1 m' Pengukuran dan pemasangan bouwplank


Bahan
0.003 M Kayu SK Kampung
@
0.020 Kg Paku biasa 2" - 5"
@
tenaga
0.010 Oh Kepala Tukang
@
0.100 Oh Tukang Kayu
@
0.005 Oh Mandor
@
0.100 Oh Pekerja
@

.
.

=
=

.
.
.
.
Jumlah
Dibulatkan

=
= Rp
-

1 m Galian tanah biasa sedalam 1 m


tenaga
0.040 Oh Mandor
1.000 Oh Pekerja

@
@

.
.
Jumlah
Dibulatkan

=
= Rp
-

1 m Urugan kembali
tenaga
0.019 Oh Mandor
0.192 Oh Pekerja

@
@

.
.
Jumlah
Dibulatkan

=
= Rp
-

@
@

.
.
Jumlah
Dibulatkan

1 m Urugan Tanah
Bahan
1.200 M Tanah timbun
tenaga
0.010 Oh Mandor
0.300 Oh Pekerja

=
= Rp
-

Analisa 1

LKB.1

PON.1

PB.2

PL.2

1 m Lantai Kerja Beton 1 : 3 : 5


Bahan
10.000 Kg Semen Portland
0.026 M Pasir
0.044 M koral beton
tenaga
0.002 Oh Kepala Tukang
0.020 Oh Tukang batu
0.006 Oh Mandor
1.150 Oh Pekerja

@
@
@

.
.
.

@
@
@
@

.
.
.
.
Jumlah
Dibulatkan

1 m Pasangan pondasi batu padas 1 Pc : 4 Ps


Bahan
1.100 M Batu belah
@
163.00 Kg Semen Portland
@
0.520 M Pasir pasang
@
tenaga
0.060 Oh Kepala Tukang
@
0.600 Oh Tukang batu
@
0.075 Oh Mandor
@
1.500 Oh Pekerja
@

.
.
.
.
.
.
.
Jumlah
Dibulatkan

1 m Pasanganan bata merah tebal bata, 1 Pc : 4 Ps


Bahan
90.000 Bh Bata merah
@ .
11.50 Kg Semen Portland
@ .
0.043 M Pasir pasang
@ .
tenaga
0.010 Oh Kepala Tukang
@ .
0.100 Oh Tukang batu
@ .
0.015 Oh Mandor
@ .
0.320 Oh Pekerja
@ .
Jumlah
Dibulatkan
1 m Plesteran, 1 Pc : 4 Ps tebal 1,5 cm
Bahan
5.20 Kg Semen Portland
0.020 M Pasir pasang
tenaga
0.015 Oh Kepala Tukang
0.150 Oh Tukang batu
0.010 Oh Mandor
0.200 Oh Pekerja

@
@

.
.

@
@
@
@

.
.
.
.
Jumlah
Dibulatkan

=
=
=

=
= Rp
-

=
=
=

=
= Rp
-

=
=
=

=
= Rp
-

=
=

=
= Rp
-

Analisa 2

KP.1

KP.2

KJ.1

1 Bh Kosen pintu berjalusi P1


Bahan
0.067 M Papan kayu kls kuat II/Setara
0.050 Kg Paku biasa 2" - 5"
tenaga
0.105 Oh Kepala Tukang
1.050 Oh Tukang kayu
0.018 Oh Mandor
0.350 Oh Pekerja

1 Bh Kosen pintu berjalusi P2


Bahan
0.065 M Papan kayu kls kuat II/Setara
0.050 Kg Paku biasa 2" - 5"
tenaga
0.105 Oh Kepala Tukang
1.050 Oh Tukang kayu
0.018 Oh Mandor
0.350 Oh Pekerja

@
@

.
.

@
@
@
@

.
.
.
.
Jumlah
Dibulatkan

@
@

.
.

@
@
@
@

.
.
.
.
Jumlah
Dibulatkan

1 Bh Kosen Jendela Naco berjalusi 1 lubang


Bahan
0.042 M Papan kayu kls kuat II/Setara @
0.050 Kg Paku biasa 2" - 5"
@
tenaga
0.105
Kepala Tukang
@
1.050
Tukang kayu
@
0.018
Mandor
@
0.350
Pekerja
@

Anl. JNK.1 1 Bh Daun Jendela Kaca 1 lubang


Bahan
0.009 M Papan kayu kls kuat II/Setara
0.050 Kg Paku biasa 2" - 5"
8.000 Kk Kaca Polos 5 mm
tenaga
0.100
Kepala Tukang
0.015
Mandor
1.030
Tukang kayu
0.350
Pekerja

.
.
.
.
.
.
Jumlah
Dibulatkan

@
@
@

.
.
.

