org/hr

0.150

65,374.00

9,806.10

Kepala Tukang Besi

org/hr

0.020

75,671.00

1,513.42

Pekerja

org/hr

0.200

55,798.00

11,159.60

6,900,000.00

20,700.00

Pekerjaan Talang Datar Seng 0,3 mm + Alas Papan, tebal 2

7 Cm

Mandor

org/hr

0.010

85,607.00

856.07
132,019.99

Eternit/asbes plat 60x120

lbr

1.400

27,600.00

38,640.00

Paku Rata-rata

kg

0.030

8,000.00

240.00

Tukang Kayu

org/hr

0.160

65,374.00

10,459.84

Kepala Tukang Kayu

org/hr

0.016

75,671.00

1,210.74

Pekerja

org/hr

0.112

55,798.00

6,249.38

Mandor

org/hr

0.006

85,607.00

513.64
57,313.59

Balok kayu bengkirai

0.005

8,050,000.00

40,250.00

Kaso Kayu

0.020

6,900,000.00

138,000.00

Paku Rata-rata

kg

0.200

8,000.00

1,600.00

Tukang Kayu

org/hr

0.400

65,374.00

26,149.60

Kepala Tukang Kayu

org/hr

0.040

75,671.00

3,026.84

Pekerja

org/hr

0.280

55,798.00

15,623.44

Mandor

org/hr

0.014

85,607.00

1,198.50
225,848.38

VII PEKERJAAN PLAFOND


1 Plafond Eternit/Asbes Ukuran eternit 60x120x0,5 cm

Rangka Plafond Kayu (Grid 60 x 60 Cm)

VIII PEKERJAAN KUSEN, PINTU, JENDELA


1 Pekerjaan Kaca (tebal < 10 mm)

Kaca polos

1.100

5,000.00

5,500.00

Tukang Kayu

org/hr

0.240

65,374.00

15,689.76

Kepala Tukang Kayu

org/hr

0.024

75,671.00

1,816.10

Pekerja

org/hr

0.080

55,798.00

4,463.84

Mandor

org/hr

0.004

85,607.00

342.43
27,812.13

Papan kayu Samarinda

0.064

Paku rata-rata

kg

0.200

8,000.00

1,600.00

Lem kayu

kg

0.300

8,000.00

2,400.00

List kayu

m'

4.000

27,600.00

110,400.00

Tukang Kayu

org/hr

5.4000

65,374.00

353,019.60

Kepala Tukang Kayu

org/hr

0.5400

75,671.00

40,862.34

Pekerja

org/hr

1.8000

55,798.00

100,436.40

Mandor

org/hr

0.0900

85,607.00

7,704.63
1,219,942.97

Plamur Kayu

kg

0.150

9,750.00

1,462.50

Amplas
Cat dasar

lbr
kg

0.500

2,000.00
8,000.00

1,000.00
1,200.00

Daun Pintu/ Jendela Jalusi/ Krepyak (Kayu Kamper, tebal 3,5

2 cm)

IX
1

9,430,000.00

603,520.00

PEKERJAAN CAT
Cat Kayu (2 Lapis)
Termasuk Pekerjaan : Plamur, mengamplas

0.150

Cat Kayu

kg

0.300

20,000.00

6,000.00

Thinner

ltr

0.150

8,000.00

1,200.00

Kuas

bh

0.050

6,500.00

325.00

Tukang Cat

org/hr

0.250

65,374.00

16,343.50

Kepala Tukang Cat

org/hr

0.025

75,671.00

1,891.78

Pekerja

org/hr

0.200

55,798.00

11,159.60

Mandor

org/hr

0.010

85,607.00

856.07
41,438.45

Plamur Tembok

kg

0.200

9,750.00

1,950.00

Amplas

lbr

0.500

2,000.00

1,000.00

Cat dasar

kg

0.100

50,000.00

5,000.00

Cat Tembok

kg

0.200

50,000.00

10,000.00

Kuas roll

bh

0.015

9,000.00

135.00

Tukang Cat

org/hr

0.250

65,374.00

16,343.50

Kepala Tukang Cat

org/hr

0.025

75,671.00

1,891.78

Pekerja

org/hr

0.200

55,798.00

11,159.60

Mandor

org/hr

0.010

85,607.00

856.07
48,335.95

Cat Dinding Exterior (Dinding Baru, 3 Lapis) ICI


Alkali ICI sebelum pengecatan

kg

50,000.00

6,250.00

Cat Dinding Interior (Dinding Baru, 3 Lapis)

0.125
Cat tembok ICI Wheathershield

kg

0.200

20,000.00

4,000.00

Amplas

lbr

0.500

2,000.00

1,000.00

Kuas roll

bh

0.015

9,000.00

135.00

Tukang Cat

org/hr

0.280

65,374.00

18,304.72

Kepala Tukang Cat

org/hr

0.030

75,671.00

2,270.13

Pekerja

org/hr

0.160

55,798.00

8,927.68

Mandor

org/hr

0.010

85,607.00

856.07
41,743.60

You might also like