9,250,000.00
19,174,503.00
35,590,452.50
60,911,019.59
29,483,576.31
57,296,265.06
106,770,416.49
95,888,075.39
2,854,144.94
854,558.59
19,820,270.63
249,420,000.00
TOTAL
PPN 10%
JUMLAH
DIBULATKAN
687,313,282.50
68,731,328.25
756,044,610.74
756,000,000.00
Kusbiyantoro
M. Fairuzzabadi Al Baha'i
Menyetujui,
Kepala SMK Ar-Rahman Watusalam
Drs. Syarifudin M.
230,000,000.00
457,313,282.50
Lampiran 10.a
NO.
ITEM PEKERJAAN
I. PEKERJAAN PERSIAPAN
1 Pek. Uitzet
2 Bowplank
3 Administrasi dan Dokumentasi
VOL.
SAT
ANALISA
HARGA
SATUAN
(Rp.)
1.00
1.00
1.00
Ls
Ls
Ls
Taksir
Taksir
Taksir
2,250,000
3,500,000
3,500,000
77.00
23.09
162.06
162.06
4.87
19.57
m3
m3
m3
m3
m3
m3
II.1
II.9
II.14
II.10
II.11
II.11
23,313
9,734
55,549
33,866
109,033
109,033
15.04
111.66
m3
m3
III.6
III.5
176,418
294,974
2,652,891
32,937,562
35,590,453
47.74
354.67
95.47
654.52
695.17
m2
m2
m2
m2
m2
IV.8
IV.10
V.4
V.6
V.17
74,582
76,632
26,752
26,032
15,217
1,795,125
224,798
9,002,117
5,488,126
530,672
2,133,666
19,174,503
2,250,000
3,500,000
3,500,000
9,250,000.00
JUMLAH (Rp.)
3,560,260
27,179,527
2,554,068
17,038,776
10,578,388
60,911,020
362.51
m2
Dihitung
81,331
29,483,576
29,483,576
26.09
6.04
m3
m3
VII.1
VII.5
685,593
407,148
17,888,430
2,459,936
NO.
ITEM PEKERJAAN
Bekisting
Penulangan
Kolom Struktur 15 x 20 Beton mutu (K175)
Bekisting
Penulangan
Kolom Praktis 15 x 20 Beton mutu (K175)
Bekisting
Penulangan
Ringbalk 15 x 20 Beton mutu (K175)
Bekisting
Penulangan
Kolom Gunungan Utama 15 x 20 Beton mutu (K175)
Bekisting
Penulangan
Ring Gunungan Utama 15 x 20 Beton mutu (K175)
Bekisting
Penulangan
VOL.
SAT
ANALISA
80.56
703.14
4.30
35.80
615.46
1.03
21.48
225.52
3.22
57.29
477.76
0.27
6.04
63.42
0.98
20.41
214.24
m2
Dihitung
VII.13
VII.5
Dihitung
VII.13
VII.5
Dihitung
VII.13
VII.5
Dihitung
VII.13
VII.5
Dihitung
VII.13
VII.5
Dihitung
VII.13
Kg
m3
m2
Kg
m3
m2
Kg
m3
m2
Kg
m3
m2
Kg
m3
m2
Kg
HARGA
SATUAN
(Rp.)
36,864
10,780
407,148
36,864
10,780
407,148
36,864
10,780
407,148
36,864
10,780
407,148
36,864
10,780
407,148
36,864
10,780
m3
m3
m3
m2
m3
m2
m2
m1
m1
m1
VI.22
VI.25
VI.25
VI.28
VI.2
VI.7
VI.11
Dihitung
VI.48
XII.17
4,966,888
5,482,415
5,482,415
87,363
323,931
628,319
200,052
18,086
22,178
78,846
12,892,875
1,472,179
23,309,498
51,391,818
550,902
5,399,067
5,013,819
3,820,550
1,091,836
1,827,873
106,770,416
588.25
49.23
517.59
517.59
143.21
m2
1
m
m2
m2
m1
VIII.1
VIII.4
VI.37
IX.3
IX.9
43,844
55,911
98,813
19,834
41,436
2,969,675
7,579,869
1,749,288
1,319,856
6,634,737
419,100
791,913
2,431,097
1,311,966
2,111,769
5,150,220
109,330
222,726
683,640
400,878
752,318
2,309,518
57,296,265
JUMLAH (Rp.)
25,791,186
2,752,478
51,144,183
10,266,027
5,934,202
95,888,075
4.00
12.00
32.00
bh
set
set
XII.2
XII.5
XII.6
87,785
25,755
19,767
351,142
309,066
632,534
NO.
ITEM PEKERJAAN
VOL.
SAT
ANALISA
32.00
60.00
set
bh
XII.9
taksir
HARGA
SATUAN
(Rp.)
21,186
14,724
PEKERJAAN LISTRIK
Kabel dari panel ke sub panel (NYM 2 x 1,5 mm2)
Stop Kontak
Saklar tunggal
Saklar ganda
Lampu SL 14 watt Type A
Instalasi Listrik
PEKERJAAN PENGECATAN
Pengecatan tembok baru kualitas B
Pengecatan plafond baru kualitas B
Pengecatan kusen kayu baru, pintu dan jendela
Pengecatan daun pintu dan jendela kayu kualitas B
Pengecatan listplank
44.75
4.00
4.00
4.00
12.00
16.00
m1
bh
bh
bh
bh
titik
Lst-03
Lst-09
Lst-10
Lst-11
Lst-12
Lst-17
5,006
10,111
10,111
13,546
29,939
8,511
PENGADAAN MEUBELAIR
Teknik Sepeda Motor
Troly tools/tempat kunci dorong
Lift sepeda motor
Hidrolic Press
Meja Perata
Tabung Pemadam Kebakaran
Pipa Pembuangan Gas
Meja Guru
Kursi Guru
Lemari
Papan Tulis
Papan Absen
Kotak Sampah
Multi Media
Meja Komputer
Kursi Murid
Meja Guru
Kursi Guru
Lemari
Papan Tulis (White Board)
Kotak Sampah
Karpet
224,051
40,442
40,442
54,185
359,269
136,169
854,559
794.48
517.68
59.26
63.06
42.25
m2
m2
m2
m2
m2
XIV.17
XV.14
XIV.9
XIV.9
XIV.9
10,938
13,379
25,546
25,546
25,546
677,955
883,449
2,854,145
JUMLAH (Rp.)
8,690,121
6,926,168
1,513,753
1,610,936
1,079,292
19,820,271
6.00
8.00
5.00
4.00
4.00
4.00
8.00
8.00
6.00
2.00
2.00
4.00
buah
set
set
buah
buah
paket
M.07
K.05
L.05
P.01
P.10
KS
3,500,000
7,000,000
5,000,000
3,000,000
1,200,000
7,500,000
290,000
145,000
450,000
850,000
85,000
50,000
21,000,000
56,000,000
25,000,000
12,000,000
4,800,000
30,000,000
2,320,000
1,160,000
2,700,000
1,700,000
170,000
200,000
80.00
80.00
2.00
2.00
2.00
2.00
2.00
40.00
M.32
K.01
M.07
K.05
L.05
P.01
KS
M
300,000
175,000
290,000
145,000
1,250,000
850,000
50,000
25,000
24,000,000
14,000,000
580,000
290,000
2,500,000
1,700,000
100,000
1,000,000
NO.
9
10
11
12
13
14
15
ITEM PEKERJAAN
Headphone
AC 1.5 Pk
Bricket Projector
LCD Projector
Penggantung LCD Proyektor
Kabel Data Proyektor (30 m)
Audio System
VOL.
SAT
ANALISA
-
40.00 unit
4.00 buah
2.00 buah
2.00 buah
2.00 paket
6.00
set
2.00
set
HARGA
SATUAN
(Rp.)
125,000
2,000,000
900,000
6,500,000
500,000
400,000
8,500,000
JUMLAH (Rp.)
5,000,000
8,000,000
1,800,000
13,000,000
1,000,000
2,400,000
17,000,000
249,420,000
TOTAL PEKERJAAN
Rp 687,313,282
Mengetahui;
Ketua Tim Pembangunan
Kusbiyantoro
M. Fairuzzabadi Al Baha'i
Menyetujui,
Kepala SMK Ar-Rahman Watusalam
Drs. Syarifudin M.
1 ruang
1.00
1.00
1.00
98.16%
23,750.00
34.41
22.94
9,916.67
10.32
6.88
56,590.00
72.42
48.28
34,500.00
72.42
48.28
111,076.00
2.18
1.45
111,076.00
8.75
5.83
179,723.00
6.72
3.36
300,500.00
49.90
24.95
75,979.00
21.33
12.19
78,068.00
158.50
90.57
27,253.00
42.67
24.38
26,520.00
292.50
167.14
15,502.00
310.66
177.52
82,855.00
162.00
81.00
698,437.00
11.66
5.83
414,776.00
2.70
1.35
1 ruang
37,554.33
36.00
18.00
10,982.00
314.22
157.11
414,776.00
1.92
0.96
37,554.33
16.00
8.00
10,982.00
275.04
137.52
414,776.00
0.46
0.23
37,554.33
9.60
4.80
10,982.00
100.78
50.39
414,776.00
1.44
0.72
37,554.33
25.60
12.80
10,982.00
213.50
106.75
414,776.00
0.12
0.06
37,554.33
2.70
1.35
10,982.00
28.34
14.17
414,776.00
0.44
0.22
37,554.33
9.12
4.56
10,982.00
95.74
47.87
5,059,940.00
1.16
0.58
5,585,125.00
0.12
0.06
5,585,125.00
1.90
0.95
89,000.00
262.88
131.44
330,000.00
0.76
0.38
640,090.00
3.84
1.92
203,800.00
11.20
5.60
18,425.00
94.40
47.20
22,593.75
22.00
11.00
80,323.00
10.36
5.18
44,665.00
262.88
131.44
56,958.00
22.00
11.00
100,664.00
231.30
115.65
20,206.00
231.30
115.65
42,212.00
64.00
32.00
89,430.00
2.00
1.00
26,238.00
6.00
3.00
20,137.00
16.00
8.00
1 ruang
21,583.00
16.00
8.00
15,000.00
30.00
15.00
5,100.00
20.00
10.00
10,300.00
2.00
1.00
10,300.00
2.00
1.00
13,800.00
2.00
1.00
30,500.00
6.00
3.00
8,670.00
8.00
4.00
11,143.00
355.04
177.52
13,630.00
231.34
115.67
26,025.00
26.48
13.24
26,025.00
28.18
14.09
26,025.00
18.88
9.44
1 ruang
205,000.00
40.00
130,500.00
40.00
485,000.00
1.00
195,000.00
1.00
Lampiran 10.b
TAHUN 2012
No.
Jenis Pekerjaan
Sat.
Koef.
