You are on page 1of 1

FORM - 7C

PROGRAM NASIONAL PEMBERDAYAAN MASYARAKAT MANDIRI


PENGEMBANGAN INFRASTRUKTUR SOSIAL EKONOMI WILAYAH
(PNPM PISEW) TAHUN 2012

HARGA SEWA SATUAN ALAT PER JAM


Kabupaten
Kecamatan
Desa
Paket Pekerjaan

:
:
:
:

NO

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48

TANAH LAUT
Takisung
Pagatan Besar
Jalan Usaha Tani RT.06 (Ruas 2)
JENIS ALAT

Aspalt Mixing Plant


Asphalt Finisher
Aspahalt Sprayer
Bulldozer
Air Compresor
Concrete Mixer
Crawler Crane (10 Ton)
Dump Truck (K)
Dump Truck
Excavator
Flat Bed Truck
Generator Set
Motor Grader
Track Loader
Wheel Loader
Three Wheel Roller
Tandem Roller
Pneumatic Tyre Roller
Vibrator Roller
Concrete Vibrator
Stone Crusher
Water Pump
Water Tank Truck
Vibrator Compactor
Stamper
Jack Hammer
Fulvi Mixer
Concrete Pump
Trailer 20 Ton
Pile Driver (Diesel Hammer)
Crane On Track
Welding Set
Pedestrian Roller
Asphal
Mesin Lier
Flat Bed Truck + Crane
Screening Plant
Cold Milling (Winget)
Rock Drill Breaker
Drop Hammer / Panc. Kayu
Hand Compactor
Concrete Bathing & Mixing Plant
Vibrating Screed
Agitator Truck (Truck Mixer)
Concrete Cutter
Ponto
Ponto
Bor

Dibuat Oleh
Tenaga Teknis Lapangan
Kecamatan Takisung

Jaya Pranata, ST

KODE

SATUAN

KET

E01
E02
E03
E04
E05
E06
E07
E08
E09
E10
E11
E12
E13
E14
E15
E16
E17
E18
E19
E20
E21
E22
E23
E24
E25
E26
E27
E28
E29
E30
E31
E32
E33
E34
E35
E36
E37
E38
E39
E40
E41
E42
E43
E44
E45
E46
E47
E48

20
100
15
140
80
10
150
50
100
100
125
120
125
95
125
60
60
60
60
3
220
6
125
3
5
3
75
120
175
25
125
40
11
5
80
125
150
125
3
75
6.5
150
25
125
25
50
100
150

50 Ton/Jam
80 Ton/Jam
800 Liter
140 HP
400 M2/Jam
250 Liter
10 Ton
6 Ton
10 Ton
0,5 M3
10 Ton
100 KVA
125 HP
1,5 M3
1,2 M3
8 Ton
8 Ton
10 Ton
8 Ton
3 HP
60 Ton/Jam
10 M3/Jam
4 M3
3 HP
0,2 Ton
3 HP
75 HP
60.0 M3/Jam
20 Ton
2,5 Ton
35 Ton
250 Amp
1 Ton
1000.0 liter
10 Ton
15 Ton
20 Ton/Jam
125.0 HP
3.0 HP
1 Ton
0.1 Ton
23.0 M3/Jam
25.0 HP
5.0 M3
25.0 HP
50.0 HP
100.0 HP
200 M

Diperiksa Oleh
PJOK Kec. Takisung

Muslim, S.Sos
Nip. 19660118.198602.1.004

Diperiksa Oleh
ATK Tanah Laut

Ir. Rahmi

HARGA SATUAN/JAM

( Rp. )

2,289,076.00
139,579.00
27,190.00
271,993.00
78,488.00
11,546.00
186,156.00
67,586.00
157,535.00
218,108.00
128,020.00
129,790.00
215,292.00
213,275.00
213,014.00
90,258.00
90,158.00
101,258.00
110,854.00
7,412.00
506,468.00
10,028.00
128,021.00
8,097.00
8,275.00
20,129.00
72,164.00
122,637.00
219,714.00
39,000.00
195,000.00
36,564.00
31,593.00
10,038.00
32,165.00
192,131.00
146,514.00
438,720.00
9,962.00
123,600.00
6,531.00
665,962.00
23,143.00
204,464.00
27,864.00
65,476.00
95,453.00
734,311.00

Disetujui Oleh
PPK PNPM PISEW
Kabupaten Tanah Laut

Normansyah, ST
NIP. 19590505.198203.1.030

You might also like