You are on page 1of 2

Pgina :

S10

Precios y cantidades de recursos requeridos por tipo


Obra
Subpresupuesto
Fecha
Lugar

0302214
009
01/03/2013

ALMACENES PESTICIDAS
ALMACENES PESTICIDAS

060103

CAJAMARCA - CAJAMARCA - CHETILLA

Cdigo

Recurso

0147000032
0147010002
0147010003
0147010004
0147010100
0147010101

TOPOGRAFO
OPERARIO
OFICIAL
PEON
LIMPIEZA FINAL DE OBRA
MITIGACIN DE IMPACTO AMBIENTAL

Unidad

Cantidad

Precio S/.

Parcial S/.

4.5534
1,439.0833
318.7838
1,819.8227
1.0000
1.0000

14.65
13.32
11.75
10.57
500.00
1,500.00

66.71
19,168.59
3,745.71
19,235.53
500.00
1,500.00

MANO DE OBRA
hh
hh
hh
hh
GLB
GLB

44,216.54
MATERIALES
0202010069
0229040001
0229500003
0229500005
0230010098
0230020001
0230190004
0230290020
0230480032
0230990066
0230990080
0232970001
0232970002
0239020071
0239020075
0239050000
0243160052
0243550001
0243570056
0244010039
0245010001
0253000000
0253030027
0254430001
0254610004
0260000002
0298010032

CLAVOS PARA MADERA C/C 1 1/2", 2", 3", 4"


CINTA AISLANTE
SOLDADURA CELLOCORD 1/8"
SOLDADURA CELLOCORD 1/8"
PEGAMENTO PLASTICO PVC
YESO DE 28 Kg
CURADOR ANTISOL
RODOPLAST
CINTA TEFLON
LIJA DE FIERRO
WINCHA
MOVILIZACION Y DESMOVILIZACION DE EQUIPO
ALMACEN Y OFICINA PROVICIONAL
COLA SINTETICA
LIJA PARA MADERA
AGUA
REGLA DE MADERA
ANDAMIO DE MADERA
LEA (TERCIO GRANDE)
MADERA TORNILLO
MADERA TORNILLO INC.CORTE P/ENCOFRADO
KEROSENE INDUSTRIAL
THINER
AGUARRAS
SELLADOR DE MADERA
TEKNOPORT DE 1" x 4' x 8'
FLETE TERRESTRE

kg
rll
kg
pza
gln
BOL
gln
m
pza
und
und
DIA
DIA
gln
und
m3
p2
p2
TER
p2
p2
gln
gln
gln
gln
pln
TER

49.2075
27.3920
15.9171
1.0008
0.9451
2.8459
0.4613
14.4900
10.5000
6.7672
0.6546
1.0000
1.0000
1.0800
13.1935
29.9422
82.3875
104.4421
11.8650
2.8459
995.3739
0.2961
0.0504
0.1800
1.0008
4.5720
1.0000

4.20
3.31
12.29
12.29
80.51
8.90
71.19
1.50
0.85
2.00
12.61
3,000.00
1,000.00
30.00
0.93
4.50
4.00
4.66
2.54
3.50
3.50
13.22
20.00
12.00
38.73
22.04
3,000.00

206.67
90.67
195.62
12.30
76.09
25.33
32.84
21.74
8.93
13.53
8.25
3,000.00
1,000.00
32.40
12.27
134.74
329.55
486.70
30.14
9.96
3,483.81
3.91
1.01
2.16
38.76
100.77
3,000.00
12,358.15

EQUIPOS
0337540001
0348010009
0348070000
0348090002
0348110008
0348220001
0348900001
0348960005
0349030003
0349070004
0349070006
0349880021
0349890001
0349900012

MIRAS Y JALONES
MEZCLADORA DE CONCRETO 11 P3
SOLDADORA ELECT. MONOF. ALTERNA 225 AMP.
ANDAMIO METAL TABLAS-ALQUILER
VOLQUETE DE 15 M3
EQUIPO PULVERIZADOR
SIERRA CIRCULAR
CIZALLA P/CORTE DE FIERRO
COMPACTADOR VIBR. TIPO PLANCHA 5.8 HP
VIBRADOR DE CONCRETO 4 HP 2.40"
VIBRADOR DE 3/4" - 2" CONCRETO
ESTACION TOTAL
NIVEL TOPOGRAFICO
CEPILLADORA ELECTRICA

hm
hm
hm
est
hm
HE
hm
hm
hm
hm
hm
hm
hm
hm

4.5534
96.7736
95.0481
72.3450
9.0368
1.4760
6.7200
53.2300
53.5261
7.5844
12.1340
4.5534
4.5534
6.7200

1.20
10.59
10.59
3.00
140.00
3.36
3.00
3.00
12.50
10.59
10.59
12.50
4.21
8.00

5.46
1,024.83
1,006.56
217.04
1,265.15
4.96
20.16
159.69
669.08
80.32
128.50
56.92
19.17
53.76
4,711.60

Total

S/.

61,286.29

Fecha :