Harga
Satuan (Rp)
3
1 1 M PEK. GALIAN TANAH BIASA
a. Pekerja
OH
0.702
27,500
b. Mandor
OH
0.025
60,000
Jumlah
3
2 1 M URUGAN KEMBALI PONDASI DIHITUNG 1/3 DARI GALIAN
a. Pekerja
OH
0.293
27,500
b. Mandor
OH
0.010
60,000
Jumlah
3
3 1 M URUGAN TANAH BARU
a. Pekerja
OH
1.606
27,500
b. Mandor
OH
0.090
60,000
Jumlah
3
4 1 M PEMADATAN TANAH
a. Pekerja
OH
1.000
27,500
b. Mandor
OH
0.045
60,000
Jumlah
3
5 1 M URUGAN PASIR URUG
a. Pasir Urug
m3
0.800
116,500
b. Pekerja
OH
0.316
27,500
c. Mandor
OH
0.010
60,000
Jumlah
3
6 1 M AANSTAMPING / PONDASI BATU KOSONG
a. Batu belah
m3
1.018
84,800
b. Pasir Urug
m3
0.332
116,500
c. Pekerja
OH
0.600
27,500
d. Tukang Batu
OH
0.311
40,500
e. Kepala Tukang Batu
OH
0.031
52,000
f. Mandor
OH
0.029
60,000
Jumlah
3
7 1 M Pasang Pondasi Batu Kali, 1 Pc : 8 Ps.
a. Batu belah
m3
1.000
84,800
b. Semen PC
kg
54.472
1,300
c. Pasir Pasang
m3
0.510
110,000
d. Pekerja
OH
1.200
27,500
e. Tukang Batu
OH
0.300
40,500
f. Kepala Tukang Batu
OH
0.046
52,000
g. Mandor
OH
0.065
60,000
Jumlah
2
8 1 M Pasang dinding bata merah tebal 1/2 bata, 1 pc : 4 ps
a. Batu bata merah bakar kelas 1
Buah 65.000
650
b. Semen PC
kg
8.500
1,300
c. Pasir Pasang
m3
0.031
110,000
d. Pekerja
OH
0.160
27,500
e. Tukang Batu
OH
0.100
40,500
Jumlah Harga
Jumlah Harga
Upah &
Upah Kerja
Bahan (Rp)
Bahan
(Rp)
(Rp)
19,300
1,500
20,800
19,300
1,500
20,800
8,059
626
8,685
8,059
626
8,685
44,162
5,400
49,562
44,162
5,400
49,562
27,500
2,715
30,215
27,500
2,715
30,215
8,680
600
9,280
93,200
8,680
600
102,480
16,503
12,596
1,596
1,740
32,435
86,288
38,678
16,503
12,596
1,596
1,740
157,401
33,000
12,150
2,392
3,900
51,442
84,800
70,814
56,122
33,000
12,150
2,392
3,900
263,178
4,400
4,050
42,250
11,050
3,410
4,400
4,050
93,200
93,200
86,288
38,678
124,966
84,800
70,814
56,122
211,736
42,250
11,050
3,410
No.
Jenis Pekerjaan
Sat.
Koef.
Harga
Satuan (Rp)
Jumlah Harga
Jumlah Harga
Upah &
Upah Kerja
Bahan (Rp)
Bahan (Rp)
(Rp)
56,710
520
862
9,832
520
862
66,542
7,927
4,050
520
900
13,397
42,250
8,204
4,521
7,927
4,050
520
900
68,372
5,500
6,075
780
600
12,955
8,273
2,640
5,500
6,075
780
600
23,868
5,500
6,075
780
600
12,955
7,301
2,970
5,500
6,075
780
600
23,226
4,125
4,050
520
480
9,175
4,402
4,125
4,050
520
480
13,577
6,003
6,075
1,820
1,800
15,698
45,315
5,800
2,750
3,600
6,003
6,075
1,820
1,800
73,164
45,375
321,100
236,281
370
86,000
45,375
42,250
8,204
4,521
54,975
8,273
2,640
10,913
7,301
2,970
10,271
4,402
4,402
45,315
5,800
2,750
3,600
57,465
321,100
236,281
370
86,000
No.
Jenis Pekerjaan
Sat.
Koef.
Harga
Satuan (Rp)
Jumlah Harga
Jumlah Harga
Upah &
Upah Kerja
Bahan (Rp)
Bahan (Rp)
(Rp)
f. Tukang Batu
OH
0.275
40,500
11,138
g. Kepala Tukang Batu
OH
0.028
52,000
1,456
h. Mandor
OH
0.083
60,000
4,980
Jumlah
643,751
62,949
15 Rabat beton bawah lantai camp. 1:3:5 tebal 5 cm
a. Semen PC
kg 217.437
1,300
282,668
b. Pasir Beton
m3
0.829
271,900
225,405
c. Kerikil
kg
0.999
370
370
d. Air
Ltr 127.000
400
50,800
e. Peralatan
Ls
1.000
500
500
f. Pekerja
OH
1.250
27,500
34,375
g. Tukang Batu
OH
0.275
40,500
11,138
h. Kepala Tukang Batu
OH
0.028
52,000
1,456
i Mandor
OH
0.083
60,000
4,980
Jumlah
559,743
51,949
2
16 1 m Bekisting
a. Kayu Papan Kelas 3
m3
0.016
1,140,000
18,240
b. Paku 8 cm s/d 12 cm
kg
0.130
15,500
2,015
c. Pekerja
OH
0.102
27,500
2,800
d. Tukang Kayu
OH
0.103
40,500
4,172
e. Kepala Tukang Batu
OH
0.102
52,000
5,304
f. Mandor
OH
0.006
60,000
360
Jumlah
20,255
12,635
17 1 Kg Penulangan
a. Besi beton U.24 Rata-rata
kg
0.790
9,920
7,837
b. Kawat Beton
kg
0.065
15,500
1,008
c. Tukang Besi
OH
0.006
40,500
229
d. Kepala Tukang Batu
OH
0.007
52,000
364
e. Mandor
OH
0.003
60,000
180
Jumlah
8,844
773
2
18 1 m Sloof 15 x 20 Beton Mutu (K175)
a. Semen PC
kg 226.000
1,300
293,800
b. Pasir Beton
m3
0.144
271,900
39,154
c. Kerikil
m3
0.410
370
152
d. Pekerja
OH
0.830
27,500
22,825
e. Tukang Batu
OH
0.141
40,500
5,721
f. Kepala Tukang Batu
OH
0.013
52,000
692
g. Mandor
OH
0.015
60,000
918
Jumlah
333,105
30,156
2
19 1 m Kolom Struktur beton bertulang (200 kg besi + bekisting) 15 x 20 Beton Mutu (K175)
a. Semen PC
kg 226.000
1,300
293,800
b. Pasir Beton
m3
0.144
271,900
39,154
c. Kerikil
m3
0.410
370
152
d. Pekerja
OH
0.830
27,500
22,825
e. Tukang Batu
OH
0.141
40,500
5,721
f. Kepala Tukang Batu
OH
0.013
52,000
692
g. Mandor
OH
0.015
60,000
918
Jumlah
333,105
30,156
2
20 1 m Kolom Praktis beton bertulang (300 kg besi + bekisting) 15 x 20 Beton Mutu (K175)
a. Semen PC
kg 226.000
1,300
293,800
b. Pasir Beton
m3
0.144
271,900
39,154
8
11,138
1,456
4,980
706,699
282,668
225,405
370
50,800
500
34,375
11,138
1,456
4,980
611,691
18,240
2,015
2,800
4,172
5,304
360
32,890
7,837
1,008
229
364
180
9,618
293,800
39,154
152
22,825
5,721
692
918
363,261
293,800
39,154
152
22,825
5,721
692
918
363,261
293,800
39,154
No.
Jenis Pekerjaan
Sat.
Koef.
Harga
Satuan (Rp)
c.
d.
e.
f.
g.
21
a.
b.
c.
d.
e.
f.
g.
22
a.
b.
c.
d.
e.
f.
g.
23
a.
b.
c.
d.
e.
f.
g.
24
a.
b.
c.
d.
e.
f.
g.
25
a.
b.
c.
d.
e.
f.
g.
Jumlah Harga
Jumlah Harga
Upah &
Upah Kerja
Bahan (Rp)
Bahan (Rp)
(Rp)
Kerikil
m3
0.410
370
152
Pekerja
OH
0.830
27,500
Tukang Batu
OH
0.141
40,500
Kepala Tukang Batu
OH
0.013
52,000
Mandor
OH
0.015
60,000
Jumlah
333,105
2
1 m Ring Balok beton bertulang 15 x 20 Beton Mutu (K175) + Bekisting
Semen PC
kg 226.000
1,300
293,800
Pasir Beton
m3
0.144
271,900
39,154
Kerikil
m3
0.410
370
152
Pekerja
OH
0.830
27,500
Tukang Batu
OH
0.141
40,500
Kepala Tukang Batu
OH
0.013
52,000
Mandor
OH
0.015
60,000
Jumlah
333,105
2
1 m Kolom Gunungan Utama beton bertulang (200 kg besi + bekisting) 15 x 20 Beton
Semen PC
kg 226.000
1,300
293,800
Pasir Beton
m3
0.144
271,900
39,154
Kerikil
m3
0.410
370
152
Pekerja
OH
0.830
27,500
Tukang Batu
OH
0.141
40,500
Kepala Tukang Batu
OH
0.013
52,000
Mandor
OH
0.015
60,000
Jumlah
333,105
2
1 m Ring Gunungan Utama beton bertulang 15 x 20 Beton Mutu (K175) + Bekisting
Semen PC
kg 226.000
1,300
293,800
Pasir Beton
m3
0.144
271,900
39,154
Kerikil
m3
0.410
370
152
Pekerja
OH
0.830
27,500
Tukang Batu
OH
0.141
40,500
Kepala Tukang Batu
OH
0.013
52,000
Mandor
OH
0.015
60,000
Jumlah
333,105
3
1 m Pasang Konstruksi kuda-kuda konvensional, kayu punak
Kayu Punak Balok 8x12 cm
kg
0.900
4,550,250
4,095,225
Besi Strip
kg
7.000
16,725
117,075
Paku 8 cm s/d 12 cm
kg
1.050
15,500
16,275
Pekerja
OH
1.010
27,500
Tukang Kayu
OH
3.001
40,500
Kepala Tukang Kayu
OH
1.010
52,000
Mandor
OH
0.018
60,000
Jumlah
4,228,575
3
1 m Pasang Kait Angin, Skor Kuda-kuda, kayu punak
Kayu Punak Balok 8x12 cm
kg
0.980
4,550,250
4,459,245
Besi Strip
kg
7.000
16,725
117,075
Paku 8 cm s/d 12 cm
kg
1.005
15,500
15,576
Pekerja
OH
1.000
27,500
Tukang Kayu
OH
5.400
40,500
Kepala Tukang Kayu
OH
1.003
52,000
Mandor
OH
0.020
60,000
Jumlah
4,591,896
8
152
22,825
5,721
692
918
363,261
22,825
5,721
692
918
30,156
22,825
5,721
692
918
30,156
Mutu (K175)
293,800
39,154
152
22,825
5,721
692
918
363,261
22,825
5,721
692
918
30,156
293,800
39,154
152
22,825
5,721
692
918
363,261
22,825
5,721
692
918
30,156
293,800
39,154
152
22,825
5,721
692
918
363,261
27,775
121,545
52,520
1,080
202,920
4,095,225
117,075
16,275
27,775
121,545
52,520
1,080
4,431,495
27,500
218,700
52,156
1,200
299,556
4,459,245
117,075
15,576
27,500
218,700
52,156
1,200
4,891,452
No.
