Fairfax County Funded Transportation Projects

Map ID Route # Project Name 747 I-395 HOV Ramp at Seminary Road 919 I-395 Fourth SB Lane 748 749 T1 750 751 752 753 754 553 756 460 487 17 757 704 497 727 758 759 760 761 762 763 764 765 766 767 768 769 770 771 772 773 774 775 776 I-395 I-395 SB Off-Ramp to Route 236 WB (Ph I) I-395 I-395 SB Off-Ramp to Route 236 WB (Ph II) I-495 Additional Lane SB (Tysons Table 7) I-495 I-495 Express Lanes Ped/Bike @ Braddock Road I-495 I-495 Express Lanes Ped/Bike @ Route 236 I-495 I-495 Express Lanes Ped/Bike @ Gallows Road I-495 I-495 Express Lanes Ped/Bike @ Idylwood Rd (South) I-495 I-495 Express Lanes Ped/Bike @ Idylwood Rd (North) I-495 I-495 Express Lanes Ped/Bike @ Oak Street I-495 I-495 Express Lanes Ped/Bike @ Chain Bridge Rd I-66 Vienna Bus Ramp I-66 I-66 Spot Improvements I-66 Multi-Modal EIS I-66 Active Traffic Management I-66 I-66/Route 28 Safety Improvements I-95 HOT Lanes I-95 Ft Belvoir Direct Access Ramps to FBNA 1 Route 1/Arlington Blvd. (RHPTI) 1 Route 1/Belford Drive (RHPTI) 1 Route 1/Frye Road - Ph II (RHPTI) 1 Route 1 /Ladson Lane (RHPTI) 1 Route 1/Lockheed Blvd./Dart Dr. (RHPTI) 1 Route 1/Lukens Lane - Ph II (RHPTI) 1 Route 1/Mohawk Lane (RHPTI) 1 Route 1/Sacramento Dr./Cooper Road (RHPTI) 1 Route 1/South Gate Drive/Bedoo St. (RHPTI) 1 Route 1 (RHPTI) 1 Route 1 (RHPTI) 1 Route 1 (RHPTI) 1 Route 1 (RHPTI) 1 Route 1 (RHPTI) 1 Route 1 (RHPTI) 1 Route 1 (RHPTI) 1 Route 1 (RHPTI) 1 Route 1 (RHPTI) 1 Route 1 (RHPTI) Project Description Direct HOV lanes connection to Seminary Road Construct from Duke St to Edsall Road Enhanced signage/wayfinding Widen Off-Ramp to Two Lanes From Route 7 to I-66 North side from Ravensworth Rd to I-495 I-495 to Heritage/Hummer North side from I-495 to Mobil Oil entrance South side from I-495 to Whitestone Hill Ct North side from I-495 to Shreve Hill Road Both sides from I-495 to Sandburg Street Both sides from Old Meadow Rd to Tysons Blvd Bus Ramp connections from I-66 to Vaden Dr Lengthen westbound acceleration/deceleration lanes from Westmoreland Street (Arlington County) to Dulles Toll Road Route 15 to I-495 Route 15 to I-495 Extend SB Left Turn Lanes onto I-66 EB From PW County Line to N of Edsall Road I-95 into Fort Belvoir North Area Pedestrian Intersection Improvements Pedestrian Intersection Improvements Pedestrian Intersection Improvements Pedestrian Intersection Improvements Pedestrian Intersection Improvements Pedestrian Intersection Improvements Pedestrian Intersection Improvements Pedestrian Intersection Improvements Pedestrian Intersection Improvements SB side from Sacramento Dr to Engleside Plaza SB side south of Skyview Dr NB side north of Reddick Ave NB side from Mt Vernon Hwy to Napper Road NB side south of Kings Village Road NB side south of Fordson Rd to Woodlawn Trail NB side at Quander Road, Phase II SB side at Belle Haven Towers NB side from Virginia Lodge to Huntington Ave. NB side from Fairhaven Ave./Quander Rd. to hotel complex District(s) MA MA MA MA PR BR BR PR PR PR PR PR PR DR SU, SP, PR, HM SU, SP, PR, HM SU MV, LE, MA LE, MV MV LE, MV MV LE, MV LE, MV MV LE, MV MV LE, MV MV MV MV MV MV MV MV MV MV MV Allocated $ (millions) Funding Source $60.228 FED $6.350 FED $0.500 FED $1.000 BOND $74.000 TYSONS $0.470 FED $0.330 FED $0.330 FED $1.280 FED $1.280 FED $1.300 FED $1.750 FED $41.149 CMAQ $33.372 FED $15.404 FED $38.566 FED $1.383 HSIP $940.000 FED $27.000 FED $0.500 CMAQ $0.150 CMAQ $0.300 CMAQ $0.400 CMAQ $0.500 CMAQ $0.300 CMAQ $0.157 CMAQ $0.500 CMAQ $0.500 CMAQ $0.350 CMAQ $0.043 FED $0.125 CMAQ $0.689 FED $0.038 FED $0.410 FED $0.113 FED $0.138 CMAQ $0.450 FED $0.450 FED

