You are on page 1of 7

COMPETENCY PROFILE (CP)

Sub Sector Job Area Level CU Title 1. Three phase drawing INDUSTRIAL ELECTRICAL THREE PHASE ELECTRICAL INSTALLATION AND MAINTENANCE THREE (3) CU Code CU Descriptor Three phase drawing is is covering the scope of competency to carry out wiring activities for Three Phase based on drawing given by utilizing wiring tools, equipment and materials in compliance with Electrical Act 1 !, Electrical "egulation 1 # and other related rules and regulations body and statutory requirements. The personnel who are competent in the three phase electrical drawing must be able to identify drawing specification for three phase wiring and carry out drawing according to standard requirements. 1. %. &. CU Work Activities $dentify three phase drawing specifications Prepare three phase drawing equipment and materials 'arry out three line ( schematic diagram drawing 'arry out three phase wiring drawing Performance Criteria 1.1 Type three phase drawing procedures determined %.1 Three phase drawing equipments and materials prepared &.1 Three phase drawing according to symbol, size cable, connection and specification #.1 Three phase drawing chec*ed according to s*ills measurement, control and incorporated with location designation and specification. ).1 Three phase drawing submitted for approval 1.1 Type three phase wiring procedures determined %.1 Tools, equipment materials determined

#.

). %. Three Phase +iring

$nspect three phase drawing

Three phase wiring covering the scope 1. $dentify three phase wiring of competency to carry out wiring specifications and procedures activities for Three Phase based on drawing given by utilizing wiring tools, %. Prepare three phase wiring tools, equipment and materials in compliance equipment and materials

CU Title

CU Code

CU Descriptor

CU Work Activities

Performance Criteria &.1 Three phase wiring tools, equipment and materials prepared on site &.% 'able laid according to drawing #.1 Earthing system installation according to drawing ).1 'able terminated to 'onsumer 3nit ).% 'able terminated to fitting and accessories

with Electrical Act 1 !, Electrical &. 'arry out wiring activities "egulation 1 # and other related rules and regulations body and statutory requirements. The personnel who are competent in the three phase electrical wiring must be able to interpret three phase wiring specifications and #. 'arry out three phase earthing procedures, three phase wiring system installation requirement, carry out wiring activities, earthing system installation and carry ). 'arry out three phase ,istribution out continuity, polarity, insulation and -oard .,-/.metallic or insulated/ resistance testing on the three phase installation wiring system.

0. 'arry out wiring system visual inspection 1. 'ary out dead circuit test 2. 'arry out live circuit test . Prepare three phase wor* activities report

0.1 4eatness of wiring system chec*ed 1.1 'ontinuity, polarity, insulation resistance tested 2.1 E5'-("'- functioning testing determined .1 6upervision and completion certificate signed

CU Title & Three phase wiring maintenance

CU Code

CU Descriptor Three phase wiring maintenance is a list of maintenance activity to carry out maintenance wor* on wiring system for Three Phase based drawing given by utilizing wiring tools, equipment and materials in compliance with Electrical Act 1 !, Electrical "egulation 1 # and other related rules and regulations body and statutory requirements. The personnel who are competent in the three phase electrical wiring maintenance must be able to interpret three phase wiring diagram, carry out electrical wiring inspection and maintenance and to conduct continuity, polarity, insulation resistance and earthing resistance testing

CU Work Activities 1. $dentify three phase wiring maintenance requirement %. $dentify three phase wiring tool, equipment and material &. 'arry out electrical wiring inspection #. 'arry out electrical wiring maintenance

Performance Criteria 1.1 Type three phase wiring maintenance procedures determined %.1 Three phase wiring maintenance tools, equipment and materials prepared on site &.1 Electrical wiring faulty identified #.1 Electrical wiring faulty rectified

). $nspect electrical wiring functionality ).1 'ontinuity, polarity, insulation resistance and earthing resistance tested

Three phase motor 7 motor control installation

0. "ecord wiring system maintenance 0.1 'hec*list, logboo* and schedule activities maintenance report submitted to superior Three phase motor and motor control 1. $dentify three phase motor 1.1 Type three phase motor installation installation is an activity that installation specifications and installation determined covers the competency requirements for procedures the installation of Three Phase motor and motor control based on installation %. Prepare three phase motor and %.1 Three phase motor and motor specification and procedures in motor control installation, control tools, equipment and accordance with Electrical Act 1 !, maintenance tools, equipment and materials prepared. Electrical "egulation 1 # and other materials related rules and regulations body and

CU Title

CU Code

CU Descriptor

CU Work Activities

Performance Criteria &.1 Three phase motor and motor control fi8ed according to manufacturer9s specification #.1 Three phase motor and motor control terminated according to manufacturer9s specification ).1 'ontinuity, polarity, insulation resistance and earthing resistance tested 0.1 'hec*list, logboo* and installation schedule updated and submitted to superior 1.1 Type of three phase electrical appliances maintenance procedures determined %.1 Three phase electrical appliances maintenance tools, equipment and materials prepared. &.1 Electrical appliances faulty identified #.1 Electrical appliances maintenance faulty rectified

