LOCATION PLAN
THE DECOMMISSIONING OF THE CLASS C HIGH HAZARD DAM AT THE RIDGEWOOD RESERVOIR BOUNDED BY HIGHLAND BOULEVARD, VERMONT PLACE AND THE JACKIE ROBINSON PARKWAY IN HIGHLAND PARK
BOROUGH OF QUEENS/BROOKLYN CONTRACT NO. Q020-113M
LIST OF DRAWINGS
ENERGY CODE COMPLIANCE TO THE BEST OF MY PROFESIIONAL EXPERIENCE AND KNOWLEDGE THE PLANS AND SPECIFICATION HEREIN ARE EXEMPT FROM COMPLIANCE WITH TH E2011 NYCECC FOR THE FOLLOWING REASON: - ALL PROPOSED WORK IS PERFORMED ON UNCONDITIONED SPACES
Q020-113M
REV. # DATE DESCRIPTION 2 7/12/13 90% PERMIT DRAWINGS 5/20/13 75% REVIEW SUBMISSION 1
BRAM GUNTHER
APPROVED-DEP CHIEF OF DESIGN APPROVED-CHIEF ENGINEER NANCY PRINCE, RLA JOHN J. NATOLI, PE
200
B-SCAN
DRAWING NO.
Q020-113M
SHEET NO.
L-001.00
2
OF
5/20/2013
25
SHEETS
GENERAL NOTES: 1. 2. ELEVATIONS, IN FEET, ARE REFERENCED TO THE QUEENS HIGHWAY DATUM. BASE MAP DEVELOPED FROM CADD FILES PROVIDED BY THE CITY OF NEW YORK, DEPARTMENT OF DESIGN AND CONSTRUCTION, DIVISION OF SAFETY AND SITE SUPPORT. LOCATIONS OF UNDERGROUND UTILITIES ARE APPROXIMATE ONLY, AND ARE NOT WARRANTED TO BE CORRECT. ADDITIONAL UTILITIES MAY EXIST WHICH ARE NOT INDICATED ON THESE PLANS. ALL EXISTING UTILITIES SHALL BE VERIFIED FOR SERVICE, SIZE, INVERT ELEVATION, LOCATION, ETC. PRIOR TO ANY CONSTRUCTION WORK IN THE VICINITY THEREOF. THE CONTRACTOR MUST NOTIFY NEW YORK CITY ONE CALL (1-800-2724480) AT LEAST 2 FULL WORKING DAYS PRIOR TO ANY CONSTRUCTION. APPROPRIATE MUNICIPAL DEPARTMENTS MUST ALSO BE NOTIFIED. NOTIFY OWNER AND ENGINEER IN WRITING OF ANY AND ALL DISCREPANCIES PRIOR TO COMMENCING WORK. EIGHT (8) TEST BORINGS (NUMBERED 1 TO 8) WERE PERFORMED BY NYCDDC AND OBSERVED BY MATRIX ENGINEERING SERVICES, P.C, IN JULY, 2011. WELL POINTS WERE INSTALLED IN BORINGS 2, 6, AND 7. FOUR (4) TEST PITS (TP-1 TO TP-4) WERE ALSO PERFORMED UNDER THE OBSERVATION OF URS CORPORATION BETWEEN JULY 18 AND 19, 2011. LOCATIONS OF SUBSURFACE EXPLORATIONS SHOWN ON PLANS ARE APPROXIMATE ONLY. LIMITED BOTTOM TOPOGRAPHY AT BASIN 2 (MIDDLE BASIN) DUE TO STANDING WATER IN THE BASIN.
DEWATERING NOTES: 1. THE CONTRACTOR IS HEREBY MADE AWARE THAT THE NYCDPR HAS NO CONTROL OVER INFLOWS INTO THE WORK AREA. MAJOR RAINFALL EVENTS MAY CAUSE THE WATER LEVEL IN THE BASINS TO RISE AND LEAD TO POTENTIAL INUNDATION OF THE WORK SITE. WHERE THE CONTRACTOR PROPOSES TO REMOVE GROUNDWATER FROM THE BOTTOM OF THE EXCAVATION BY SUMPING AS APPROVED BY THE RESIDENT ENGINEER, THE SUMP SHALL BE SURROUNDED BY A SUITABLE FILTER TO PREVENT REMOVAL OF SOIL FINES. THE INTAKE MUST BE PLACED WITHIN A PERFORATED PIPE AND THE ANNULAR SPACE BETWEEN THE PIPE AND THE SUMP PIT (AS WELL AS THE BOTTOM OF THE PIT) MUST BE FILLED WITH CRUSHED STONE. FILTER FABRIC MAY ALSO BE USED, IF NECESSARY. WHERE THE CONTRACTOR PROPOSES TO DEWATER, HE/SHE SHALL PROVIDE DEWATERING BAGS FOR THE PURPOSE OF TREATING DISCHARGE FROM ALL PUMPING SYSTEMS, INCLUDING BUT NOT LIMITED TO GROUNDWATER DEWATERING SYSTEMS. SETTLING TANKS SHALL BE CONSTRUCTED OF METAL WITH WATERTIGHT SEAMS AND SUFFICIENT STIFFNESS TO ACCOMMODATE FULL TANK LEVELS. TANKS SHALL BE SIZED TO PROVIDE SUFFICIENT RESIDENCE TIME COMMENSURATE WITH PUMPING RATES AND SEDIMENT GRAIN SIZE. BAFFLES AND BOOMS SHALL BE PROVIDED AS NEEDED. PUMPS, CONDUIT, PIPES, AND/OR SIPHONS USED AT THE SITE SHALL BE SIZED ACCORDINGLY AND SHALL BE MAINTAINED IN GOOD WORKING ORDER. FUEL FOR PUMPS AND GENERATORS MUST BE LOCATED SUCH THAT FUEL CANNOT BE RELEASED. SECONDARY CONTAINMENT SHALL BE PROVIDED FOR GASOLINE OR DIESEL-POWERED ELECTRICAL GENERATORS AND PUMPING EQUIPMENT. PUMPS SHALL BE OPERATED IN A MANNER WHICH DOES NOT CREATE A NUISANCE TO ABUTTERS (I.E. QUIETLY AND WITHOUT SIGNIFICANT EXHAUST). GROUNDWATER LEVELS IN EXCAVATIONS SHALL BE MAINTAINED AT LEAST TWO FEET BELOW SUBGRADE. GROUNDWATER CONTROL MAY CEASE WHEN THE CONTRACTOR AND THE NYCDPR AND ITS ENGINEER ARE SATISFIED THAT GROUNDWATER WILL NO LONGER AFFECT THE WORK OR THE INTEGRITY OF THE STRUCTURE IN THE AREA.
