1.7
Plans to be reviewed by an ABS Technical office should generally be submitted electronically. However, hard copies will also be accepted. A fee may be charged for the review of plans for which there is no contract of classification.
SECTION 20
20.3
General
(Revise first paragraph of Subparagraph 20.3.1a as follows.)
ABS GUIDE FOR BUILDING AND CLASSING MOTOR PLEASURE YACHTS . 2000
SECTION 21
ELECTRICAL INSTALLATION
(Revise first paragraph of Subsection 21.3 as follows.)
20.3
Plans should generally be submitted electronically to ABS. However, hard copies will also be accepted. Data to be submitted are to include a complete feeder list giving for each feeder and branch circuit, the load, wire size, and voltage drop for the longest run of each size of cable, type of cable, rating or setting of circuit breakers, rating of fuses and switches and interrupting capacity of circuit breakers and fuses. The following drawings/calculations are to be submitted. (Following text remains unchanged.)
ABS GUIDE FOR BUILDING AND CLASSING MOTOR PLEASURE YACHTS . 2000