CONTENTS
SECTION 1 2 3 4 5 6 7 8 9 10 11 12 13 14 DESCRIPTION GENERAL SCOPE OF WORKS DESIGN DATA DX DUCTABLE SPLIT UNITS SHEET METAL WORKS DAMPERS DIFFUSERS DUCTING INSULATION MEASUREMENTS TESTING AND BALANCING SERVICE AND MAINTENANCE TESTS COMMISSIONING REPORT APPROVED MAKES LIST OF TENDER DRAWINGS PAGE NOS 3-4 4-4 5-6 6-18 19-19 20-21 22-24 25-26 27-35 36-40 41-41 42-42 43-43 44-45
SECTION: 1 GENERAL SCOPE OF WORKS The works covered by this specification consists of supply, delivery, unloading at site, installation, testing, commissioning of the Air Conditioning equipment as outlined in the following pages. a. Supply, Installation, testing and commissioning of FOUR ( 4 ) 8.75 TR DX ceiling suspended ductable split unit complete with all accessories to capacities shown on the Drawings or Schedules of equipment. b. Co ordination for installation of Air Distribution System complete with factory fabricated G.S.S. Ducting insulated acoustically and thermally G.I. / Aluminum Volume Control Dampers, Supply air and Return air Diffusers, to sizes shown on the Drawing or Schedule of materials. c. Testing, Balancing and Commissioning of the entire ACMV installation and submission of duly filled up all testing, balancing and commissioning reports. d. Technical Data Sheets of all equipment, materials and Samples shall be submitted for Consultants for approval prior to installation works. Shop drawings and descriptive technical brochures for all equipment shall be submitted for review by the Consultant prior to fabrication and installation works. The drawings shall include but not limited to detail room layouts, riser, floor and wall penetration details, builder's work requirements, bracket spacing, details of installation and dimensions, weights, control panel schematic and layouts and all other information related to the ACMV contractor's works. The ACMV Contractor shall provide all other information needed to complete related works by the Main Contractor and other sub-contractors. Relevant shop drawings and details shall be submitted to the Main Contractor and approval obtained for purposes of co-ordination with other trades. The ACMV Contractor shall carry out any other incidental works or supply and install accessories not specifically mentioned but considered necessary to bring the whole installation to proper and satisfactory working order. All other accessories required to comply fully with Local Authority Regulation/Requirements shall also be supplied and installed. No additional claims will be allowed if the ACMV Contractor fails to include these items in the tender, or Summary of Price Schedules. Submission of Six (6) hard-bound copies of Operation and Maintenance Manuals complete with as-built drawings.
Standards and codes STANDARD ASHRAE ASHRAE 52 NFPA 90 A UL ARI AMCA NEMA- 250 NFPA 70 NFPA 75 ASME SEC 8 D BSRIA AG 1 / 2001.1 DESCRIPTION Standards for System and Equipment Air Cleaning Devices Used in General Ventilation for Removing Particulate Matter Installation of Air Conditioning and Ventilation Systems Underwriters Laboratories. Cooling Coil ratings/Chiller Fans Enclosures for Electrical Equipment National Electric Code Protection of Electronic computer/ DPU Boliers and Pressure Vessel codes construction of pressure Vessels. Rules for
SL NO 1 2 3 4 5 6 7 8 9 10 11
LAB NAME
INSIDE CONDITION Temp in Deg 241 241 241 241 RH in % 605 605 605 605
VENTILATION TYPE
SECTION: 3 AIR COOLED DX DUCTABLE SPLIT UNIT General The Air cooled SPLITS shall be with hermetic type scroll compressor of minimum capacity and performance as indicated in the schedule and /or as shown on the drawings. Each unit shall be completely factory assembled, piped, wired and tested and shall comprise of multiple scroll compressor, starter for compressors, condenser fans, Insulated cooler, air cooled condenser with microprocessor control panel. The split shall utilize a non-chlorofluorocarbon (CFC) refrigerant, R-134A/R22. CASINGS The unit shall consist of galvanized steel cabinet mounted on a frame, the whole of which shall be rust proofed and finished with a scratched-resistant and wear resistant baked on enamel so as to resist marine environment corrosion. Removable panels shall be provided to enable all maintenance and repairs to be carried out without removal of the unit or structural alteration to prevent rattles and looseness after prolonged period of operation. The inside of the cabinet (where the compressor is located) shall be insulated with 2" (50 mm) thick high density fiberglass or rock wool or as per manufacturers standard. The nuts and bolts shall be treated with anti rust and coat with rust proof paint. Mild Steel Bolts and Nuts are NOT ACCEPTABLE. COMPRESSORS The air cooled chiller shall be fitted with two or more screw compressors of the semihermetic type. In either case, the availability of spare parts shall be assured. The compressors shall be driven by electric motors designed for operation on 415 6% volts, 50 cycles and three-phase. Compressors motors shall be cooled with suction gas or other approved means.
