Professional Documents
Culture Documents
No
URAIAN PEKERJAAN
1
A TENAGA
1 Tukang Kayu
2 Pekerja
3 Kepala Tukang
4 Mandor
Jumlah
BAHAN
1 Kayu Kelas II uk. 5/7
2 Paku
3 Papan Bekisting
Jumlah
C Jumlah A + B
D Harga Satuan
( A-02 / m' )
SATUAN
3
HARGA
SATUAN
(Rp)
4
KUANTITAS
5
BIAYA
SATUAN
(Rp)
6
OH
OH
OH
OH
62,218.18
56,601.87
73,099.78
78,365.06
0.100
0.100
0.010
0.005
6,221.82
5,660.19
731.00
391.83
13,004.83
m3
Kg
m3
2,003,010.11
16,395.36
1,220,911.44
0.012
0.020
0.007
24,036.12
327.91
8,546.38
32,910.41
45,915.24
45,915.24
No
( B-01 / m3 )
URAIAN PEKERJAAN
SATUAN
1
A TENAGA
1 Pekerja
2 Mandor
OH
OH
HARGA
SATUAN
(Rp)
4
56,601.87
78,365.06
KUANTITAS
5
0.400
0.040
Jumlah
B
BAHAN
C
D
E
Jumlah
Jumlah A + B
Harga Satuan
Galian sedalam > 1 meter
Acuan : SNI.2835.b - 6.1
25,775.35
1.32
BIAYA
SATUAN
(Rp)
6
22,640.75
3,134.60
25,775.35
0.00
25,775.35
25,775.35
33,894.58
No
( B-02 / m3 )
URAIAN PEKERJAAN
SATUAN
1
A TENAGA
1 Pekerja
2 Mandor
OH
OH
HARGA
SATUAN
(Rp)
4
56,601.87
78,365.06
KUANTITAS
5
0.625
0.0625
Jumlah
B
BAHAN
C
D
E
Jumlah
Jumlah A + B
Harga Satuan
Galian sedalam > 1 meter
40,273.98
1.32
BIAYA
SATUAN
(Rp)
6
35,376.17
4,897.82
40,273.98
0.00
40,273.98
40,273.98
52,960.29
No
URAIAN PEKERJAAN
1
A TENAGA
1 Pekerja
2 Kepala Tukang
( B-05 / m3 )
SATUAN
3
OH
OH
HARGA
SATUAN
(Rp)
4
56,601.87
78,365.06
KUANTITAS
5
0.192
0.0192
Jumlah
B
BIAYA
SATUAN
(Rp)
6
10,867.56
1,504.61
12,372.17
BAHAN
Jumlah
C
D
0.00
12,372.17
12,372.17
Jumlah A + B
Harga Satuan
Acuan : SNI.2835.b - 6.9
( B-06 / m3 )
No
URAIAN PEKERJAAN
SATUAN
HARGA SATUAN
(Rp)
KUANTITAS
BIAYA SATUAN
(Rp)
TENAGA
1 Pekerja
OH
56,601.87
0.250
2 Mandor
OH
78,365.06
0.010
Jumlah
B
14,150.47
783.65
14,934.12
BAHAN
1 Tanah Urug / Tanah Datang
Jumlah
m3
64,927.50
1.200
77,913.00
77,913.00
Jumlah A + B
92,847.12
Harga Satuan
92,847.12
No
URAIAN PEKERJAAN
1
A TENAGA
1 Pekerja
2 Kepala Tukang
SATUAN
3
HARGA
SATUAN
(Rp)
4
( B-10 / m3 )
KUANTITAS
5
OH
OH
56,601.87
78,365.06
0.300
0.010
16,980.56
783.65
17,764.21
m3
96,886.57
1.200
116,263.88
116,263.88
134,028.09
134,028.09
Jumlah
B
BAHAN
1 Pasir Urug
Jumlah
C
D
Jumlah A + B
Harga Satuan
Acuan : SNI.2835.b - 6.11
BIAYA
SATUAN
(Rp)
6
No
URAIAN PEKERJAAN
1
A TENAGA
1 Tukang Kayu
2 Pekerja
3 Kepala Tukang
4 Mandor
SATUAN
3
( C-06 / m2 )
HARGA
SATUAN
(Rp)
4
KUANTITAS
5
OH
OH
OH
OH
62,218.18
56,601.87
73,099.78
78,365.06
0.105
0.315
0.0105
0.015
6,532.91
17,829.59
767.55
1,175.48
26,305.52
Bh
Kg
m3
1,659.76
1,380.73
98,654.84
22.000
8.846
0.028
36,514.82
12,213.90
2,762.34
51,491.05
77,796.57
77,796.57
Jumlah
BAHAN
1 Batako
2 Semen Portland
3 Pasir Beton / Pasang
Jumlah
C Jumlah A + B
D Harga Satuan
BIAYA
SATUAN
(Rp)
6
Acuan : G.33.h
Pasangan Rooster/Terawang
No
URAIAN PEKERJAAN
1
A TENAGA
1 Tukang Kayu
2 Pekerja
3 Kepala Tukang
4 Mandor
( C-07 / m2 )
SATUAN
3
HARGA
SATUAN
(Rp)
4
KUANTITAS
5
OH
OH
OH
OH
62,218.18
56,601.87
73,099.78
78,365.06
0.105
0.315
0.0105
0.015
6,532.91
17,829.59
767.55
1,175.48
26,305.52
Bh
Kg
m3
2,214.36
1,380.73
98,654.84
36.000
12.800
0.035
79,716.92
17,673.29
3,452.92
100,843.13
127,148.65
127,148.65
Jumlah
BAHAN
1 Terawang / Rooster Batako
2 Semen Portland
3 Pasir Beton / Pasang
Jumlah
C Jumlah A + B
D Harga Satuan
BIAYA
SATUAN
(Rp)
6
No
URAIAN PEKERJAAN
1
A TENAGA