1
26
a.
b.
c.
d.
e.
f.
g.
27
a.
b.
c.
d.
e.
f.
g.
28
a.
b.
c.
d.
e.
f.
29
a.
b.
c.
d.
e.
30
a.
b.
c.
d.
e.
f.
31
a.
b.
c.
d.
e.
f.
32
a.
Jenis Pekerjaan
Sat.
Koef.
Harga
Satuan (Rp)
Jumlah Harga
Jumlah Harga
Upah &
Upah Kerja
Bahan (Rp)
Bahan (Rp)
(Rp)
4,459,245
117,075
46,500
4,622,820
38,500
186,300
36,920
6,912
268,632
4,459,245
117,075
46,500
38,500
186,300
36,920
6,912
4,891,452
2,750
405
52
60
3,267
47,220
24,678
2,781
2,750
405
52
60
77,946
27,500
19,693
2,600
1,800
51,593
218,046
19,375
27,500
19,693
2,600
1,800
289,014
2,750
2,589
10,452
3,000
18,791
541,800
2,750
2,589
10,452
3,000
560,591
19,250
78,338
10,400
2,400
110,388
64,500
3,600
19,250
78,338
10,400
2,400
178,488
1,925
3,240
936
300
6,401
9,062
675
1,925
3,240
936
300
16,138
47,220
24,678
2,781
74,679
218,046
19,375
237,421
541,800
541,800
64,500
3,600
68,100
9,062
675
9,737
6,675
6,675
No.
Jenis Pekerjaan
Sat.
Koef.
Harga
Satuan (Rp)
b.
c.
d.
e.
f.
33
a.
b.
c.
d.
e.
34
a.
b.
c.
d.
e.
35
a.
b.
c.
d.
e.
f.
36
a.
b.
c.
d.
e.
f.
37
a.
b.
c.
d.
e.
f.
38
a.
b.
c.
d.
e.
f.
Paku 4 cm s/d 7 cm
kg
0.050
13,500
Pekerja
OH
0.100
27,500
Tukang Kayu
OH
0.190
40,500
Kepala Tukang Kayu
OH
0.033
52,000
Mandor
OH
0.005
60,000
Jumlah
1 m3 Pasang Kaca Bening tebal 5 mm
Kaca Polos 5 mm
m2
1.010
65,500
Pekerja
OH
0.020
27,500
Tukang Kayu
OH
0.074
40,500
Kepala Tukang Kayu
OH
0.010
52,000
Mandor
OH
0.002
60,000
Jumlah
1 m2 Pasang Atap Genteng Palentong Kecil
Genteng
buah 8.650
4,150
Pekerja
OH
0.080
27,500
Tukang Kayu
OH
0.021
40,500
Kepala Tukang Kayu
OH
0.002
52,000
Mandor
OH
0.001
60,000
Jumlah
1 m1 Pasang Atap Genteng bubung palentong
Genteng bubungan
buah 4.540
7,750
Semen PC
kg
3.000
1,300
Pekerja
OH
0.180
27,500
Tukang Kayu
OH
0.120
40,500
Kepala Tukang Kayu
OH
0.016
52,000
Mandor
OH
0.003
60,000
Jumlah
1 m3 Pasang rangka langit-langit (60x60 cm), kayu punak
Kayu Punak 5x7 cm
kg
0.016
4,292,750
Paku 8 cm s/d 12 cm
kg
0.250
15,500
Pekerja
OH
0.200
27,500
Tukang Kayu
OH
0.164
40,500
Kepala Tukang Kayu
OH
0.030
52,000
Mandor
OH
0.010
60,000
Jumlah
1 m3 Langit-langit asbes semen, tebal 4 mm
Asbes Semen 4 mm
m2
1.100
15,000
Paku 4 cm s/d 7 cm
kg
0.011
13,500
Pekerja
OH
0.012
27,500
Tukang Kayu
OH
0.007
40,500
Kepala Tukang Kayu
OH
0.006
52,000
Mandor
OH
0.002
60,000
Jumlah
1 m3 List langit-langit, profil kayu 5 cm
Lis profil kamper 5 cm
m2
1.050
12,000
Paku 4 cm s/d 7 cm
kg
0.100
13,500
Pekerja
OH
0.690
27,500
Tukang Kayu
OH
0.081
40,500
Kepala Tukang Kayu
OH
0.008
52,000
Mandor
OH
0.006
60,000
Jumlah Harga
Jumlah Harga
Upah &
Upah Kerja
Bahan (Rp)
Bahan (Rp)
(Rp)
2,750
7,695
1,693
300
12,438
675
2,750
7,695
1,693
300
19,788
550
3,002
520
120
4,192
66,155
550
3,002
520
120
70,347
2,200
857
104
60
3,221
35,898
2,200
857
104
60
39,118
4,950
4,860
809
180
10,799
35,185
3,900
4,950
4,860
809
180
49,884
5,500
6,655
1,560
600
14,315
69,972
3,875
5,500
6,655
1,560
600
88,162
332
284
312
120
1,048
16,500
149
332
284
312
120
17,696
18,975
3,268
416
360
12,600
1,350
18,975
3,268
416
360
675
7,350
66,155
66,155
35,898
35,898
35,185
3,900
39,085
69,972
3,875
73,847
16,500
149
16,649
12,600
1,350
No.
Jenis Pekerjaan
Sat.
Koef.
Harga
Satuan (Rp)
39
a.
b.
c.
d.
40
a.
b.
c.
d.
41
a.
b.
c.
d.
42
a.
b.
c.
d.
43
a.
b.
c.
d.
44
a.
b.
c.
d.
45
a.
b.
c.
46
a.
b.
c.
47
a.
b.
c.
Jumlah
1 buah Kunci tanam biasa
Kunci Pintu
buah
Tukang Kayu
OH
Kepala Tukang Kayu
OH
Mandor
OH
Jumlah
1 buah Engsel Pintu
Engsel
buah
Tukang Kayu
OH
Kepala Tukang Kayu
OH
Mandor
OH
Jumlah
1 buah Engsel Jendela
Engsel
buah
Tukang Kayu
OH
Kepala Tukang Kayu
OH
Mandor
OH
Jumlah
1 buah Kait Angin
Kait Angin Jendela
buah
Tukang Kayu
OH
Kepala Tukang Kayu
OH
Mandor
OH
Jumlah
1 buah Grendel Pintu dan Jendela
Grendel
buah
Tukang Kayu
OH
Kepala Tukang Kayu
OH
Mandor
OH
Jumlah
1 m Kabel dari panel ke sub panel (NYM 2 x 1,5
Kabel NYM
m
MCB Box 4 grup inbow
buah
Tukang Listrik
OH
Mandor
OH
Jumlah
1 buah Stop Kontak
Stop Kontak
buah
Tukang Listrik
OH
Mandor
OH
Jumlah
1 buah Saklar Tunggal
Saklar Tunggal
buah
Tukang Listrik
OH
Mandor
OH
Jumlah
1 buah Saklar Double
Saklar Double
buah
Tukang Listrik
OH
Mandor
OH
1.000
0.030
0.027
0.003
75,500
40,500
52,000
60,000
Jumlah Harga
Jumlah Harga
Upah &
Upah Kerja
Bahan (Rp)
Bahan (Rp)
(Rp)
13,950
23,019
36,969
1,215
1,428
180
2,823
75,500
1,215
1,428
180
78,323
7,695
5,304
480
13,479
9,500
7,695
5,304
480
22,979
3,645
4,311
180
8,136
9,500
3,645
4,311
180
17,636
10,935
3,987
180
15,102
3,800
10,935
3,987
180
18,902
2,025
2,682
180
4,887
8,250
2,025
2,682
180
13,137
22
765
180
967
3,500
22
765
180
4,467
1,841
180
2,021
7,000
1,841
180
9,021
1,841
180
2,021
7,000
1,841
180
9,021
851
235
11,000
851
235
75,500
75,500
1.000
0.190
0.102
0.008
9,500
40,500
52,000
60,000
9,500
9,500
1.000
0.090
0.083
0.003
9,500
40,500
52,000
60,000
9,500
9,500
1.000
0.270
0.077
0.003
3,800
40,500
52,000
60,000
3,800
3,800
1.000
0.050
0.052
0.003
8,250
40,500
52,000
60,000
8,250
8,250
mm2)
1.000
0.001
0.019
0.003
3,500
22,300
40,500
60,000
3,500
3,500
1.000
0.045
0.003
7,000
40,500
60,000
7,000
7,000
1.000
0.045
0.003
7,000
40,500
60,000
7,000
7,000
1.000
0.021
0.004
11,000
40,500
60,000
11,000
No.
Jenis Pekerjaan
Sat.
Koef.
Harga
Satuan (Rp)
48
a.
b.
c.
49
a.
b.
c.
