URAIAN PEKERJAAN
PEKERJAAN PERSIAPAN
PEKERJAAN TANAH
PEKERJAAN PONDASI
PEKERJAAN DINDING
PEKERJAAN PLESTERAN
PEKERJAAN KAYU
PEKERJAAN BETON
PEKERJAAN PENUTUP ATAP
PEKERJAAN SANITASI
PEKERJAAN BESI DAN ALUMINIUM
PEKERJAAN KUNCI DAN KACA
PEKERJAAN PENUTUP LANTAI DAN DINDING
PEKERJAAN INSTALASI LISTRIK
JUMLAH HARGA
DIBULATKAN
TERBILANG :
Menyetujui ;
PIMPINAN KEGIATAN
Di Buat Oleh ;
CV. ARDIKON CIPTA ARTISTIKA
Drs. SUWARTO, MM
NIP. 19580610 198103 1 018
Drs. B U N A J I
NIP. 19540203 197408 1 001
Mengetahui ;
KEPALA DINAS PEKERJAAN UMUM
DAN ENERGI SUMBER DAYA MINERAL
KABUPATEN JEPARA
Ir. SOEGIARTO, MT
NIP. 19540719 198603 1 005
REKAPITULASI
RENCANA ANGGARAN BIAYA
HARGA
850,000.00
6,305,915.39
17,826,759.72
14,315,404.83
15,196,776.57
73,054,519.41
43,801,069.36
9,729,102.50
3,151,250.00
804,750.00
3,795,342.81
1,421,458.50
1,748,000.00
192,000,349.09
192,000,000.00
SERATUS SEMBILAN PULUH DUA JUTA
Jepara,
Maret 2010
Di Buat Oleh ;
CV. ARDIKON CIPTA ARTISTIKA
Ir. SOEGIARTO, MT
NIP. 19540719 198603 1 005
PEKERJAAN
LOKASI
TAHUN
: 2010
VOLUME
: 8 x 15 m2
NO
URAIAN PEKERJAAN
VOLUME
ANALISA
(Rp)
PEKERJAAN PERSIAPAN
1 Pengukuran dan pemasangan bouwplank
1.000
ls
300,000.00
2 Air Kerja
1.000
ls
1.000 bh
ls
250,000.00
250,000.00
300,000.00
SUB TOTAL I :
II
PEKERJAAN TANAH
1 Galian tanah biasa
84.700 m3
T.1
25,437.00
2,154,513.90
60.000 m3
T.10
50,775.00
3,046,500.00
3 Urugan kembali
42.350 m3
T.13
8,479.00
359,085.65
7.392 m3
T.14
100,895.00
745,815.84
13.860 m3
Pd.1
221,996.00
3,076,864.56
33.880 m3
Pd.3
435,357.00
14,749,895.16
21.344 m2
D.4
70,305.00
1,500,589.92
209.078 m2
D.5
61,292.00
12,814,814.91
42.688 m2
PL.1
35,497.00
1,515,295.94
372.556 m2
PL.2
31,523.00
11,744,089.09
66.290 m2
PL.4
29,226.00
1,937,391.54
0.946 m3
KY.2
12,966,300.00
12,270,891.40
236.980 m2
KY.7
85,876.00
20,350,894.48
KY.13
SUB TOTAL IV :
V PEKERJAAN PLESTERAN
7,990,820.00
23,109,451.44
12.430 m2
KY.17.a
334,822.00
4,161,837.46
9.240 m2
KY.22
639,457.00
5,908,582.68
8.245 m2
KY.27
375,710.00
3,097,728.95
43.000 m2
KY.33.a
79,613.00
3,423,359.00
17.200 m1
KY.35
42,545.00
731,774.00
2.310 m3
B.2
818,365.00
1,890,423.15
253.626 kg
B.6
16,612.00
4,213,229.80
30.253 m2
B.11
60,263.00
1,823,136.54
B.2
818,365.00
1,119,523.32
158.104 kg
B. 6
16,612.00
2,626,428.96
18.240 m2
B. 11
60,263.00
1,099,197.12
0.594 m3
B.2
818,365.00