1 Tukang Batu
2 Pekerja
( C-08 / m2 )
SATUAN
3
HARGA
SATUAN
(Rp)
4
KUANTITAS
5
OH
OH
62,218.18
56,601.87
0.100
0.400
6,221.82
22,640.75
28,862.56
Bh
m3
2,428.03
96,886.57
36.000
0.120
87,408.90
11,626.39
99,035.29
127,897.85
127,897.85
Jumlah
B
BAHAN
1 Paving Block
2 Pasir Urug
Jumlah
C
D
BIAYA
SATUAN
(Rp)
6
Jumlah A + B
Harga Satuan
Acuan : G.60
No
URAIAN PEKERJAAN
1
A TENAGA
1 Tukang Batu
2 Pekerja
3 Kepala Tukang
4 Mandor
Jumlah
BAHAN
1 Semen Portland
2 Pasir Beton / Pasang
3 Batu Belah 10-15 cm
Jumlah
C Jumlah A + B
D Harga Satuan
SATUAN
3
( C-12 / m3 )
HARGA
SATUAN
(Rp)
4
KUANTITAS
5
BIAYA
SATUAN
(Rp)
6
OH
OH
OH
OH
62,218.18
56,601.87
73,099.78
78,365.06
0.600
1.500
0.060
0.075
37,330.91
84,902.80
4,385.99
5,877.38
132,497.07
Kg
m3
m3
1,380.73
98,654.84
257,578.29
163.000
0.520
1.000
225,058.29
51,300.52
257,578.29
533,937.10
666,434.17
666,434.17
No
URAIAN PEKERJAAN
1
A TENAGA
1 Tukang Semen
2 Pekerja
3 Kepala Tukang
4 Mandor
B
1
2
3
4
5
C
D
Jumlah
BAHAN
Semen Portland
Pasir Beton / Pasang
Besi Simpai Kawat
Papan Mal Kayu Kelas III
Paku
Jumlah
Jumlah A + B
Harga Satuan
SATUAN
3
HARGA
SATUAN
(Rp)
4
( D-01 / m2 )
KUANTITAS
5
BIAYA
SATUAN
(Rp)
6
OH
OH
OH
OH
62,218.18
56,601.87
73,099.78
78,365.06
0.120
0.360
0.012
0.018
7,466.18
20,376.67
877.20
1,410.57
30,130.62
Kg
m3
Kg
m3
Kg
1,380.73
98,654.84
13,175.64
1,220,911.44
16,395.36
13.055
0.039
0.500
0.020
0.200
18,025.37
3,827.81
6,587.82
24,418.23
3,279.07
56,138.30
86,268.92
86,268.92
Acuan : G.51.h
No
URAIAN PEKERJAAN
1
A TENAGA
1 Tukang Semen
2 Pekerja
3 Kepala Tukang
4 Mandor
Jumlah
BAHAN
1 Semen Portland
2 Pasir Beton / Pasang
Jumlah
C Jumlah A + B
D Harga Satuan
( D-04 / m2 )
SATUAN
3
HARGA
SATUAN
(Rp)
4
KUANTITAS
5
BIAYA
SATUAN
(Rp)
6
OH
OH
OH
OH
62,218.18
56,601.87
73,099.78
78,365.06
0.150
0.200
0.015
0.010
9,332.73
11,320.37
1,096.50
783.65
22,533.25
Kg
m3
1,380.73
98,654.84
5.400
0.013
7,455.92
1,282.51
8,738.43
31,271.68
31,271.68
No
URAIAN PEKERJAAN
1
A TENAGA
1 Tukang Semen
2 Pekerja
3 Kepala Tukang
4 Mandor
( D-07 / m2 )
SATUAN
Jumlah
BAHAN
1 Semen Portland
2 Pasir Beton / Pasang
Jumlah
C Jumlah A + B
D Harga Satuan
HARGA
SATUAN
(Rp)
4
KUANTITAS
5
BIAYA
SATUAN
(Rp)
6
OH
OH
OH
OH
62,218.18
56,601.87
73,099.78
78,365.06
0.150
0.200
0.015
0.010
9,332.73
11,320.37
1,096.50
783.65
22,533.25
Kg
m3
1,380.73
98,654.84
6.480
0.019
8,947.10
1,874.44
10,821.54
33,354.79
33,354.79
No
URAIAN PEKERJAAN
1
A TENAGA
1 Tukang Kayu
2 Pekerja
3 Kepala Tukang
4 Mandor
Jumlah
BAHAN
1 Kayu Belian (Tidak Ketam)
2 Baut
Jumlah
C Jumlah A + B
D Harga Satuan
( E-01 / m3 )
SATUAN
3
HARGA
SATUAN
(Rp)
4
KUANTITAS
5
BIAYA
SATUAN
(Rp)
6
OH
OH
OH
OH
62,218.18
56,601.87
73,099.78
78,365.06
5.000
5.000
0.300
0.250
311,090.88
283,009.33
21,929.93
19,591.27
635,621.41
m3
Bh
6,719,654.63
9,108.61
1.100
41.000
7,391,620.10
373,453.02
7,765,073.12
8,400,694.53
8,400,694.53
Acuan : F.1.b
No
URAIAN PEKERJAAN
1
A TENAGA
1 Tukang Kayu
2 Pekerja
3 Kepala Tukang
4 Mandor
Jumlah
BAHAN
1 Kayu Belian (Tidak Ketam)
2 Baut
Jumlah
C Jumlah A + B
D Harga Satuan
(E-02 / m3 )
SATUAN
3
HARGA
SATUAN
(Rp)
4
KUANTITAS
5
BIAYA
SATUAN
(Rp)
6
OH
OH
OH
OH
62,218.18
56,601.87
73,099.78
78,365.06
8.000
8.000
0.800
0.400
497,745.41
452,814.93
58,479.82
31,346.03
1,040,386.19
m3
Bh
