COMMISSIONING SCHEDULE FOR PLTU 2 SUMATERA UTARA 2200MW MEDAN SUMATERA UTARA

ITEM

DATE
START FINISH

ELECTRICAL FOR UNIT 1


Generator & transformer protections
Excitation system
Synchronising system
MV distribution system
LV distribution system
Electrical auxiliary system
Emergency (power) supply system

11/10/2013
11/20/2013
12/1/2013
9/25/2013
9/1/2013
10/15/2013
12/1/2013

1/25/2014
1/30/2014
1/10/2014
10/30/2013
11/30/2013
1/30/2014
1/15/2014

ELECTRICAL FOR UNIT 2


Generator & transformer protections
Excitation system
Synchronising system
MV distribution system
LV distribution system
Electrical auxiliary system
Emergency (power) supply system

10/5/2013
10/25/2013
10/10/2013
2/1/2013
2/1/2013
8/8/2013
10/25/2013

11/20/2013
11/30/2013
11/15/2013
5/15/2013
8/15/2013
10/20/2013
11/30/2013

ELECTRICAL FOR BOP


Back up transformer
Dc and ups for main system
Switch yard control system
Switch yard system
Electrical backfilling(energizing of power system)

8/10/2013
11/20/2012
12/20/2013
12/20/2012
10/5/2013

9/30/2013
2013/6/31
9/30/2013
9/30/2013
10/15/2013

Earthing system
Bop electroical system

11/20/2013
9/1/2013

12/20/2013
11/20/2013