50
a.
b.
c.
d.
e.
f.
g
h
i
51
a.
b.
c.
d.
e.
f.
g
h
i
52
a.
b.
c.
d.
e.
f.
g
h
i
j
Jumlah
1 buah Lampu SL 14 watt Type A
SL 14 W Type A
buah
Tukang Listrik
OH
Mandor
OH
Jumlah
1 titik Instalasi Listrik
Fitting Lampu Segi 4
buah
Tukang Listrik
OH
Mandor
OH
Jumlah
1 m2 Pengecatan Tembok baru Kualitas B
Cat Tembok
kg
Plamir Tembok
kg
Rol Cat Tembok
buah
Steger Werk
Ls
Amplas
m
Pekerja
OH
Tukang Cat
OH
Kepala Tukang Cat
OH
Mandor
OH
Jumlah
1 m2 Pengecatan Plafond baru Kualitas B
Cat Tembok
kg
Plamir Tembok
kg
Rol Cat Tembok
buah
Steger Werk
Ls
Amplas
m
Pekerja
OH
Tukang Cat
OH
Kepala Tukang Cat
OH
Mandor
OH
Jumlah
1 m2 Pengecatan Kayu
Meni Kayu
kg
Dempul Kayu
kg
Cat Kayu
kg
Amplas
m
Tiner B
Ltr
Kwas 3"
buah
Pekerja
OH
Tukang Cat
OH
Kepala Tukang Cat
OH
Mandor
OH
Jumlah
Jumlah Harga
Jumlah Harga
Upah &
Upah Kerja
Bahan (Rp)
Bahan (Rp)
(Rp)
11,000
1.000
0.090
0.004
22,800
40,500
60,000
1.000
0.047
0.003
5,500
40,500
60,000
15,530
9,250
15,915
1,000
5,500
27,500
40,500
52,000
60,000
15,530
9,250
15,915
1,000
5,500
27,500
40,500
52,000
60,000
17,940
11,000
40,400
5,500
15,850
10,150
27,500
40,500
52,000
60,000
1,913
180
2,093
5,500
1,913
180
7,593
2,778
2,497
57
120
5,452
1,631
1,018
159
400
1,100
2,778
2,497
57
120
9,759
2,200
4,091
572
60
6,922
1,553
1,203
159
1,000
1,100
2,200
4,091
572
60
11,937
2,750
4,050
1,560
600
8,960
2,637
342
6,868
1,100
2,378
508
2,750
4,050
1,560
600
22,793
1,553
1,203
159
1,000
1,100
5,015
0.147
0.031
0.170
0.200
0.150
0.050
0.100
0.100
0.030
0.010
3,645
267
3,912
22,800
3,645
267
26,712
1,631
1,018
159
400
1,100
4,307
0.100
0.130
0.010
1.000
0.200
0.080
0.101
0.011
0.001
12,086
5,500
5,500
0.105
0.110
0.010
0.400
0.200
0.101
0.062
0.001
0.002
1,086
22,800
22,800
2,637
342
6,868
1,100
2,378
508
13,833
Mengetahui;
Ketua Tim Pembangunan
Kusbiyantoro
M. Fairuzzabadi Al Baha'i
77.00
54.04
1.93
23.09
6.77
0.24
162.06
260.25
14.59
Pemadatan tanah
162.06
162.06
7.33
4.87
19.55
7.71
0.24
15.04
15.30
4.99
9.02
4.68
0.46
0.44
111.66
111.66
6,082.49
56.97
134.00
33.50
5.14
7.26
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
1,486,130
115,500
186,100
14,463
7,156,772
875,104
4,456,549
439,983
2,277,435
212,107
14,662
1,297,563
581,622
248,161
189,405
24,006
26,165
9,468,994
7,907,235
6,266,732
3,684,868
1,356,701
267,097
435,484
2,016,861
527,487
162,781
210,040
193,332
24.44
0.48
0.69
Pasang dinding bata merah tebal 1/2 bata, 1 pc
354.67
: 6 ps
23,053.84
2,238.35
14.58
102.24
35.47
3.55
5.32
Plesteran 1 pc : 4 ps, tebal 15 mm
95.47
607.59
2.29
19.09
14.32
1.43
0.95
654.52
3,675.81
17.67
130.90
98.18
9.82
6.55
Acian
695.17
2,353.79
104.28
69.52
6.95
5.56
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
24,823
41,158
14,984,994
2,909,855
1,603,483
2,811,557
1,436,431
184,431
319,207
789,865
252,048
525,100
579,997
74,469
57,284
4,778,552
1,943,938
3,599,885
3,976,236
510,529
392,715
3,059,921
2,867,588
2,815,450
361,490
333,683
16,427,397
2,102,570
996,908
1,305,043
2,176,251
2,202,261
659,772
652,522
-
Penulangan
80.56
3.5452785
28.805388
22.556834
22.82273
22.60115
1.3294794
615.46
1816.6325
149.46977
13.015367
16.096744
6.8986046
6.04
1,365.46
0.87
2.48
5.01
0.85
0.08
0.09
4.30
971.00
0.62
1.76
3.57
0.61
0.06
0.07
1.03
232.63
0.15
Rp
Rp
Rp
Rp
Rp
Rp
7,375,353
Rp
5,881,251
Rp
9,644
Rp
1,325,469
Rp
13,046
Rp
896,910
Rp
290,599
Rp
37,990
Rp
129,938
Rp
Bekisting
35.80
Bekisting
Rp
4,041,617
Rp
446,484
Rp
620,313
Rp
924,321
Rp
1,175,260
Rp
79,769
Rp
Penulangan
703.14
Penulangan
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
18,020,995
2,316,781
527,122
837,031
413,916
1,775,101
236,561
917
137,906
34,566
4,179
5,546
1,262,294
168,221
652
98,066
24,580
2,971
3,944
302,425
40,303
0.42
0.85
0.15
0.01
0.02
Rp
Rp
Rp
Rp
Rp
Rp
Ringbalk 15 x 20 Beton mutu (K175)
3.22
Rp
728.25
Rp
0.46
Rp
1.32
Rp
2.67
Rp
0.46
Rp
0.04
Rp
0.05
Rp
Rp
Kolom Gunungan Utama 15 x 20 Beton mutu (K175)
0.27
Rp
60.69
Rp
0.04
Rp
0.11
Rp
0.22
Rp
0.04
Rp
0.00
Rp
0.00
Rp
Rp
Ring Gunungan Utama 15 x 20 Beton mutu (K175)
0.98
Rp
222.52
Rp
0.14
Rp
0.40
Rp
0.82
Rp
0.14
Rp
0.01
Rp
0.02
Rp
Rp
Pasang Konstruksi kuda-kuda konvensional, kayu
2.60
punak Rp
2.34
Rp
18.17
Rp
2.73
Rp
2.62
Rp
7.79
Rp
2.62
Rp
0.05
Rp
Rp
Pasang kait angin, skor kuda-kuda, kayu punak0.27
Rp
0.26
Rp
1.88
Rp
0.27
Rp
0.27
Rp
1.45
Rp
0.27
Rp
0.01
Rp
Rp
156
23,495
5,889
712
945
946,720
126,166
489
73,550
18,435
2,229
2,958
78,893
10,514
41
6,129
1,536
186
247
289,276
38,551
149
22,474
5,633
681
904
10,630,243
303,899
42,246
72,097
315,501
136,330
2,803
1,197,430
31,438
4,183
7,385
58,727
14,005
322
-
4.25
4.17
29.76
12.76
5.95
19.56
3.02
0.49
1.70
0.10
2.13
1.70
0.83
0.09
0.05
8.59
1.44
0.86
0.55
1.73
0.43
25.06
0.50
7.52
17.54
48.48
5.01
1.00
0.00
211.24
0.59
10.56
14.79
16.90
3.80
1.06
49.23
2.46
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
18,959,304
497,766
197,703
163,690
792,089
156,972
29,388
27,777,508
14,517,068
1,635,758
1,617,699
238,243
30,589
35,295
370,826
32,951
46,769
33,491
4,422
3,061
4,655,622
23,630
22,249
89,813
25,779
1,616,535
90,225
482,454
1,963,349
260,651
60,150
1,914,324
142,588
406,640
684,423
197,722
63,372
328,610
2.46
4.92
9.35
1.60
0.25
Pasang kaca bening tebal 5 mm
23.18
23.41
0.46
1.72
0.23
0.05
588.25
5,088.40
47.06
12.44
1.18
0.59
49.23
223.50
147.69
8.86
5.91
0.77
0.15
517.59
569.35
5.69
6.26
3.62
3.11
1.04
143.21
150.38
14.32
98.82
11.56
1.15
0.86
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
33,230
135,383
378,825
83,327
14,769
1,533,663
12,751
69,592
12,055
2,782
21,116,853
1,294,159
503,884
61,178
35,295
1,732,159
191,997
243,689
239,258
39,833
8,861
36,216,484
2,005,648
2,846,727
3,444,728
807,435
310,552
8,540,180
76,862
172,085
146,736
161,487
62,110
1,804,505
193,340
2,717,498
468,076
59,577
51,557
4.00
4.00
0.12
0.11
0.01
12.00
12.00
2.28
1.22
0.10
32.00
32.00
2.88
2.65
0.10
32.00
32.00
8.64
2.45
0.10
60.00
60.00
3.00
3.09
0.18
4.00
4.00
0.18
0.01
Saklar tunggal
4.00
4.00
0.18
0.01
Saklar ganda
4.00
4.00
0.08
0.02
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
302,000
4,860
5,712
720
114,000
92,340
63,648
5,760
304,000
116,640
137,962
5,760
121,600
349,920
127,596
5,760
495,000
121,500
160,898
10,800
156,641
998
34,221
8,056
28,000
7,365
720
28,000
7,365
720
44,000
3,402
941
12.00
12.00
1.08
0.05
Instalasi Listrik
16.00
16.00
0.76
0.05
794.48
83.42
87.39
7.94
317.79
158.90
80.24
48.98
0.87
1.59
517.68
51.77
67.30
5.18
517.68
103.54
41.41
52.29
5.69
0.52
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
273,600
43,740
3,204
88,000
30,612
2,880
1,295,524
808,387
126,442
317,793
873,932
2,206,677
1,983,686
45,444
95,338
803,951
622,506
82,388
517,676
569,444
1,138,745
2,117,554
296,111
31,061
21.48
Bekisting
57.29
Bekisting
6.04
225.52
Penulangan
477.76
Penulangan 63.42
Bekisting
20.41
Penulangan 214.24
221.58
2,299.53
42.25
164.56
Pasir Urug
Pasir Pasang
Pasir Beton
Batu Belah
Batu Bata Merah Bakar Kelas 1
Kerikil
Air
Semen PC
Semen Keramik
Semen Warna
Lem Kayu Putih Rachol
Plamir Tembok
Cat Tembok
Rol Cat Tembok
Kwas 3"
Steger Werk
Tiner B
Dempul Kayu
Amplas
Meni Kayu
Cat Kayu
Kayu Papan Kelas 3
Kayu Punak Balok 8x12 cm
Kayu Punak 2x3 cm
Kayu Punak 5x7 cm
Kayu Punak 6x12 cm
Kayu Papan Punak 3x30 cm
Kayu Papan Suri Punak
Lis Profil Kamper 5 Cm
Keramik 30 x 30
Besi Beton U.24 Rata-rata
Besi Beton U.12 Rata-rata
Besi Beton U.8 Rata-rata
Kawat Beton
Besi Strip
Kaca Polos 5 mm
Paku 4 cm s/d 7 cm
Paku 8 cm s/d 12 cm
Asbes Semen 4 mm
Genteng
Genteng Bubungan
Kunci Pintu
Grendel
Kait Angin Jendela
Lampiran 10.c
SATUAN
116,500
110,000
271,900
84,800
650
370
400
1,300
1,450
9,000
12,000
9,250
15,530
15,915
10,150
1,000
15,850
11,000
5,500
17,940
40,400
1,140,000
4,550,250
4,182,750
4,292,750
3,695,700
3,225,000
133,500
12,000
45,225
9,920
8,920
8,420
15,500
16,725
65,500
13,500
15,500
15,000
4,150
7,750
75,500
8,250
3,800
M3
3
M
M3
M3
Bh
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
Kg
Bh
Bh
Ls
Ltr
Kg
Lbr
Kg
Kg
M3
M3
M3
M3
M3
M3
M3
M
M2
Kg
Kg
Kg
Kg
Kg
M2
Kg
Kg
Lbr
Bh
Bh
Bh
Bh
Bh
NO
45
46
47
48
49
50
51
52
53
54
55
56
57
58
B.