11/6/2013

Page 1

Map ID 777 778 779 780 781 782 783 784 692 489 669 786 40 T2 668 671 707 709 T3 710 711 712 897 39 T4 787 788 833 834 835 836 323 571 696 789 790 916 735

Route #

Project Name 1 Route 1 (RHPTI) 1 Route 1 (RHPTI) 1 Route 1 (RHPTI) 1 Route 1 (RHPTI) 1 Route 1 (RHPTI) 1 Route 1 (RHPTI) 1 Route 1 (RHPTI) 1 Route 1 (RHPTI) 1 Route 1 7 Route 7/Towlston Road 7 Leesburg Pike/Baron Cameron/Springvale 7 Route 7 Shared Use Paths (TMSAMS) 7 Route 7 (Design Working Group Only) 7 Route 7 Widening (Tysons Table 7) 7 Leesburg Pike/Lewinsville Road 7 Leesburg Pike/Colvin Run 7 Route 7 Pedestrian Initiative 7 Route 7 Pedestrian Initiative 7 Route 7 Widening (Tysons Table 7) 7 Route 7 Pedestrian Initiative 7 Route 7 Pedestrian Initiative 7 Route 7 Pedestrian Initiative 7 Route 7 Pedestrian Initiative 7 Route 7 7 Route 7 Widening (Tysons Table 7) 7 Route 7 Walkway (DCBPA) 7 Route 7 Walkway (DCBPA) 7 Leesburg Pike/Gosnell/Westpark (TMSAMS) 7 Leesburg Pike/Spring Hill Road (TMSAMS) 7 Leesburg Pike/Tyco/Westwood Ctr (TMSAMS)

Project Description SB side, Belle Haven Towers to Mount Eagle Dr. SB side from Buckman Rd/Mt Vernon Hwy to Janna Lee Ave SB side from Roxbury Dr. to Russell Road SB side from Russell Road to Gregory Dr. + signalization NB side from Radford Ave. to Frye Road NB side from Engleside St. to Forest Place SB side from Dogue Creek to Mobile Home Sales Park + bridge NB side from Sacramento Dr. to Dogue Creek + bridge Widen from Old Mill Road/Mulligan Road to Telegraph Road Add left turn lane from NB Towlston Road to WB Route 7 Pedestrian Intersection Improvements Both sides from Tysons to Beulah Road (missing links) Widen from Reston Ave to Jarrett Valley Dr Widen from Reston Ave to Jarrett Valley Dr Pedestrian Intersection Improvements Pedestrian Intersection Improvements Seven Corners to Juniper La East side from Row Street north Widen from I-495 to I-66 Rio Dr to Glenmore Dr Culmore Shopping Ctr to Church St Columbia Pike Interchange Seminary Ramp Streetscape Ph II Widen from Rolling Holly to Reston Ave Widen from Route 123 to I-495 North side under Route 123 Interchange South side under Route 123 Interchange Pedestrian Intersection Improvements Pedestrian Intersection Improvements Pedestrian Intersection Improvements Pedestrian Intersection Improvements Federalist Way to Stevenson St Widen from Legato Road to Shirley Gate Road Bridge over Little Rocky Run From Shirley Gate Road to PW County Line (segments) Missing segments from Stringfellow Road to PW County Line

District(s) MV LE LE LE MV MV MV MV MV DR DR, HM DR DR, HM DR, HM DR DR, HM MA MA DR, PR MA MA MA MA DR, HM PR PR PR, HM HM, PR HM, PR HM, PR SU BR BR SU SP, BR, SU SU

Allocated $ (millions)