6,719,654.63
9,108.61
1.100
3.000
7,391,620.10
27,325.83
7,418,945.93
8,459,332.11
8,459,332.11
Acuan : F.3
No
URAIAN PEKERJAAN
1
A TENAGA
1 Tukang Kayu
2 Pekerja
3 Kepala Tukang
4 Mandor
Jumlah
BAHAN
1 Kayu Belian (Tidak Ketam)
2 Paku
Jumlah
C Jumlah A + B
D Harga Satuan
SATUAN
3
( E-03 / m3 )
HARGA
SATUAN
(Rp)
4
KUANTITAS
5
BIAYA
SATUAN
(Rp)
6
OH
OH
OH
OH
62,218.18
56,601.87
73,099.78
78,365.06
5.000
5.000
0.300
0.250
311,090.88
283,009.33
21,929.93
19,591.27
635,621.41
m3
Kg
6,719,654.63
16,395.36
1.100
3.000
7,391,620.10
49,186.09
7,440,806.19
8,076,427.60
8,076,427.60
Acuan : F.1
No
URAIAN PEKERJAAN
1
A TENAGA
1 Tukang Kayu
2 Pekerja
3 Kepala Tukang
4 Mandor
B
Jumlah
BAHAN
1 Kayu Kelas I
2 Paku
SATUAN
3
( E-04 / m3 )
HARGA
SATUAN
(Rp)
4
KUANTITAS
5
OH
OH
OH
OH
62,218.18
56,601.87
73,099.78
78,365.06
5.000
5.000
0.300
0.250
311,090.88
283,009.33
21,929.93
19,591.27
635,621.41
m3
Kg
3,126,079.84
16,395.36
1.100
3.000
3,438,687.83
49,186.09
3,487,873.92
4,123,495.33
4,123,495.33
Jumlah
C
D
BIAYA
SATUAN
(Rp)
6
Jumlah A + B
Harga Satuan
Acuan : F.1.a
No
URAIAN PEKERJAAN
1
A TENAGA
1 Tukang Kayu
2 Pekerja
3 Kepala Tukang
4 Mandor
Jumlah
BAHAN
1 Papan Kayu Belian (Ketam), t = 2 cm
2 Paku
Jumlah
C Jumlah A + B
D Harga Satuan
( E-05 / m2 )
SATUAN
3
HARGA
SATUAN
(Rp)
4
KUANTITAS
5
BIAYA
SATUAN
(Rp)
6
OH
OH
OH
OH
62,218.18
56,601.87
73,099.78
78,365.06
0.800
0.280
0.080
0.014
49,774.54
15,848.52
5,847.98
1,097.11
72,568.16
m3
Kg
6,598,868.26
16,395.36
0.020
0.100
131,977.37
1,639.54
133,616.90
206,185.06
206,185.06
Acuan : F.37
No
URAIAN PEKERJAAN
1
A TENAGA
1 Tukang Kayu
2 Pekerja
3 Kepala Tukang
4 Mandor
Jumlah
BAHAN
1 Papan Kayu Kelas I (Ketam, t = 2 cm
2 Paku
Jumlah
C Jumlah A + B
D Harga Satuan
( E-06 / m2 )
SATUAN
3
HARGA
SATUAN
(Rp)
4
KUANTITAS
5
BIAYA
SATUAN
(Rp)
6
OH
OH
OH
OH
62,218.18
56,601.87
73,099.78
78,365.06
0.800
0.280
0.080
0.014
49,774.54
15,848.52
5,847.98
1,097.11
72,568.16
m3
Kg
3,167,760.83
16,395.36
0.020
0.100
63,355.22
1,639.54
64,994.75
137,562.91
137,562.91
Acuan : F.37.a
No
URAIAN PEKERJAAN
1
A TENAGA
1 Tukang Kayu
2 Pekerja
3 Kepala Tukang
4 Mandor
Jumlah
BAHAN
1 Kayu Belian (Ketam)
2 Paku
Jumlah
C Jumlah A + B
D Harga Satuan
( E-07 / m3 )
SATUAN
3
HARGA
SATUAN
(Rp)
4
KUANTITAS
5
BIAYA
SATUAN
(Rp)
6
OH
OH
OH
OH
62,218.18
56,601.87
73,099.78
78,365.06
36.000
12.000
3.600
0.600
2,239,854.33
679,222.40
263,159.19
47,019.04
3,229,254.96
m3
Kg
6,862,823.04
16,395.36
1.100
0.050
7,549,105.35
819.77
7,549,925.12
##########
##########
Acuan : F.27
No
URAIAN PEKERJAAN
1
A TENAGA
1 Tukang Kayu
2 Pekerja
3 Kepala Tukang
4 Mandor
Jumlah
BAHAN
1 Kayu Kelas I (Ketam)
2 Paku
Jumlah
C Jumlah A + B
D Harga Satuan
( E-08 / m3 )
SATUAN
3
HARGA
SATUAN
(Rp)
4
KUANTITAS
5
BIAYA
SATUAN
(Rp)
6
OH
OH
OH
OH
62,218.18
56,601.87
73,099.78
78,365.06
36.000
12.000
3.600
0.600
2,239,854.33
679,222.40
263,159.19
47,019.04
3,229,254.96
m3
Kg
3,438,687.56
16,395.36
1.100
0.050
3,782,556.32
819.77
3,783,376.08
7,012,631.04
7,012,631.04
Acuan : F.27.a
No
URAIAN PEKERJAAN
1
A TENAGA
1 Tukang Kayu
2 Pekerja
3 Kepala Tukang
4 Mandor
Jumlah
BAHAN
1 Papan Kayu Belian (Ketam, t = 2 cm
2 Paku
Jumlah
C Jumlah A + B
D Harga Satuan
( E-09 / m2 )
SATUAN
3
HARGA
SATUAN
(Rp)
4
KUANTITAS
5
BIAYA
SATUAN
(Rp)
6
OH
OH