1
2
3
4
5
6
7
8
9
10
SATUAN
9,500
22,800
7,000
7,000
11,000
5,500
3,500
22,300
205,000
130,500
485,000
195,000
850,000
50,000
1/2 Ps
Bh
Bh
Bh
Bh
Bh
M
Bh
Bh
Bh
Bh
Bh
Bh
Bh
52,000
52,000
52,000
60,000
27,500
40,500
40,500
40,500
40,500
40,500
Mengetahui;
Ketua Tim Pembangunan
Kusbiyantoro
M. Fairuzzabadi Al Baha'i
Per
Per
Per
Per
Per
Per
Per
Per
Per
Per
hari
hari
hari
hari
hari
hari
hari
hari
hari
hari
NO
SATUAN
NO
SATUAN
Total Realisasi
24.54
Rp
2,859,057
102.05
Rp
11,225,890
23.91
Rp
6,501,567
126.96
Rp
10,766,557
26156.70
Rp
17,001,855
32.56
Rp
12,048
3313.67
Rp
1,325,469
24765.37
Rp
32,194,975
145.00
Rp
1,305,043
7.52
Rp
90,225
154.69
Rp
1,430,892
135.19
Rp
2,099,475
13.12
Rp
208,830
8.23
Rp
83,516
835.47
Rp
835,469
24.68
Rp
391,248
5.12
Rp
56,333
295.34
Rp
1,624,394
24.19
Rp
433,981
27.98
Rp
1,130,216
3.55
Rp
4,041,617
6.77
Rp
30,786,977
3.47
Rp
14,517,068
14.91
Rp
63,993,992
0.10
Rp
370,826
2.54
Rp
8,186,481
2.46
Rp
328,610
150.38
Rp
1,804,505
363.24
Rp
16,427,397
1816.63
Rp
18,020,995
149.47
Rp
2,316,781
49.81
Rp
833,103
23.41
Rp
1,533,663
33.04
Rp
446,020
281.61
Rp
4,364,973
569.35
Rp
8,540,180
5088.40
Rp
21,116,853
223.50
Rp
1,732,159
4.00
Rp
302,000
60.00
Rp
495,000
32.00
Rp
121,600
Total Realisasi
44.00
Rp
418,000
12.00
Rp
273,600
4.00
Rp
28,000
4.00
Rp
28,000
44,000
4.00
Rp
16.00
Rp
88,000
44.75
Rp
156,641
0.04
Rp
998
80.00
Rp
16,400,000
80.00
Rp
10,440,000
2.00
Rp
970,000
2.00
Rp
390,000
2.00
Rp
1,700,000
2.00
Rp
100,000
80.15
11.51
50.22
88.88
1656.02
324.22
13.02
117.72
270.83
3.13
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
4,167,854
598,273
2,611,212
5,332,652
45,540,572
13,131,052
527,122
4,767,718
10,968,751
126,704
410,666,989
#VALUE!
#VALUE!
Genteng Krepus/B
Genteng Plentong
Grendel Jendela
Grendel Pintu
Hak/Kait Angin Pin
Kaca Bening
Total Realisasi
Kayu Meranti - Us
Kayu Papan Bekis
Kayu Papan Kamp
Kayu Papan Kamp
Penyambung T 4"
Pipa Air PVC "
Pipa Air PVC 1"
Total Realisasi
Pipa Air PVC 3"
blonos
2-3 cm
Altex
Avian
Decolite
Decolite
KW.B
KW.B
Indoplek
Broco
Jatiwangi
Jatiwangi
KW.B
KW.B
KW.C
495
74800
143000
16725
8920
8470
16940
37400
13420
13530
8250
10450
13200
12500
24750
4180
1320
6050
8250
2200
Kaca Bening
60500
16500
4947255
4850250
4950250
4102750
4292750
2475000
5500000
5500000
Motif-Warna
KW.1
INA
PVC
PVC
PVC
PVC
Penyambung T 4"
Pipa Air PVC "
Pipa Air PVC 1"
PVC
WAVIN
WAVIN
MD
MD
MD
KW.C
Philips
Philips
PVC
PVC
PVC
PVC
PVC
93500
42927
6132
41812
30105
108900
3850
25300
30250
5500
24200
3850
7150
10450
82500
8250
72800
14850
9350
59400
99000
14300
14300
14300
14300
14300
137500
110000
3850
25300
30250
4400
30250
38500
24200
52250
WAVIN
121000
WAVIN
199650
16335
8250
520000
13915
13500
Saklar Ganda
Sirtu
Sock Drat "
Stop Kontak
Tanah urug
Broco
Shimizu
Standar
Broco
PVC
Broco
15000
74250
5500
18000
79200
Lampiran 7
JADWAL PELAKSANAAN PEMBANGUNAN RUANG KELAS BARU
SMK AR-RAHMAN WATUSALAM
13
20
27
3
10
17
24 31
NO.
JENIS PEKERJAAN
1 PEKERJAAN
2 PEKERJAAN
3 PEKERJAAN
4 PEKERJAAN
PERSIAPAN
TANAH
PONDASI
DINDING DAN PLESTERAN
LANTAI
BETON
KAYU DAN KACA
ATAP DAN PLAFOND
KUNCI, ENGSEL/BESI PENGGANTUNG
5 PEKERJAAN
6 PEKERJAAN
7 PEKERJAAN
8 PEKERJAAN
9 PEKERJAAN
10 PEKERJAAN LISTRIK
11 PEKERJAAN PENGECATAN
12 PENGADAAN MEUBELAIR
2
V
V
V
14
21
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
Shobirin Charil
28
14
V
V
V
V
V
V
V
V
V
1 ruang
Lampiran 11b
Lampiran Berita Acara Pemeriksaan Kemajuan Pekerjaan
Pembangunan Ruang Kelas Baru
SMK Ar-Rahman Watusalam
Nomor : 315/D/SMK.AR/IV/2013
Tanggal : 30 April 2013
NO.
JENIS PEKERJAAN
VOL.
Prestasi
Tahap
Nilai
Terhadap
SAT
Penyelesaian
Bobot %
Keseluruhan
%
Pekerjaan %
I. PEKERJAAN PERSIAPAN
1 Pek. Uitzet
1.00
Ls
0.26
100
0.26
2 Bowplank
1.00
Ls
0.36
100
0.36
Ls
0.36
100
0.36
0.98
100
0.98
1.00
45.88
m3
0.46
100
0.46
13.76
m3
0.06
100
0.06
96.56
m3
2.29
100
2.29
96.56
1.40
100
1.40
0.13
100
0.13
0.54
100
0.54
4.88
100
4.88
m3
0.51
100
0.51
6.28
100
6.28
6.79
100
6.79
m2
0.78
100
0.78
5.92
100
5.92
48.76
0.56
100
0.56
334.28
m2
3.71
100
3.71
355.04
2.31
100
2.31
13.27
100
13.27
5.62
100
5.62
5.62
100
5.62
2.90
11.66
6.72
49.90
24.38
181.14
162.00
m2
Membuat Beton mutu f'c=7,4 Mpa (K100), slump (102)cm, w/c = 0,87
11.66
m3
3.41
100
3.41
2.70
m3
0.47
100
0.47
0.57
100
0.57
Bekisting
36.00
Penulangan
314.22
Kg
1.45
100
1.45
0.33
100
0.33
0.25
100
0.25
Kg
1.27
100
1.27
0.08
100
0.08
9.60
0.15
100
0.15
100.78
Kg
0.46
100
0.46
1.92
16.00
275.04
0.46
NO.
JENIS PEKERJAAN
VOL.
1.44
25.60
213.50
0.12
Prestasi
Tahap
Nilai
Terhadap
SAT
Penyelesaian
Bobot %
Keseluruhan
%
Pekerjaan %
m3
0.25
100
0.25
m2
0.40
100
0.40
Kg
0.98
100
0.98
0.02
100
0.02
0.04
100
0.04
Bekisting
2.70
Penulangan
28.34
Kg
0.13
100
0.13
0.44
m3
0.08
100
0.08
Bekisting
9.12
m2
0.14
100
0.14
Penulangan
95.74
Kg
0.44
100
0.44
10.93
100
10.93
1.16
m3
2.46
100
2.46
0.12
0.28
100
0.28
4.44
100
4.44
9.80
100
9.80
0.76
0.11
100
0.11
3.84
m2
1.03
100
1.03
0.96
100
0.96
0.73
100
0.73
0.21
100
0.21
0.35
100
0.35
20.36
100
20.36
m2
4.92
100
4.92
22.00
0.52
100
0.52
231.30
m2
9.75
100
9.75
231.30
1.96
100
1.96
1.13
100
1.13
18.28
100
18.28
1.90
262.88
11.20
94.40
22.00
10.36
262.88
64.00
2.00
bh
0.07
100
0.07
6.00
set
0.07
100
0.07
16.00
set
0.13
100
0.13
16.00
set
0.14
100
0.14
bh
0.19
100
0.19
0.61
100
0.61
30.00
20.00
m1
0.04
100
0.04
2 Stop Kontak
2.00
bh
0.01
100
0.01
3 Saklar tunggal
2.00
bh
0.01
100
0.01
4 Saklar ganda
2.00
bh
0.01
100
0.01
6.00
bh
0.08
100
0.08
6 Instalasi Listrik
8.00
titik
0.03
100
0.03
0.18
100
0.18
NO.
JENIS PEKERJAAN
VOL.
