ENGINEER ESTIMATE

SD NEGERI CIATER 3
Kegiatan
: Perencanaan dan Pengawasan Bangunan SD
Pekerjaan
: Perencanaan TRK Dana DAK
Tahun Anggaran : 2012
No

Uraian pekerjaan

II

III

Satuan Volume
3

Harga Satuan
(Rp)
5

Jumlah Harga
(Rp)
6=4x5

PEKERJAAN PERSIAPAN
1 Papan nama proyek
2 Direksi Keet 9 m2
3 Listrik Kerja Proyek
4 Pembersihan Lokasi
5 Pagar Pengaman Sementara

bh
m2
Bln
Ls
m1

1.00
9.00
3.00
1.00
20.00

251,374.00
583,302.00
500,000.00
700,000.00
238,953.00
Sub Jumlah

251,374.00
5,249,718.00
1,500,000.00
700,000.00
4,779,060.00
12,480,152.00

PEKERJAAN TANAH
# Pas. Bouwplank
# Galian tanah pondasi & Sloof
# Urugan pasir bawah pondasi t = 5 cm
# Urugan tanah kembali
# Urugan tanah peninggian lantai

m1
m3
m3
m3
m3

40.00
40.96
2.31
27.63
47.52

41,167.00
36,615.00
256,958.00
34,136.00
140,542.00
Sub Jumlah

1,646,680.00
1,499,750.40
593,572.98
943,177.68
6,678,555.84
11,361,736.90

m3
m3
m3
m3

2.31
3.98
1.23
0.88

760,823.00
4,424,305.00
4,339,045.00
4,339,045.00

1,757,501.13
17,608,733.90
5,337,025.35
3,818,359.60

m3
m3
m3

3.59
0.75
6.60

5,238,308.00
5,170,100.00
760,823.00
Sub Jumlah

18,805,525.72
3,877,575.00
5,021,431.80
56,226,152.50

m3
m3
m3

2.80
1.00
0.21

4,879,704.00
4,794,444.00
4,484,067.00

13,663,171.20
4,794,444.00
941,654.07

m3
m3
m3
m3
m3
m3
m3
m3
m3

4.11
2.69
0.72
0.32
1.08
8.74
0.07
1.06
3.10

5,608,662.00
5,438,141.00
5,438,141.00
4,059,582.00
4,059,582.00
4,145,260.00
4,025,478.00
4,059,582.00
4,145,260.00
Sub Jumlah

23,051,600.82
14,628,599.29
3,915,461.52
1,299,066.24
4,384,348.56
36,229,572.40
281,783.46
4,303,156.92
12,850,306.00
120,343,164.48

m2
m2
m2
m2
m1

127.65
255.31
16.39
26.52
35.60

95,224.00
41,217.00
23,342.00
94,072.00
93,974.00
Sub Jumlah

12,155,343.60
10,523,112.27
382,575.38
2,494,789.44
3,345,474.40
28,901,295.09

PEKERJAAN PONDASI
# Lantai kerja bawah pondasi,sloof dan keramik ad. 1:3:5, t = 5 cm
# Pondasi beton Tapak P1 uk. 1,50x1,50 m - K.225
# Pondasi beton Tapak P2 uk. 1,20x1,20 m - K.225
# Pondasi beton Tangga P3 uk. 1,35x1,20 m - K.226
# Sloof beton
a. Sloof beton SL1 25/35 - K.225
b. Sloof beton SL2 20/25 - K.226
# Lantai kerja bawah lantai dasar ad. 1:3:5, t = 5 cm

IV PEKERJAAN LANTAI I
A PEKERJAAN STRUKTUR
# Kolom beton struktur
a. Kolom beton K1 25/35 - K.225
b. Kolom beton K2 25/25 - K.225
c. Kolom beton Praktis KP 12/12 - K.175
# Balok beton struktur
a. Balok beton B1 25/60 - K.225
b. Balok beton B2 25/35 - K.225
c. Balok beton B3 20/35 - K.225
d. Balok beton B4 20/25 - K.225
e. Balok beton canopy atas jendela B5 15/35 - K.225
# Plat lantai beton, t = 12 cm - K.225
# Beton Lisplank / janggutan t = 10 cm - K.225
# Plat Canopy Beton atas jendela t = 10 cm - K.225
# Tangga beton - K.225
B PEKERJAAN ARSITEKTUR
# Pekerjaan pasangan dinding + Rabat
a. Pas.dinding 1/2 batu bata, ad. 1 : 5
b. Plesteran dinding ad 1 : 5
c. Acian Balok & Canopy
d. Rabat beton ad. 1:3:5 + bingkai bata merah
e. Pek. Saluran buis beton terbuka 1/2 dia. 20 cm (keliling bangunan)
# Pekerjaan kusen pintu, jendela dan kaca

No

Uraian pekerjaan

1
a.

b.