486,108.81
74.577 kg
B. 6
16,612.00
1,238,867.14
2.892 m
SUB TOTAL VI :
VII PEKERJAAN BETON
1.368 m
6.080 m2
B. 11
60,263.00
0.919 m3
B.2
818,365.00
752,179.73
133.537 kg
B. 6
16,612.00
2,218,317.31
17.295 m2
B. 11
60,263.00
1,042,248.59
0.432 m3
B.2
818,365.00
353,533.68
60.396 kg
B. 6
16,612.00
1,003,298.35
7.200 m2
366,399.04
B. 11
60,263.00
433,893.60
B.2
818,365.00
2,160,483.60
289.858 kg
B. 6
16,612.00
4,815,119.77
26.400 m2
B. 11
60,263.00
1,590,943.20
0.810 m3
B.2
818,365.00
662,875.65
2.640 m
88.934 kg
B. 6
16,612.00
1,477,366.29
10.800 m2
B. 11
60,263.00
650,840.40
2.700 m2
B. 10
68,477.00
184,887.90
2.700 m3
B.2
818,365.00
2,209,585.50
33.878 kg
B. 6
16,612.00
562,787.98
7.680 m2
B. 11
60,263.00
462,819.84
1.280 m2
B. 10
68,477.00
87,650.56
1.050 m3
B.2
818,365.00
859,283.25
102.480 kg
B. 6
16,612.00
1,702,397.76
9.000 m2
B.9
167,712.00
1,509,408.00
4.200 m2
B.7
72,812.00
305,810.40
5.533 m3
B. 1
703,470.00
3,892,018.12
236.980 m2
PA.5
28,845.00
6,835,688.10
51.200 m1
PA.9
56,512.00
2,893,414.40
5.00 bh
S.5
391,750.00
1,958,750.00
5.00 bh
taksir
36,000.00
180,000.00
25.00 m'
taksir
11,700.00
292,500.00
12.00 m'
taksir
60,000.00
720,000.00
17.000 kg
BS.10
30,801.00
523,617.00
taksir
46,855.50
281,133.00
4.000 bh
KK. 1
133,537.00
534,148.00
18.000 bh
KK. 3
27,319.00
491,742.00
28.000 bh
KK. 4
20,537.00
575,036.00
28.000 bh
KK. 6
14,019.00
392,532.00
32.000 bh
KK. 8
19,092.00
610,944.00
14.000 bh
taksir
9,500.00
133,000.00
11.688 m2
KK. 11
90,519.00
1,057,940.81
10.500 m2
L.11
135,377.00
1,421,458.50
SUB TOTAL IX :
X PEKERJAAN BESI DAN ALUMINIUM
1 Pasang angkur dan baut
2 Pasang scrool seng BJLS 28
6.000 m
SUB TOTAL X :
XI PEKERJAAN KUNCI DAN KACA
1 Pasang kunci pintu 2 x putar
SUB TOTAL XI :
XII PEKERJAAN PENUTUP LANTAI DAN DINDING
1 Pasang keramik 20 x 20 meja laborat
SUB TOTAL XII :
12.000 titik
taksir
100,000.00
1,200,000.00
8.000 bh
taksir
50,000.00
400,000.00
2.000 bh
taksir
25,000.00
50,000.00
2.000 bh
taksir
22,000.00
44,000.00
1.000 bh
taksir
18,000.00
18,000.00
2.000 bh
taksir
18,000.00
36,000.00
JUMLAH
(Rp)
7
850,000.00
6,305,915.39
17,826,759.72
14,315,404.83
15,196,776.57
73,054,519.41
43,801,069.36
9,729,102.50
3,151,250.00
804,750.00
3,795,342.81
1,421,458.50
1,748,000.00
192,000,349.09
192,000,000.00
URAIAN PEKERJAAN
2
I
1
4
I
1
2
PEKERJAAN PERSIAPAN