Funding Source

$0.100 CMAQ $0.050 CMAQ $0.300 CMAQ $0.500 CMAQ $0.500 CMAQ $0.300 CMAQ $0.500 CMAQ $0.500 CMAQ $183.000 FED $0.750 BOND $0.375 C&I $4.500 RSTP $5.024 FED $300.000 TYSONS $0.260 C&I $1.950 C&I $0.800 BOND $0.260 BOND $71.000 TYSONS $0.890 BOND $0.750 BOND $0.495 BOND $0.250 BOND $34.273 FED $22.000 TYSONS $1.200 RSTP $1.200 RSTP $0.250 RSTP $0.250 RSTP $0.250 RSTP $0.150 BOND $4.400 STATE $4.000 BOND $18.341 BRIDGE $2.830 BOND $0.334 PROFFER $0.550 BRIDGE $1.525 HSIP

28 Centreville Road/Machen Road 29 Route 29 Trail 29 Route 29 (segments) 29 Route 29 29 Route 29 Widening (Design Only) 29 Route 29 Trail (proffer) 29 Route 29 Bridge Repairs 29 Route 29 at Nutley Street

Structural Repairs of Bridge at Route 29 over Tributary of Accotink Creek PR Construct raised concrete median along the east leg of Route 29, provide dual eastbound left turn lane, and upgrade traffic signal PR

11/6/2013

Page 2

Map ID 920 450 791 792 793 794 795 796 797 798 799 800 801 802 803 805 806 663 700 804 808 T5 T6 594 642 811 809 810 621 743 543 544 826 827 921 T7 T8

Route #

Project Name

Project Description Replace Street Lights Widen from Route 28 to Poland Road (Loudoun County) From West Ox Rd to east of Lee Road (missing segments) South side from Patrick Henry Dr. to Olin Dr. North side from Cedar Hill Road to Allen Street Intersection and bus stop improvements South side from Graham Road to Wayne Road Signalization and sidewalk North side from Woodlawn Ave. to Baptist Church North side from Westcott Street to Annandale Road Pedestrian Intersection Improvements North side from Annandale Road to Cherry Street North side from Meadow Lane to Linden Lane South side from South Street to Aspen Lane Pedestrian Intersection Improvements South side from Chain Bridge Rd to bus stop east of Kurtz Rd South side missing links from Old Dominion Dr to Beverly Ave Pedestrian Intersection Improvements Intersection improvements and pedestrian access North side from Anderson Road to Colonial Lane Great Falls St/Lewinsville Rd to Tysons East Metrorail Station From Old Courthouse Road to Route 7 From Route 7 to I-495 Construct 1,750 LF walkway from Utterback Store Road (Krop Property) to Falls Chase Court West side from Route 1 to Sunny View Dr Construct NB RTL from Cherokee Ave to EB Route 236 Channelize Route 236 WB Left Turn Lane at Beauregard St Close EB Service Drive and Install Bus Pullout Pedestrian Refuge Install 9900 LF of 8-foot asphalt trail along Gunston Road from Pohick Bay Drive to the Pohick Bay Golf Course entrance North side from Maple Ct to Blair Rd South side from Gallows Rd at Annandale Methodist Church Pedestrian Intersection Improvements Pedestrian Intersection Improvements Construct and operate streetcar from Skyline in Fairfax County to Pentagon City in Arlington County Collector-Distributor Road along EB DTR Construct Ramp to Boone Blvd Extension

District(s) PR SU SU MA PR MA, PR MA MA, PR PR PR MA, PR PR PR MA SU DR DR DR PR PR DR, PR HM, PR HM, PR DR MV MA MA MA LE MV MA MA MA MA MA HM, PR HM, PR

Allocated $ (millions)

Funding Source

29 Route 29/Gallows Road Intersection Lighting 50 Route 50 50 Route 50 Trail 50 Route 50 Walkway 50 Route 50 Walkway 50 Route 50/Allen St. 50 Route 50 Walkway 50 Route 50/Wayne Rd./Woodlawn Ave. 50 Route 50 Walkway 50 Route 50 Walkway 50 Route 50/Annandale Road 50 Route 50 Walkway 50 Route 50 Walkway 50 Route 50 Walkway 50 Route 50/Sullyfield Circle/Centerview Dr 123 Dolley Madison Blvd Sidewalk 123 Dolley Madison Blvd Sidewalk 123 Dolley Madison Blvd/Churchill Road 123 Route 123/Jermantown Road 123 Chain Bridge Road Walkway (TMSAMS) 123 Chain Bridge Road Walkway (DCBPA) 123 Route 123 Widening (Tysons Table 7) 123 Route 123 Widening (Tysons Table 7) 193 Georgetown Pike Walkway Phase II 235 Mount Vernon Hwy Walkway 236 Route 236/Cherokee Ave 236 Route 236/Beauregard St 236 Route 236/Beauregard St Bus Pullout 241 North Kings Highway Median 242 Mason Neck Trail 2B 244 Columbia Pike Walkway 244 Columbia Pike Walkway 244 Columbia Pike/John Marr Dr 244 Columbia Pike/Gallows Road 244 Columbia Pike Streetcar 267 DTR Eastbound CD Road (Tysons Table 7) 267 DTR Ramp to Boone Blvd Ext (Tysons Table 7)