OH
OH
62,218.18
56,601.87
73,099.78
78,365.06
0.450
0.150
0.045
0.075
27,998.18
8,490.28
3,289.49
5,877.38
45,655.33
m3
Kg
6,862,823.04
16,395.36
0.022
0.100
150,982.11
1,639.54
152,621.64
198,276.97
198,276.97
No
URAIAN PEKERJAAN
1
A TENAGA
1 Tukang Kayu
2 Pekerja
3 Kepala Tukang
4 Mandor
Jumlah
BAHAN
1 Papan Kayu Kelas I (Ketam, t = 2 cm
2 Paku
Jumlah
C Jumlah A + B
D Harga Satuan
( E-10 / m3 )
SATUAN
3
HARGA
SATUAN
(Rp)
4
KUANTITAS
5
BIAYA
SATUAN
(Rp)
6
OH
OH
OH
OH
62,218.18
56,601.87
73,099.78
78,365.06
0.450
0.150
0.045
0.075
27,998.18
8,490.28
3,289.49
5,877.38
45,655.33
m3
Kg
3,438,687.56
16,395.36
0.022
0.100
75,651.13
1,639.54
77,290.66
122,945.99
122,945.99
No
URAIAN PEKERJAAN
1
A TENAGA
1 Tukang Kayu
2 Pekerja
3 Kepala Tukang
4 Mandor
Jumlah
BAHAN
1 Tripleks tebal 3 mm
2 Paku Tripleks
Jumlah
C Jumlah A + B
D Harga Satuan
SATUAN
3
HARGA
SATUAN
(Rp)
4
KUANTITAS
5
BIAYA
SATUAN
(Rp)
6
OH
OH
OH
OH
62,218.18
56,601.87
73,099.78
78,365.06
0.075
0.025
0.0075
0.0013
4,666.36
1,415.05
548.25
101.87
6,731.53
Lbr
Kg
74,391.00
28,789.34
0.500
0.050
37,195.50
1,439.47
38,634.97
45,366.50
45,366.50
No
URAIAN PEKERJAAN
1
A TENAGA
1 Tukang Kayu
2 Pekerja
3 Kepala Tukang
4 Mandor
Jumlah
BAHAN
1 Tripleks tebal 3 mm
2 Paku Tripleks
Jumlah
C Jumlah A + B
D Harga Satuan
SATUAN
3
HARGA
SATUAN
(Rp)
4
KUANTITAS
5
BIAYA
SATUAN
(Rp)
6
OH
OH
OH
OH
62,218.18
56,601.87
73,099.78
78,365.06
0.075
0.025
0.0075
0.0013
4,666.36
1,415.05
548.25
101.87
6,731.53
Lbr
Kg
74,391.00
28,789.34
1.000
0.100
74,391.00
2,878.93
77,269.93
84,001.47
84,001.47
No
URAIAN PEKERJAAN
1
A TENAGA
1 Tukang Kayu
2 Pekerja
3 Kepala Tukang
4 Mandor
Jumlah
BAHAN
1 Kayu Kelas I (Ketam)
Jumlah
C Jumlah A + B
D Harga Satuan
SATUAN
3
( E-16 / m3 )
HARGA
SATUAN
(Rp)
4
KUANTITAS
5
BIAYA
SATUAN
(Rp)
6
OH
OH
OH
OH
62,218.18
56,601.87
73,099.78
78,365.06
18.000
6.000
2.000
0.300
1,119,927.17
339,611.20
146,199.55
23,509.52
1,629,247.44
m3
3,438,687.56
1.200
4,126,425.07
4,126,425.07
5,755,672.51
5,755,672.51
No
URAIAN PEKERJAAN
1
A TENAGA
1 Tukang Kayu
2 Pekerja
3 Kepala Tukang
4 Mandor
Jumlah
BAHAN
1 Papan Kayu Kelas I (Ketam, t = 2 cm
Jumlah
C Jumlah A + B
D Harga Satuan
( E-20 / m2 )
SATUAN
3
HARGA
SATUAN
(Rp)
4
KUANTITAS
5
BIAYA
SATUAN
(Rp)
6
OH
OH
OH
OH
62,218.18
56,601.87
73,099.78
78,365.06
2.500
1.000
0.250
0.050
155,545.44
56,601.87
18,274.94
3,918.25
234,340.50
m3
3,438,687.56
0.040
137,547.50
137,547.50
371,888.01
371,888.01
No
URAIAN PEKERJAAN
1
A TENAGA
1 Tukang Kayu
2 Pekerja
3 Kepala Tukang
4 Mandor
B
1
2
3
4
C
D
Jumlah
BAHAN
Papan Kayu Kelas I (Ketam, t = 2 cm
List Pintu / Jendela
Kaca Polos 5 mm
Paku
Jumlah
Jumlah A + B
Harga Satuan
Acuan : SNI.3434 - 6.10
SATUAN
3
HARGA
SATUAN
(Rp)
4
( E-22 / m2 )
KUANTITAS
5
BIAYA
SATUAN
(Rp)
6
OH
OH
OH
OH
62,218.18
56,601.87
73,099.78
78,365.06
2.000
0.800
0.200
0.040
124,436.35
45,281.49
14,619.96
3,134.60
187,472.40
m3
m'
m2
Kg
3,438,687.56
3,959.19
215,918.07
16,395.36
0.035
8.000
0.600
0.030
120,354.06
31,673.50
129,550.84
491.86
282,070.27
469,542.67
469,542.67
No
URAIAN PEKERJAAN
1
A TENAGA
1 Tukang Kayu
2 Pekerja
3 Kepala Tukang
4 Mandor
Jumlah
BAHAN
1 Reng Lat Kayu Kelas I
2 Paku
Jumlah
C Jumlah A + B
D Harga Satuan
SATUAN
3
( E-30 / m2 )
HARGA
SATUAN
(Rp)
4
KUANTITAS
5
BIAYA
SATUAN