Pengukuran dan pemasangan bouwplank
Papan nama kegiatan 120 cm x 120 cm
PEKERJAAN TANAH
Galian tanah biasa
Urugan tanah biasa dipadatkan
3 Urugan kembali
4 Urugan pasir bawah pondasi
Urugan pasir bawah lantai
II PEKERJAAN PONDASI
1 Aanstampeng batu belah
2 Pasang pondasi batu belah 1:4 pasir pasang
3 Pasang trashraam batu merah 1 : 3
III PEKERJAAN DINDING
1 Pas. batu merah Kalipucang tbl. 1/2 bata, 1Pc : 3Ps
2 Pasangan roster 1Pc : 4Ps
IV PEKERJAAN PLESTERAN
1 Plesteran 1Pc : 3 Ps tbl 15 mm
2 Plesteran 1Pc : 8 Ps tebal 15 mm
3 Plesteran skoneng 1 Pc : 2 Ps
V PEKERJAAN KAYU
1 Pasang gantungan pyan
2 Pasang kusen pintu dan jendela kayu bengkirai
P1
P2
J1
J2
J3
1
2
4 Kolom praktis
5 Sloof beton bertulang
ring balk beton bertulang
ring balk gunungan
6 Begisting untuk plat beton
kantilever
meja laborat
plat dag atap 1
plat dag atap 2
plat dag atap doorluup
latiue
Beton kolom 15/15 ( K 3 )
Beton kolom 15/15 ( K 3 )
Beton kolom 15/20 ( K 1 )
Beton kolom 20/20 ( K 2 )
Beton Balok 15/20
Beton konsol 15/20
plat balok sunduk
VIII
1
IX
1
2
3
4
5
6
7
8
9
X
1
2
3
XI
1
2
3
4
5
6
XII
PEKERJAAN LANGIT-LANGIT
Pasang pyan eternit kerang super
PEKERJAAN SANITASI
Pasang closet jongkok porselen
Pasang floordrain
Pasang pintu PVC 70/200
Bikin bak mandi 80x70x70
Pasang pipa PVC 3/4"
Pasang pipa PVC 4"
Pasang kran air biasa
Membuat sumur galian
Membuat septictank 2 x 2 x 2 m + peresapan
PEKERJAAN BESI DAN ALUMUNIUM
Pasang talang miring seng BJLS 28
Pasang angkur dan baut
Pasang scroll seng BJLS 28
PEKERJAAN KUNCI DAN KACA
Pasang kunci tanam biasa
Pasang engsel pintu
Pasang engsel jendela kupu-kupu
Pasang kait angin
Pasang kunci sloot
Pasang kaca tb. 5 mm
PEKERJAAN PENUTUP LANTAI DAN DINDING
1
2
3
4
XIII
1
2
XIV
1
2
3
4
5
6
L/l
Bnyk
Koef
Jmlh
Jmlh Tot
0.12
0.06
9.30
2.00
0.13
0.12
0.06
0.12
0.06
7.48
2.00
0.11
14.69
3.00
0.32
0.12
0.06
13.69
3.00
0.30
0.12
0.06
6.37
2.00
0.09
12.00
OK
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.95
17.00
6.37
108.29
17.00
7.57
128.69
0.08
0.12
153.00
1.469
0.08
0.12
32.00
3.00
0.92
0.06
0.12
17.00
3.00
0.37
0.08
0.12
0.06
0.12
25.75
0.00
0.00
17.00
0.00
0.00
0.08
0.12
8.75
0.00
0.00
0.06
0.12
4.00
0.00
0.00
0.08
0.12
7.00
2.00
0.13
2.10
1.40
2.00
5.88
2.10
0.80
2.00
3.36
0.85
0.80
2.00
3.00
4.08
0.85
0.55
2.00
3.00
2.81
0.85
0.80
1.00
2.00
1.36
236.98
2.89
9.24
8.25
208.3
