You are on page 1of 3

2.2.

Pengolahan dan Analisis Data Manual Material Handling Berikut pengolahan dan analisis data manual material handling. Tabel 2.2 Pengolahan Data Manual Material Handling

No Tugas 1 2 3

LC 23kg 23kg 23kg

HM 0,48 0,54 0,54

VM 0,8035 0,949 1,051

DM 0,97 1,057 0,89

AM 1 1 1

CM 0,95 0,95 0,95

FM 0,892 0,892 0,892

FIRWL 8,45 11,84 11,04

STRWL 7,54 10,56 9,84

FILI 0,47 0,34 0,36

STLI 0,53 0,37 0,406

No Tugas Baru 1 3 2

F 2,6 2,6 2,6

Keterangan: LC : HM : VM : DM : AM : CM : FM : Load Constanta Horizontal Multiplier Vertical Multiplier Distance Multiplier Assymmetry Multiplier Coupling Multiplier Frequency Multiplier

FIRWL : Frequency Independent Recommended Weight Limit STRWL : Single Task Recommend Weight Limit FILI : Frequency Independent Lifting Index L : Object Weight STLI : Single Task Lifting Index Berikut adalah contoh perhitungan pada nomor tugas 1. HM = = = VM = = = DM = = = AM = = ( ) ( ) | | | |

= FM = (interpolasi dari tabel FM dengan nilai F pada nomor tugas 1) Frequency Lift/min 2 2.6 3 Work Duration 0.91 X 0.88

CM = (lihat tabel Coupling Multiplier) = Coupling type: Fair; V < 75cm = 0.95 FIRWL = = = 8,45 STRWL = = = = STLI = = = CLI = = = LI = = = [( *( ) ) ( ( )] )+ *( [( ) ) ( ( )+ )]

= = = Dari perhitungan diatas dapat disimpulkan bahwa pada hasil perhitungan CLI menunjukkan nilai CLI < 1, sehingga kegiatan pengangkatan dapat direkomendasikan karena tidak menyebabkan cedera tulang belakang.

You might also like