(Rp)
6
OH
OH
OH
OH
62,218.18
56,601.87
73,099.78
78,365.06
2.000
0.500
0.200
0.025
124,436.35
28,300.93
14,619.96
1,959.13
169,316.37
m3
Kg
2,262,686.21
16,395.36
0.060
0.150
135,761.17
2,459.30
138,220.48
307,536.84
307,536.84
No
URAIAN PEKERJAAN
1
A TENAGA
1 Tukang Kayu
2 Pekerja
3 Kepala Tukang
4 Mandor
B
1
2
3
4
Jumlah
BAHAN
Kayu Kelas I
Besi Strip
Baut
Paku
Jumlah
C
D
Jumlah A + B
Harga Satuan
Acuan : F.23
SATUAN
3
HARGA
SATUAN
(Rp)
4
KUANTITAS
5
BIAYA
SATUAN
(Rp)
6
OH
OH
OH
OH
62,218.18
56,601.87
73,099.78
78,365.06
18.000
6.000
1.800
0.300
1,119,927.17
339,611.20
131,579.60
23,509.52
1,614,627.48
m3
Btg
Bh
Kg
3,126,079.84
25,313.00
9,108.61
16,395.36
1.100
15.000
41.000
0.800
3,438,687.83
379,695.00
373,453.02
13,116.29
4,204,952.14
5,819,579.62
5,819,579.62
No
URAIAN PEKERJAAN
1
A TENAGA
1 Tukang Kayu
2 Pekerja
3 Kepala Tukang
4 Mandor
B
Jumlah
BAHAN
1 Kayu Kelas II
2 Paku
( E-34 / m2 )
SATUAN
3
HARGA
SATUAN
(Rp)
4
KUANTITAS
5
OH
OH
OH
OH
62,218.18
56,601.87
73,099.78
78,365.06
0.100
0.150
0.010
0.0075
6,221.82
8,490.28
731.00
587.74
16,030.83
m3
Kg
2,003,010.11
16,395.36
0.011
0.100
22,233.41
1,639.54
23,872.95
39,903.78
39,903.78
Jumlah
C
D
BIAYA
SATUAN
(Rp)
6
Jumlah A + B
Harga Satuan
Acuan : F.19
No
URAIAN PEKERJAAN
1
A TENAGA
1 Tukang Kayu
2 Pekerja
3 Kepala Tukang
4 Mandor
B
Jumlah
BAHAN
1 Kayu Kelas I
2 Paku
Jumlah
C
D
Jumlah A + B
Harga Satuan
Acuan : F.22.a
( E-35 / m3 )
SATUAN
3
HARGA
SATUAN
(Rp)
4
KUANTITAS
5
BIAYA
SATUAN
(Rp)
6
OH
OH
OH
OH
62,218.18
56,601.87
73,099.78
78,365.06
24.000
8.000
2.400
0.400
1,493,236.22
452,814.93
175,439.46
31,346.03
2,152,836.64
m3
Kg
3,126,079.84
16,395.36
1.100
2.000
3,438,687.83
32,790.73
3,471,478.56
5,624,315.20
5,624,315.20
No
URAIAN PEKERJAAN
1
A TENAGA
1 Tukang Kayu
2 Pekerja
3 Kepala Tukang
4 Mandor
Jumlah
BAHAN
1 Kayu Kelas I (Ketam)
2 Paku
Jumlah
C Jumlah A + B
D Harga Satuan
SATUAN
3
( E-41 / m' )
HARGA
SATUAN
(Rp)
4
KUANTITAS
5
BIAYA
SATUAN
(Rp)
6
OH
OH
OH
OH
62,218.18
56,601.87
73,099.78
78,365.06
0.220
0.110
0.022
0.005
13,688.00
6,226.21
1,608.20
391.83
21,914.22
m3
Kg
3,438,687.56
16,395.36
0.011
0.050
37,825.56
819.77
38,645.33
60,559.56
60,559.56
No
URAIAN PEKERJAAN
1
A TENAGA
1 Tukang Kayu
2 Pekerja
3 Kepala Tukang
4 Mandor
Jumlah
BAHAN
1 Kayu Cerucuk Dia.10/15, P = 2.5 m
Jumlah
C Jumlah A + B
D Harga Satuan
SATUAN
3
HARGA
SATUAN
(Rp)
4
( E-48 / batang )
KUANTITAS
5
BIAYA
SATUAN
(Rp)
6
OH
OH
OH
OH
62,218.18
56,601.87
73,099.78
78,365.06
0.900
0.300
0.090
0.015
55,996.36
16,980.56
6,578.98
1,175.48
80,731.37
Btg
16,791.22
1.000
16,791.22
16,791.22
97,522.59
97,522.59
Acuan : F.60
No
URAIAN PEKERJAAN
1
A TENAGA
1 Tukang Semen
2 Pekerja
3 Kepala Tukang
4 Mandor
Jumlah
BAHAN
1 Semen Portland
2 Pasir Beton / Pasang
3 Kerikil Sungai - Royalti
Jumlah
C Jumlah A + B
D Harga Satuan
( F-01.a / m3 )
SATUAN
3
HARGA
SATUAN
(Rp)
4
KUANTITAS
5
BIAYA
SATUAN
(Rp)
6
OH
OH
OH
OH
62,218.18
56,601.87
73,099.78
78,365.06
0.250
1.650
0.025
0.080
15,554.54
93,393.08
1,827.49
6,269.21
117,044.32
Kg
m3
m3
1,380.73
98,654.84
242,179.59
218.000
0.520
0.870
300,998.21
51,300.52
210,696.24
562,994.96
680,039.29
680,039.29
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Beton - 6.1
No
URAIAN PEKERJAAN
1
A TENAGA
1 Tukang Besi
2 Pekerja
