Professional Documents
Culture Documents
RST01 Hoc
Saturday, March 26, 2011 10:57 AM GE Hitachi; INPO ERC Main; INPO ERC Tech; John Kelly - DOE; Richard Stark - DOE; Rob Versluis - DOE; RST01B Hoc; RST03 Hoc; Sal Golub - DOE NRC RST Format for Unit 1-3 Recommendations 03-26-11 1100 Recommendations Table.docx
All, Here is a revision that includes Units 1-3. We are working on cleaning it up. Please provide comments/feedback to this address. Regards, Eric Thomas NRC RST
DK 591 of 1892
UNIT ONE REACTOR PIORITY * Make the protection of primary containment the first priority RECOMMENDATIONS Notes.Assumptions/Other
th'nnq MRpmpmhpr I
(b)(5)
DK 592 of 1892
to continue parallel In
(b)(5)
DK 593 of 1892
(b)(5)
DK 594 of 1892
UNIT ONE SPENT FUEL POOL PIORITY Ensure SFP level maintained as full as possible RECOMMENDATIONS NoteslAssumptions/Other things to Remember
DK 595 of 1892
UNIT TWO REACTOR PIORITY Make the protection of primary containment the first priority RECOMMENDATIONS NoteslAssumptions/Other things to Remember
(b)(5)
DK 596 of 1892
(b)(5)
DK 597 of 1892
(b)(5)
DK 598 of 1892
UNIT TWO SPENT FUEL POOL PIORITY Ensure SFP level maintained as full as possible RECOMMENDATIONS Notes/Assumptions/Other things to Remember
(b)(5)
DK 599 of 1892
UNIT THREE REACTOR PIORITY Make the protection of primary containment the first priority RECOMMENDATIONS Notes/AssumptionslOther things to Remember
(b)(5)
DK 600 of 1892
o Inparallel continue to
(b)(5)
DK 601 of 1892
DK 602 of 1892
UNIT THREE SPENT FUEL POOL PIORITY Ensure SFP level maintained as full as possible RECOMMENDATIONS NoteslAssumptions/Other things to Remember
(b)(5)
DK 603 of 1892
DK 604 of 1892
PIORITY o Maintain coverage of spent fuel pool with fresh borated water
RECOMMENDATIONS (b)(5)
DK 605 of 1892