The compressors and motors shall be fully protected against abnormal operating conditions by high and low pressure switches, thermal relays, overload relays and safety controls and Phase Failure fuses. The compressors shall be fitted with gauge connections for reading oil, suction and discharge pressures and shall be fitted with a sight glass, crankcase heater, muffler, discharge manifold and internal motor protection. The capacity Control shall be step less control by use of a slide valve or step control by use of solenoid valves. The compressors shall be mounted on spring vibration isolators. Compressors should be provided with acoustic jacket for sound attenuation from the factory. Field assembly is not acceptable. CONDENSERS The condenser shall be of the air cooled cross-finned type with copper tube type to suit the capacity of the unit. Bonding of the fins to the tubes shall be by mechanical means to ensure a positive lasting bond. The condenser fan shall be the propeller type Low noise fans Please state noise criteria. This is a statically and dynamically balanced and shall be mounted on a solid steel shaft running in self-aligning ball bearings, amply sized for quiet operation and long life. The condenser fan shall be driven directly by resiliently mounted squirrel cage induction motor with adequate horsepower for the duty. Condenser Coil fins to be coated against corrosion. UNIT CONTROL PANEL Each machine shall be furnished with a complete control centre in an enclosure, factory mounted, piped and wired. The capacity, operating and safety controls sequences shall be designed for completely fail safe, automatic operation. The control sequence shall provide for operation of oil heaters during normal shut down. Provision shall be made in the control centre for inter-locking of compressor motor starter, chilled water pump. Machine shall also be fitted with no-load center and shall contain the following in a weather proof compartment. Safety controls shall be electric or electronic fully automatic and shall be fail safe. Machine shall shut down for oil low pressure, chilled water low temperature, refrigerant low pressure, condenser high pressure, lubrication oil high and low temperature. Each shut down
shall be indicated with light individually. Controls center should be fitted with remote alarm indicating terminals. Machine shall not restart until manually reset. Machine shall be provided with start/stop, remote/local and reset switches. Terminals strips shall be clearly marked for field wiring connections. Incoming power will be provided at single point. VIBRATION ISOLATION MOUNTING The unit shall be supplied with adequate number of level adjusting spring type isolation provided by the manufacturer.
SECTION: 4 SHEET METAL WORK Scope: The scope of this section comprises supply fabrication, installation and testing of all sheet metal ducts. Governing Standards Unless otherwise specified here, the construction, erection, testing and performance of the ducting system shall conform to the SMACNA 1995 Standards (HVAC Duct Construction Standards Metal and Flexible Second Edition 1995 SMACNA ) Raw Material Ducting All ducting shall be fabricated of LFQ (Lock Forming Quality) grade prime G.I. raw material furnished with accompanying Mill Test Certificates. Galvanizing shall be of 120 gms/ Sqmt. (Total coating on both sides) In addition, if deemed necessary, samples of raw material, selected at random by PMCs site representative shall be subject to approval and tested for thickness and zinc coating at contractors expense. G.I. raw material should be used in coil form (instead of sheets) so as to limit the longitudinal joints at the edges only irrespective of cross-section dimensions.
Duct Connectors and Accessories All transverse duct connectors (flanges /cleats) and accessories / related hardware are such as support system shall be zinc coated (galvanized). FABRICATION STANDARDS All ductwork including straight sections, tapers, elbows, branches, shoe pieces, collars, terminal diffuse boxes and other transformation pieces must be factory fabricated o o Coil line to ensure location of longitudinal seams at corners / folded edges only to obtain the required duct rigidity and low leakage characteristics. No longitudinal seams permitted along any face side of the duct. All ducts, transformation pieces and fittings to be made on CNC profile cutters for required accuracy of dimensions, location and dimensions of notches at the folding lines.
o o
All edges to be machine treated using lock formers, flanges and roller for turning up edges. Sealant dispensing equipment for applying built in sealant in Pittsburgh lock where sealing of longitudinal joints are specified.