statutory requirements. The personnel &. 'arry out three phase motor who are competent in the three phase installation motor and motor control must be able to interpret installation manuals and procedures, carry out three phase motor #. 'arry out three phase motor control and motor control installation, inspect termination three phase motor and motor control functionality and to conduct continuity, polarity, insulation resistance and ). $nspect three phase motor and earthing resistance testing. motor control functionality 0. "ecord three phase motor and motor control installation. ) Three Phase electrical appliances maintenance Three Phase electrical appliances maintenance is a set of competency to carry out repair wor* and maintenance on electrical appliances faulty by referring to appliances service manual and standard operating procedures and in compliances with Electrical Act 1 !, Electrical "egulation 1 # and other related rules and regulations body and statutory requirements. The personnel who are competent in the electrical appliances maintenance must be able to identify appliances specification and manuals, carry out maintenance 1. $dentify electrical appliances maintenance requirement, specification and manuals %. Prepare three phase electrical appliances maintenance tools, equipment and materials &. 'arry out electrical appliances inspection #. 'arry out electrical appliances maintenance

CU Title

CU Code

CU Descriptor activities and to conduct polarity, insulation, resistance and earthing resistance testing in accordance with manufacturer9s specification requirements.

CU Work Activities

Performance Criteria #.% 'ontinuity, polarity, insulation resistance and earthing resistance tested #.& 'hec*list, logboo* and schedule :aintenance 1.1 Type three phase testing and commissioning procedures determined %.1 Three phase testing and commissioning tools, equipment and materials. &.1 $nsulation resistance tested #.1 Polarity tested ).1 'ontinuity tested 0.1 Earthing resistance tested 1.1 Testing certification signed 1.% Testing result validity, accuracy and sufficiency chec*ed

Three phase wiring testing and commissioning

Three phase wiring testing and commissioning is a competency to carry out testing and inspection on Three Phase wiring system for the purpose of commissioning the wiring system according to Electrical Act 1 !, Electrical "egulation 1 # and other related rules and regulations body and statutory requirements. The personnel who are competent in the three phase wiring testing and commissioning must be able to identify three phase testing and commissioning specifications and procedures, carry out electrical testing including resistance testing, polarity testing, continuity testing, earthing testing and carry out commissioning on the wiring system

1. $dentify three phase testing and commissioning specifications and procedures %. Prepare three phase testing and commissioning tools, equipment and materials &. 'arry out three phase insulation resistance testing #. 'arry out three phase polarity testing ). 'arry out three phase continuity testing 0. 'arry out three phase earthing resistance testing 1. 'arry out testing commissioning

CU Title

CU Code

CU Descriptor

CU Work Activities 2. Prepare testing and commissioning report 2.1

Performance Criteria Testing and commissioning report submitted to superior

6upervisory ;unction

6upervisory function is a competency to carry out supervisory function for the purpose activities for three phase electrical system according to Electrical Act 1 !, Electrical "egulation 1 # and other related rules and regulations body and statutory requirements. The personnel who are competent in the supervisory function must be able to monitor wor* progress, conduct section meeting, carry out staff training, provide appraisal accommodation, implement safety measures, carry out customer and inter departmental liaison, prepare section budget and prepare technical report

1. :onitor wor* progress %. 'onduct section briefing

1.1 Procedure wor* done recommended %.1 Participant or members notified %.% ,ata information of briefing recorded &.1 6taff communication s*ill identified &.% ,isciplinary staff recorded #.1 "elevant <ob duties #.% 6taff performance achievement ).1 Types of hazard listed out ).% Procedures of first aid applied correctly 0.1 5iaison procedure listed out according to company procedure 1.1 'ompany budgetary procedures listed out 2.1 Type of report determined

&. 'arry out staff training

#. Provide appraisal accommodation ). $mplement safety measures

0. 'arry out customer and inter departmental liaison 1. Prepare section budget 2. Prepare technical report

CU Title 2 Electrical 6ignage .4eon/ $nstallation 7 :aintenance

CU Code

CU Descriptor Electrical signage .neon/ installation 7 maintenance is to carry out installation and maintenance activities for electrical signage .neon/ electrical system according to Electrical Act 1 !, Electrical "egulation 1 # and other related rules and regulations body and statutory requirements. The personnel who are competent in the electrical signage .neon/ installation 7 maintenance must be able to identify electrical signage .neon/ installation requirements and procedures, carry out electrical signage .neon/ installation 7 maintenance, carry out electrical testing including resistance testing, polarity testing, continuity testing, earthing testing and to prepare installation 7 maintenance report on electrical signage .neon/ installation 7 maintenance

CU Work Activities 1. $dentify electrical signage .neon/ installation requirements %. Plan electrical signage .neon/ installation 7 maintenance activities

Performance Criteria 1.1 Electrical signage .neon/ installation procedures determined %.1 Electrical signage .neon/ installation 7 maintenance tools, equipment and materials obtained %.% Electrical signage .neon/ manufacturer9s manual interpreted &.1 Electrical signage .neon/ installed in accordance with customer requirements #.1 Electrical signage .neon/ defect chec*ed and rectified according to manufacturer9s manual and 6tandard =perating Procedure ).1 'ontinuity, polarity, insulation resistance and earthing resistance tested 0.1 Procedure to produce electrical signage .neon/ submitted

&. 'arry out electrical signage .neon/ installation #. 'arry out electrical signage .neon/ maintenance

). $nspect electrical signage .neon/ installation and maintenance activities 0. Prepare electrical signage .neon/ installation 7 maintenance report

You might also like