$0.150 C&I $94.913 FED $1.400 BOND $0.225 RSTP $0.630 RSTP $0.400 RSTP $0.765 RSTP $0.400 RSTP $0.500 RSTP $1.260 RSTP $0.400 RSTP $0.495 RSTP $0.270 RSTP $0.585 RSTP $0.200 BOND $0.300 BOND $0.400 BOND $0.250 C&I $0.950 C&I $0.750 RSTP $1.200 RSTP $8.000 TYSONS $20.000 TYSONS $0.520 FED $0.500 C&I $0.700 RSTP $0.050 RSTP $0.200 BOND $0.675 C&I $1.840 FED $0.630 BOND $0.550 BOND $0.150 BOND $0.200 BOND $35.300 CMAQ, RSTP $62.000 TYSONS $79.000 TYSONS

11/6/2013

Page 3

Map ID T9 T10 T11 386 812 113 828 495 924 925 868 869 534 536 582 887 75 289 539 871 541 816 287 819 918 818 706 820 841 493 720 912 537 605 862 853 501 854

Route #

Project Name

Project Description Construct Ramp to Greensboro Drive Extension Construct Ramp to Jones Branch Collector-Distributor Road along WB DTR Phase I Phase II Interchange & Intersection Improvements from I-66 to Route 50 Median Safety Improvements Braddock Road to Route 29 Improve sight distance at intersection Pedestrian Intersection and bus stop improvements Intersection improvements, EB left turn lane South side from Hooes Road to South County HS North side from Southrun Rd to Monacan Rd North side from Silverthorn Rd to Bayberry Ridge Rd Bridge over Nichols Branch Missing segments from Penderbrook Road to Route 50 Beulah St to Leaf Rd; part of Mulligan Road South Van Dorn St to S Kings Hwy West side from S Kings Hwy to Lee District Park Southwest quadrant missing link East side opposite the Wilburdale Community Pedestrian Intersection Improvements Connection between Telegraph Road and Route 1/Old Mill Rd Pedestrian Intersection Improvements Intersection Improvements Construct short-term left-turn lane improvements Dual left turn lanes on Route 123 Construct Right Turn Lane from NB Roberts to EB Braddock Rd Intersection improvements, and extend sidewalk Intersection Improvements, re-construct culvert Widen 1-lane Ramp to 2-Lane at Fx Co Pkwy Signal Improvements North side from Briarcliff Dr to Galgate Dr Construct SB right turn lane Intersection improvements, and extend sidewalk Extend WB LTL and convert signal to protected only phasing Route 123 to Silverbrook Road Extend WB Left Turn Lane

District(s) PR DR, PR DR, PR PR, DR, HM DR, HM SP


BR, HM, LE, MV, SP, SU

Allocated $ (millions)

Funding Source

267 DTR Ramp to Greensboro Dr Ext (Tysons Table 7) 267 DTR Ramp to Jones Branch Drive (Tysons Table 7) 267 DTR Westbound CD Road (Tysons Table 7) 267 Dulles Rail 267 Dulles Rail 286 Fairfax County Pkwy/Fair Lakes Pkwy 286 Fairfax County Pkwy/Franconia-Springfield Pkwy 286 Fairfax County Pkwy Aux Lane 309 Old Dominion Drive/Bellview Road 309 Old Dominion Drive/Linway Terrace/Birch Road 600 Silverbrook Road @ Southrun Road 600 Silverbrook Road Walkway 600 Silverbrook Walkway 600 Silverbrook Walkway 603 Beach Mill Road Bridge 608 West Ox Road Trail 611 Telegraph Road Widening 611 Telegraph Road Widening 611 Telegraph Road Walkway 613 South Van Dorn St @ Franconia Rd Walkway 617 Backlick Road Walkway 617 Backlick Rd/Edsall Rd 619 Mulligan Road 620 Braddock Road/Olley Lane 620 Braddock Road/Pleasant Valley Road 620 Braddock Rd/Danbury Rd/Wakefield Chapel 620 Braddock Road/Rt 123 Improvements 620 Braddock Road/Roberts Road 636 Hooes Road/Newington Forest Ave 637 Cinder Bed Road 638 Rolling Road Loop Ramp 638 Rolling Road/Hunter Village Drive 640 Sydenstricker Walkway 640 Gambrill/Pohick 641 Pohick Road/Southrun Road 642 Lorton Road/Lorton Station Blvd 642 Lorton Road Widening 642 Lorton Road/Lorton Market Road