0.05
93.83
0.05
0.12
0.12
48.00
0.15
0.15
3.00
0.15
0.15
5.50
0.15
0.20
0.20
0.20
0.15
0.30
0.15
0.40
0.69
14.00
0.95
11.00
1.36
5.50
20.00
3.30
5.50
4.00
0.88
21.50
0.97
0.20
74.00
2.22
0.08
3.50
0.11
0.20
0.08
29.50
0.47
2.00
0.10
0.00
0.00
3.20
0.10
0.00
0.00
=
4.00
48.00
2.47
118.46
48.00
0.67
31.97
3.00
14.00
3.55
149.18
3.00
14.00
0.80
33.57
5.50
11.00
3.55
214.90
5.50
11.00
0.80
48.35
5.50
20.00
3.55
390.72
5.50
20.00
0.93
102.56
5.50
4.00
5.33
117.22
5.50
4.00
1.07
23.44
21.50
3.55
76.37
21.50
1.40
30.07
1.00
74.00
3.55
262.85
1.00
74.00
0.93
69.00
3.50
1.98
6.91
3.50
2.33
8.16
29.50
6.43
189.68
0.00
12.34
0.00
0.00
12.34
0.00
=
1,873.41
0.00
0.00
####
172.85
172.85
172.85
16.00
16.00
45.56
7.65
0.40
33.50
13.40
0.60
4.60
2.76
3.00
3.00
9.00
2.00
3.00
6.00
3.20
4.50
14.40
0.15
#DIV/0!
51.00
7.65
0.24
48.00
11.52
0.60
3.00
14.00
25.20
0.30
5.50
0.40
5.50
11.00
18.15
20.00
44.00
0.40
5.50
4.00
8.80
0.30
21.50
0.00
0.55
74.00
0.00
0.48
29.50
0.00
20.30
20.30
63.00
63.00
107.67
83.30
0.36
9.30
3.00
10.04
0.36
7.64
3.00
8.25
0.36
5.64
0.00
0.00
0.36
11.65
1.00
4.19
0.36
15.29
5.00
27.52
0.36
11.74
2.00
8.45
0.36
10.27
0.00
0.00
0.36
14.05
2.00
10.12
0.36
14.85
8.00
42.77
0.36
9.41
0.00
0.00
0.36
3.70
2.00
2.66
0.36
9.00
17.00
55.08
43.00
OK
169.09
SAT
10
unit
m
m
m
m
m
m
m
m
m
m
m
0.61
0.32
3.43
1.58
0.49
0.28
lubang kosen2
P1
P2
J1
J2
J3
m
2.89
1.75
4.13
3.43
1.58
0.76
1.40
1.40
0.54
0.85
0.80
0.85
0.55
0.85
0.80
0.00
LUAS KACA
J1
J2
J3
0.00
m
m
#DIV/0!
kg
m'
m'
m'
m'
m'
0.00
0.00
0.00
m'
0.00
2.00
1.22
2.00
0.64
0.00
0.00
0.00
0.00
0.00
0.00
3.00
0.00
1.86
Jalusi
2.00
5.78
1.54
2.00
3.00
3.50
0.99
12.39
4.46
3.00
10.30
4.46
2.00
3.17
0.99
=
35.12
12.43
2.31
8.91
11.22
4
2.00
1.52
4.00
5.58
4.00
5.58
2.00
1.07
13.75
#######
#######
3.00
3.00
6.12
3.00
3.00
4.21
1.00
2.00
1.36
=
11.69
0.00
JALUSI
0.76
3.00
1.48
2.00
1.48
8.00
0.00
2.00
15.00
OK
214.10
34.00
4.00
0.12
17.00
4.00
kuda-kuda0.08
trapesiumx
0.12
26.75
2.00
0.06
0.06
0.12
17.00
2.00
kuda-kuda0.08
1/4
0.12
9.50
4.00
0.06
0.12
4.00
4.00
Balok angin0.08
0.12
9.30
2.00
NGECAT
P1
P2
J1
J2
J3
2.28
2.95
11.80
0.00
=
17.03
0.00
1.00
1.00
1.00
1.00
1.00
2.055
1.31
0.49
0.51
0.24
0.36
0.12
0.18
=
5.27
0.36
9.30
2.00
0.36
0.36
7.48
2.00
14.69
3.00
0.36
13.69
3.00
0.36
6.37
2.00
12.00
OK
6.70
5.39
15.87
14.79
4.59
=
47.32
0.00
NO
I.