3 Kepala Tukang
4 Mandor
Jumlah
BAHAN
1 Besi Beton (Polos / Ulir)
2 Kawat Ikat Beton
Jumlah
C Jumlah A + B
D Harga Satuan
SATUAN
3
( F-04 / kg )
HARGA
SATUAN
(Rp)
4
KUANTITAS
5
BIAYA
SATUAN
(Rp)
6
OH
OH
OH
OH
62,218.18
56,601.87
73,099.78
78,365.06
0.007
0.007
0.0007
0.0003
435.53
396.21
51.17
23.51
906.42
Kg
Kg
15,602.99
22,728.32
1.050
0.015
16,383.14
340.92
16,724.07
17,630.49
17,630.49
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Beton - 6.25
No
URAIAN PEKERJAAN
1
A TENAGA
1 Tukang Kayu
2 Pekerja
3 Kepala Tukang
4 Mandor
Jumlah
BAHAN
1 Papan Kayu Bekisting
2 Paku
Jumlah
C Jumlah A + B
D Harga Satuan
( F-06 / m2 )
SATUAN
3
HARGA
SATUAN
(Rp)
4
KUANTITAS
5
BIAYA
SATUAN
(Rp)
6
OH
OH
OH
OH
62,218.18
56,601.87
73,099.78
78,365.06
0.260
0.300
0.026
0.005
16,176.73
16,980.56
1,900.59
391.83
35,449.71
m3
Kg
1,220,911.44
16,395.36
0.040
0.300
48,836.46
4,918.61
53,755.07
89,204.77
89,204.77
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Beton - 6.28
No
URAIAN PEKERJAAN
1
A TENAGA
1 Tukang Kayu
2 Pekerja
3 Kepala Tukang
4 Mandor
B
Jumlah
BAHAN
1 Genteng Mal
2 Paku
Jumlah
C
D
Jumlah A + B
Harga Satuan
Acuan : SNI.3436 - 6.32
( G-10 / m2 )
SATUAN
3
HARGA
SATUAN
(Rp)
4
KUANTITAS
5
BIAYA
SATUAN
(Rp)
6
OH
OH
OH
OH
62,218.18
56,601.87
73,099.78
78,365.06
0.100
0.200
0.010
0.001
6,221.82
11,320.37
731.00
78.37
18,351.55
Bh
Kg
75,294.23
16,395.36
1.620
0.200
121,976.65
3,279.07
125,255.72
143,607.28
143,607.28
No
URAIAN PEKERJAAN
1
A TENAGA
1 Tukang Kayu
2 Pekerja
3 Kepala Tukang
4 Mandor
Jumlah
BAHAN
1 Bumbungan / Nok Genteng Mal
2 Paku
Jumlah
C Jumlah A + B
D Harga Satuan
SATUAN
3
(G-11 / m' )
HARGA
SATUAN
(Rp)
4
KUANTITAS
5
BIAYA
SATUAN
(Rp)
6
OH
OH
OH
OH
62,218.18
56,601.87
73,099.78
78,365.06
0.150
0.250
0.015
0.130
9,332.73
14,150.47
1,096.50
10,187.46
34,767.15
m'
Kg
81,937.97
16,395.36
1.100
0.050
90,131.77
819.77
90,951.54
125,718.69
125,718.69
No
URAIAN PEKERJAAN
1
A TENAGA
1 Tukang Kayu
2 Pekerja
3 Kepala Tukang
4 Mandor
Jumlah
BAHAN
1 Seng Gelombang BJLS 0.20
2 Paku Payung
Jumlah
C Jumlah A + B
D Harga Satuan
( G-14 / m2 )
SATUAN
3
HARGA
SATUAN
(Rp)
4
KUANTITAS
5
BIAYA
SATUAN
(Rp)
6
OH
OH
OH
OH
62,218.18
56,601.87
73,099.78
78,365.06
0.060
0.120
0.006
0.006
3,733.09
6,792.22
438.60
470.19
11,434.10
Lbr
Kg
50,671.71
17,272.80
0.700
0.020
35,470.20
345.46
35,815.65
47,249.76
47,249.76
No
URAIAN PEKERJAAN
1
A TENAGA
1 Tukang Kayu
2 Pekerja
3 Kepala Tukang
4 Mandor
SATUAN
Jumlah
BAHAN
1 Papan Kayu Kelas I
2 Seng Datar BJLS 0.20
3 Paku
Jumlah
C Jumlah A + B
D Harga Satuan
( G-15 / m' )
HARGA
SATUAN
(Rp)
4
KUANTITAS
5
BIAYA
SATUAN
(Rp)
6
OH
OH
OH
OH
62,218.18
56,601.87
73,099.78
78,365.06
0.070
0.150
0.008
0.006
4,355.27
8,490.28
584.80
470.19
13,900.54
m3
Lbr
Kg
3,167,760.83
48,719.91
16,395.36
0.0088
0.400
0.110
27,876.30
19,487.96
1,803.49
49,167.75
63,068.29
63,068.29
No
URAIAN PEKERJAAN
1
A TENAGA
1 Tukang Kayu
2 Pekerja
3 Kepala Tukang
4 Mandor
Jumlah
BAHAN
1 Zincalume Gelombang Polos 0.30
2 Paku Payung
Jumlah
C Jumlah A + B
D Harga Satuan
( G-16 / m2 )
SATUAN
3
HARGA
SATUAN
(Rp)
4
KUANTITAS
5
BIAYA
SATUAN
(Rp)
6
OH
OH
OH
OH
62,218.18
56,601.87
73,099.78
78,365.06
0.060
0.120
0.006
0.006
3,733.09
6,792.22
438.60
470.19
11,434.10
m2
Kg
98,547.00
17,272.80
1.050
0.020
103,474.35