2
Kusen alumunium Coated Black
- Type J.1
- Type J.2
- Type BV.1
Kusen Pintu Kayu kamper samarinda oven
- Type P.1
- Type P.2

Satuan Volume

Harga Satuan
(Rp)
5

Jumlah Harga
(Rp)
6=4x5

bh
bh
bh

3.00
1.00
1.00

3,882,318.00
3,481,807.00
404,875.00

11,646,954.00
3,481,807.00
404,875.00

m3
m3

0.05
0.05

11,557,953.00
11,557,953.00

577,897.65
577,897.65

No

Uraian pekerjaan

1
c.
d.
e.
f.

2
Daun pintu panil kayu kamper samarinda (kualitas export)
Daun Bouvenlight diatas pintu kayu kamper samarinda
Kaca polos bouvenlight 5 mm
Kaca es daun pintu panel 5 mm

3 Pekerjaan Kunci dan Aksesoris pintu jendela


a. Engsel Pintu nilon uk. 4 "
b. Engsel Bouvenlight nilon 3"
c. Kunci Double slaag (SOLID)

Satuan Volume
3
m2
m2
m2
m2

4
3.67
0.44
0.49
0.29

bh
bh
bh

6.00
4.00
2.00

Harga Satuan
(Rp)
5
839,806.00
734,578.00
234,032.00
322,398.00
Sub Jumlah

Jumlah Harga
(Rp)
6=4x5
3,082,088.02
323,214.32
114,675.68
93,495.42
20,302,904.74

44,435.00
40,777.00
250,140.00
Sub Jumlah

266,610.00
163,108.00
429,718.00

# Pekerjaan Plafond
a. Plafond Gypsum, t=9mm + rangka besi hollow 20x40
b. Plafond GRC, t=4 mm + rangka besi hollow 20x40

m2
m2

53.77
26.20

101,848.00
113,278.00
Sub Jumlah

5,476,366.96
2,967,883.60
8,444,250.56

# Pekerjaan Pasangan Keramik


a. Lantai keramik 40x40 cm, DN putih polos

m2

110.76

121,065.00
Sub Jumlah

13,409,159.40
13,409,159.40

# Pekerjaan finishing
a. Pengecatan dinding, setara Vinilex (3x)
b. Pengecatan plafond setara Metrolite (3x)
c. Pengecatan kayu & besi setara F-Talit (3x)

m2
m2
m2

116.38
72.15
3.75

26,267.00
27,745.00
44,762.00
Sub Jumlah

3,056,953.46
2,001,801.75
167,857.50
5,226,612.71

C PEKERJAAN MEKANIKAL DAN ELEKTRIKAL


# Pekerjaan instalasi penerangan dan armature
a. Instalasi titik lampu
b. Instalasi stop kontak
c. Pas. Saklar Tunggal
d. Pas. Saklar Ganda
e. Pas. Stop kontak
f. Lampu TKI-031 TL. 2x18 watt
g. Lampu SL. 18 watt setara phillips

ttk
ttk
bh
bh
bh
bh
bh

9.00
1.00
1.00
2.00
1.00
6.00
3.00

226,037.00
275,537.00
273,466.00
350,312.00
251,551.00
219,189.00
76,102.00
Sub Jumlah

2,034,333.00
275,537.00
273,466.00
700,624.00
251,551.00
1,315,134.00
228,306.00
5,078,951.00

m3
m3

2.63
0.15

4,794,444.00
4,484,067.00

12,609,387.72
672,610.05

m3
m3
m3
m3

1.79
0.72
0.34
1.08

5,438,141.00
5,438,141.00
4,059,582.00
5,608,662.00

9,734,272.39
3,915,461.52
1,380,257.88
6,057,354.96

m3

0.49

4,672,426.00

2,289,488.74

m3

1.06

4,059,582.00
Sub Jumlah

4,303,156.92
40,961,990.18

m2
m2
m2

155.86
311.71
21.82

95,224.00
41,217.00
23,342.00
Sub Jumlah

14,841,612.64
12,847,751.07
509,322.44
28,198,686.15

bh
bh
bh

3.00
1.00
1.00

3,882,318.00
3,481,807.00
404,875.00

11,646,954.00
3,481,807.00
404,875.00

PEKERJAAN LANTAI II
A PEKERJAAN STRUKTUR
# Kolom beton struktur
a. Kolom beton K2, 25/25 - K.225
b. Kolom beton Praktis KP 12/12 - K.175
# Balok beton struktur
a. Balok beton B2 25/35 - K.225
b. Balok beton B3 20/35 - K.225
c. Balok beton B4 20/25 - K.225
d. Balok beton canopy atas jendela B5 15/35 - K.225
# Ringbalk beton
a. Ring balk beton RB 12/20 - K.175
4 Plat beton
a. Plat Canopy Beton atas jendela, t = 10 cm - K.225
B PEKERJAAN ARSITEKTUR
# Pekerjaan pasangan dinding + Rabat
a. Pas.dinding 1/2 batu bata, ad. 1 : 5
b. Plesteran dinding ad 1 : 5
c. Acian Balok & Canopy
# Pekerjaan kusen pintu, jendela dan kaca
a. Kusen alumunium Coated Black
- Type J.1
- Type J.2
- Type BV.1
b. Kusen Pintu Kayu kamper

No

Uraian pekerjaan

1
c.
d.
e.
f.
g.
h.