Prestasi
Tahap
Nilai
Terhadap
SAT
Penyelesaian
Bobot %
Keseluruhan
%
Pekerjaan %
355.04
m2
1.66
100
1.66
231.34
m2
1.32
100
1.32
0.29
100
0.29
0.31
100
0.31
0.21
100
0.21
3.78
100
3.78
26.48
28.18
18.88
80.00
bh
7.84
100
7.84
2 Kursi Murid
80.00
bh
4.99
100
4.99
3 Meja Guru
2.00
bh
0.46
100
0.46
100
0.19
4 Kursi Guru
2.00
bh
0.19
5 Papan Tulis
2.00
bh
0.81
100
0.81
2.00
bh
0.05
100
0.05
14.35
100
100
100
14.35
100
Shobirin Charil
1 ruang
4,567.94
550,000.00
605,000.00
750,000.00
825,000.00
750,000.00
825,000.00
2,050,000.00
2,255,000.00
0.00
23,750.00
954,315.47
1,049,747.02
9,916.67
119,505.87
131,456.46
56,590.00
4,785,660.56
5,264,226.62
34,500.00
2,917,570.06
3,209,327.06
111,076.00
282,113.05
310,324.35
111,076.00
1134289.007
1,247,717.91
10,193,454.01
11,212,799.41
0.00
179,723.00
1,057,737.43
1,163,511.17
300,500.00
13,132,577.21
14,445,834.93
14,190,314.64
15,609,346.10
75,979.00
1,622,303.91
1,784,534.30
78,068.00
12,384,895.82
13,623,385.40
27,253.00
1,163,812.33
1,280,193.56
26,520.00
7,764,059.48
8,540,465.43
15,502.00
4,820,254.38
5,302,279.82
27,755,325.93
30,530,858.52
0.00
0.00
82,855.00
11,755,434.26
12,930,977.68
11,755,434.26
12,930,977.68
0.00
0.00
698,437.00
7,132,318.51
7,845,550.36
414,776.00
980,804.22
1,078,884.64
37,554.33
1,184,042.96
1,302,447.26
10,982.00
3,022,179.15
3,324,397.06
414,776.00
697,460.78
767,206.85
37,554.33
526,241.32
578,865.45
10,982.00
2,645,344.51
2,909,878.96
414,776.00
167099.9776
183,809.98
37,554.33
315,744.79
347,319.27
10,982.00
969,305.63
1,066,236.19
1 ruang
414,776.00
523,095.58
575,405.14
37,554.33
841,986.10
926,184.72
10,982.00
2,053,450.60
2,258,795.66
414,776.00
43,591.30
47,950.43
37,554.33
88,803.22
97,683.54
10,982.00
272,575.13
299,832.64
414,776.00
159834.7612
175,818.24
37,554.33
299,957.55
329,953.30
10,982.00
920,830.73
1,012,913.80
22,844,666.81
25,129,133.49
0.00
5,059,940.00
5,140,534.72
5,654,588.20
5,585,125.00
586,974.30
645,671.73
5,585,125.00
9,293,759.70
10,223,135.67
89,000.00
20,490,497.06
22,539,546.76
330,000.00
219,650.64
241,615.70
640,090.00
2,152,668.76
2,367,935.63
203,800.00
1,999,066.05
2,198,972.65
18,425.00
1,523,296.46
1,675,626.10
22,593.75
435,327.34
478,860.07
80,323.00
728,793.71
801,673.08
42,570,568.73
46,827,625.60
0.00
44,665.00
10,283,236.53
11,311,560.18
56,958.00
1,097,443.96
1,207,188.36
100,664.00
20391762.17
22,430,938.38
20,206.00
4,093,180.74
4,502,498.82
42,212.00
2,366,033.25
2,602,636.58
38231656.65
42,054,822.32
89,430.00
156,645.59
172,310.15
26,238.00
137,875.44
151,662.99
20,137.00
282,175.75
310,393.33
21,583.00
302,438.26
332,682.09
0.00
15,000.00
394,110.00
433,521.00
1,273,245.05
1,400,569.55
0.00
5,100.00
89,331.60
98,264.76
10,300.00
18,041.48
19,845.63
10,300.00
18,041.48
19,845.63
13,800.00
24,172.08
26,589.29
30,500.00
160,271.40
176,298.54
8,670.00
60,745.49
66,820.04
370,603.53
407,663.88
1 ruang
0.00
11,143.00
3,464,849.35
3,811,334.28
13,630.00
2,761,541.21
3,037,695.33
26,025.00
603,550.56
663,905.62
26,025.00
642,298.15
706,527.96
26,025.00
430,326.08
473,358.69
7,902,565.35
8,692,821.88
205,000.00
16,400,000.00
18,040,000.00
130,500.00
10,440,000.00
11,484,000.00
485,000.00
970,000.00
1,067,000.00
0.00
195,000.00
390,000.00
429,000.00
850,000.00
1,700,000.00
1,870,000.00
50,000.00
100,000.00
110,000.00
30,000,000.00
33,000,000.00
Pasir Urug
Pasir Pasang
Pasir Beton
Batu Koral
Batu Belah
Batu Split 2/3
Batu Bata Merah Bakar Kelas 1
Kerikil
Air
Paving Blok Natural 6 Cm
Semen PC
Semen Warna
Lem Kayu Putih Rachol
Buis Beton 1/2 dia 20 cm panjang 1 m
Plamir Tembok
Plamir Kayu
Cat Tembok
Rol Cat Tembok
Soliginium 1 Blik
Pling Cut
Kwas 3"
Steger Werk
Tiner B
Dempul Kayu
Amplas
Meni Kayu
Cat Kayu
Cat Dasar
Residu
Minyak Bekisting
Cat seng
Kayu Kelas 3
Kayu Papan Kelas 3
Kayu Balok Kelas 1
Kayu Papan Kelas 1
Kayu Papan Kelas 2
Kayu Balok kelas 2
Kayu Punak Balok 4x12 cm
Kayu Punak Balok 5x10 cm
Kayu Punak Balok 6x15 cm
Kayu Punak Balok 8x12 cm
Kayu Punak 2x3 cm
Kayu Punak 4x6 cm
Kayu Punak 5x7 cm
Kayu Punak 6x12 cm
Lampiran 10.c
SATUAN
116,500
110,000
271,900
107,000
84,800
173,000
650
370
400
91,500
1,300
9,000
12,000
35,000
9,250
17,335
15,530
15,915
46,000
6,500
10,150
1,000
15,850
11,000
5,500
17,940
40,400
14,420
16,000
11,600
14,000
1,675,000
1,140,000
3,600,000
4,200,000
2,600,000
2,200,000
4,147,255
4,595,000
4,550,250
4,550,250
4,182,750
4,175,900
4,292,750
3,695,700
M3
3
M
M3
M3
3
M
M3
Bh
Kg
Ltr
2
M
Kg
Kg
Kg
Bh
Kg
Kg
Kg
Bh
5 Ltr
Kg
Bh
Ls
Ltr
Kg
Lbr
Kg
Kg
Kg
Kg
Liter
Kg
M3
3
M
3
M
M3
M3
M3
M3
M3
3
M
3
M
M3
M3
M3
M3
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
3,275,000
3,225,000
3,090,700
88,500
20,000
133,500
12,000
8,750,000
14,200
52,000
75,000
27,105
33,812
33,927
45,225
105,890
230,000
285,000
9,920
15,500
15,500
18,000
15,725
7,500
450,000
16,725
65,500
9,000
13,500
15,500
15,300
5,500
15,300
27,200
55,250
199,650
105,890
110,750
15,000
4,150
7,750
45,000
60,000
19,700
14,000
25,000
42,000
75,500
8,250
3,800
M3
M3
3
M
lembar
Batang
M3
M
M3
Lbr
Lbr
Lbr
M2
M2
M2
2
M
unit
unit
M
Kg
Kg
Kg
Kg
Kg
M
btg
Kg
M2
Kg
Kg
Kg
Kg
Bh
Kg
M
M
M
Bh
Ltr
Lbr
Bh
Bh
Lbr
Lbr
Lbr
M
Lbr
M
Bh
Bh
Bh
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
B.
1
2
3
4
5
6
7
8
9
10
11
Engsel
Kunci Laci
Tali Ijuk
Minyak Solar
Oli Mesran 40 SAE
SL 14 W Type A
Lampu Pijar
Stop Kontak
Saklar Tunggal
Saklar Double
Fitting Lampu Segi 4
Kabel NYM
Panel Induk
MCB Box 4 grup inbow
MCB 4 A
Meja Murid
Kursi Murid
Meja Guru
Kursi Guru
Lemari Kelas
Papan Tulis
Papan Absen
Kotak Sampah Bekas Ban
Upah Pekerja
Kepala Tukang Batu
Kepala Tukang Besi
Kepala Tukang Cat
Kepala Tukang Kayu
Mandor
Pekerja
Tukang batu
Tukang besi
Tukang cat
Tukang kayu
Tukang Listrik
9,500
26,500
15,000
8,800
26,000
22,800
9,250
7,000
7,000
11,000
5,500
3,500
155,000
22,300
35,700
205,000
130,500
485,000
195,000
650,000
850,000
85,000
50,000
52,000
52,000
52,000
52,000
60,000
27,500
40,500
40,500
40,500
40,500
40,500
1/2 Ps
Bh
Kg
Ltr
Ltr
Bh
Bh
Bh
Bh
Bh
Bh
M
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Per
Per
Per
Per
Per
Per
Per
Per
Per
Per
Per
hari
hari
hari
hari
hari
hari
hari
hari
hari
hari
hari
Total Realisasi
24.54
Rp
2,859,057
102.05
Rp
11,225,890
23.91
Rp
6,501,567
126.96
-
Rp
10,766,557
26156.70
Rp
32.56
Rp
12,048
3313.67
Rp
1,325,469
17,001,855
24765.37
Rp
32,194,975
145.00
Rp
1,305,043
7.52
Rp
90,225
154.69
-
Rp
1,430,892
135.19
Rp
2,099,475
13.12
Rp
208,830
8.23
Rp
83,516
835.47
Rp
835,469
24.68
Rp
391,248
5.12
Rp
56,333
295.34
Rp
1,624,394
24.19
Rp
433,981
27.98
Rp
1,130,216
3.55
Rp
4,041,617
6.77
Rp
30,786,977
3.47
Rp
14,517,068
14.91
Rp
63,993,992
0.10
Rp
370,826
2.54
Rp
8,186,481
2.46
Rp
328,610
150.38
Rp
1,804,505
363.24
Rp
1816.63
149.47
Rp
16,427,397
18,020,995
Rp
2,316,781
49.81
Rp
833,103
23.41
Rp
1,533,663
33.04
Rp
446,020
281.61
Rp
4,364,973
569.35
Rp
8,540,180
5088.40
Rp
21,116,853
223.50
Rp
1,732,159
4.00
Rp
302,000
60.00
Rp
495,000
32.00
Rp
121,600
44.00
Rp
12.00
-
Rp
418,000
273,600
4.00
Rp
28,000
4.00
Rp
28,000
4.00
Rp
44,000
16.00
Rp
88,000
44.75
Rp
156,641
0.04
-
Rp
998
80.00
Rp
16,400,000
80.00
Rp
10,440,000
2.00
Rp
970,000
2.00
Rp
390,000
2.00
-
Rp
1,700,000
2.00
Rp
80.15
11.51
50.22
88.88
1656.02
324.22
13.02
117.72
270.83
3.13
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
598,273
2,611,212
5,332,652
45,540,572
13,131,052
527,122
4,767,718
10,968,751
126,704
410,666,989
Rp
230,000,000
Rp
Rp
Rp
Rp
412,716,989
41,271,699
453,988,688
223,988,688
100,000
4,167,854
Besi Beton 6 mm
Kayu Meranti - Us
Kayu Papan Bekis
Kayu Papan Kamp
Kayu Papan Kamp
Penyambung 3"
Penyambung 4"
Penyambung T "
Penyambung T 3"
Penyambung T 4"
Pipa Air PVC "
Pipa Air PVC 1"
Pipa Air PVC 3"
blonos
2-3 cm
Altex
Avian
Decolite
Decolite
KW.B
KW.B
Indoplek
Broco
495
74800
143000
16725
8920
8470
16940
37400
13420
13530
8250
10450
13200
12500
Jatiwangi
Jatiwangi
KW.B
KW.B
KW.C
Kaca Bening
24750
4180
1320
6050
8250
2200
60500
16500
4947255
4850250
4950250
4102750
4292750
2475000
5500000
5500000
Motif-Warna
KW.1
INA
PVC
PVC
PVC
PVC
MD
MD
MD
KW.C
Philips
Philips
PVC
93500
42927
6132
41812
30105
108900
3850
25300
30250
5500
24200
3850
7150
10450
82500
8250
72800
14850
9350
59400
99000
14300
14300
14300
14300
14300
137500
110000
3850
Penyambung 3"
Penyambung 4"
Penyambung T "
Penyambung T 3"
PVC
PVC
PVC
PVC
Penyambung T 4"
Pipa Air PVC "
Pipa Air PVC 1"
Pipa Air PVC 3"
PVC
WAVIN
WAVIN
WAVIN
38500
24200
52250
121000
WAVIN
199650
16335
8250
520000
13915
13500
Saklar Ganda
Sirtu
Sock Drat "
Stop Kontak
Tanah urug
Broco
Shimizu
Standar
Broco
PVC
Broco
25300
30250
4400
30250
15000
74250
5500
18000
79200
KETERANGAN
b.