ANTICIPATED CONSTRUCTION SEQUENCE: 1. 2. DEVELOP PROJECT SCHEDULE, APPLY FOR NECESSARY PERMITS, BEGIN PREPARATION OF SUBMITTALS AS SPECIFIED PRIOR TO START OF WORK. MOBILIZE ALL NECESSARY EQUIPMENT, PERSONNEL, AND MATERIAL TO THE SITE. PROVIDE ALL TEMPORARY FACILITIES AND CONTROLS NECESSARY FOR PERSONNEL AND EQUIPMENT TO EXECUTE THE WORK IN A SAFE, LAWFUL, AND EFFICIENT MANNER AND NECESSARY TO PROTECT EXISTING FACILITIES, UTILITIES, DESIGNATED RESOURCES, AND TO COMPLY WITH ALL PERMIT CONDITIONS. PROVIDE TEMPORARY CONSTRUCTION TRAILER AND SPECIFIED EQUIPMENT AND SUPPLIES FOR THE RESIDENT ENGINEER. MAINTAIN FOR THE DURATION OF THE PROJECT. PROVIDE AND MAINTAIN TRAFFIC AND PEDESTRIAN CONTROLS FOR THE DURATION OF THE WORK INCLUDING BARRIERS, GATES, FENCING, SIGNAGE, FLAGGING, AND PUBLIC NOTIFICATIONS. PROVIDE AND MAINTAIN TEMPORARY SEDIMENT AND EROSION CONTROLS AS PER THE CONTRACT PLANS AND SPECIFICATIONS, FEDERAL, STATE, LOCAL REGULATIONS, AND PROJECT-SPECIFIED PERMITS FOR THE PROTECTION OF NATURAL RESOURCES. OBTAIN FROM THE REGULATORY AGENCIES ALL OTHER REQUIRED PERMITS NOT INCLUDED IN THE SPECIFICATION. WEST EMBANKMENT WORK AREA PROVIDE TEMPORARY CONSTRUCTION ACCESS INTO WORK AREA FROM VERMONT PLACE. CLEAR AND LEGALLY DISPOSE OF TREES AND WOODY VEGETATION WITHIN THE WORK ZONE EXCAVATE EMBANKMENT TO THE EXTENT SHOWN ON THE CONTRACT DRAWINGS. USE EXCAVATED SOIL AS FILL FOR CONSTRUCTION TEMPORARY ACCESS ROAD/RAMP OR STORE IN ON-SITE TEMPORARY SHORT-TERM STOCKPILE AREAS AS SHOWN ON DRAWINGS CONSTRUCT TEMPORARY ACCESS ROAD THROUGH BASIN 3 TO WESTERN DIVISION EMBANKMENT WORK AREA WESTERN DIVISION EMBANKMENT CULVERT CLEAR AND LEGALLY DISPOSE OF TREES AND WOODY VEGETATION WITHIN THE WORK ZONE EXCAVATE EMBANKMENT TO THE EXTENT SHOWN ON THE CONTRACT DRAWINGS. USE EXCAVATED SOIL AS FILL FOR CONSTRUCTION OR STORE IN ON-SITE TEMPORARY SHORT-TERM STOCKPILE AREAS AS SHOWN ON DRAWINGS CONSTRUCT TEMPORARY COFFERDAM AROUND WORK AREA IN BASIN 2 CONSTRUCT CAST-IN-PLACE CONCRETE CULVERT BACKFILL AND COMPACT FILL TO PRE-CONSTRUCTION CONDITIONS AS SHOWN ON THE DRAWINGS REMOVE TEMPORARY CONSTRUCTION ACCESS ROAD THROUGH BASIN 3 WEST EMBANKMENT CULVERT: PLACE AND COMPACT DENSE GRADED CRUSHED STONE IN EXCAVATION AS SHOWN ON THE DRAWINGS POUR FOOTINGS AS SHOWN ON THE DRAWINGS PLACE PRE-CAST CULVERTS ON FOOTINGS AS SHOWN ON THE DRAWINGS BACKFILL AND COMPACT FILL TO PRE-CONSTRUCTION CONDITIONS AS SHOWN ON THE DRAWINGS EASTERN DIVISION EMBANKMENT CULVERT PROVIDE TEMPORARY CONSTRUCTION ACCESS INTO WORK AREA FROM JACKIE ROBINSON PARKWAY RAMP, AROUND NORTH EMBANKMENT CLEAR AND LEGALLY DISPOSE OF TREES AND WOODY VEGETATION WITHIN THE WORK ZONE CONSTRUCT TEMPORARY ACCESS RAMP DOWN EASTERN DIVISION EMBANKMENT INTO BASIN 1 EXCAVATE EMBANKMENT TO THE EXTENT SHOWN ON THE CONTRACT DRAWINGS. USE EXCAVATED SOIL AS FILL FOR CONSTRUCTION OF ACCESS ROAD AND TEMPORARY CONSTRUCTION STAGING AND STOCKPILE AREA OR STORE IN ON-SITE TEMPORARY SHORT-TERM STOCKPILE AREAS AS SHOWN ON DRAWINGS CONSTRUCT TEMPORARY COFFERDAM AROUND WORK AREA IN BASIN 2 CONSTRUCT CAST-IN-PLACE CONCRETE CULVERTS BACKFILL AND COMPACT FILL TO PRE-CONSTRUCTION CONDITIONS AS SHOWN ON THE DRAWINGS CONSTRUCT PERMANENT RETAINING WALL ALONG ACCESS RAMP EXCAVATE TEMPORARY FILL AROUND FORMER EFFLUX CHAMBER TRAINING WALLS REPLACE AND RESTORE DISTURBED AREAS ALONG CONSTRUCTION ACCESS ROUTE RESTORE ALL DISTURBED AREAS. REMOVE ALL REMAINING TEMPORARY FACILITIES AND MAKE FINAL RESTORATIONS TO SITE. CONDUCT SITE WALK WITH OWNER, ENGINEER, AND RESIDENT ENGINEER TO INSPECT SITE. MAKE MODIFICATIONS AS REQUIRED. DE-MOBILIZE PERMANENTLY FROM THE SITE UPON APPROVAL
