Item
Descripcin
Metrado
Precio
MES
3.00
200.00
600.00
600.00
GUARDIANIA Y ALMACEN
MES
3.00
2,400.00
7,200.00
7,200.00
01.03.00
UND
1.00
1,331.36
1,331.36
1,331.36
02.00.00
02.01.00
TRABAJOS PRELIMINARES
TRAZO NIVELACION Y REPLANTEO
GLB
1.00
3,500.00
3,500.00
3,500.00
02.02.00
GLB
1.00
800.00
800.00
800.00
02.03.00
GLB
1.00
6,000.00
6,000.00
6,000.00
02.04.00
GLB
GLB
1.00
1.00
2,000.00
80,000.00
2,000.00
80,000.00
2,000.00
80,000.00
03.00.00
03.01.00
03.01.01
M3
1,230.00
26.05
0.00
0.00
03.01.02
M3
10.40
62.04
0.00
0.00
03.01.03
REFINE Y NIVELACION
M2
1,243.55
3.80
0.00
0.00
03.01.04
M3
1,585.48
16.84
0.00
0.00
03.02.00
03.02.01
CONCRETO SIMPLE
SOLADO PARA PISO Y ZAPATAS DE 2" MEZCLA 1:12 CEMENTO-HORMIGON
M2
1,119.83
7.94
0.00
0.00
03.02.02
M3
21.58
175.56
0.00
0.00
03.02.03
M2
1,523.84
1.26
0.00
0.00
03.02.04
M2
1,119.83
10.83
0.00
0.00
03.02.05
M2
149.10
12.43
0.00
0.00
03.02.06
M3
111.98
287.07
0.00
0.00
03.02.07
M3
14.91
261.45
0.00
0.00
03.02.08
M3
45.35
177.31
0.00
0.00
03.02.09
528.00
11.87
0.00
0.00
01.00.00
01.01.00
TRABAJOS PROVISIONALES
ALQUILER DE CAMPAMENTO
01.02.00
Unidad
Parcial
MES 3 TOTAL
03.02.10
M2
255.87
36.89
0.00
0.00
03.03.00
03.03.01
CONCRETO ARMADO
CONCRETO F'C=175 KG/CM2. PARA ZAPATAS
M3
56.78
291.62
0.00
0.00
03.03.02
KG
1,150.08
5.09
0.00
0.00
03.03.03
M3
6.15
372.47
0.00
0.00
03.03.04
KG
1,033.98
5.09
0.00
0.00
03.03.05
M3
59.65
350.02
0.00
0.00
03.03.06
KG
4,515.02
5.09
0.00
0.00
03.03.07
M2
319.41
44.68
0.00
0.00
03.04.00
03.04.01
VARIOS
JUNTAS ASFALTICAS
752.56
2.34
0.00
0.00
03.04.02
M2
291.02
20.02
0.00
0.00
03.04.03
UND
1.00
600.00
0.00
0.00
04.00.00
04.01.00
04.01.01
CANAL DE CONCRETO
MOVIMIENTO DE TIERRAS
DEMOLICION DE OBRAS EXISTENTES
M2
98.30
11.30
1,110.79
1,110.79
04.01.02
M3
235.00
18.40
4,324.00
4,324.00
04.01.03
M3
1,597.78
27.54
44,002.86
44,002.86
04.01.04
M3
1,592.30
31.82
50,666.99
50,666.99
04.01.05
1,765.54
32.56
57,485.98
57,485.98
04.01.06
M3
754.50
39.42
29,742.39
29,742.39
04.02.00
04.02.01
CONCRETO SIMPLE
CONCRETO F'C=175 KG/CM2. PARA CANAL
M3
1,523.85
41.35
63,011.20
63,011.20
04.02.02
M2
1,345.12
40.56
54,558.07
54,558.07
04.02.03
M2
1,234.65
34.54
42,644.81
42,644.81
04.02.04
M2
56.90
34.78
1,978.98
1,978.98
04.04.00
04.04.01
VARIOS
OBRAS DE ARTE (cunetas , desviacion de torrenteras)
985.00
40.78
40,168.30
40,168.30
04.04.02
UND
12.00
42.78
513.36
513.36
04.04.03
UND
4.00
44.78
179.12
179.12
05.00.00
05.01.00
05.01.01
M3
1.13
60.15
0.00
0.00
05.01.02
M3
3.10
36.09
0.00
0.00
05.01.03
M3
0.81
36.09
0.00
0.00
05.01.04
M3
0.54
62.04
0.00
0.00
05.01.05
2.70
6.38
0.00
0.00
05.01.06
M3
4.94
16.84
0.00
0.00
05.02.00
05.02.01
CONCRETO SIMPLE
CONCRETO F'C=175 KG/CM2. PARA DESARENADOR
M3
1.49
328.26
0.00
0.00
05.02.02
M2
11.96
22.87
0.00
0.00
05.02.03
M2
8.56
1.14
0.00
0.00
05.03.00
05.03.01
2.70
60.94
0.00
0.00
05.04.00
05.04.01
VARIOS
JUNTAS ASFALTICAS
2.40
2.34
0.00
0.00
05.04.02
COMPUERTA TIPO TARJETA PLANCHA MET. e=3/16" CON ANG. 45X65 CM.