3
1 1 M PEK. GALIAN TANAH BIASA
a. Pekerja
OH
b. Mandor
OH
Total
0.750
0.025
Total Harga
27,500
60,000
Rp.
UPAH (Rp)
g=(dxe)
20,625
1,500
22,125
BAHAN (Rp)
h=(dxe)
JUMLAH
i=(f+g+h)
20,625
1,500
0
Rp.
22,125
500
500
500
0
Rp.
500
OH
OH
0.500
0.050
Total Harga
27,500
60,000
Rp.
13,750
3,000
3,000
13,750
3,000
13,750
Rp.
16,750
4 1 M PEMADATAN TANAH
a. Pekerja
b. Mandor
Total
OH
OH
0.500
0.050
Total Harga
5
a.
b.
c.
3,000
3,000
13,750
3,000
13,750
Rp.
m3
org.
1.200
0.300
0.010
16,750
116,500
27,500
60,000
Rp.
139,800
600
600
139,800
600
139,800
Rp.
140,400
m3
m3
OH
OH
OH
OH
1.200
0.432
0.780
0.390
0.039
0.039
Total Harga
7
a.
b.
c.
d.
13,750
Total Harga
6
a.
b.
c.
d.
e.
f.
27,500
60,000
Rp.
84,800
116,500
27,500
40,500
52,000
60,000
Rp.
2,028
2,340
4,368
101,760
101,760
15,795
15,795
2,028
2,340
117,555
Rp.
121,923
84,800
1,300
110,000
27,500
101,760
101,760
41,250
41,250
NO.
KETERANGAN
a.
b.
e. Tukang Batu
f. Kepala Tukang Batu
g. Mandor
Total
Total Harga
8
a.
b.
c.
d.
e.
f.
g.
65,550
45,500
45,500
8,250
8,250
4,050
4,050
4,050
8,250
Rp.
12,300
Buah
kg
m3
OH
OH
OH
OH
70.000
8.320
0.049
0.300
0.100
0.010
0.015
650
1,300
110,000
27,500
40,500
52,000
60,000
Rp.
45,500
45,500
8,250
8,250
4,050
4,050
4,050
8,250
Rp.
12,300
kg
kg
OH
OH
OH
OH
6.240
0.024
0.200
0.150
0.015
0.010
Total Harga
11
a.
b.
c.
d.
e.
f.
41,250
Rp.
Total Harga
10
a.
b.
c.
d.
e.
f.
24,300
JUMLAH
i=(f+g+h)
24,300
Total Harga
9
a.
b.
c.
d.
e.
f.
g.
UPAH (Rp)
BAHAN (Rp)
g=(dxe)
h=(dxe)
24,300
1,300
110,000
27,500
40,500
52,000
60,000
Rp.
8,112
8,112
5,500
5,500
6,075
6,075
6,075
5,500
Rp.
11,575
kg
kg
OH
OH
OH
OH
4.416
0.027
0.200
0.150
0.015
0.010
1,300
110,000
27,500
40,500
52,000
60,000
Rp.
Rp.
5,741
5,741
5,500
5,500
6,075
6,075
6,075
5,500
11,575
NO.
a.
12
a.
b.
c.
d.
e.
KETERANGAN
b.
Semen PC
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Total
kg
OH
OH
OH
OH
3.250
0.150
0.100
0.010
0.008
1,300
27,500
40,500
52,000
60,000
Rp.
4,225
4,125
4,050
4,050
4,225
4,125
4,050
4,125
Rp.
8,175
45,225
1,300
110,000
9,000
27,500
40,500
52,000
60,000
Rp.
536,821
17,050
17,050
14,175
14,175
14,175
17,050
31,225
321,100
321,100
45,375
45,375
11,138
11,138
11,138
45,375
Rp.
1,300
271,900
#N/A
400
27,500
40,500
52,000
60,000
Rp.
Rp.
16 1 m Bekisting
a. Kayu Kelas 3
b. Paku 8 cm s/d 12 cm
536,821
Rp.
Total Harga
15
a.
b.
c.
d.
e.
f.
g.
h.
JUMLAH
i=(f+g+h)
Total Harga
14
a.
b.
c.
d.
e.
f.
g.
h.
BAHAN (Rp)
h=(dxe)
1 M3 Acian
Total Harga
13
a.
b.
c.
d.
e.
f.
g.
h.
UPAH (Rp)
g=(dxe)
m3
kg
0.040
0.400
#N/A
15,500
56,513
321,100
321,100
45,375
45,375
11,138
11,138
11,138
45,375
56,513
NO.
a.
c.
d.
e.
f.
KETERANGAN
b.
Minyak Bekisting
Kayu balok kelas 2
Plywood 9 mm
Dolken Kayu Galam,
(810) cm, panjang 4 m
g. Pekerja
h. Tukang Kayu
i Kepala Tukang Batu
j Mandor
Total
2.000
0.660
0.330
0.330
0.033
Total Harga
17
a.
b.
c.
d.
e.
f.
g.
h.
18
a.
b.
c.
d.
e.
f.
g.
h.
i
j
k
l
m
n
#N/A
27,500
40,500
52,000
60,000
Rp.
UPAH (Rp)
g=(dxe)
BAHAN (Rp)
h=(dxe)
Rp.
m3 210.000
kg
3.000
kg 336.000
m3
0.540
m3
0.810
m3
0.140
lmbr
2.800
btg
OH
OH
OH
OH
OH
16.000
6.350
0.275
1.400
0.333
0.318
JUMLAH
i=(f+g+h)
9,920
15,500
1,300
271,900
#N/A
#N/A
#N/A
27,500
40,500
40,500
52,000
60,000
Rp.
Rp.
NO.
a.
19
a.
b.
c.
d.
e.
f.
g.
h.
i
j
k
KETERANGAN
b.
Total Harga
BAHAN (Rp)
h=(dxe)
JUMLAH
i=(f+g+h)
0
1 m Kolom Struktur beton bertulang (200 kg besi + bekisting) 15 x 20 Beton Mutu (K175)
Kayu Kelas 3
Paku 8 cm s/d 12 cm
Minyak Bekisting
Besi Beton U.24 rata-rata
Kawat beton
Semen PC
Pasir Beton
Kerikil (maks. 30 mm)
Kayu balok kelas 2
Plywood 9 mm
Dolken Kayu Galam,
(8 - 10) cm, panjang 4 m
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang Batu
Total
Total Harga
l
m
n
o
p
q
UPAH (Rp)
g=(dxe)
l
m
n
o
p
q Mandor
20
a.
b.
c.
d.
e.
f.
g.
h.
i
j
k
16.000
6.350
0.275
1.650
1.400
0.333
0.318
#N/A
15,500
#N/A
9,920
15,500
1,300
271,900
#N/A
#N/A
#N/A
#N/A
27,500
40,500
40,500
40,500
52,000
60,000
Rp.
Rp.
1 m Kolom Praktis beton bertulang (300 kg besi + bekisting) 15 x 20 Beton Mutu (K175)
Kayu Kelas 3
m3
0.400
#N/A
Paku 8 cm s/d 12 cm
kg
4.000
15,500
Minyak Bekisting
Ltr
2.000
#N/A
Besi Beton U.24 rata-rata
kg 315.000
9,920
Kawat beton
kg
4.500
15,500
Semen PC
kg 336.000
1,300
Pasir Beton
m3
0.540
271,900
Kerikil (maks. 30 mm)
m3
0.810
#N/A
Kayu balok kelas 2
m3
0.150
#N/A
Plywood 9 mm
Lmbr
3.500
#N/A
Dolken Kayu Galam,
(8 - 10) cm, panjang 4 m
Btg
20.000
#N/A
Pekerja
OH
7.050
27,500
Tukang Batu
OH
0.275
40,500
Tukang Kayu
OH
1.650
40,500
Tukang Besi
OH
2.100
40,500
Kepala Tukang Batu
OH
0.403
52,000
Mandor
OH
0.353
60,000
Total
Rp.
0
Total Harga
2
Rp.
0
0
NO.
a.
a.
b.
c.
d.
e.
f.
g.
h.
i
j
k
l
m
n
KETERANGAN
b.
Kayu Kelas 3
Paku 8 cm s/d 12 cm
Minyak Bekisting
Besi Beton U.24 rata-rata
Kawat beton
Semen PC
Pasir Beton
Kerikil (maks. 30 mm)
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang Batu
Mandor
Total
Total Harga
22
a.
b.
c.
d.
e.
f.
g.
h.
i
j
k
l
m
n
o
p
q
BAHAN (Rp)
h=(dxe)
JUMLAH
i=(f+g+h)
Rp.
