Project: Location: Contract: Engineer: Filename: UNIT1DTTL

ETAP PowerStation
4.0.0C

Page: Date: SN:

1 09-16-2013 KLGCONSULT Base Normal

Study Case: LF

Revision: Config.:

Electrical Transient Analyzer Program ETAP PowerStation

Load Flow Analysis


Loading Category: Design None

Load Diversity Factor:

Swing Number of Buses: 1

Generator 0

Load 2

Total 3

XFMR2 Number of Branches: 1

XFMR3 0

Reactor 0

Line/Cable 1

Impedance 0

Tie PD 0

Total 2

Method of Solution: Maximum No. of Iteration: Precision of Solution:

Newton-Raphson Method 99 0.000100

System Frequency: Unit System: Project Filename: Output Filename:

60.00 English UNIT1DTTL C:\ETAP 400\PowerStation\UNIT1DTTL\Untitled.lf1

Project: Location: Contract: Engineer: Filename: UNIT1DTTL

ETAP PowerStation
4.0.0C

Page: Date: SN:

2 09-16-2013 KLGCONSULT Base Normal

Study Case: LF

Revision: Config.:

BUS Input Data

Bus
ID Bus1 Bus2 Bus5 Total Nunmber of Buses: 3 Type Swing Load Load kV 20.000 0.380 0.380

Initial Voltage
% Mag. 100.0 100.0 100.0 Ang. 0.0 0.0 0.0

Generator
MW Mvar

Motor Load
MW Mvar

Static Load
MW Mvar

Mvar Limits
Max. Min.

0.241

0.103

5.000

0.000

0.000

0.000

0.241

0.103

5.000

0.000

Project: Location: Contract: Engineer: Filename: UNIT1DTTL

ETAP PowerStation
4.0.0C

Page: Date: SN:

3 09-16-2013 KLGCONSULT Base Normal

Study Case: LF

Revision: Config.:

LINE / CABLE Input Data


Line/Cable
ID Cable1 Library 5MCUS3

Ohms or Mohs / 1000 ft per Conductor (Cable) or per Phase (Line)


Size 6 Length(ft) 100.0 #/Phase 1 T (C) 75 R 0.510000 X 0.061000 Y

Line / Cable resistances are listed at the specified temperatures.

Project: Location: Contract: Engineer: Filename: UNIT1DTTL

ETAP PowerStation
4.0.0C

Page: Date: SN:

4 09-16-2013 KLGCONSULT Base Normal

Study Case: LF

Revision: Config.:

2-WINDING TRANSFORMER Input Data

Transformer
ID T1 MVA 50.000 Prim. kV 20.000

Rating
Sec. kV 0.380 %Z 6.750 X/R 5.8 + 5% 0

Z Variation
- 5% 0 % Tol. 0

% Tap Setting
Prim. 0 Sec. 0

Adjusted
%Z 6.7500

Phase Shift
Type Std Pos. Seq. Angle 0.0

Project: Location: Contract: Engineer: Filename: UNIT1DTTL

ETAP PowerStation
4.0.0C

Page: Date: SN:

5 09-16-2013 KLGCONSULT Base Normal

Study Case: LF

Revision: Config.:

BRANCH CONNECTIONS
CKT/Branch
ID T1 Cable1 Type 2W XFMR Cable Bus1 Bus5 From Bus Bus5 Bus2

Connected Bus ID
To Bus

% Impedance, Pos. Seq., 100 MVAb


R 2.30 3531.86 X 13.30 422.44 Z 13.50 3557.03 Y

Project: Location: Contract: Engineer: Filename: UNIT1DTTL

ETAP PowerStation
4.0.0C

Page: Date: SN:

6 09-16-2013 KLGCONSULT Base Normal

Study Case: LF

Revision: Config.:

EQUIPMENT CABLE Input Data


O/L Equipment Cable
ID

Equipment
ID Type Library Size

ohms / 1000 ft per Conductor


L(ft) #/ph T (C) R X Y

Heater
R (ohm)

Project: Location: Contract: Engineer: Filename: UNIT1DTTL

ETAP PowerStation
4.0.0C

Page: Date: SN:

7 09-16-2013 KLGCONSULT Base Normal

Study Case: LF

Revision: Config.:

LOAD FLOW REPORT

Bus
ID * Bus1 Bus2 Bus5 kV 20.000 0.380 0.380

Voltage
%Mag. 100.000 20.534 99.907 Ang. 0.0 4.7 -0.2

Generation
MW 2.21 0 0 Mvar 0.32 0 0

Motor Load
MW 0 0.24 0 Mvar 0 0.10 0

Static Load
MW 0 0.21 0 Mvar 0 0.00 0 Bus5 Bus5 Bus2 Bus1 ID

Load Flow
MW 2.21 -0.45 2.21 -2.21 Mvar 0.32 -0.10 0.31 -0.31 Amp 64 3394 3394 3398 %PF 99.0 97.5 99.0 99.0

XFMR
% Tap

* Indicates a voltage regulated bus ( voltage controlled or swing type machine connected to it) # Indicates a bus with a load mismatch of more than 0.1 MVA

Project: Location: Contract: Engineer: Filename: UNIT1DTTL

ETAP PowerStation
4.0.0C

Page: Date: SN:

8 09-16-2013 KLGCONSULT Base Normal

Study Case: LF

Revision: Config.:

BUS LOADING Summary Report

Bus
ID Bus1 Bus2 Bus5 kV 20.000 0.380 0.380 Rated Amp MW 2.214 0.447 2.210 Mvar 0.321 0.103 0.314

Bus Total Load


MVA 2.237 0.459 2.232 % PF 99.0 97.5 99.0 Amp 64.57 3394.33 3394.33 % Loading

Project: Location: Contract: Engineer: Filename: UNIT1DTTL

ETAP PowerStation
4.0.0C

Page: Date: SN:

9 09-16-2013 KLGCONSULT Base Normal

Study Case: LF

Revision: Config.:

BRANCH LOADING Summary Report

Transformer CKT / Branch


ID T1 Type Transformer

Cable & Reactor


Ampacity (Amp) Loading Amp % Capability (MVA) 50.000 Loading (input) MVA 2.237 % 4.5 Loading (output) MVA 2.235 % 4.5

* Indicates a branch with operating load exceeding the branch capability

Project: Location: Contract: Engineer: Filename: UNIT1DTTL

ETAP PowerStation
4.0.0C

Page: Date: SN:

10 09-16-2013 KLGCONSULT Base Normal

Study Case: LF

Revision: Config.:

BRANCH LOSSES Summary Report


Vd % Drop in Vmag 0.09 79.37

CKT / Branch
ID T1 Cable1

From-To Bus Flow


MW 2.214 -0.447 Mvar 0.321 -0.103

To-From Bus Flow


MW -2.212 2.210 Mvar -0.315 0.314 kW

Losses
Kvar 6.7 210.8 217.5

% Bus Voltage
From 100.0 20.5 To 99.9 99.9

1.1 1762.8 1763.9

Project: Location: Contract: Engineer: Filename: UNIT1DTTL

ETAP PowerStation
4.0.0C

Page: Date: SN:

11 09-16-2013 KLGCONSULT Base Normal

Study Case: LF

Revision: Config.:

EQUIPMENT CABLE LOSSES Summary Report


Vd % Drop in Vmag Vst % for Motor

Equipment Cable
ID

Connected
Load Type kW

Losses
kvar

% Voltage
Bus Load

Project: Location: Contract: Engineer: Filename: UNIT1DTTL

ETAP PowerStation
4.0.0C

Page: Date: SN:

12 09-16-2013 KLGCONSULT Base Normal

Study Case: LF

Revision: Config.:

Alert Summary Report % Alert Settings Critical Loading


Bus Cable Reactor Generator Transformer Protective Device

Marginal

Bus Voltage
OverVoltage UnderVoltage 105.0 95.0 102.0 98.0

Generator Excitation
OverExcited (Q Max.) UnderExcited (Q Min.)

Critical Report
ID Bus2 Device Type Bus Rating 0.380 Unit kV Calculated 0.078 %Mag. 20.5 Condition UnderVoltage

Project: Location: Contract: Engineer: Filename: UNIT1DTTL

ETAP PowerStation
4.0.0C

Page: Date: SN:

13 09-16-2013 KLGCONSULT Base Normal

Study Case: LF

Revision: Config.:

SUMMARY OF TOTAL GENERATION , LOADING & DEMAND

MW Swing Bus(es): Generators: Total Demand: Total Motor Load: Total Static Load: Apparent Losses: System Mismatch: 2.214 0.000 2.214 0.236 0.211 1.767 0.007

Mvar 0.321 0.000 0.321 0.103 0.000 0.219 0.002

MVA 2.237 0.000 2.237 0.258

% PF 98.96 Lagging 100.00 Lagging 98.96 Lagging 91.68 Lagging

Number of Iterations: 4