@
@
@
@

.
.
.
.
Jumlah
Dibulatkan

=
=

=
= Rp
-

=
=

=
= Rp
-

=
=

= Rp
= Rp
-

=
=
=

=
= Rp
-

Analisa 3

PP.1

PP.2

1 set pintu panel uk. 60 x 200 cm ( 2 buah )


Bahan
0.055 M Papan kayu kls kuat II/Setara
tenaga
0.250 Oh Kepala Tukang
2.500 Oh Tukang kayu
0.050 Oh Mandor
1.000 Oh Pekerja

1 set pintu panel uk. 80 x 200 cm


Bahan
0.036 M
tenaga
Papan kayu kls kuat II/Setara
0.250 Oh
2.500 Oh Kepala Tukang
0.050 Oh Tukang kayu
1.000 Oh Mandor
Pekerja

@
@
@
@

.
.
.
.
Jumlah
Dibulatkan

@
@
@
@

.
.
.
.
Jumlah
Dibulatkan

Anl. RFG.1 1 m Pasang rangka plafond Gypsum board


Bahan
2.250 M' Puring Stell Celling
@
0.050 Kg Paku sekrup spesial
@
tenaga
0.020 Oh Kepala Tukang
@
0.200 Oh Tukang kayu
@
0.180 Oh Pekerja
@

.
.
.
.
.
Jumlah
Dibulatkan

=
= Rp
-

=
= Rp
-

=
=

=
= Rp
-

LBRC.1

1 m ' Pasang listplank Uk. 20 cm bahan Sicaboard BRC t= 8 mm


Bahan
0.460 lbr BRC Sicaboard t = 8 mm
@ . =

0.025 Kg Paku sekrup spesial


@ . =

tenaga
0.010 Oh Kepala Tukang
@ . =

0.100 Oh Tukang kayu


@ . =

0.050 Oh Mandor
@ . =

0.100 Oh Pekerja
@ . =

Jumlah
=
Dibulatkan
= Rp
-

BR.1

1 m Membuat beton tumbuk 1 Pc : 3 Ps : 6 Kr


Bahan
197.00 Kg Semen Portland
@ .
0.470 M Pasir pasang
@ .
0.940 M Kerikil bersih
@ .

=
=
=

Analisa 4

tenaga
0.025
0.250
0.080
1.650

BT.225

Oh
Oh
Oh
Oh

Kepala Tukang
Tukang batu
Mandor
Pekerja

1 m Membuat beton mutu K 125


Bahan
323.00 Kg Semen Portland
0.650 M Pasir pasang
0.650 M Kerikil bersih
tenaga
0.100 Oh Kepala Tukang
1.000 Oh Tukang batu
0.300 Oh Mandor
6.000 Oh Pekerja

@
@
@
@

.
.
.
.
Jumlah
Dibulatkan

@
@
@

.
.
.

@
@
@
@

.
.
.
.
Jumlah
Dibulatkan

=
= Rp
-

=
=
=

=
= Rp
-

BPB.1

1 m Membuat pondasi beton bertulang (125 kg besi + bekesting)


Bahan
0.200 M Broti/papan sembarang
@ . =

1.500 Kg Paku biasa 2" - 5"


@ . =

0.400 Ltr Minyak bekesting


@ . =

125.000 Kg Besi beton


@ . =

2.250 M Kawat beton


@ . =

323.00 Kg Semen Portland


@ . =

0.520 M Pasir pasang


@ . =

0.780 M Kerikil bersih


@ . =

tenaga
0.245 Oh Kepala Tukang
@ . =

0.350 Oh Tukang batu


@ . =

1.040 Oh Tukang kayu


@ . =

1.050 Oh Tukang besi


@ . =

0.165 Oh Mandor
@ . =

3.900 Oh Pekerja
@ . =

Jumlah
=
Dibulatkan
= Rp
-

BSB.1

1 m Membuat sloof beton bertulang (125 kg besi + bekesting)


Bahan
0.270 M Broti/papan sembarang
@ .
2.000 Kg Paku biasa 2" - 5"
@ .
0.600 Ltr Minyak bekesting
@ .
125.000 Kg Besi beton
@ .
2.250 M Kawat beton
@ .
323.00 Kg Semen Portland
@ .
0.520 M Pasir pasang
@ .
0.780 M Kerikil bersih
@ .