GENERAL NOTES:
1. ALTERATION OF EXISTING SPACE AND RELATED CONSTRUCTION TO COMPLY WITH THE 1968 NYC BUILDING CODE EXCEPT AS NOTED PER AC 28-101.4.3. PER THAT SECTION, WORK THAT FALLS UNDER THE FOLLOWING MUST COMPLY WITH THE 2008 NYC BUILDING CODE:
3.
2.
3.
3.
4.
4.
TITLE 28 CHAP 1. - ADMINISTRATION TITLE 28 CHAP 2. - ENFORCEMENT NYCBC CHAP. 33 - SAFETY OF PUBLIC & PROPERTY DURING CONSTRUCTION NYC PLUMBING CODE NYC MECHANICAL CODE NYC FUEL GAS CODE NYCBC CHAP.9 - FIRE PROTECTION NYCBC CHAP.30 - ELEVATORS NYCBC CHAP. 32 - ENCROACHMENTS INTO PUBLIC RIGHT OF WAY NYCBC CHAP.11 - ACCESSIBILITY (APPLIES ONLY IN CASES WHEN PROPOSED WORK EXCEEDS 50% OF BUILDING VALUE OR WHEN CHANGING MAIN USE OR DOMINANT OCCUPANCY)
5.
2. 3.
5. 6.
4.
4.
6.
5.
6.
SEDIMENT, EROSION, AND WATER CONTROL NOTES: 1. THE SCOPE OF WORK FOR SEDIMENT & EROSION CONTROL SHALL INCLUDE THE INSTALLATION OF STRAW BALE DIKE/SILT FENCE AS SHOWN AND AS NEEDED ELSEWHERE. THIS WORK SHALL ALSO INCLUDE MONITORING, CLEANING, MAINTENANCE, AND REPAIR/REPLACEMENT OF ALL INSTALLED STRAWBALE/SILT FENCE AND THE PROPER REMOVAL AND DISPOSAL OF STRAW BALE DIKE/SILT FENCING AFTER FINAL STABILIZATION OF THE SITE. ALL WORK SHALL COMPLY WITH ALL CODES, RULES, REGULATIONS, LAWS, AND ORDINANCES AND EXECUTED IN CONFORMANCE WITH ANY PERMITS, LICENSES ETC., AS ISSUED BY THE CITY OF NEW YORK, NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION, U.S. ENVIRONMENTAL PROTECTION AGENCY, AND ALL OTHER AUTHORITIES HAVING JURISDICTION WITHIN THE PROJECT AREA. THE CONTRACTOR SHALL SUBMIT A WATER CONTROL PLAN TO THE NYCDPR FOR REVIEW AND MAY, AT THAT TIME, PROPOSE ALTERNATIVE WATER CONTROL STRATEGIES. THE CONTRACTOR'S WATER CONTROL PLAN MUST SATISFY THE TERMS AND CONDITIONS OF ALL PERMITS ISSUED TO THE PROJECT. THE CONTRACTOR WILL BE RESPONSIBLE FOR SUBMITTING A NOTICE OF INTENT (NOI) FOR STATE POLLUTANT DISCHARGE ELIMINATION SYSTEM (CONSTRUCTION STORMWATER GENERAL PERMIT) - NY SPDES. AS PART OF THIS PROCESS, THE CONTRACTOR SHALL BE RESPONSIBLE FOR DEVELOPING A STORMWATER POLLUTION PREVENTION PLAN (SWPPP) FOR THE PROJECT SITE. THE SWPPP WILL ENCOMPASS THE IMPLEMENTATION OF SEDIMENT, EROSION, AND WATER CONTROL PERFORMANCE SPECIFICATIONS. IT SHALL BE UNDERSTOOD THAT THE MEASURES CALLED FOR REPRESENT THE MINIMUM ACCEPTABLE LEVEL OF SEDIMENT AND EROSION CONTROL. THE CONTRACTOR'S PLAN SHALL BE DESIGNED TO ACCOUNT FOR THE ANTICIPATED WORK PLAN, CONSTRUCTION SEQUENCE, AND ANTICIPATED LEVEL OF DISTURBANCE. NO MATERIALS SHALL BE DISPERSED OR STOCKPILED IN ANY AREAS BEYOND THE AUTHORIZED LIMITS OF DISTURBANCE, EXCEPT FOR AREAS SPECIFICALLY DESIGNATED FOR SPOIL DISPOSAL. MATERIALS REJECTED FOR USE IN THE WORK SHALL BE REMOVED AND DISPOSED OF AS SOON AS PRACTICAL TO DO SO. ADEQUATE PROTECTIVE MEASURES SHALL BE TAKEN TO PREVENT THE EROSION OF