$28.000 TYSONS $38.000 TYSONS $124.000 TYSONS $2,740.000 FED $330.000 FED $69.660 FED $1.429 FED $1.200 BOND $0.400 C&I $0.400 C&I $1.200 BOND $2.300 BOND $0.275 BOND $0.150 BOND $1.279 BRIDGE $1.000 BOND $24.868 FED $19.207 C&I $2.350 BOND $0.400 BOND $0.150 BOND $0.200 BOND $80.000 FED $0.150 BOND $2.500 STATE $0.050 C&I $4.308 C&I $0.850 BOND $0.200 BOND $5.800 BOND $14.000 RSTP $0.170 HSIP $0.575 BOND $1.100 C&I $0.200 BOND $1.200 BOND $60.000 BOND $0.300 BOND

SP DR DR MV MV MV MV DR SU LE, MV LE LE LE MA MA MV, LE BR SU BR BR, SP BR SP, MV MV SP SP SP SP MV MV MV MV

11/6/2013

Page 4

Map ID

Route #

Project Name

913 829 860 821 92 641 461 461 830 814 832 831 T12 T13 822 358 358 608 602 639 662 525 348 533 877 858 859 673 655 523 612 842 926 850 883 882 856 538

643 Burke Centre SRTS 644 Franconia Road Walkway 644 Old Keene Mill Rd Walkway 645 Burke Lake Rd/Coffer Woods Rd 645 Stringfellow Road Widening 645 Lees Corner Road Walkway 645 Stringfellow Road PNR Expansion 645 Stringfellow Road Bus Transfer Facility 650 Gallows Rd/Boone Blvd (TMSAMS) 650 Annandale Road/Graham Road 650 Gallows Road Walkway (TMSAMS) 650 Gallows Rd/Gallows Branch Rd (TMSAMS) 650 Gallows Road Widening (Tysons Table 7) 650 Magarity Road Widening (Tysons Table 7) 652 Burke Road Bike Lanes 657 Walney Road Bridge 657 Walney Road Widening 661 Lee Road Culvert 665 Fox Mill Rd/Monroe St 674 Hunter Mill Rd/Mystic Meadow Way 674 Hunter Mill Rd/Sunrise Valley Dr 675 Beulah Road Walkway 675 Sunset Hills Walkway (Plaza America) 675 Sunset Hills Walkway 675 Sunset Hills Rd/Town Center Pkwy (RMAG) 677 Old Courthouse Rd Bike Shoulders (TMSAMS) 677 Old Courthouse Rd/Woodford Rd (TMSAMS) 681 Walker Road Diet 693 Westmoreland St/Old Chesterbrook Rd 693 Westmoreland Street @ Haycock Road 694 Lewinsville Road Walkway 695 Idylwood Rd Bike Lanes (TMSAMS) 695 Idyllwood Road Sidewalk 695 Kirby Road Sidewalk 710 Wakefield Chapel Road Bike Lanes 710 Wakefield Chapel Rd Walkway 713 North Chambliss St/Beauregard St 749 Ashburton Ave Walkway

