You are on page 1of 3

CL

TOP OF PAVER FLUSH WITH WALKING PATH BRIDGE BEAM

FINISHED GRADE 6'-8"

CONCRETE PAVER CONCRETE FOOTING 6" 1'-0"

EXISTING SUBSOIL

6"

CONCRETE PAVERS ELEVATION


scale: 1"=1'

3'

12" SONO TUBE BACKFILLED WITH CONCRETE END PAVER

01

INTERIOR PAVER

END PAVER

CONCRETE PAVERS
NTS

GRAVEL BED 6" MIN.

6"

01

12' TO OTHER CENTER LINE

A
01

FOOTING DETAIL
scale: 1"=1'

PARALLEL FOUNDATION INSTALLATION 01


:: ::

FOUNDATION INSTALLATION: 1) Excavate/Auger area for footing, 12" x 3' sono tubes and 6" gravel bed as per A01 & B01. 2) Backfill augured holes with gravel (6") as per A01. 3) Place sono tubes in augured holes and then backfill with concrete. Allow to cure. 4) Construct and set form work as per A01 & B01for concrete footing. Poor concrete, allow to cure. 5) Set precast concrete pavers on concrete footing. Align each side so they are parallel. Pavers are dry stacked and need no bonding agent. C01 & D01 6) Proceed to placing timber. (02)
D
01 CONCRETE PAVERS ELEVATION
scale: 1/2"=1'

12'-1/2"

Arc 4990 Building Bridges ::The Crosby Arboretum :: Picayune, MS :: December 11, 2013 ::

6"

7"

2'-0"

CUT TO 8.33% SLOPE TO COMPLY WITH ADA REGULATIONS


2 1/2"

2'-0"

4'-0" 12'-0"

A
02

TIMBER TEMPLATE
scale: 1"=1'

TIMBER SPACER (WASHER) BTWN EACH TIMBER 6'-6" ALL-THREAD ROD

PRECAST CONCRETE PAVERS TIMBER NUT WASHER ALL THREAD

PRECAST CONCRETE PAVERS

B
02

TIMBER ASSEMBLY
NTS

C
02

TIMBER ASSEMBLY
NTS

1/4" GAP BACKFILLED WITH GRAVEL

TIMBER INSTALLATION: 1) CUT TIMBER AS PER TEMPLATE A02 2) PLACE FIRST TIMBER 2 1/2" FROM OUTSIDE EDGE OF PAVERS. 3) INSERT ALL-THREAD INTO PRE-DRILLED HOLES AND ASSEMBLE WASHER AND NUT ON OUTSIDE !!!!EDGE AS SHOWN IN C02. 4) SLIDE SPACER WASHERS ONTO ALL THREE ALL-THREAD RODS AND THEN SLIDE NEXT PIECE OF !!!!TIMBER UNTIL FLUSH AGAINST SPACERS. REPEAT THIS STEP UNTIL THE LAST BOARD IS PLACED. 5) ASSEMBLE WASHER AND NUT ON ALL THREE RODS' OUTSIDE EDGES. TIGHTEN EACH, !!!!!SET!SIMULTANEOUSLY, UNTIL BOARDS ARE PULLED TIGHTLY TO SPACERS. 6) BACKFILL GAP BETWEEN PAVERS AND TIMBER WITH GRAVEL THAT MATCHES THE TRAILS.
::

D
02

BOARD PLACEMENT
scale: 1"=1'

02

::

TIMBER INSTALLATION

2 1/2"

Arc 4990 Building Bridges ::The Crosby Arboretum :: Picayune, MS :: December 11, 2013 ::

3" 2"

3"X5" ROUGH SAWN TIMBER ALL-THREAD, WASHER, NUT

PRECAST CONCRETE PAVER FINISHED GRADE

2'-0"

4'-0"

4'-0"

2'-0"

A
03

FINISHED BRIDGE PLA N VIEW


scale: 1/2"=1'

B
03

FINISHED BRIDGE PERSPECTIVE


NTS

DESCRIPTION

UNIT

SIZE

QUANTITY

C
03

FINISHED BRIDGE ELEVATION


scale: 1/2"=1'

03

::

OVERALL VIEW & MATERIALS

Timber All-thread Rod Washers Nuts Sono Tubes Concrete

ea ea ea ea ea cy

3"x5" 6'-6" 2" 12"x3' -

24 3 75 6 4 1.2

::

Arc 4990 Building Bridges ::The Crosby Arboretum :: Picayune, MS :: December 11, 2013 ::

13'-4 1/4" 12'-0"