PEKERJAAN :
LOKASI :
Jumlah Harga
No Uraian Volume
(Rp)
A TOTAL
B PAJAK PERTAMBAHAN NILAI = 10 % x A
C GRAND TOTAL
DIBULATKAN
TERBILANG : Seratus Enam Puluh Satu Juta Sembilan Ratus Dua Puluh Tujuh Ribu
REKAPITULASI
NA ANGGARAN BIAYA
Total Harga
(Rp)
4,580,251.96
646,561.92
10,727,973.00
65,804,388.74
27,092,489.14
11,233,350.00
27,121,235.60
147,206,250.36
14,720,625.04
161,926,875.40
161,927,000.00
PEKERJAAN :
LOKASI :
I PEKERJAAN PENDAHULUAN
1 Pembersihan Lokasi / Perataan Tanah I.020 200.00 m²
2 Pek. Pasangan Bowplank Kayu Meranti Jambi (75%) I.011 62.00 m'
3 Mobilisasi Proyek 1.00 ls
II PEKERJAAN PONDASI
1 Galian Pondasi III.003 0.77 m³
2 Urugan Pasir Bawah Umpak VI.001 0.13 m³
Pondasi Umpak, Beton K-125 (Bo) Site Mix, Bekisting
3 XIX.021 0.83 m³
Multiplex 9 mm (2x pakai), Tanpa Vibrator
IV PEKERJAAN ATAP
1 Tiang 8/12, Kayu Kamper Samarinda XIV.002 0.38 m³
2 Sikon / Pengaku Tiang Balok, 6/12, XIV.002 0.45 m³
3 Kuda - Kuda 6/12, Kayu Kamper Samarinda XIV.002 0.92 m³
4 Gording, Nok, Murplat 6/12 XIV. 005 0.50 m³
5 Papan Rutter 2/20 XIV. 005 0.09 m³
6 Rangka Atap Kaso + Reng XIV.045 184.00 m²
Pasangan Genteng Plentong Super tidak glazuur model
7 XIII.002 184.00 m²
Morando, 20 buah/m²
8 Pasang Bubungan XIII.007 23 m'
VI PEKERJAAN ELEKTRIKAL
1 Penyambungan Daya Listrik 2200 Watt Taksir 1.00 ls
2 Pemasangan Box MCB ( 4 grup ) 1.00 unit
Instalasi Penerangan kabel NYM 3 x 2,5 mm (tidak
3 XXVII.002 15.00 ttk
termasuk lampu)
Stop Kontak Dalam Tembok (BROCO) kabel NYM 3 x 2,5
4 XXVII.003 2.00 bh
mm
Saklar Tanam Dalam Tembok (BROCO) kabel NYM 3 x 2,5
5 XXVII.006 4.00 bh
mm
Total ( I+II+III+IV+V+VI+VII
RENCANA ANGGARAN BIAYA
3,060.75 612,150.00
31,743.58 1,968,101.96
2,000,000.00 2,000,000.00
Jumlah I 4,580,251.96
21,480.00 16,496.64
157,170.00 20,117.76
733,110.00 609,947.52
Jumlah II 646,561.92
157,170.00 1,084,473.00
642,900.00 9,643,500.00
Jumlah III 10,727,973.00
10,496,900.00 4,030,809.60
10,496,900.00 4,685,816.16
10,496,900.00 9,673,943.04
5,645,720.00 2,804,793.70
5,645,720.00 519,406.24
179,770.00 33,077,680.00
51,230.00 9,426,320.00
68,940.00 1,585,620.00
Jumlah IV 65,804,388.74
5,645,720.00 16,938,289.14
72,530.00 10,154,200.00
Jumlah V 27,092,489.14
3,500,000.00 3,500,000.00
900,500.00 900,500.00
321,390.00 4,820,850.00
263,660.00 527,320.00
371,170.00 1,484,680.00
Jumlah VI 11,233,350.00
21,480.00 482,011.20
157,170.00 320,626.80
625,410.00 1,275,836.40
87,050.00 11,838,800.00
3,220,830.00 13,140,986.40
10,290.00 62,974.80
Jumlah VII 27,121,235.60
Total ( I+II+III+IV+V+VI+VII ) 147,206,250.36