STOCKPILED AND/OR PLACED MATERIALS AND RESULTANT SEDIMENTATION OF ADJACENT WATERCOURSES, WETLAND AREAS, DRAINAGE FACILITIES, AND RELATED AREAS, DURING THE COURSE OF PERFORMING THE WORK. THE DEPLOYMENT OF SILT STRAWBALE/SILT FENCE, DEWATERING BAGS, AND CONSTRUCTION ENTRANCES ARE SHOWN. THE LIMITS OF THESE CONTROLS HAVE BEEN ESTABLISHED BASED ON GROUND CONDITIONS, ANTICIPATED RUNOFF CONDITIONS, AND EXPECTED WATER SURFACE ELEVATIONS IN BASIN 2. PRIOR TO THE INSTALLATION OF ANY SEDIMENTATION BARRIER, THE CONTRACTOR, NYCDPR, RESIDENT ENGINEER, AND ENGINEERING DESIGN CONSULTANT SHALL MEET ON SITE TO DISCUSS CONDITIONS. ANY ADJUSTMENTS TO THE CONFIGURATION SHOWN ON THE CONTRACT PLANS HALL BE DISCUSSED AT THE TIME AND MUTUALLY AGREED UPON. THE CONTRACTOR SHALL EXPECT THE POSSIBILITY THAT SEDIMENTATION CONTROLS MAY BE INSTALLED AND/OR REMOVED IN THE WET. PRIOR TO BEGINNING ANY DEWATERING, CLEARING, STOCKPILING, EXCAVATION OR FILLING, THE CONTRACTOR SHALL PERFORM THE FOLLOWING SEQUENCE OF IMPLEMENTATION OF SEDIMENTATION AND SILTATION CONTROL MEASURES: PERFORM ALL NECESSARY WORK TO INSTALL ALL ANTICIPATED SEDIMENTATION BARRIERS INCLUDING BUT NOT NECESSARILY LIMITED TO SILT FENCES, STRAWBALES, STABILIZED CONSTRUCTION ENTRANCES, AND OTHER ITEMS AS NECESSARY. PROVIDE ALL NECESSARY SEDIMENTATION AND SILTATION CONTROL MEASURES AS REQUIRED BY THE ENGINEER, THE NYCDPR AND REGULATORY AGENCIES TO MINIMIZE SEDIMENTATION OR SILTATION OCCURRING BEYOND THE IMMEDIATE LIMITS OF WORK. TAKE ADDITIONAL STEPS AS NECESSARY TO MINIMIZE SEDIMENTATION AND SILTATION WITHIN WORK AREAS AND ELIMINATE SEDIMENTATION AND SILTATION OUTSIDE OF WORK AREAS THROUGHOUT THE CONDUCT OF THE WORK. FOLLOWING INITIAL SETUP OF SEDIMENT AND EROSION CONTROLS, THE SITE SHALL BE INSPECTED BY THE NYCDPR, RESIDENT ENGINEER, AND ENGINEERING DESIGN CONSULTANT. NO WORK CAN CONTINUE UNTIL THE EROSION CONTROLS MEET THE APPROVAL OF THE NYCDPR DAMAGED OR LOOSE STRAWBALES, SILTATION FENCE OR OTEHR CONTROL MEASURES SHALL BE REPLACED AS NECESSARY TO MAINTAIN THEIR FUNCTION OF CONTROLLING SEDIMENTATION AND SILTATION. REMOVE ANY ACCUMULATION OF SILT OR SOIL BUILD-UP BEHIND SILT FENCES AS IT OCCURS. FOLLOWING PERIODIC CLEANING OF ALL SEDIMENTATION CONTROLS AND UPON COMPLETION OF THE USE OF THE CONTROLS, THE ACCUMULATED SEDIMENT SHALL BE ALLOWED TO DRY PRIOR TO TRANSPORTING TO LAWFUL OFF-SITE UPLAND DISPOSAL AREAS OR ON-SITE DISPOSAL LOCATIONS DESIGNATED BY THE ENGINEER. THE CONTRACTOR SHALL REPAIR AND DAMAGE RESULTING FROM SEDIMENTATION OR SILTATION DURING THE WORK AND RESTORE PROPERTY TO ITS PRIOR CONDITION AT NO ADDITIONAL COST TO THE NYCDPR. ADDITIONAL EROSION AND SEDIMENTATION CONTROL NECESSARY TO DEAL WITH TRANSIENT CONDITIONS ON THE SITE SHALL BE PROVIDED BY THE CONTRACTOR AS NEEDED. AFTER THE SITE HAS BEEN FULLY STABILIZED AGAINST EROSION AND UPON APPROVAL OF THE RESIDENT ENGINEER, REMOVE SEDIMENT CONTROL DEVICES AND ACCUMULATED SILT. LEGALLY DISPOSE OFF-SITE ALL ACCUMULATED SILT AND ALL SEDIMENTATION AND SILTATION CONRTOL DEVICES SUCH AS, BUT NOT LIMITED TO SILTATION FENCING, SAND BAGS, AND OTHER RELATED PRODUCTS. ON-SITE DISPOSAL OF CLEAN SEDIMENTS IN UPLAND AREA SHALL BE ALLOWED ONLY WITH THE EXPRESS APPROVAL OF THE NYCDPR.