SELECTION OF G.I. GAUGE AND TRANSVERSE CONNECTORS Duct Construction shall be in compliance with 1 (250 Pa) w.g Static norms as per SMACNA. All transverse connectors shall be 4 bolt slip on flange system with built-in sealant. The specific class of transverse connector and duct gauge for a given duct dimension will be as per Table 1 below for 1 (250 Pa) pressure class. Non toxic, AC applications grade P.E. or PVC Gaskets are required in between all mating flanged joints. Gasket sizes should conform to flange duct manufacturers specification. Table 1: Article I. STANDARDS
FOR SELECTION OF ROLAMATE OR APPROVED EQUIVALENT FLANGE CLASS AND DUCT GAUGES AT 1200 MM SPACING Duct Duct Pressure in Inches / (Pascals) Dimension 1"(250) 2"(500) 3"(750) 4"(1000 6"(1500)* 10"(2500) 4 *5 ) (in mm) Reinforcement Class - Duct Gauge upto 250 *3E-24 E-24 E-24 E-24 E-24 E-24 251-300 E-24 E-24 E-24 E-24 E-24 301-350 351-400 401-450 451-500 501-550 551-600 601-650 651-700*2 701-750 751-900 901-1000 10 01-1200 12 01-1300 E-24 E-24 E-24 E-24 E-24 E-24 E-24 E-24 E-24 E-24 E-24 *3H-24 E-24 E-24 E-24 E-24 E-24 E-24 E-24 E-24 E-24 E-24 H-24 H-22 H-20 E-24 E-24 E-24 E-24 E-24 E-24 E-24 E-24 E-24 H-22 H-22 H-20 J-18 E-24 E-24 E-24 E-24 E-24 E-24 E-24 H-24 H-24 H-22 H-20 J-18 J-18 E-24 E-24 E-24 E-24 H-24 H-22 H-22 H-22 H-22 H-20 J-18 J-18 J-16 E-22 E-22 H-20 H-20 H-20 H-20 H-20 H-18 J-18 J-18 J-16
J-18 J-16
J-16
*1- SMACNA- Sheet Metal and Air conditioning Contractors National Association IncHVAC Duct Construction Standards- Metal and Flexible-1995, U.S.A. *2- Reading Guide- For duct sizes between, say, 651 mm and 700 mm, when the pressure class is 1 w.g. static, require aE class flange and duct gauge of 24. For the same size range but with static pressure at 4 w.g. a H class flange with duct gauge of 24 should be used. *3- The flange classes are designated E, H and J. For E & H class of flanges use gasket size 10 mm wide and 4.5 mm thick. For J-class use 15 mm wide and 6 mm thick gasket. *4- For pressure class 6 w.g. static and above gasket type and size shall be as per manufacturers recommendation. *5- (Not Applicable for Current Specifications) for non-critical comfort cooling applications (1 w.g. pressure class), optional C & S or C & SS cleat joints can be used. Upto 450 mm duct size use C & S cleats. 451 to 750 mm duct size use C & SS cleats. Over 750 mm duct size use flanges. A higher class flange can always be substituted for a lower class (e.g. classJ for classH, classH for class E).
DUCT CONSTRUCTION o The fabricated duct dimensions should be as per approved drawings and all connecting sections are dimensionally matched to avoid any gaps. o Dimensional Tolerances: All fabricated dimensions will be within +/- 1.0mm of specified dimension. To obtain required perpendicularity, permissible diagonal tolerances shall be +/- 1.0 mm per meter. 6.3 Each and every duct pieces should be identified by colour coded sticker which shows specific part numbers, job name, drawing number, duct sizes and gauge. o Ducts shall be straight and smooth on the inside. Longitudinal seams shall be Airtight and at corners only, which shall be either Pittsburgh or Snap Button Punch as SMACNA practice, to ensure air tightness. 6.5 Changes in dimensions and shape of ducts shall be gradual (between 1:4 and 1:7). Turning vanes or air splitters shall be installed in all bends and duct collars designed to permit the air to make the turn without appreciable turbulence. o Plenums shall be factory fabricated panel type and assembled at site. To be supplied along with Air Handling Units by AHU supplier only. o The deflection of transverse joints should be within specified limit for rectangular duct deflection as given in SMACNA. Page No. 7.6. o Reinforcement of ducts shall be achieved by either cross breaking or straight beading depending on length of ducts. As per SMACNA page no. 1. 74, fig 1-8 Duct sizes 19 (483 mm) wide and larger which have more than 10 Sqft. of unbraced panel shall be beaded or cross broken unless ducts will have insulation covering or acoustical liner. This requirement is applicable to 20 G (1.00 mm) or less and 3 W.G. (750 Pa) pressure or less. Ducts for 4 W.G. (1000 Pa) or more do not require beads or cross brackets. SUPPORT SYSTEM A completely galvanized system consisting of fully threaded rods, double L bottom brackets (made out of 3.0 mm M.S. sheet) nuts, Washers and anchor bolts as supplied by Rolaster or approved equivalent or generally conforming to SMACNA standards should be used.
Table 3 Support for Horizontal duct-Rectangular Sr. Maximum No. Duct Size(mm)
1 2 3 4
6 mm 8 mm 10 mm 12 mm
o As an alternative, slotted galvanized brackets attached to the top two bolts of the system may also be used as appropriate for the site condition. o To provide the required thermal brake effect, Neoprene or equivalent material of suitable thickness shall be used between duct supports and duct profiles in all supply air ducts not enclosed by return air plenums. INSTALLATION Tools and tackles for site work The duct installation shall confirm to SMACNA norms. For duct assembly and Installation the use of suitable tools and tackles should be used to give the required duct quality and speed of installation including (but not restricted to) a) Electric Pittsburgh Seamer used for closing Pittsburgh joints. b) Electric Slitting shear to make cut outs. c) Drilling machine with drill bits for drilling holes in sheet metal work. d) Hammer drill machine with drill bits for drilling holes in building structures for anchors. e) Hoisting system for lifting the duct assembly upto mounting heights. Installation Practice All ducts shall be installed as per tender drawings and in strict accordance with approved shop drawing to be prepared by the Contractor. The Contractor shall provide and neatly erect all sheet metal work as may be required to carry out the intent of these specifications and drawings. The