BAHAN / MATERIAL
SATUAN
KODE
HARGA SATUAN
BAHAN
BAHAN / MATERIAL
1
Batu belah 15 - 20 cm
/ m3
M 001
Rp
120,000
Batu pecah 1 - 2 cm
/ m3
M 006
Rp
195,000
/ bj
M 018
Rp
400
Batu tempel 10 x 20 cm
/ m2
M 020
Rp
97,900
M 023
Rp
75,600
/ m3
/ m3
M 024
Rp
250,000
M 025
Rp
137,500
Tanah hurug
/ m3
/ m3
M 026
Rp
18,900
S e m e n ( PC )
/ kg
M 031
Rp
1,320
Semen PC warna
/ kg
M 033
Rp
8,100
10
11
Kapur
Rp
495,000
/m
/ kg
M 034
12
M 035
Rp
54,600
13
Cat kayu
/ kg
M 036
Rp
46,830
14
/ kg
M 037
Rp
78,200
15
/ kg
M 038
Rp
53,000
16
/ kg
M 041
Rp
19,400
17
Plamur
/ kg
M 044
Rp
25,500
18
Amplas
/ lbr
M 045
Rp
3,360
19
Meni
/ kg
M 046
Rp
23,940
20
Kawat Galvanis 3 mm
/ kg
M 047
Rp
21,420
21
Baut Baja
/ kg
M 049
Rp
20,160
22
/ kg
M 051
Rp
15,000
23
/ kg
M 052
Rp
16,200
24
/ kg
M 053
Rp
16,800
25
Multiplek 9 mm (90x220)
/ lbr
M 054
Rp
151,500
26
/ lbr
M 055
Rp
58,300
27
Lem kayu
/ kg
M 060
Rp
15,300
28
Tir
/ kg
M 061
Rp
12,700
29
Afduners
/ ltr
M 062
Rp
9,300
30
/ bj
M 065
Rp
1,500
31
/ bh
M 074
Rp
3,940
32
/ bh
M 076
Rp
1,900
33
M 080
Rp
37,800
34
/ m2
/ m2
M 081
Rp
39,500
35
/ m'
M 090
Rp
128,000
36
/ m'
M 091
Rp
216,800
37
Buis beton U 20
/ m'
M 094
Rp
45,360
38
/ bh
M 097
Rp
4,400
39
/ bh
M 098
Rp
134,000
40
Wastafel
/ bh
M 103
Rp
330,000
41
/ bh
M 104
Rp
235,000
42
/ bh
M 105
Rp
45,000
43
Floor drain
/ bh
M 106
Rp
15,000
/m
/ m2
M 107
Rp
55,900
M 108
Rp
12,280
44
Seng BJLS 30
45
46
Rp
15,540
Asbes plat tb 4 mm
/m
/ m2
M 109
47
M 110
Rp
21,000
48
/ bh
M 112
Rp
780
49
/ bh
M 113
Rp
3,400
50
/ bh
M 117
Rp
16,700
51
/ bh
M 118
Rp
6,900
M 124
Rp
4,273,500
52
Kayu hutan
/m
KET
53
Kayu randu
/ m3
M 125
Rp
976,500
54
M 126
Rp
6,232,000
55
Kayu bengkirai
/ m3
/ m3
M 128
Rp
9,765,000
56
Kayu kanfer
/ m3
M 129
Rp
10,080,000
57
Bambu
/ btg
M 136
Rp
15,400
58
Kaca bening 5 mm
/ m2
M 139
Rp
75,000
59
/ bh
M 143
Rp
19,300
60
Engsel jendela
/ set
M 146
Rp
15,000
61
/ bh
M 147
Rp
110,000
62
/ bh
M 148
Rp
8,400
63
/ bh
M 150
Rp
6,000
64
/ bh
M 153
Rp
275,000
65
Kran stainlesteel
/ bh
M 154
Rp
36,000
66
/ m'
M 157
Rp
9,000
67
/ m'
M 158
Rp
12,300
68
/ m'
M 159
Rp
20,000
69
/ m'
M 160
Rp
26,500
70
/ m'
M 161
Rp
48,500
71