5. 6.
7.
7.
2.
8. 9.
STRAWBALE AND SILT FENCE NOTES: 1. BALES SHALL BE PLACED WHERE SPECIFIED ON DRAWINGS IN A ROW WITH ENDS TIGHTLY ABUTTING THE ADJACENT BALES. STRAW BALES SHALL BE COMPOSED ONLY OF THE DRY STOCK OF A CEREAL PLANT CONTAINING NO LIVING PLANT MATERIAL OR SEED PRODUCT. EACH BALE SHALL BE EMBEDDED IN THE SOIL A MINIMUM OF FOUR (4) INCHES, AND PLACED SO THE BINDINGS ARE HORIZONTAL. BALES SHALL BE SECURELY ANCHORED IN PLACE BY TWO WOODEN STAKES DRIVEN THROUGH THE BALE. THE FIRST STAKE SHALL BE DRIVEN TOWARD THE PREVIOUSLY LAID BALE AT AN ANGLE TO FORCE THE BALES TOGETHER. STAKES SHALL BE DRIVEN FLUSH WITH THE BALE. SILTATION FENCE SHALL BE "ENVIROFENCE" AS MANUFACTURED BY MIRAFI INC. OR APPROVED EQUIVALENT. IF NECESSARY, THE CONTRACTOR SHALL PROVIDE A BACKING MESH TO PROVIDE STABILITY TO THE SILT FENCE FABRIC AGAINST BLOW OVER OR KNOCK DOWN. WHEN TWO SECTIONS OF FILTER CLOTH ADJOIN EACH OTHER THEY SHALL BE OVERLAPPED BY SIX INCHES AND FOLDED . INSPECTION SHALL BE FREQUENT AND REPAIR OR REPLACEMENT SHALL BE MADE PROMPTLY AS NEEDED. SEDIMENT SHALL BE REMOVED WHEN ACCUMULATIONS REACH 1/3 ABOVE THE GROUND HEIGHT OF THE BARRIER BALES SHALL BE REMOVED WHEN THEY HAVE SERVED THEIR USEFULNESS SO AS NOT TO BLOCK OR IMPEDE STORM FLOW OR DRAINAGE. STRAWBALE/SILT FENCE BARRIER PLACED ON EMBANKMENT FACE SHALL BE SECURED USING SANDBAGS.
3.
10.
2. 3.
4.
8. 9.
4.
5.
5. 6.
10.
NO CHANGE TO USE, EGRESS OR OCCUPANCY. ALL WORK SHALL CONFORM TO THE REQUIREMENT OF THE NEW YORK CITY BUILDING CODE, FIRE DEPARTMENT REGULATIONS, UTILITY COMPANY REQUIREMENTS, AND THE BEST TRADE PRACTICES. BEFORE COMMENCING WORK, THE CONTRACTOR SHALL FILE ALL REQUIRED INSURANCE CERTIFICATES WITH THE DEPARTMENT OF BUILDINGS, OBTAIN ALL REQUIRED PERMITS, AND PAY ALL FEES REQUIRED BY THE GOVERNING NEW YORK CITY AGENCIES. MINOR DETAILS NOT USUALLY SHOWN OR SPECIFIED, BUT REQUIRED FOR PROPER CONSTRUCTION OF ANY PART OF THE WORK SHALL BE INCLUDED AS IF THEY WERE INDICATED IN THE DRAWINGS. THE CONTRACTOR SHALL COORDINATE ALL WORK PROCEDURES WITH THE STIPULATIONS OF LOCAL AUTHORITIES, BUILDING MANAGEMENT OR BOARD OF DIRECTORS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION OF ALL CONDITIONS AND MATERIALS WITHIN THE PROPOSED CONSTRUCTION AREA. THE CONTRACTOR SHALL DESIGN AND INSTALL ADEQUATE SHORING AND BRACING FOR ALL STRUCTURAL OR REMOVAL TASKS. THE CONTRACTOR SHALL HAVE SOLE RESPONSIBILITY FOR ANY DAMAGE OR INJURIES CAUSED BY OR DURING HIS EXECUTION OF THE WORK. THE CONTRACTOR SHALL LAY OUT HIS OWN WORK, AND SHALL PROVIDE ALL DIMENSIONS REQUIRED FOR OTHER TRADES: PLUMBING, ELECTRICAL, ETC. PLUMBING AND ELECTRICAL WORK SHALL BE PERFORMED BY PERSONS LICENSED IN THEIR TRADES, WHO SHALL ARRANGE FOR AND OBTAIN INSPECTIONS AND REQUIRED SIGN-OFFS. THE CONTRACTOR SHALL DO ALL CUTTING, PATCHING REPAIRING AS REQUIRED TO PERFORM ALL OF THE WORK INDICATED ON THE DRAWINGS, AND ALL OTHER WORK THAT MAY BE REQUIRED TO COMPLETE THE JOB. ALL PIPING AND WIRING SHALL BE REMOVED TO A POINT OF CONCEALMENT AND SHALL BE PROPERLY CAPPED OR PLUGGED. TO THE BEST OF MY KNOWLEDGE, BELIEF AND PROFESSIONAL JUDGEMENT THE DESIGN, DETAILS AND NOTES HEREIN ARE IN COMPLIANCE WITH THE 2010 NYCECC. THE ARCHITECT HAS NOT BEEN RETAINED TO PROVIDE SUPERVISION. ITEMS SUBJECT TO SPECIAL/PROGRESS INSPECTION ARE: FIRESTOPS FINAL DIR. 14 ENERGY CODE COMPLIANCE + LIGHTING CONTROLS
6.
