You are on page 1of 2

KURA-Future Roads Projects

PROJECT DESCRIPTION Missing Link Roads Design and Construction of the Greater Eastern Bypass Project Construction of Nairobi Link Road:(Waiyaki WayRedhill Road) Dualling of Ngong Road: All Saints Cathedral to Adams Arcade Dualling of Ngong Road: Adams Arcade-KarenNgong-Bomas Design of Upper Hill Roads Phase 2(Construction) Eastleigh Roads Phase 2 (Construction) Dualling of Outering Road Upgrading of Kasarani-Mwiki-Githurai Link Road(Phase 2) Upgrading of Syokimau-Katani Road phase 2 Kisumu Foot Bridge Construction of Kapsoya Roads in Eldoret Municipality Phase 2 Construction of Meru Bypass Nakuru Bypass Design of Ilala-Murhanda-Lubao, Ilesi-StermanEmaondo, and Mwiyala-Mungulu-Ikonyero Roads Construction of Missing Link 1a (River RoadNgara) Construction of Missing Link 5(Muratina General Waruinge street to Juja Road) Construction of Missing Link 5a(Ring Road parklands) LENGTH(KM) STATUS Road - 13.6 NMT - 11.7 77 5 4.7 30 12.3 7.6 13 0.8 3 1 6 17 20 42 0.7 3 4 Under design Under design Sourcing for funding Awaiting tendering Under design Under design Under design Under design Under design Under design Under design Under design Under design Under design Under design Consultations with stakehlders ongoing Awaiting tendering Awaiting tendering

Mombasa Road-Lukenya-Daystar University, Shell- 43.7 Pepe, Kinanie-Joska and Quarry Roads in Mavoko Construction of Missing Link 5b(Limuru road Thika Road) 1.6

Under design by Kiri Consultants Ltd Awaiting tendering

You might also like