Project Description Provide a refuge island and upgrade ramps and pavement striping at intersection of Burke Centre Parkway and Marshall Pond Road/Schoolhouse Woods Road North side from Norton Rd to Governor's Pond Cir (west) North side from Carrleigh Pkwy west to existing Pedestrian Intersection Improvements and extend sidewalk Fair Lakes Blvd to Route 50 West side from Route 50 to Bokel Dr 300 Additional Spaces 3 Additional Bus Bays and transit transfer center w/bike facilities Pedestrian Intersection Improvements Pedestrian Intersection Improvements Gallows Road at Old Courthouse Road Pedestrian Intersection Improvements From Route 7 to Prosperity Ave From Route 7 to Great Falls Street On-Road Bike Lanes/Road Diet from Mill Cove Ct to VRE Station Bridge over Flatlick Branch 0.4 mile S of Willard Rd to Willard Rd Widen to 4 lanes and replace culvert WB Right turn lane and pedestrian improvements Roundabout at Mystic Meadow Way Pedestrian Intersection Improvements Abbotsford Dr to Coral Crest La and along Clarks Crossing Rd Reston Center to Town Center Pkwy North side from W&OD trail to Michael Faraday Ct Pedestrian Intersection Improvements Both sides from Westbriar Dr NE to Battery Park St Pedestrian Intersection Improvements Road diet features south of Georgetown Pike intersection Realign intersection and extend culvert crossing Construct SB right turn lane and sidewalk Snow Meadow to Elsinore Both sides from Helena Dr to Idyl Lane Idyllwood Rd from Redd Road to 600 feet south North side from Chesterbrook pool to east of Chesterbrook ES Extend On-Road Bike Lanes from Pulley Ct to NVCC Campus East side from Braddock Rd to Stahlway La Eliminate exclusive RTL from N Chambliss to Beauregard West side at Cedar Run

District(s)

Allocated $ (millions)

Funding Source

BR LE BR BR, SP SU, SP SU SU SU PR MA PR PR PR DR, PR SP SU SU SU HM PR HM HM HM HM HM HM PR DR DR DR DR PR DR DR BR BR MA SU

$0.140 FED $1.100 BOND $0.100 BOND $0.400 BOND $63.322 BOND $1.415 C&I $4.600 BOND $1.500 BOND $0.150 RSTP $0.150 BOND $0.250 RSTP $0.250 RSTP $94.000 TYSONS $63.000 TYSONS $0.040 BOND $7.000 BRIDGE $8.496 RSTP $4.149 RSTP $1.250 C&I $1.600 C&I $0.500 C&I $1.700 BOND $0.251 PROFFER $0.600 BOND $0.200 RSTP $0.115 RSTP $0.200 RSTP $0.400 C&I $0.730 C&I $1.600 C&I $0.625 C&I $1.050 RSTP $0.361 C&I $0.300 BOND $0.130 BOND $0.500 BOND $1.000 BOND $0.600 BOND

11/6/2013

Page 5

Map ID 553 817 T14 294 890 893 894 889 892 855 865 839 838 840 741 739 857 626 740 813 861 T15 898 475 T16 851 875 911 876 915 872 873 874 852 885 843 844 914 870

Route #

Project Name

Project Description From Sandburg Street to Morgan Lane Pedestrian Intersection Improvements From Route 123 to Ashgrove Lane 2300 spaces, 10 bus bays, 42 kiss & ride, ped and bike facilities Station entrance to Sunrise Valley Dr Raised median and signage Construct Pedestrian/Bicycle Overpass Pedestrian Intersection Improvements Pedestrian Intersection Improvements East side between Gallows Rd and Boss St Trail from Oak St to Sandburg Ridge Ct East side north of Route 123 Pedestrian Intersection Improvements Pedestrian Intersection Improvements North side from N Kings Hwy to Pine Grove Circle West side from Grove Ave to City of Falls Church North side from Great Falls St to Brilyn Pl South side from Braddock Road to Old Columbia Pike South side from Carper St to Congress Lane South side between Gallows Rd and first entrance on Aline Ave Pedestrian Intersection Improvements From Tysons Corner Center to Old Meadow Road Over I-495 Bridge over Johnny Moore Creek East side from South Lakes Dr to Glade Dr From Spring Hill Road to Tyco Road On-Road Bike Lanes from Burke Road to Rolling Road South side from Soapstone Dr to South Lakes Dr North side from Soapstone Dr to South Lakes Dr East side from River Birch Rd to Legacy Circle Complete missing sidewalk links from Glade Drive to Reston Avenue (south side) Pedestrian Intersection Improvements Pedestrian Intersection Improvements Pedestrian Intersection Improvements Pedestrian Intersection Improvements, extend sidewalk on Lakepointe Pedestrian Intersection Improvements Pedestrian Intersection Improvements Pedestrian Intersection Improvements Pedestrian Intersection Improvements Pedestrian Intersection Improvements

District(s) PR PR HM HM HM HM HM HM HM PR PR HM HM, PR LE LE DR DR MA DR PR PR PR SU HM PR BR HM HM DR HM HM HM HM BR PR PR PR PR PR