7. 8.
7.
8.
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
9.
5.
6. 7.
9. 10.
11.
12.
13.
NOTES
DRAWN BY CHECKED BY
CBN
REVIEWED-TEAM LEADER DML FORESTRY:
CBN
WHH
APPROVED-DIRECTOR CONTRACT NO.
APPROVED-DEP CHIEF OF DESIGN APPROVED-CHIEF ENGINEER NANCY PRINCE, RLA JOHN J. NATOLI, PE B-SCAN SCALE AS SHOWN DATE 7-10-13 DRAWING NO.
Q020-113M
SHEET NO.
OF
25 SHEETS
NOTES: 1. EFFLUX CHAMBER FOR BASIN 1 AND 2 APPEARED TO BE DECOMMISSIONED VIA CONCRETE FILL, AS OBSERVED BY GZA PERSONNEL DURING THE COURSE OF THEIR JUNE 29, 2012 SITE VISIT.
MATCHLINE
AREA (1)
0
AREA (1) AREA (3)
15'
30'
60'
MATCHLINE
CBN
CBN
FORESTRY:
WHH
APPROVED-DIRECTOR CONTRACT NO.
GZA
Engineers and Scientists
1 EXISTING EMBANKMENT SECTION AT LOCATION OF AREA 1 PROPOSED CULVERT G-101 0 5 10 20 FEET
APPROVED-DEP CHIEF OF DESIGN APPROVED-CHIEF ENGINEER NANCY PRINCE, RLA JOHN J. NATOLI, PE B-SCAN SCALE AS SHOWN DATE 7-10-13 DRAWING NO.
Q020-113M
SHEET NO.
OF
25 SHEETS
AREA (2)
SEE SHEET 5
MATCHLINE
AREA (1)
AREA (2)
SEE SHEET 4
MATCHLINE
15'
30'
60'
CBN
CBN
FORESTRY:
WHH
APPROVED-DIRECTOR CONTRACT NO.
GZA
Engineers and Scientists
2 G-102 EASTERN DIVISION EMBANKMENT SECTION
0 5 10 20 FEET
APPROVED-DEP CHIEF OF DESIGN APPROVED-CHIEF ENGINEER NANCY PRINCE, RLA JOHN J. NATOLI, PE B-SCAN SCALE AS SHOWN DATE 7-10-13 DRAWING NO.
Q020-113M
SHEET NO.
OF
25 SHEETS
MATCHLINE
1 G-104
AREA (5)
MATCHLINE
0 15' 30' 60'
PROJECT TITLE THE DECOMMISSIONING OF THE CLASS C HIGH HAZARD DAM AT THE RIDGEWOOD RESERVOIR BOUNDED BY HIGHLAND BOULEVARD, VERMONT PLACE AND THE JACKIE ROBINSON PARKWAY IN HIGHLAND PARK DRAWING TITLE DESIGNED BY
CBN
REVIEWED-TEAM LEADER DML FORESTRY:
CBN
WHH
APPROVED-DIRECTOR CONTRACT NO.
APPROVED-DEP CHIEF OF DESIGN APPROVED-CHIEF ENGINEER NANCY PRINCE, RLA JOHN J. NATOLI, PE B-SCAN SCALE AS SHOWN DATE 7-10-13 DRAWING NO.
Q020-113M
SHEET NO.
OF
25 SHEETS
AREA (6)
15'
30'
60'
REV. # DATE DESCRIPTION 2 7/12/13 90% PERMIT DRAWINGS 5/20/13 75% REVIEW SUBMISSION 1
BRAM GUNTHER
APPROVED-DEP CHIEF OF DESIGN APPROVED-CHIEF ENGINEER NANCY PRINCE, RLA JOHN J. NATOLI, PE B-SCAN SCALE AS SHOWN DATE DRAWING NO.
Q020-113M
SHEET NO.
NTS
L-109.00
7
OF
5/20/2013
25
SHEETS
REV. # DATE DESCRIPTION 2 7/12/13 90% PERMIT DRAWINGS 5/20/13 75% REVIEW SUBMISSION 1 60'
15'
30'
BRAM GUNTHER
APPROVED-DEP CHIEF OF DESIGN APPROVED-CHIEF ENGINEER NANCY PRINCE, RLA JOHN J. NATOLI, PE B-SCAN SCALE AS SHOWN DATE DRAWING NO.
Q020-113M
SHEET NO.
NTS
L-110.00
8
OF
5/20/2013
25
SHEETS
REV. # DATE DESCRIPTION 2 7/12/13 90% PERMIT DRAWINGS 5/20/13 75% REVIEW SUBMISSION 1
15'
30'
60'
BRAM GUNTHER
APPROVED-DEP CHIEF OF DESIGN APPROVED-CHIEF ENGINEER NANCY PRINCE, RLA JOHN J. NATOLI, PE B-SCAN SCALE AS SHOWN DATE DRAWING NO.
Q020-113M
SHEET NO. 9 OF
NTS
L-111.00
25
SHEETS
5/20/2013
15'
30'
60'
REV. # DATE DESCRIPTION 2 7/12/13 90% PERMIT DRAWINGS 5/20/13 75% REVIEW SUBMISSION 1
BRAM GUNTHER
APPROVED-DEP CHIEF OF DESIGN APPROVED-CHIEF ENGINEER NANCY PRINCE, RLA JOHN J. NATOLI, PE B-SCAN SCALE AS SHOWN DATE DRAWING NO.