UND
1.00
107.63
0.00
0.00
05.04.03
UND
1.00
163.64
0.00
0.00
491,818.20
49,181.80
============
=======
541,000.00
491,818.20
49,181.80
============
541,000.00
59,000.00
600,000.00
59,000.00
600,000.00
COSTO DIRECTO
GASTOS GENERALES 10%
GASTOS GENERALES
PROYECTO: CONSTRUCCION RESERVORIO Y CANAL DE DISTRIBUCION SECTOR LOS TORRES"
ITEM
DESCRIPCION
GASTOS VARIABLES
1.00
DIRECCION TECNICA
1.01
1.02
2.00
PERSONAL ADMINISTRATIVO
2.01
Administrador de Obra
3.00
3.01
3.02
4.00
ALQUILER Y SERVICIOS
4.01
4.02
4.03
Utiles de Oficina
Ensayo de rotura
Diseo de Mezclas
5.00
OTROS
5.01
PRECIO
PRECIO
UNITARIO PARCIAL
TOTAL
26,250.00
mes
mes
3.5
3
1.00
1.00
4,500.00 15,750.00
3,500.00 10,500.00
mes
0.50
1,400.00
2,100.00
glb
glb
1.00
1.00
450.00
300.00
450.00
300.00
glb
glb
glb
1.00
1.00
1.00
70.96
120.00
450.00
70.96
120.00
450.00
glb
1.00
600.00
600.00
2,100.00
750.00
640.96
600.00
S/.
30,340.96
HOJA DE METRADOS
PROYECTO : CONSTRUCCION RESERVORIO Y CANAL DE DISTRIBUCION SECTOR LOS TORRES
ITEM
DESCRIPCION
CANT.
LONG
ANCHO
ALTO
SUB_TOTAL
TOTAL
UNID
3.00
3.00
3.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
3.00
MES
3.00
MES
1.00
UND
1.00
GLB
1.00
GLB
1.00
GLB
1.00
GLB
1,230.00
M3
10.40
M3
1,243.55
M2
1,585.48
M3
1,119.83
M2
21.58
M3
1,523.84
M2
1,119.83
M2
03.00.00 RESERVORIO
03.01.00 MOVIMIENTO DE TIERRAS
03.01.01 EXCAVACION EN ROCA CON PRE-CORTE
1.00
1,230.00
1.00
10.40
1,230.00
1.00
1,119.83
Camineria
1.00
123.72
1,119.83
123.72
1,585.48
1.00
1,119.83
10.99
0.50
0.60
3.30
1.00
22.78
0.50
0.60
6.83
1.00
13.45
0.50
0.60
4.04
1.00
9.09
0.50
0.60
2.73
1.00
5.47
0.50
0.60
1.64
1.00
10.14
0.50
0.60
3.04
Muros
1.00
1,119.83
1.00
123.72
1.00
24.42
1,119.83
123.72
24.42
1.00
58.64
1.70
1.00
23.91
0.70
16.74
1.00
71.92
1.60
115.07
1.00
60.94
0.40
24.38
99.69
1.00
1,119.83
1,119.83
1.00
123.72
1.00
24.42
2.00
Piso
1.00
1,119.83
0.10
111.98
Piso
1.00
123.72
0.10
12.37
0.10
2.44
0.10
0.10
14.95
1.60
0.30
Graderias
2.00
Muros
1.00
58.64
0.15
1.70
1.00
23.91
0.15
0.70
2.51
1.00
71.92
0.20
1.60
23.01
1.00
60.94
0.20
0.40
4.88
1.00
528.00
1.00
58.64
1.70
1.00
23.91
0.70
16.74
1.00
71.92
1.60
115.07
1.00
60.94
0.40
24.38
1.00
141.96
0.40
56.78
0.30
M3
14.91
M3
45.35
M3
528.00
255.87
M2
56.78
