Professional Documents
Culture Documents
DATE
NAME
DAYS OF
POSITION
WORK
NOV.25-30
NOV. 28
Rate
Rate/hr
(PHP)
1.0 MARSAM
WELDER/SM
300
37.50
TOTAL
Total
Deduction
HOURS
Amount
( CA )
48.00
1,800.00
NET PAY
1,800.00
HELPER
250
31.25
8.00
250.00
250.00
HELPER
270
33.75
32.00
1,080.00
1,080.00
NOV.25-30
HELPER
270
33.75
48.00
1,620.00
1,620.00
HELPER
270
33.75
24.00
810.00
810.00
NOV.25-30
LM-C/M
400
50.00
32.00
1,600.00
1,600.00
NOV.25-30
MASON
350
43.75
48.00
2,100.00
2,100.00
NOV. 26-28
PAINTER
350
43.75
24.00
1,050.00
1,050.00
NOV. 27
9.0 RELIEVER
HELPER
250
31.25
8.00
250.00
250.00
TOTAL
AMOUNT
Prepared by:
Aris R. Alcantara
Civil Engineer
PRC no. 74768
10,560.00
10,560.00
SIGNATURE
LEVEL
GROUND FLOOR
RESIDENTIAL
Description
Area
( SQM)
Maid's Room
14.00
Sub-total
Library /
Study Room
SECOND FLOOR
THIRD FLOOR
a. Kitchen/ Dining
b. Master's Bedroom
c.Balcony
d. Hallway
e. Stairway
f. Living Room
Sub-total
FOURTH FLOOR
a. Boy's Room
b. Girl's Room
c. Family /
Entertainment room
d. Hallway
e. Stairway
Sub-total
ROOF DECK
16.25
Aris R. Alcantara
Civil Engineer
PRC no. 74768
PTR no. 9937091
25.50
COMMON AREA
Description
Area
( SQM)
Driveway
Entrance
/Lobby
25.50
a. Law Office
b. Rentable Space 1
c. Rentable Space 2
16.25
14.28
18.00
60.00
16.25
76.25
a. Hallway
b. Balcony
c. Stairway
18.50
11.50
8.00
48.53
38.00
74.03
114.25
37.10
18.00
11.50
18.50
8.00
18.00
111.10
37.10
18.00
30.00
18.50
8.00
111.60
a. Laundry
Drying Area
b. Stairway
c. Garden
d. Multi-purpose Area
8.00
8.00
24.00
65.00
Sub-total
105.00
357.95
Prepared by:
Water Station
14.00
16.25
Sub-total
COMMERCIAL
Description
Area
( SQM)