Q020-113M
SHEET NO. 10 OF
NTS
L-112.00
25
SHEETS
5/20/2013
MATCHLINE
AREA (1) AREA (1) AREA (3)
MATCHLINE
15'
30'
60'
CBN
CBN
FORESTRY:
WHH
APPROVED-DIRECTOR CONTRACT NO.
GZA
Engineers and Scientists
104 WEST 29TH STREET NEW YORK, NY 10001 (781) 278-3700
APPROVED-DEP CHIEF OF DESIGN APPROVED-CHIEF ENGINEER NANCY PRINCE, RLA JOHN J. NATOLI, PE B-SCAN SCALE AS SHOWN DATE 7-10-13 DRAWING NO.
Q020-113M
SHEET NO. 11 OF
25 SHEETS
AREA (2)
SEE SHEET 12
MATCHLINE
AREA (1)
AREA (2)
SEE SHEET 11
MATCHLINE
15'
30'
60'
TEMPORARY RAMP CONSTRUCTION SEQUENCE NOTES: 1. 2. 3. TRAP ROCK FILL IN EFFLUX CHAMBER WILL BE HANDLED TWICE: DURING INITIAL PLACEMENT OF TEMPORARY FILL AND DURING REMOVAL OF TEMPORARY FILL CLOSE RAMP TO ALL TRAFFIC DURING CONSTRUCTION OF PERMANENT RETAINING WALL CONTRACTOR MAY CONSTRUCT PERMANENT RETAINING WALL BEFORE CONSTRUCTION OF RAMP IN LIEU OF PLACEMENT AND REMOVAL OF TEMPORARY FILL IN EFFLUX CHAMBER
CBN
CBN
FORESTRY:
WHH
APPROVED-DIRECTOR CONTRACT NO.
GZA
Engineers and Scientists
104 WEST 29TH STREET NEW YORK, NY 10001 (781) 278-3700
APPROVED-DEP CHIEF OF DESIGN APPROVED-CHIEF ENGINEER NANCY PRINCE, RLA JOHN J. NATOLI, PE B-SCAN SCALE AS SHOWN DATE 7-10-13 DRAWING NO.
Q020-113M
SHEET NO. 12 OF
25 SHEETS
MATCHLINE
AREA (5)
MATCHLINE
0 15' 30' 60'
CBN
CBN
FORESTRY:
WHH
APPROVED-DIRECTOR CONTRACT NO.
GZA
Engineers and Scientists
104 WEST 29TH STREET NEW YORK, NY 10001 (781) 278-3700
APPROVED-DEP CHIEF OF DESIGN APPROVED-CHIEF ENGINEER NANCY PRINCE, RLA JOHN J. NATOLI, PE B-SCAN SCALE AS SHOWN DATE 7-10-13 DRAWING NO.
Q020-113M
SHEET NO. 13 OF
25 SHEETS
AREA (6)
MATCHLINE
AREA (1) AREA (1) AREA (3)
MATCHLINE
15'
30'
60'
CBN
CBN
FORESTRY:
WHH
APPROVED-DIRECTOR CONTRACT NO.
GZA
Engineers and Scientists
1 C-104 DIVISION EMBANKMENT SECTION
0 5 10 20 FEET
APPROVED-DEP CHIEF OF DESIGN APPROVED-CHIEF ENGINEER NANCY PRINCE, RLA JOHN J. NATOLI, PE B-SCAN SCALE AS SHOWN DATE 7-10-13 DRAWING NO.
Q020-113M
SHEET NO. 14 OF
25 SHEETS
AREA (2)
SEE SHEET 15
MATCHLINE
AREA (1)
AREA (2)
SEE SHEET 14
MATCHLINE
15'
30'
60'
CBN
CBN
FORESTRY:
WHH
APPROVED-DIRECTOR CONTRACT NO.
GZA
Engineers and Scientists
2 C-105 DIVISION EMBANKMENT SECTION
0 5 10 20 FEET
APPROVED-DEP CHIEF OF DESIGN APPROVED-CHIEF ENGINEER NANCY PRINCE, RLA JOHN J. NATOLI, PE B-SCAN SCALE AS SHOWN DATE 7-10-13 DRAWING NO.
Q020-113M
SHEET NO. 15 OF
25 SHEETS
MATCHLINE
1 C-106 WEST EMBANKMENT SECTION
0 5 10 20 FEET
AREA (5)
MATCHLINE
0 15' 30' 60'
PROJECT TITLE THE DECOMMISSIONING OF THE CLASS C HIGH HAZARD DAM AT THE RIDGEWOOD RESERVOIR BOUNDED BY HIGHLAND BOULEVARD, VERMONT PLACE AND THE JACKIE ROBINSON PARKWAY IN HIGHLAND PARK DRAWING TITLE DESIGNED BY
CBN
REVIEWED-TEAM LEADER DML FORESTRY:
CBN
WHH
APPROVED-DIRECTOR CONTRACT NO.
APPROVED-DEP CHIEF OF DESIGN APPROVED-CHIEF ENGINEER NANCY PRINCE, RLA JOHN J. NATOLI, PE B-SCAN SCALE AS SHOWN DATE 7-10-13 DRAWING NO.
