You are on page 1of 4

DAFTAR HARGA SATUAN UPAH BAHAN

KABUPATEN BANGKA SELATAN


APBN TAHUN ANGGARAN 2008
NO.
1

I.
1
2
3
4
5
II.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62

URAIAN

SATUAN

HARGA
(Rp)

KET.

UPAH
Pekerja
Tukang batu/besi/cat/kayu
Kepala Tukang
Pembantu tukang
Mandor Lapangan

Hari
Hari
Hari
Hari
Hari

54,000.00
75,600.00
108,000.00
60,000.00
102,000.00

6,000.00
11,142.86
13,714.29
8,571.43
12,000.00

BAHAN
Asbes gelombang 3,00 x 1,05 (m), tebal = 4 mm
Batu Bata Merah
Batu Belah
Besi Beton
Besi Strip Plat
Batu Pecah 2-3 cm
Box MCB 4 Group
Box Sekering
Bak mandi fiber glass 70x70x65
Bubungan Asbes Gelombang
Cat Besi
Cat Tembok setara "PLATON"
Cat Meni Besi/Kayu
Cat Kayu
Closed jongkok Keramik
Dempul Kayu
Engsel Pintu/Jendela 3"
Engsel Pintu/Jendela 4"
Eternit Asbes 1 x 1 (m), tebal 5 mm
Fitting lampu
Floor drain
Grendel Kuningan
Kayu klas II
Kayu klas III
Kayu klas IV
Kayu bulat dia. 4 cm
Kayu dolken dia. 8-10 / 4m
Kawat Beton
Kawat Elektroda
Kawat Harmonika
Kaca Polos/Bening 5 mm
Kunci Tanam
Kunci Pintu Biasa
Kait Angin Istimewa
Kran air (kran tembok dia. 1/2")
List Kayu profil 5 x 5 cm
Lampu SL 14 Watt
MCB 6A
Minyak Cat
Nok Genteng Biasa
Pasir Pasang/Beton
Pasir Urug
Paku Berbagai Ukuran (2'-5")
Paku Ulir Asbes
Plamuer Tembok
Pipa PVC dia. 3/4, AW, Panjang 4 m
Pipa PVC dia. 1" Aw, Panjang 4 m
Pipa PVC dia. 2" AW, Panjang 4 m
Pipa PVC dia. 3" AW, Panjang 4 m
Pipa PVC dia. 4"-6" AW, Panjang 4 m
Pipa Besi Medium 1"
Pintu Fiber uk. 75 x 195 cm (Lengkap)
Pintu Besi UK. 60x70 cm
Pelumas
Ram Nyamuk
Rooflight fibreglass Uk. 2,25 x 0,9 (m)
Roster beton
Semen PC
Semen Nat Warna
Saklar Tunggal
Saklar Ganda
Solar

M2
Kp
M3
Kg
M'
M3
Set
Set
Bh
Bh
Bh
Kg
Kg
Kg
Bh
Kg
Bh
Bh
M2
Bh
Bh
Bh
M3
M3
M3
Btg
M3
Kg
Kg
M2
M2
Set
Set
Bh
Bh
M'
Bh
Bh
Ltr
Bh
M3
M3
Kg
Kg
Kg
M'
M'
M'
M'
M'
M'
Unit
Unit
ltr
M2
Bh
Bh
Kg
Kg
Unit
Unit
ltr

34,609.52
1,035.00
310,500.00
17,250.00
14,292.52
483,000.00
33,000.00
33,000.00
336,000.00
7,260.00
48,300.00
12,420.00
41,400.00
45,360.00
372,600.00
27,600.00
13,468.80
16,560.00
24,150.00
16,200.00
39,744.00
12,420.00
2,484,000.00
2,070,000.00
1,656,000.00
9,900.00
483,000.00
13,800.00
26,136.00
27,600.00
122,666.67
69,000.00
107,640.00
13,800.00
15,840.00
6,900.00
33,000.00
34,320.00
34,500.00
5,124.00
69,000.00
65,550.00
24,150.00
30,360.00
12,420.00
14,835.60
9,315.60
9,487.80
9,660.00
90,390.00
264,000.00
300,000.00
4,200,000.00
30,360.00
31,740.00
47,703.70
8,004.00
1,518.00
4,140.00
21,390.00
28,980.00
7,176.00

109,020.00

85,755.12

62,100.00

1,980,000.00
9,660.00

220,800.00

759.00

96,600.00
75,900.00
165,600.00

NO.

URAIAN

63
64
65
66
67
68
69
III.
1
2
3
4
5
6
7
IV.

SATUAN

HARGA
(Rp)

KET.
5

Stop kran dia. 1/2'


Stop kran dia. 1'
Stop kontak
Seng Plat BJLS uk. O.3 x 1.83 (m)
Tempat sabun keramik
Taekwood 1.2 x 2.4 (m), Tebal 4 mm
Tanah Puru dari Luar Lokasi proyek/Material Pilihan

bh
bh
Unit
M'
Bh
M2
M3

5,727.60
8,694.00
21,390.00
44,160.00
48,300.00
57,500.00
71,760.00

BAHAN BOX PANEL LISTRIK


Box panel uk. 40x60cm
MCB 6A,10A dan 16 A
Ampere Meter
Volt Meter
Breker 100A
Sisir MCB
Pas Nol

Bh
Bh
Bh
Kg
Bh
Btg
Bh

278,355.00
26,510.00
86,157.50
86,157.50
231,962.50
26,510.00
26,510.00

Ttk

135,240.00

LAIN - LAIN
1 Biaya Pemasangan Instalasi listrik per titik

Catatan :
Harga Satuan Upah dan Bahan sudah termasuk Pajak (PPN) untuk bahan.
Harga Satuan Upah dan Bahan tidak termasuk jasa
Harga satuan Upah dan bahan berdasarkan daftar yang didapat dari
Dinas Pekerjaan Umum Kabupaten Bangka Selatan Tahun Anggaran 2008

165,600.00

AR HARGA SATUAN UPAH BAHAN


ABUPATEN BANGKA SELATAN
APBN TAHUN ANGGARAN 2008
KET.
5

/Jam
/Jam
/Jam
/Jam
/Jam

/Lbr

/Btg

/5 Kg

/m3
/Btg

/Kpg

/bh

/Lbr
/Zak
/Zak

KET.
5

/Lbr

You might also like