2
- Type P.1
Daun pintu panil kayu kamper samarinda (kualitas export)
Daun Bouvenlight diatas pintu kayu kamper samarinda
Kaca polos bouvenlight 5 mm
Kaca es daun pintu panel 5 mm
Railing tangga Pipa Galvanized dia. 2" t=2mm + finishing cat
Railing selasar Pipa Galvanized steel PV. Dia. 3" + finishing cat

Satuan Volume
3
m3
m2
m2
m2
m2
m1
m1

4
0.05
1.94
0.23
0.26
0.15
9.50
12.40

Harga Satuan
(Rp)
5
11,557,953.00
839,806.00
734,578.00
234,032.00
322,398.00
245,354.00
227,334.00
Sub Jumlah

Jumlah Harga
(Rp)
6=4x5
577,897.65
1,629,223.64
168,952.94
60,848.32
48,359.70
2,330,863.00
2,818,941.60
23,168,722.85

No
1

Uraian pekerjaan

Satuan Volume

Harga Satuan
(Rp)
5

Jumlah Harga
(Rp)
6=4x5

2
# Pekerjaan kunci dan aksesoris pintu jendela
a. Engsel Pintu nilon uk. 4 "
b. Engsel Bouvenlight nilon 3"
c. Kunci double slaag (SOLID)

bh
bh
bh

3.00
2.00
1.00

44,435.00
40,777.00
250,140.00
Sub Jumlah

133,305.00
81,554.00
250,140.00
464,999.00

# Pekerjaan plafond
a. Plafond Gypsum, t=9mm + rangka besi hollow 20x40
b. Plafond GRC, t=4 mm + rangka besi hollow 20x40

m2
m2

53.77
40.02

101,848.00
113,278.00
Sub Jumlah

5,476,366.96
4,533,385.56
10,009,752.52

# Pekerjaan pasangan keramik


a. Lantai keramik 40x40 cm, DN putih polos

m2

80.34

121,065.00
Sub Jumlah

9,726,362.10
9,726,362.10

# Pekerjaan finishing
a. Pengecatan dinding, setara Vinilex (3x)
b. Pengecatan plafond setara Metrolite (3x)
c. Pengecatan kayu & besi setara F-Talit (3x)

m2
m2
m2

164.68
80.70
18.29

26,267.00
27,745.00
57,830.00
Sub Jumlah

4,325,649.56
2,239,021.50
1,057,710.70
7,622,381.76

C PEKERJAAN MEKANIKAL DAN ELEKTRIKAL


# Pekerjaan instalasi penerangan dan armature
a. Instalasi titik lampu
b. Instalasi stop kontak
c. Pas. Saklar ganda
d. Pas. Stop kontak
e. Lampu TKI-031 TL. 2x18 watt
f. Lampu SL. 18 watt setara phillips
g. Pas. Penangkal Petir

ttk
ttk
bh
bh
bh
bh
unit

9.00
1.00
2.00
1.00
6.00
3.00
1.00

226,037.00
275,537.00
350,312.00
251,551.00
219,189.00
76,102.00
2,144,023.00
Sub Jumlah

2,034,333.00
275,537.00
700,624.00
251,551.00
1,315,134.00
228,306.00
2,144,023.00
6,949,508.00

m2
m2
m1
m1

171.60
171.60
13.00
52.40

230,306.00
121,061.00
68,094.00
48,444.00
Sub Jumlah

39,520,509.60
20,774,067.60
885,222.00
2,538,465.60
63,718,264.80

m2
m2
m1

31.08
62.16
64.00

95,224.00
41,217.00
35,367.00
Sub Jumlah

2,959,561.92
2,562,048.72
2,263,488.00
7,785,098.64

bh
bh
unit
bh
bh
unit

80.00
80.00
2.00
2.00
2.00
2.00

100,000.00
8,000,000.00
170,000.00
13,600,000.00
1,200,000.00
2,400,000.00
800,000.00
1,600,000.00
150,000.00
300,000.00
300,000.00
600,000.00
Sub Jumlah
26,500,000.00
JUMLAH
507,309,863.38
PPN 10 %
50,730,986.34
TOTAL
558,040,849.72
DIBULATKAN 558,040,000.00

VI PEKERJAAN ATAP
1 Kuda-kuda rangka Baja Ringan Zinc Alume
2 Genteng Metal Admaroof Type Stone tebal: 0,35 mm
3 Nok Atap Metal Roof type stone
4 Listplank GRC t = 12 mm Profil susun lebar 30 cm
VII PEKERJAAN PROFILAN
1 Penebalan dinding kolom bata ad. 1 : 5
2 Plesteran + acian ad 1 : 5
3 Pek. profilan tali air
VIII PEKERJAAN MEUBELAIR
1 Kursi siswa
2 Meja siswa
3 Lemari kelas
4 Meja guru
5 Kursi guru
6 Papan tulis