=
=
=
=
=
=
=
=

Analisa 5

tenaga
0.245
0.350
1.040
1.050
0.165
3.900

Oh
Oh
Oh
Oh
Oh
Oh

Kepala Tukang
Tukang batu
Tukang kayu
Tukang besi
Mandor
Pekerja

@
@
@
@
@
@

.
.
.
.
.
.
Jumlah
Dibulatkan

=
= Rp
-

BKB.1

1 m Membuat kolom beton bertulang (125 kg besi + bekesting)


Bahan
0.400 M Broti/papan sembarang
@ . =

4.000 Kg Paku biasa 2" - 5"


@ . =

2.000 Ltr Minyak bekesting


@ . =

125.000 Kg Besi beton


@ . =

2.250 M Kawat beton


@ . =

323.00 Kg Semen Portland


@ . =

0.520 M Pasir pasang


@ . =

0.780 M Kerikil bersih


@ . =

0.150 M Broti/papan sembarang


@ . =

3.500 Lbr Pluwood tebal 9 mm


@ . =

15.000 Btg Dolken 8 - 10/4 m


@ . =

tenaga
0.570 Oh Kepala Tukang
@ . =

0.350 Oh Tukang batu


@ . =

2.300 Oh Tukang kayu


@ . =

1.050 Oh Tukang besi


@ . =

0.165 Oh Mandor
@ . =

3.900 Oh Pekerja
@ . =

Jumlah
=
Dibulatkan
= Rp
-

BBB.1

1 m Membuat balok beton bertulang (125 kg besi + bekesting)


Bahan
0.320 M Broti/papan sembarang
@ .
3.200 Kg Paku biasa 2" - 5"
@ .
1.600 Ltr Minyak bekesting
@ .
125.000 Kg Besi beton
@ .
2.250 M Kawat beton
@ .
323.00 Kg Semen Portland
@ .
0.520 M Pasir pasang
@ .
0.780 M Kerikil bersih
@ .
0.120 M Broti/papan sembarang
@ .
2.800 Lbr Pluwood tebal 9 mm
@ .
32.000 Btg Dolken 8 - 10/4 m
@ .

=
=
=
=
=
=
=
=
=
=
=

Analisa 6

tenaga
0.420
0.350
2.800
1.050
0.185
5.800

Oh
Oh
Oh
Oh
Oh
Oh

Kepala Tukang
Tukang batu
Tukang kayu
Tukang besi
Mandor
Pekerja

@
@
@
@
@
@

.
.
.
.
.
.
Jumlah
Dibulatkan

Anl. ASG.1 1 m Pasangan atap Genteng Metal tebal = 0,25


Bahan
1.0965 m Atap Genteng Metal
@ .
4.0000 bh Paku spesial
@ .
tenaga
0.009 Oh Kepala Tukang
@ .
0.090 Oh Tukang kayu
@ .
0.107 Oh Pekerja
@ .
Jumlah
Dibulatkan
RGM.1

1 m' Rabung Genteng Metal tebal = 0,25


Bahan
1.2500 m' Rabung Genteng Metal
6.0000 bh Paku spesial
tenaga
0.002 Oh Kepala Tukang
0.020 Oh Tukang kayu
0.002 Oh Mandor
0.040 Oh Pekerja

Anl. FPG.1 1 m Plafond Gypsum board


Bahan
0.3640 lbr Gypsum board
0.110 Kg Paku sekrup spesial
0.4250 Kg Tepung gypsum
tenaga
0.005 Oh Kepala Tukang
0.050 Oh Tukang kayu
0.090 Oh Pekerja

Anl. FPG.2 1 m' Propil Gypsum board


Bahan
0.5000 m' Propil
0.010 Kg Paku sekrup spesial
0.2000 Kg Tepung Gypsum

@
@

.
.

@
@
@
@

.
.
.
.
Jumlah
Dibulatkan

@
@
@

.
.
.

@
@
@

.
.
.
Jumlah
Dibulatkan

@
@
@

.
.
.

=
= Rp
-

=
=

=
= Rp
-

=
=

= Rp
= Rp
-

=
=
=

=
= Rp
-

=
=
=

Analisa 7

tenaga
0.004
0.040
0.002
0.020

KT.1

EP.1

EK.1

GT.1

Oh
Oh
Oh
Oh

Kepala Tukang
Tukang kayu
Mandor
Pekerja

1 buah pasang kunci tanam biasa


Bahan
1.00 Bh Kunci tanam
tenaga
0.010 Oh Kepala Tukang
0.500 Oh Tukang kayu
0.0050 Oh Mandor
0.010 Oh Pekerja

1 buah pasang pintu & engsel


Bahan
3.00 bh Engsel pintu
tenaga
0.015 Oh Kepala Tukang
0.015 Oh Tukang kayu
0.0008 Oh Mandor
0.015 Oh Pekerja

1 buah pasang engsel jendela kupu-kupu


Bahan
2.00 bh Engsel jendela
tenaga
0.010 Oh Kepala Tukang
0.100 Oh Tukang kayu
0.0005 Oh Mandor
0.010 Oh Pekerja