1 m Kolom Gunungan Utama beton bertulang (200 kg besi + bekisting) 15 x 20 Beton Mutu (K175)
Kayu Kelas 3
m3
0.400
#N/A
Paku 8 cm s/d 12 cm
kg
4.000
15,500
Minyak Bekisting
Ltr
2.000
#N/A
Besi Beton U.24 rata-rata
kg 210.000
9,920
Kawat beton
kg
4.500
15,500
Semen PC
kg 336.000
1,300
Pasir Beton
m3
0.540
271,900
Kerikil (maks. 30 mm)
m3
0.810
#N/A
Kayu balok kelas 2
m3
0.150
#N/A
Plywood 9 mm
Lmbr
3.500
#N/A
Dolken Kayu Galam,
(8 - 10) cm, panjang 4 m
Btg
20.000
#N/A
Pekerja
OH
7.050
27,500
Tukang Batu
OH
0.275
40,500
Tukang Kayu
OH
1.650
40,500
Tukang Besi
OH
2.100
40,500
Kepala Tukang Batu
OH
0.403
52,000
Mandor
OH
0.353
60,000
Total
Rp.
0
0
Total Harga
23
a.
b.
c.
d.
e.
f.
UPAH (Rp)
g=(dxe)
Rp.
m3
kg
Ltr
kg
kg
kg
0.003
0.020
2.000
3.600
0.050
5.500
#N/A
15,500
#N/A
9,920
15,500
1,300
NO.
a.
g.
h.
i
j
k
l
m
n
KETERANGAN
b.
Pasir Beton
Kerikil (maks. 30 mm)
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang Batu
Mandor
Total
Total Harga
24
a.
b.
c.
d.
e.
f.
g.
JUMLAH
i=(f+g+h)
Rp.
0
5,005,275
5,005,275
110,000
110,000
486,000
486,000
486,000
110,000
Rp.
596,000
kg
kg
kg
OH
OH
OH
OH
1.300
15.000
5.600
4.000
12.000
1.200
0.200
Total Harga
26
a.
b.
c.
d.
e.
f.
g.
BAHAN (Rp)
h=(dxe)
Total Harga
25
a.
b.
c.
d.
e.
f.
g.
UPAH (Rp)
g=(dxe)
4,550,250
16,725
15,500
27,500
40,500
52,000
60,000
Rp.
5,915,325
5,915,325
110,000
110,000
486,000
486,000
486,000
110,000
Rp.
6,511,325
kg
kg
kg
OH
OH
OH
OH
1.100
15.000
3.000
2.400
7.200
0.720
0.120
4,550,250
16,725
15,500
27,500
40,500
52,000
60,000
Rp.
5,005,275
5,005,275
66,000
66,000
291,600
291,600
291,600
66,000
Rp.
3
27 1 m Pasang rangka atap (reng 2/3 Kaso 5/7), kayu punak
a. Kayu Punak 5x7 cm
kg
0.014
4,292,750
b. Kayu Punak 2x3 cm
kg
0.036
4,182,750
5,362,875
60,099
60,099
NO.
a.
c.
d.
e.
f.
g.
KETERANGAN
b.
Paku 8 cm s/d 12 cm
Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor
Total
Total Harga
28
a.
b.
c.
d.
e.
f.
g.
4,050
4,050
JUMLAH
i=(f+g+h)
2,750
4,050
2,750
66,899
3,695,700
12,000
15,500
27,500
40,500
52,000
60,000
Rp.
4,434,840
4,434,840
165,000
165,000
729,000
729,000
729,000
165,000
Rp.
5,328,840
0.040
0.500
1.000
2.500
0.250
0.050
3,225,000
12,000
27,500
40,500
52,000
60,000
Rp.
129,000
129,000
27,500
27,500
101,250
101,250
101,250
27,500
Rp.
257,750
0.024
0.300
0.800
2.000
0.200
0.040
Total Harga
31
a.
b.
c.
d.
e.
f.
2,750
Rp.
Total Harga
30
a.
b.
c.
d.
e.
f.
BAHAN (Rp)
h=(dxe)
Total Harga
29
a.
b.
c.
d.
e.
f.
UPAH (Rp)
g=(dxe)
3,225,000
12,000
27,500
40,500
52,000
60,000
Rp.
77,400
77,400
22,000
22,000
81,000
81,000
81,000
22,000
Rp.
180,400
0.011
0.050
0.100
0.200
0.020
0.005
3,225,000
13,500
27,500
40,500
52,000
60,000
Rp.
35,475
35,475
2,750
2,750
8,100
8,100
8,100
2,750
NO.
a.
32
a.
b.
c.
d.
e.
f.
KETERANGAN
b.
Total Harga
kg
kg
OH
OH
OH
OH
0.011
0.050
0.100
0.200
0.020
0.005
35,475
35,475
2,750
2,750
8,100
8,100
8,100
2,750
Rp.
46,325
kg
kg
OH
OH
OH
OH
0.013
0.050
0.100
0.200
0.020
0.005
133,500
13,500
27,500
40,500
52,000
60,000
Rp.
1,736
1,736
2,750
2,750
8,100
8,100
8,100
2,750
Rp.
12,586
m2
OH
OH
OH
OH
1.200
0.100
0.200
0.020
0.005
65,500
27,500
40,500
52,000
60,000
Rp.
78,600
2,750
8,100
8,100
78,600
2,750
8,100
2,750
Rp.
89,450
36
a.
b.
c.
d.
e.
3,225,000
13,500
27,500
40,500
52,000
60,000
Rp.
Total Harga
35
a.
b.
c.
d.
e.
JUMLAH
i=(f+g+h)
46,325
Total Harga
34
a.
b.
c.
d.
e.
BAHAN (Rp)
h=(dxe)
Total Harga
33
a.
b.
c.
d.
e.
f.
UPAH (Rp)
g=(dxe)
4,150
27,500
40,500
52,000
60,000
Rp.
3,528
2,200
810
810
3,528
2,200
810
2,200
Rp.
6,538
7,750
27,500
40,500
52,000
60,000
Rp.
Rp.
4,185
2,200
810
810
4,185
2,200
810
2,200
7,195
NO.
a.
37
a.
b.
c.
d.
e.
f.
KETERANGAN
b.
kg
kg
OH
OH
OH
OH
0.016
0.250
0.200
0.300
0.030
0.010
4,292,750
15,500
27,500
40,500
52,000
60,000
Rp.
69,972
69,972
5,500
5,500
12,150
12,150
12,150
5,500
Rp.
87,622
m2
kg
OH
OH
OH
OH
1.100
0.010
0.030
0.070
0.007
0.002
15,000
13,500
27,500
40,500
52,000
60,000
Rp.
16,500
16,500
825
825
2,835
2,835
2,835
825
Rp.
20,160
1.050
0.010
0.050
0.050
0.005
0.003
Total Harga
40
a.
b.
c.
d.
JUMLAH
i=(f+g+h)
Total Harga
39
a.
b.
c.
d.
e.
f.
BAHAN (Rp)
h=(dxe)
Total Harga
38
a.
b.
c.
d.
e.
f.
UPAH (Rp)
g=(dxe)
12,000
13,500
27,500
40,500
52,000
60,000
Rp.
12,600
12,600
1,375
1,375
2,025
2,025
2,025
1,375
Rp.
buah
OH
OH
OH
1.000
0.060
0.067
0.003
Total Harga
75,500
40,500
52,000
60,000
Rp.
16,000
75,500
2,430
2,430
75,500
2,430
Rp.
77,930
Engsel
Tukang Kayu
Kepala Tukang Kayu
Mandor
Total
buah
OH
OH
OH
1.000
0.060
0.067
0.003
Total Harga
42 1 buah Engsel Jendela
a. Engsel
9,500
40,500
52,000
60,000
Rp.
9,500
2,430
2,430
Rp.
buah
1.000
9,500
9,500
2,430
11,930
9,500
9,500
NO.
KETERANGAN
a.
b.
b. Tukang Kayu
OH
0.067
52,000
d. Mandor
OH
0.003
60,000
Rp.
Total
Total Harga
43
a.
b.
c.
d.
buah
OH
OH
OH
1.000
0.060
0.067
0.003
1.000
0.060
0.067
0.003
buah
OH
OH
1.000
0.060
0.003
2,430
2,430
7,000
40,500
60,000
Rp.
buah
OH
OH
1.000
0.060
0.003
7,000
40,500
60,000
Rp.
6,230
8,250
2,430
2,430
1.000
0.060
0.003
11,000
40,500
60,000
Rp.
8,250
2,430
0
10,680
3,500
22
2,430
2,430
3,500
22
2,430
0
0
5,952
7,000
2,430
2,430
7,000
2,430
0
9,430
7,000
2,430
2,430
7,000
2,430
Rp.
buah
OH
OH
3,800
2,430
Rp.
Total Harga
48
a.
b.
c.
3,800
Rp.
Total Harga
47
a.
b.
c.
8,250
40,500
52,000
60,000
Rp.
11,930
Rp.
Total Harga
46
a.
b.
c.
3,800
40,500
52,000
60,000
Rp.
JUMLAH
i=(f+g+h)
2,430
Rp.
Total Harga
45
a.
b.
c.
d.
2,430
Rp.
Total Harga
44
a.
b.
c.
d.
UPAH (Rp)
BAHAN (Rp)
g=(dxe)
h=(dxe)
2,430
9,430
11,000
2,430
2,430
11,000
2,430
NO.
a.
49
a.
b.
c.
KETERANGAN
b.
Total Harga
1.000
0.060
0.003
Total Harga
50
a.
b.
c.
buah
OH
OH
1.000
0.060
0.003
0.175
0.160
0.010
0.500
0.500
0.104
0.182
0.019
0.007
2,430
2,430
5,500
40,500
60,000
Rp.
15,530
9,250
15,915
1,000
5,500
27,500
40,500
52,000
60,000
Rp.
0.200
0.160
0.010
1.000
0.500
0.130
0.195
0.019
0.007
15,530
9,250
15,915
1,000
5,500
27,500
40,500
52,000
60,000
Rp.
0.167
0.083
0.200
0.400
0.150
0.050
17,940
11,000
40,400
5,500
15,850
10,150
22,800
2,430
25,230
5,500
2,430
2,430
5,500
2,430
0
7,930
2,718
988
988
2,718
988
0
3,706
3,106
988
988
3,106
988
0
Rp.
kg
kg
kg
m
Ltr
buah
JUMLAH
i=(f+g+h)
13,430
Rp.
Total Harga
53
a.
b.
c.
d.
e.
f.
22,800
Rp.
Total Harga
52
a.
b.
c.
d.
e.
f.
g
h
i
BAHAN (Rp)
h=(dxe)
Rp.
Total Harga
51
a.
b.
c.
d.
e.
f.
g
h
i
22,800
40,500
60,000
Rp.
UPAH (Rp)
g=(dxe)
4,094
2,996
2,996
NO.
a.
g
h
i
j
KETERANGAN
b.
Pekerja
Tukang Cat
Kepala Tukang Cat
Mandor
Total
Total Harga
UPAH (Rp)
g=(dxe)
BAHAN (Rp)
h=(dxe)
1,560
1,560
JUMLAH
i=(f+g+h)
1,560
0
4,556
Amplas
Tiner B
Kwas 3"
Pekerja
Tukang kayu