Q020-113M
SHEET NO. 16 OF
25 SHEETS
AREA (6)
1 S-001
2 S-001
3 S-001
F S-001
10' WIDE BY 4' HIGH BOX CULVERT ELEVATION VIEW (EASTERN AND WESTERN DIVISION EMBANKMENTS)
0 2.5 5 10 FEET
4 S-001
Olmsted Center Flushing Meadows Corona Park Flushing, New York 11368
E S-001 KEY WAY DETAIL (TYP.)
NOT TO SCALE
5 S-001
PROJECT TITLE THE DECOMMISSIONING OF THE CLASS C HIGH HAZARD DAM AT THE RIDGEWOOD RESERVOIR BOUNDED BY HIGHLAND BOULEVARD, VERMONT PLACE AND THE JACKIE ROBINSON PARKWAY IN HIGHLAND PARK DRAWING TITLE DESIGNED BY
STRUCTURAL DETAILS
DRAWN BY CHECKED BY
CBN
CBN
FORESTRY:
WHH
APPROVED-DIRECTOR CONTRACT NO.
GZA
Engineers and Scientists
104 WEST 29TH STREET NEW YORK, NY 10001 (781) 278-3700
APPROVED-DEP CHIEF OF DESIGN APPROVED-CHIEF ENGINEER NANCY PRINCE, RLA JOHN J. NATOLI, PE B-SCAN SCALE AS SHOWN DATE 7-10-13 DRAWING NO.
Q020-113M
SHEET NO. 17 OF
25 SHEETS
15'
30'
60'
REV. # DATE DESCRIPTION 2 7/12/13 90% PERMIT DRAWINGS 5/20/13 75% REVIEW SUBMISSION 1
BRAM GUNTHER
APPROVED-DEP CHIEF OF DESIGN APPROVED-CHIEF ENGINEER NANCY PRINCE, RLA JOHN J. NATOLI, PE B-SCAN SCALE AS SHOWN DATE DRAWING NO.
Q020-113M
SHEET NO.
NTS
L-113.00
18
OF
5/20/2013
25
SHEETS
REV. # DATE DESCRIPTION 2 7/12/13 90% PERMIT DRAWINGS 5/20/13 75% REVIEW SUBMISSION 1 60'
15'
30'
BRAM GUNTHER
APPROVED-DEP CHIEF OF DESIGN APPROVED-CHIEF ENGINEER NANCY PRINCE, RLA JOHN J. NATOLI, PE B-SCAN SCALE AS SHOWN DATE DRAWING NO.
Q020-113M
SHEET NO.
NTS
5/20/2013
L-114.00
19
OF
25
SHEETS
0 REV. # DATE DESCRIPTION 2 7/12/13 90% PERMIT DRAWINGS 5/20/13 75% REVIEW SUBMISSION 1
15'
30'
60'
BRAM GUNTHER
APPROVED-DEP CHIEF OF DESIGN APPROVED-CHIEF ENGINEER NANCY PRINCE, RLA JOHN J. NATOLI, PE B-SCAN SCALE AS SHOWN DATE DRAWING NO.
Q020-113M
SHEET NO. 20 OF
NTS
L-115.00
25
SHEETS
5/20/2013
0 REV. # DATE DESCRIPTION 2 7/12/13 90% PERMIT DRAWINGS 5/20/13 75% REVIEW SUBMISSION 1
15'
30'
60'
BRAM GUNTHER
APPROVED-DEP CHIEF OF DESIGN APPROVED-CHIEF ENGINEER NANCY PRINCE, RLA JOHN J. NATOLI, PE B-SCAN SCALE AS SHOWN DATE DRAWING NO.
Q020-113M
SHEET NO. 21 OF
NTS
L-116.00
25
SHEETS
5/20/2013
C L
C L
6 24
6 24
REV. # DATE DESCRIPTION 2 7/12/13 90% PERMIT DRAWINGS 5/20/13 75% REVIEW SUBMISSION 1
BRAM GUNTHER
APPROVED-DEP CHIEF OF DESIGN APPROVED-CHIEF ENGINEER NANCY PRINCE, RLA JOHN J. NATOLI, PE B-SCAN SCALE DATE DRAWING NO.
Q020-113M
SHEET NO.
L-201.00
22 OF 25
SHEETS
5/20/2013
C L
C L
C L
C L
REV. # DATE DESCRIPTION 2 7/12/13 90% PERMIT DRAWINGS 5/20/13 75% REVIEW SUBMISSION 1
BRAM GUNTHER
APPROVED-DEP CHIEF OF DESIGN APPROVED-CHIEF ENGINEER NANCY PRINCE, RLA JOHN J. NATOLI, PE B-SCAN SCALE DATE DRAWING NO.
Q020-113M
SHEET NO.
L-202.00
23 OF 25
SHEETS
5/20/2013
REV. # DATE DESCRIPTION 2 7/12/13 90% PERMIT DRAWINGS 5/20/13 75% REVIEW SUBMISSION 1
BRAM GUNTHER
APPROVED-DEP CHIEF OF DESIGN APPROVED-CHIEF ENGINEER NANCY PRINCE, RLA JOHN J. NATOLI, PE B-SCAN SCALE DATE DRAWING NO.
Q020-113M
SHEET NO.
L-203.00
24 OF 25
SHEETS
5/20/2013
0 REV. # DATE DESCRIPTION 2 7/12/13 90% PERMIT DRAWINGS 5/20/13 75% REVIEW SUBMISSION 1
15'
30'
60'
BRAM GUNTHER
APPROVED-DEP CHIEF OF DESIGN APPROVED-CHIEF ENGINEER NANCY PRINCE, RLA JOHN J. NATOLI, PE B-SCAN SCALE DATE DRAWING NO.
Q020-113M
SHEET NO.
NTS
L-204.00
25
OF
5/20/2013
25
SHEETS