Dian Hernanto
PT. PLN (Persero) Sektor Pembangkitan Pandan
Abstract:
One of the challenges of managing Hydro Electric Power Plant is handling the sediment. Where these sediment accumulated in Main Intake and Tributary Intake that can decrease productivity of Power Plant. Sedimentation can not be prevented but minimized because the sediment caused by natural factors and human activity factors. To improve productivity of PLTA Renun then applied sedimentation management with vegetative conservation methods, mechanical excavation and sediment flushing. With the application of sedimentation management, the operational of PLTA Renun can be keep in good condition. Keyword: Sediment, Excavation, Flushing, Vegetative Conservation