Allocated $ (millions)

Funding Source

769 Oak Street Walkway 786 Boone Blvd/Aline Ave (TMSAMS) 786 Boone Blvd Extension (Tysons Table 7) 828 Wiehle Ave Garage 828 Wiehle Ave Station Walkway/Bikeway (RMAG) 828 Wiehle Ave @ W&OD Trail - Ph I (RMAG) 828 Wiehle Ave @ W&OD Trail - Ph II (RMAG) 828 Wiehle Ave/ DTR Ramps (RMAG) 828 Wiehle Ave/Isaac Newton Sq South (DCBPA) 839 Madrillon Road Walkway (TMSAMS) 936 Sandburg St Trail (TMSAMS) 939 Gosnell Rd Walkway (DCBPA) 939 Gosnell Rd/Old Courthouse Rd (DCBPA) 1155 Highland St/Backlick Rd/Amherst Ave 1647 School Street Walkway 1744 Birch Street Walkway 1799 North West St Sidewalk 2248 Elmdale Road Walkway 3141 Dead Run Dr Walkway 3402 Aline Avenue Walkway (TMSAMS) 3543 Old Meadow Rd/Old Meadow La (TMSAMS) 3543 Overpass at Tysons Corner Center 3546 Twin Lakes Bridge 4720 Soapstone Road Walkway 5063 Greensboro Drive Extension (Tysons Table 7) 5101 Lake Braddock Drive Road Diet 5320 Sunrise Valley Drive Walkway (DCBPA) 5320 Sunrise Valley Drive Walkway (DCBPA) 5320 Sunrise Valley Drive Sidewalk 5320 Sunrise Valley Drive Sidewalk (RMAG) 5320 Sunrise Valley Dr/Commerce Pk Dr (RMAG) 5320 Sunrise Valley/Great Meadow/Cntnl (RMAG) 5320 Sunrise Valley Dr/Mercator Dr - USGS (RMAG) 5422 Lakepointe Dr/Guinea Rd 5457 Westbranch Dr/Westpark Dr (TMSAMS) 6034 International Dr/Jones Br/Spring Hill (TMSAMS) 6034 International Dr/Tysons Blvd (TMSAMS) 6034 International Dr/Greensboro Dr (DCBPA) 6054 Solutions Dr/Greensboro Blvd (TMSAMS)

$0.480 BOND $0.050 RSTP $126.000 TYSONS $121.400 FED $0.500 RSTP $0.046 RSTP $2.337 RSTP $0.019 RSTP $0.300 RSTP $0.250 RSTP $0.150 RSTP $0.100 RSTP $0.300 RSTP $0.300 BOND $0.425 C&I $0.395 C&I $0.300 BOND $0.780 C&I $0.700 C&I $0.250 RSTP $0.050 RSTP $18.000 TYSONS $1.446 BRIDGE $1.870 CMAQ $58.000 TYSONS $0.040 BOND $1.250 RSTP $1.105 RSTP $0.300 BOND $2.484 RSTP $0.054 RSTP $0.097 RSTP $0.200 RSTP $0.300 BOND $0.100 RSTP $0.150 RSTP $0.150 RSTP $0.175 RSTP $0.050 RSTP

11/6/2013

Page 6

Map ID 635 607 878 879 722 T17 496 823 824 837

Route #

Project Name

Project Description North side from Merridith Circle to Roberts Parkway Old Keene Mill to Painted Daisy Ped/Bike Improvement Underpass/Overpass connection over DTR - structural underpin Pedestrian Intersection Improvements Preliminary Design and NEPA Construct Roadway Connection, with bike, ped, transit Four bus bays and amenities Trail from VRE Station west to Oak Leather/Lake Barton Upgrade segments between Rt 236 and Old Keene Mill Rd Brand and sign bike route between GMU and Vienna Station Bicycle Master Plan routes in Tysons Throughout Tysons area Widen from Isaac Newton Sq S to Station entrance East side from Station entrance to Isaac Newton Sq S Construct an additional 300 spaces, 3 additional bus bays (total of 6), and a transit center facility with bicycle facilities Magarity Rd, Jones Branch Dr, Westmoreland St, Madrillon Rd Ten bus bays and amenities Local Street Grid with Pedestrian and Bicycle Facilities Roadway over Route 123 west to Braddock Road Construct 10' trail from Wharton Lane to Stringfellow Road Trail along Ashgrove Lane to western Tysons Connection through Scotts Run Community Park Trail from Vesper Ct to Route 7 at Spring Hill Rd Shelters, benches, pads, at locations throughout Fairfax County Locations & specific mitigation yet to be determined