M3
1,150.08
KG
6.15
M3
1,033.98
KG
59.65
M3
4,515.02
KG
319.41
M2
752.56
291.02
M2
528.00
111.98
0.96
1.60
M2
24.42
Graderias
1.00
149.10
123.72
99.69
Cant
Long
1.00
F Diam
Coef
710.00
1.00
1/2
1.02
724.20
5.00
141.96
3/8
0.60
425.88
Reservorio
47.00
0.20
0.20
2.25
4.23
24.00
0.20
0.20
2.00
1.92
Cant
Reservorio
Long
F Diam
Coef
188.00
2.90
1/2
1.02
556.10
658.00
0.80
1/4
0.25
131.60
96.00
2.85
1/2
1.02
279.07
336.00
0.80
1/4
0.25
67.20
Reservorio
1.00
141.96
0.20
2.25
63.88
Columnas
-47.00
0.20
0.20
2.25
-4.23
Cant
Reservorio
Long
F Diam
Coef
1420.00
2.90
3/8
0.60
2,470.80
24.00
141.96
3/8
0.60
2,044.22
1.00
141.96
2.25
319.41
2.05
16.40
03.04.00 VARIOS
03.04.01 JUNTAS ASFALTICAS
Muros Reservorio
8.00
Piso Reservorio
1.00
141.96
141.96
1.00
270.20
270.20
1.00
324.00
324.00
1.00
141.96
291.02
1.00
UND
10.15
M2
49.74
M3
34.48
6.90
M3
136.90
66.64
M3
50.68
M3
180.20
M2
270.30
M2
10.15
M2
136.90
90.00
7.00
UND
3.00
UND
1.13
M3
1.00
10.15
1.00
10.15
1.00
1.00
41.98
20.15
0.70
41.98
0.55
7.76
1.00
34.48
34.48
34.48
1.00
136.90
0.50
0.40
6.90
136.90
66.64
2.00
205.10
0.15
0.40
24.61
1.00
205.10
0.70
0.15
21.54
2.00
20.15
0.15
0.40
2.42
1.00
20.15
0.70
0.15
2.12
Canal de Distribucion
2.00
205.10
0.40
164.08
2.00
20.15
0.40
16.12
2.00
205.10
0.40
164.08
1.00
205.10
2.00
20.15
1.00
20.15
1.00
10.15
1.00
136.90
136.90
Canal de Distribucion
68.00
1.20
81.60
7.00
1.20
8.40
0.40
82.04
0.40
0.40
16.12
8.06
10.15
04.04.00 VARIOS
04.04.01 JUNTAS ASFALTICAS
04.04.02 COMPUERTA TIPO TARJETA PLANCHA METALICA e=3/16" CON ANG. 45X45 CM
Canal de Distribucion
6.00
6.00
1.00
1.00
Canal de Distribucion
2.00
2.00
1.00
1.00
Canal Existente
2.00
5.00
0.15
0.40
0.60
1.00
5.00
0.70
0.15
0.53
4.30
0.90
0.80
3.10
1.00
2.70
0.50
0.60
0.81
1.00
2.70
0.50
0.40
0.54
1.00
2.70
3.10
M3
0.81
0.54
M3
2.70
4.94
M3
1.49
M3
11.96
M2
8.56
M2
2.70
2.40
1.00
UND
1.00
UND
2.70
4.94
4.30
0.15
0.65
0.84
1.00
0.70
0.15
0.65
0.07
1.00
4.30
0.90
0.15
0.58
4.00
4.30
0.65
11.18
2.00
0.60
0.65
0.78
2.00
4.30
0.65
5.59
1.00
0.60
0.65
0.39
1.00
4.30
1.00
2.70
2.70
2.00
1.20
2.40
0.60
2.58
05.04.00 VARIOS
05.04.01 JUNTAS ASFALTICAS
05.04.02 COMPUERTA TIPO TARJETA PLANCHA MET. e=3/16" CON ANG. 45X65 CM.
1.00
1.00
1.00
1.00