345.46
103,819.81
115,253.91
115,253.91
No
URAIAN PEKERJAAN
SATUAN
1
A TENAGA
2 Pekerja
4 Mandor
Jumlah
BAHAN
1 Kayu Kelas II
2 Tripleks T = 3 mm
3 Paku
Jumlah
C Jumlah A + B
D Harga Satuan
HARGA
SATUAN
(Rp)
4
( H-01 / m2 )
KUANTITAS
5
BIAYA
SATUAN
(Rp)
6
OH
OH
56,601.87
78,365.06
0.500
0.025
28,300.93
1,959.13
30,260.06
m3
Lbr
Kg
2,003,010.11
66,436.12
16,395.36
0.0110
0.364
0.020
22,033.11
24,182.75
327.91
46,543.77
76,803.83
76,803.83
Acuan : SUPL.VIII
No
URAIAN PEKERJAAN
1
A TENAGA
1 Tukang Kayu
2 Pekerja
3 Kepala Tukang
4 Mandor
Jumlah
BAHAN
1 Kayu Kelas II
2 Gypsum Board T = 9 mm
3 Paku Gypsum
Jumlah
C Jumlah A + B
D Harga Satuan
SATUAN
3
HARGA
SATUAN
(Rp)
4
( H-02 / m2 )
KUANTITAS
5
BIAYA
SATUAN
(Rp)
6
OH
OH
OH
OH
62,218.18
56,601.87
73,099.78
78,365.06
0.050
0.100
0.005
0.005
3,110.91
5,660.19
365.50
391.83
9,528.42
m3
Lbr
Kg
2,003,010.11
66,436.12
28,789.34
0.0230
0.364
0.110
46,069.23
24,182.75
3,166.83
73,418.81
82,947.23
82,947.23
No
URAIAN PEKERJAAN
1
A TENAGA
1 Tukang Kayu
2 Pekerja
3 Kepala Tukang
4 Mandor
Jumlah
BAHAN
1 Papan Reng Lat Kayu Kelas I
2 Paku
Jumlah
C Jumlah A + B
D Harga Satuan
SATUAN
3
( H-03 / m2 )
HARGA
SATUAN
(Rp)
4
KUANTITAS
5
BIAYA
SATUAN
(Rp)
6
OH
OH
OH
OH
62,218.18
56,601.87
73,099.78
78,365.06
0.600
0.200
0.060
0.010
37,330.91
11,320.37
4,385.99
783.65
53,820.92
m3
Kg
2,262,686.21
16,395.36
0.060
0.060
135,761.17
983.72
136,744.89
190,565.81
190,565.81
No
URAIAN PEKERJAAN
1
2
A TENAGA
1 Tukang Batu / Semen
2 Pekerja
3 Kepala Tukang
4 Mandor
Jumlah
B BAHAN
1 Keramik Uk.30 x 30 cm Polos
2 Semen Portland
3 Pasir Beton / Pasang
4 Semen Warna
Jumlah
C Jumlah A + B
D Harga Satuan
SATUAN
3
( L-02 / m2 )
HARGA
SATUAN
(Rp)
4
KUANTITAS
5
BIAYA
SATUAN
(Rp)
6
OH
OH
OH
OH
62,218.18
56,601.87
73,099.78
78,365.06
0.350
0.620
0.035
0.030
21,776.36
35,093.16
2,558.49
2,350.95
61,778.96
Ktk
Kg
m3
Kg
62,283.36
1,380.73
98,654.84
9,105.93
1.000
11.380
0.042
0.100
62,283.36
15,712.66
4,143.50
910.59
83,050.12
144,829.08
144,829.08
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Penutup Lantai & Dinding - 6.44
No
URAIAN PEKERJAAN
1
A TENAGA
1 Tukang Batu
2 Pekerja
3 Kepala Tukang
4 Mandor
B
1
2
3
4
C
D
Jumlah
BAHAN
Keramik Uk.30 x 30 cm Polos
Semen Portland
Pasir Beton / Pasang
Semen Warna
Jumlah
Jumlah A + B
Harga Satuan
SATUAN
3
( L-17 / m2 )
HARGA
SATUAN
(Rp)
4
KUANTITAS
5
BIAYA
SATUAN
(Rp)
6
OH
OH
OH
OH
62,218.18
56,601.87
73,099.78
78,365.06
0.100
0.600
0.045
0.030
6,221.82
33,961.12
3,289.49
2,350.95
45,823.38
Ktk
Kg
m3
Kg
62,283.36
1,380.73
98,654.84
9,105.93
1.000
9.300
0.018
0.100
62,283.36
12,840.75
1,775.79
910.59
77,810.49
123,633.87
123,633.87
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Penutup Lantai & Dinding - 6.68
No
URAIAN PEKERJAAN
1
A TENAGA
1 Tukang Cat
2 Pekerja
3 Kepala Tukang
4 Mandor
B
Jumlah
BAHAN
1 Cat Kilat
( M-02 / m2 )
SATUAN
3
KUANTITAS
5
BIAYA
SATUAN
(Rp)
6
OH
OH
OH
OH
62,218.18
56,601.87
73,099.78
78,365.06
0.075
0.070
0.0075
0.0025
4,666.36
3,962.13
548.25
195.91
9,372.65
Kg
43,183.35
0.170
7,341.17
7,341.17
16,713.82
16,713.82
Jumlah
C
D
HARGA
SATUAN
(Rp)
4
Jumlah A + B
Harga Satuan
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Pengecatan - 6.7
No
URAIAN PEKERJAAN
1
A TENAGA
1 Tukang Cat
2 Pekerja
3 Kepala Tukang