District(s) BR SP HM PR PR PR BR BR BR BR PR PR, HM, DR HM HM SU PR, DR BR PR BR, SP SU HM PR HM CW DR, HM, PR

Allocated $ (millions)

Funding Source

6493 Burke Commons Road Walkway 6945 Hunter Village Drive 7414 Town Center Pkwy (RMAG) 7648 Tysons Blvd/Galleria Dr (DCBPA) 8102 Jones Branch Drive Connector 8102 Jones Branch Drive Connector (Tysons Table 7) XXXX NVCC Transit Center XXXX Burke VRE Connector Ph IV XXXX CCT Pavement Upgrades XXXX GMU-City-Vienna Metrorail Bike Route XXXX Tysons Pavement Markings (TMSAMS) XXXX Tysons Wayfinding Signage (TMSAMS)

$0.737 C&I $1.325 C&I $6.148 RSTP $0.300 RSTP $0.695 C&I $41.400 TYSONS $1.000 BOND $1.200 BOND $0.200 BOND $0.010 BOND $0.015 RSTP $0.100 RSTP $2.234 RSTP $0.283 RSTP $6.100 BOND, C&I $0.100 RSTP $1.000 BOND $304.000 TYSONS $15.000 STATE $1.400 C&I $0.500 RSTP $2.500 RSTP $1.000 RSTP $9.248 BOND $77.000 TYSONS

845 845 461

XXXX Isaac Newton Sq W (RMAG) XXXX Isaac Newton Sq W Walkway (RMAG) Stringfellow Road Park & Ride Lot Expansion and Bus XXXX Transfer Facility XXXX Pavement Marking Plans (TMSAMS)

502

XXXX GMU Transit Center XXXX Tysons Grid of Streets

896 742 815 866 881

XXXX GMU West Campus Bypass XXXX Bobann Drive Bikeway XXXX Ashgrove Lane Trail (TMSAMS) XXXX Scotts Run Walkway (TMSAMS) XXXX Vesper Ct Trail (TMSAMS) XXXX Bus Stop Improvement Program XXXX Tysons Neighborhood & Access Improvements

PE or Study Only
917 718 I-66 I-66/Route 28 Interchange Improvements (PE Only) I-95 I-95 NB Off-Ramp to Fx Co Pkwy (PE Only) 1 Route 1 Transit Center Study 785 726 745 736 921 721 864 83 922 7 Route 7 Bridge (Study Only) 7 Route 7 7 Route 7/Route 123 123 Route 123 Bridge (PE Only) 244 Columbia Pike Transit Initiative (PE +) 267 Dulles Toll Road Tysons Ramp Study 638 Rolling Road VRE Parking Expansion Study 638 Rolling Road Widening (PE Only) 674 Hunter Mill Road Bridge (PE Only) Phase 1 NB at Exit 166 Feasibility and conceptual Study of Transit Center Bridge over Dulles Toll Road Widen from Route 123 to I-495 (Study only) Interchange Study Bridge over I-66 Enhanced Transit Corridor from Arlington County to Skyline Interchange Improvements/Alternatives to/from Tysons Study additional parking spaces at Rolling Road VRE Station DeLong Dr to Fullerton Road Replace Temporary Bridge with permanent Structure SU LE, MV LE, MV DR, PR, HM PR PR, HM PR MA DR, HM, PR SP, BR MV HM $50.000 FED $4.193 FED $0.144 C&I $1.316 BRIDGE $0.500 PROFFER $0.500 PROFFER $1.073 BRIDGE $26.438 FED $0.800 PROFFER $0.250 C&I $3.000 FED $0.320 RSTP

11/6/2013

Page 7

Map ID 425 514 738 730

Route #

Project Name

Project Description Bridge over Rocky Run Bridge over Piney Run Connection Over DTR from Sunrise Valley to Sunset Hills 1000 spaces, transit transfer, bike/ped facil, multi-use

District(s) DR DR HM LE

Allocated $ (millions)

Funding Source

676 Towlston Road Bridge (PE Only) 681 Walker Road Bridge (PE Only) 4720 Soapstone Overpass Study XXXX Springfield CBC Parking Garage (PE +)

$0.434 BRIDGE $0.892 BRIDGE $0.300 C&I $21.173 CMAQ