PEKERJAAN
Pendugaan aquifer dengan Geolistrik
Mobilisasi dan demobilisasi
Pemboran : 0-50 m
: 50-100 m
Pipa jambang/casing (galvanis 6")
Pipa saringan (galvanis 4")
Pipa Naik (galvanis 2")
Pasang Filter Gravel
Sementing/grauting (mulai 60 m)
Pembersihan sumur (water jetting)
SATUAN
VOLUME
ls
1
ls
1
m
50
m
50
m
80
m
20
m
60
m3
10
ls
1
ls
1
Jumlah total
HARGA
SATUAN
10,000,000
20,000,000
450,000
500,000
300,000
1,000,000
100,000
500,000
3,000,000
4,500,000
JUMLAH
HARGA
10,000,000
20,000,000
22,500,000
25,000,000
24,000,000
20,000,000
6,000,000
5,000,000
3,000,000
4,500,000
140,000,000