Professional Documents
Culture Documents
13
1,046 1,046 952 991 911 28
F
UNP 120 UNP 120
teava din otel zincat 60x3 galvanized steel pipe 60x3
28
1,28
1,402
1,401
UNP 120
IPE 120
IPE 120
IPE 120
IPE 120
NOTA : COTELE SUNT CONFORM PROIECT. LA PUNEREA IN OPERA, EXECUTANTUL VA EFECTUA RELEVEU PENTRU ACTUALIZAREA COTELOR
1:100
456
59 IPE 120 IPE 120 IPE 120 IPE 120 IPE 120 vedere 1,192 1,177 1,174
575
placuta metalica in baza montantului se sudeaza pe profilul IPE
0.00=+89.70
NORD NORTH
0.0m
1.0m
2.0m
5.0m
DESCRIERE DESCRIPTION
scara metalica
CORP B CORP A
CORP C
ZZ
LL AA
+48.60
575
65
1,28
ETAJ TEHNIC TECHNICAL FLOOR ETAJ 11 11th FLOOR ETAJ 10 10th FLOOR ETAJ 9 9th FLOOR ETAJ 8 8th FLOOR ETAJ 7 7th FLOOR ETAJ 6 6th FLOOR ETAJ 5 5th FLOOR ETAJ 4 4th FLOOR ETAJ 3 3rd FLOOR ETAJ 2 2nd FLOOR ETAJ 1 1st FLOOR PARTER GROUNDFLOOR
D D'
IPE 120
50
340
CATEGORIA DE IMPORTANTA A CLADIRII: "C" (NORMALA) CLASA II CONSTRUCTII DE IMPORTANTA NORMALA GRAD DE REZISTENTA LA FOC - GRF I RISC DE INCENDIU - MIC - BIROURI - MARE - PARCAJ
CLIENTI/ ADRESE CLIENTS / ADDRESSES
GRATAR METALIC
UNP 120 1,587
IPE 120 IPE 120
1,06
1,06
CP
30
SECTIUNE M-M
gratar metalic presat `Meiser` 40x3, ochiuri de 30x20 din otel zincat termic
846
950
a rchitect service srl b-dul. dimitrie pompei, nr. 10 A, cladirea conect 3, parter
p r o i e c t a n t a r h i t e c t u r a
208 534
68
578
33
05
90
sector2, bucuresti, J 40 / 9767 / 11.08.2011, R RO 824576 tel. 031 / 402 22 72 fax 031 / 402 22 73 e-mail office @ architectservice.ro
w w w.a r c h i t e c t s e r v i c e.r o
32
200
49
17.4/28.0
30 576 64 40 50
60
Punct de lucru Bucureti: Calea Grivitei, nr.136, sector 1, Bucuresti - tel. +40(21)3178828 e-mail: office@popp-si-asociatii.ro
Sediul social: Bucureti, sector 3, Aleea Barajul Cucuteni, nr.2, bl.M4a, sc.3, et.1, ap.14 Reg. com. J40/6425/24.07.2002
64
64
1650
18.3/27.0
24
25
8 Tr.
1,19
7
16 Tr.
130
100
36 27
33
180
IPE 120
960
24
33
240
24
1,00
IPE 120
1,30
1,45
UNP 120
1,45
UNP 120
860
IPE 120
placuta metalica in baza montantului se sudeaza pe profilul IPE la montaj
315
+48.60
SEMNATURA SIGNATURE
EXIGENTA EXIGENCE
12
110
+47.40
M 55 16 05
80
FAZA 1 1st PHASE OBIECT PROJECT NAME TITLUL PLANSEI DRAWING TITLE
CLADIRE A A BUILDING
1,60
IPE 120
IPE 120
260
751
335
790
1,28 M
ARHITECTURA
arh. Ion Mircea Argatu arh. Simona CIUREA arh. Constantin CIUREA
DATA DATE
06.12.2013
PROIECT NR. 1205.08 PROJECT NO. CONTRACT NR. 1205.08 CONTRACT NO. COD: FP-008-5/1.1
2,85
1850 GOL 850
1,70
G C B
NUME PROIECT PROJECT NAME BLOCK 1
200
A
CLADIRE / FAZA PHASE / BUILDING BLOCK 2
E X A D E D 0 0 0 0 8 0 9 0 0
SPECIALITATEA BRANCH NAME BLOCK 4 DESCRIERE DESCRIPTION BLOCK 6 FAZA DE PROIECTARE DESIGN PHASE BLOCK 3 TIP PLAN TYPE / SUB BRANCH BLOCK 5 NIVEL LEVEL BLOCK 7 NR. IDENTITATE ID NUMBER BLOCK 8 REVIZIE REVISION BLOCK 9
- -
A08A.06
Allplan 2013
REPRODUCEREA, IMPRUMUTAREA SAU EXPUNEREA ACESTUI DOCUMENT, PRECUM SI TRANSMITEREA INFORMATIILOR CONTINUTE ESTE PERMISA NUMAI IN CONDITIILE STIPULATE IN CONTRACT. UTILIZAREA EXTRACONTRACTUALA NECESITA ACORDUL SCRIS AL S.C. ARCHITECT SERVICE S.R.L.