@
@
@
@

.
.
.
.
Jumlah
Dibulatkan

@
@
@
@

.
.
.
.
Jumlah
Dibulatkan

@
@
@
@

.
.
.
.
Jumlah
Dibulatkan

@
@
@
@

.
.
.
.
Jumlah
Dibulatkan

1 set pasang grendel tanam pintu atas dan bawah


Bahan
1.00 set Grendel tanam
@ .
tenaga
0.010 Oh Kepala Tukang
@ .
0.180 Oh Tukang kayu
@ .
0.0005 Oh Mandor
@ .
0.010 Oh Pekerja
@ .
Jumlah
Dibulatkan

=
= Rp
-

= Rp
= Rp
-

= Rp
= Rp
-

= Rp
= Rp
-

= Rp
= Rp
-

Analisa 8

LK.30

CK.1

CD.1

1 m Pasang lantai keramik 30 x 30 cm


Bahan
11.49 bh Lantai keramik 30 x 30 cm
10.69 Kg Semen Portland
0.043 M Pasir pasang
1.50 Kg Semen putih
tenaga
0.024 Oh Kepala Tukang
0.230 Oh Tukang kayu
0.020 Oh Mandor
0.440 Oh Pekerja

@
@
@
@

.
.
.
.

@
@
@
@

.
.
.
.
Jumlah
Dibulatkan

1 m Pengecetan kayu, meni, cat dasar, 3 lapis cat penutup


Bahan
0.20 M Cat meni
@ .
0.170 btg Cat dasar
@ .
0.350 btg Cat minyak
@ .
tenaga
0.004 Oh Kepala Tukang
@ .
0.105 Oh Tukang cat
@ .
0.0025 Oh Mandor
@ .
0.070 Oh Pekerja
@ .
Jumlah
Dibulatkan

=
=
=
=

= Rp
= Rp
-

=
=
=

= Rp
= Rp
-

1 m Pengecetan tembok / plafond (1 lapis cat dasar, 2 lapis cat penutup)


Bahan
0.120 btg Cat dasar
@ . =

0.180 btg Cat Penutup


@ . =

tenaga
0.004 Oh Kepala Tukang
@ . =

0.042 Oh Tukang cat


@ . =

0.0025 Oh Mandor
@ . =

0.028 Oh Pekerja
@ . =

Jumlah
= Rp
Dibulatkan
= Rp
-

Anl. Taksir 1 Ttk Pemasangan Lampu TL 20 Watt


Bahan
1.000 bh Lampu XL 20 W (lengkap)
Upah
0.200
Tukang

Anl. Taksir 1 Ttk Pemasangan Lampu XL 40 Watt


Bahan
1.000 set Lampu XL 40 W (lengkap)
Upah
0.200
Tukang

.
Jumlah
Dibulatkan

.
Jumlah

= Rp
= Rp
-

= Rp
Analisa 9

Dibulatkan
Anl. Taksir 1 Ttk Pekerjaan Instalasi Listrik
Bahan
9.000 M' Kabel NYA 1x2,5mm
1.000 bh Tedos
1.000 bh Elbow
Upah
0.800
Tukang

@
@
@

.
.
.

.
Jumlah
Dibulatkan

Anl. Taksir 1 Ttk Pemasangan Stop Kontak


Bahan
1.000 bh Stop Kontak
0.800 btg Pipa Listrik
1.000 bh Dos
Upah
0.800
Tukang

@
@
@

.
.
.

.
Jumlah
Dibulatkan

Anl. Taksir 1 Ttk Pemasangan Saklar Doble


Bahan
1.000 bh Saklar Doble
1.000 bh Dos
Upah
0.800
Tukang

@
@

.
.

.
Jumlah
Dibulatkan

Anl. Taksir 1 Ttk Pemasangan Saklar Tunggal


Bahan
1.000 bh Saklar Tunggal
1.000 bh Dos
Upah
0.750
Tukang

@
@

.
.

.
Jumlah
Dibulatkan

@
@
@
@

.
.
.
.

@
@
@
@

.
.
.
.
Jumlah
Dibulatkan

Anal.Taksir 1M2 Rangka Kuda-Kuda Baja Ringan


Bahan
4.750 M1 Propil C.75.75
2.825 M1 Reng U 30-50
12.000 Bh Baut truss PF 12 - 14x20
11.000 Bh Baut reng PF 10 - 16 x 16
Upah
0.140
Pekerja
0.070
Mandor
0.350
Tukang
0.035
Kepala Tukang

=
=
=

Rp

= Rp
= Rp
-

=
=
=

= Rp
= Rp
-

=
=

= Rp
= Rp
-

=
=

= Rp
= Rp
-

=
=
=
=

=
= Rp
Analisa 10

You might also like