4 Mandor
B
1
2
3
4
C
D
Jumlah
BAHAN
Cat Meni
Plamur
Cat Dasar Kayu
Cat Penutup 1 Kali
Jumlah
Jumlah A + B
Harga Satuan
SATUAN
3
HARGA
SATUAN
(Rp)
4
( M-03 / m2 )
KUANTITAS
5
BIAYA
SATUAN
(Rp)
6
OH
OH
OH
OH
62,218.18
56,601.87
73,099.78
78,365.06
0.009
0.070
0.006
0.0025
559.96
3,962.13
438.60
195.91
5,156.61
Kg
Kg
Kg
Kg
25,190.51
33,218.06
23,603.08
146,500.00
0.200
0.150
0.170
0.130
5,038.10
4,982.71
4,012.52
19,045.00
33,078.33
38,234.94
38,234.94
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Pengecatan - 6.8
No
URAIAN PEKERJAAN
1
A TENAGA
1 Tukang Cat
2 Kepala Tukang
B
Jumlah
BAHAN
1 Vernis
( M-07 / m2 )
SATUAN
3
KUANTITAS
5
BIAYA
SATUAN
(Rp)
6
OH
OH
62,218.18
73,099.78
0.100
0.006
6,221.82
438.60
6,660.42
Ltr
46,505.55
0.350
16,276.94
16,276.94
22,937.36
22,937.36
Jumlah
C
D
HARGA
SATUAN
(Rp)
4
Jumlah A + B
Harga Satuan
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Pengecatan - 6.13
No
URAIAN PEKERJAAN
1
A TENAGA
1 Tukang Cat
2 Pekerja
3 Kepala Tukang
4 Mandor
B
Jumlah
BAHAN
1 Melamic
( M-08 / m2 )
SATUAN
3
HARGA
SATUAN
(Rp)
4
KUANTITAS
5
OH
OH
OH
OH
62,218.18
56,601.87
73,099.78
78,365.06
0.075
0.050
0.0075
0.0025
4,666.36
2,830.09
548.25
195.91
8,240.62
Ltr
43,183.35
0.399
17,230.15
17,230.15
25,470.77
25,470.77
Jumlah
C
D
BIAYA
SATUAN
(Rp)
6
Jumlah A + B
Harga Satuan
Acuan : K.15.a
No
URAIAN PEKERJAAN
1
A TENAGA
1 Tukang Cat
2 Pekerja
3 Kepala Tukang
4 Mandor
Jumlah
BAHAN
1 Plamur
2 Cat Dasar Tembok
3 Cat Penutup 1 Kali
Jumlah
C Jumlah A + B
D Harga Satuan
SATUAN
3
HARGA
SATUAN
(Rp)
4
( M-09 / m2 )
KUANTITAS
5
BIAYA
SATUAN
(Rp)
6
OH
OH
OH
OH
62,218.18
56,601.87
73,099.78
78,365.06
0.063
0.020
0.0063
0.0025
3,919.75
1,132.04
460.53
195.91
5,708.22
Kg
Kg
Ltr
33,218.06
23,603.08
146,500.00
0.100
0.100
0.130
3,321.81
2,360.31
19,045.00
24,727.11
30,435.34
30,435.34
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Pengecatan - 6.14
No
URAIAN PEKERJAAN
1
A TENAGA
1 Tukang Cat
2 Pekerja
3 Kepala Tukang
4 Mandor
B
Jumlah
BAHAN
1 Cat Tembok
( M-10 / m2 )
SATUAN
3
HARGA
SATUAN
(Rp)
4
KUANTITAS
5
OH
OH
OH
OH
62,218.18
56,601.87
73,099.78
78,365.06
0.042
0.028
0.0042
0.0025
2,613.16
1,584.85
307.02
195.91
4,700.95
Kg
26,574.32
0.090
2,391.69
2,391.69
7,092.64
7,092.64
Jumlah
C
D
BIAYA
SATUAN
(Rp)
6
Jumlah A + B
Harga Satuan
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Pengecatan - 6.15
No
URAIAN PEKERJAAN
1
A TENAGA
1 Tukang Cat
2 Pekerja
3 Kepala Tukang
4 Mandor
B
Jumlah
BAHAN
1 Meni Besi
Jumlah
C
D
Jumlah A + B
Harga Satuan
Acuan : K.23.e
( M-14 / m2 )
SATUAN
3
HARGA
SATUAN
(Rp)
4
KUANTITAS
5
BIAYA
SATUAN
(Rp)
6
OH
OH
OH
OH
62,218.18
56,601.87
73,099.78
78,365.06
0.075
0.050
0.0075
0.0025
4,666.36
2,830.09
548.25
195.91
8,240.62
Kg
25,190.51
0.525
13,225.02
13,225.02
21,465.63
21,465.63
No
URAIAN PEKERJAAN
1
A TENAGA
1 Tukang Kayu
2 Pekerja
3 Kepala Tukang
4 Mandor
B
Jumlah
BAHAN
1 Kayu Kelas II
2 Paku
( E-37 / m2 )
SATUAN
3
HARGA
SATUAN
(Rp)
4
KUANTITAS
5
OH
OH
OH
OH
62,218.18
56,601.87
73,099.78
78,365.06
0.120
0.120
0.0120
0.0060
7,466.18
6,792.22
877.20
470.19
15,605.79
m3
Kg
2,195,962.74
16,395.36
0.018
0.200
39,527.33
3,279.07
42,806.40
58,412.20
58,412.20
Jumlah
C
D
BIAYA
SATUAN
(Rp)
6
Jumlah A + B
Harga Satuan
Acuan : SNI.3434 - 6.36
KASIANUS
Direktur