Professional Documents
Culture Documents
PROYECTO
UBICACIN
CONSULTOR
04
04.04
04.02.01
04.02.02
04.02.03
04.02.04
04.02.05
04.02.06
OBRA DE ARTE
01
DESCRIPCION
MURO DE CONTENCION
TOTAL
: OCTUBRE 2013
MOV. DE TIERRAS
CANTIDAD
ALCANT.
EXCAVACIN
(m3)
54.00
20.40
33.60
82.20
114.72
48.60
m3
m3
m3
m2
m2
m3
MATERIAL EXCEDENTE
RELLENO
MATERIAL
PROPIO(m3)
DESMONT. ALC.
(m)
ELIMINACION
MATERIAL
EXCEDENTE
(M3)
ENCOFRADO Y
DESENCOFRAD
O (m2)
ENCOFRADO Y
CONCRETO
CONCRETO
DESENCOFRAD
f'c=175 kg/cm2 + f'c=175 kg/cm2
O CARAVISTA
30% PM. (m3)
(m3)
(m2)
30 m
54.00
20.40
33.60
82.20
114.72
48.60
30 m
54.00
20.40
33.60
82.20
114.72
48.60
CONCRETO
f'c=210 kg/cm2
(m3)
PARTIDA
04.02.01
#
VEC
.
DESCRIPCION
EXCAVACION PARA ESTRUCTURAS
04.02.04
30.00
1.80
1.00
54.00
30.00
area=
0.68
20.40
1
Excavacion
54.00
54.00
Relleno
-1
20.40
-20.40
ENCOFRADO Y DESENCOFRADO
1
Zapata
04.02.05
Perimetro=
62.40
0.50
31.20
1.70
51.00
1
Pantalla principal
30.00
Pantalla posterior
30.00
Tapas laterales 11
04.02.07
PARCIAL
ALTO
1
Pantalla posterior
04.02.03
VOL
ANCHO
1
Zapata
04.02.02
DIMENSIONES
LONG
1.75
52.50
area=
1.02
11.22
1
Zapata
30.00
1.20
0.50
18.00
Muro
30.00
area=
1.02
30.60
SUBTOTAL
TOTAL
UND
54.00
54.00
m3
20.40
20.40
m3
33.60
33.60
m3
82.20
82.20
m2
114.72
114.72
m2
48.60
48.60
m3