/ m'
M 162
Rp
70,400
72
Besi Strip 2 cm
M 183
Rp
17,400
73
/ m1
/ lbr
M 195
Rp
40,000
74
Air
/ ltr
M 204
Rp
17
KODE
HARGA SATUAN
NO
SATUAN
Mandor
1 hari
L 061
Rp
42,500
1 hari
L 062
Rp
45,000
1 hari
L 063
Rp
32,500
1 hari
L 064
Rp
45,000
Tukang batu
1 hari
L 065
Rp
42,500
1 hari
L 066
Rp
35,000
1 hari
L 067
Rp
47,500
1 hari
L 068
Rp
35,000
Tukang kayu
1 hari
L 069
Rp
45,000
10
1 hari
L 070
Rp
47,500
11
Tukang besi
1 hari
L 071
Rp
45,000
12
1 hari
L 072
Rp
35,000
13
1 hari
L 073
Rp
47,500
14
Tukang cat
1 hari
L 074
Rp
45,000
15
1 hari
L 075
Rp
35,000
16
1 hari
L 084
Rp
23,900
NO
KODE
ALAT BERAT
HARGA
Motor Grader
100 HP
E 010
Rp
236,500
/ jam
Wheel loader
115 HP
E 052
Rp
192,500
/ jam
Wheel tractor
60 HP
E 053
Rp
82,500
/ jam
Roller vibrator
Self P6 - 6 T E 082
Rp
170,500
/ jam
115 HP
E 182
Rp
82,500
/ jam
E 211
Rp
71,500
/ jam
Service Car
E 408
Rp
95,300
/ jam
SNI
KODE
KOEF
SAT.
URAIAN PEKERJAAN
II
DT 91-0006
2007
HARGA BAHAN/
UPAH
7
JUMLAH
JUMLAH TOTAL
8=4x7
PEKERJAAN TANAH
T.1
1.0000 m3
0.7500 OH
0.0250 OH
32,500.00
42,500.00
24,375.00
1,062.50
25,437.50
T.10
1.2000
1.2000
0.0714
0.0178
0.0178
0.2289
0.0061
0.0100
0.0070
1.0000
m3
m3
jam
jam
jam
jam
jam
jam
jam
ls
18,900.00
32,500.00
42,500.00
192,500.00
71,500.00
236,500.00
170,500.00
82,500.00
1,500.00
22,680.00
2,320.50
756.50
3,426.50
16,366.35
1,442.65
1,705.00
577.50
1,500.00
50,775.00
T.13
1.0000 m3
0.2500 OH
0.0083 OH
Urugan Kembali
pekerja
mandor
1.0000
1.2000
0.3000
0.0100
32,500.00
42,500.00
8,125.00
354.17
8,479.17
T.14
m3
m3
OH
OH
75,600.00
32,500.00
42,500.00
90,720.00
9,750.00
425.00
100,895.00
T.23
1.0000 ttk
0.1250 OH
0.0125 OH
1.0000 btg
0.1000 jam
0.0165 jam
Bambu
alat pancang
alat bantu
4,375.00
531.25
4,906.25
15,400.00
9,000.00
250.00
15,400.00
900.00
4.13
16,304.13
21,210.38
III
DT 91-0007
2007
PEKERJAAN PONDASI
Pd.1
1.0000 m3
1.2000 m3
0.4320 m3
0.7800
0.3900
0.0390
0.0390
pekerja
tukang batu
kepala tukang
mandor
120,000.00
75,600.00
144,000.00
32,659.20
32,500.00
42,500.00
45,000.00
42,500.00
25,350.00
16,575.00
1,755.00
1,657.50
176,659.20
OH
OH
OH
OH
45,337.50
221,996.70
Pd.5
1.0000
1.2000
163.0000
0.5220
m3
m3
kg
m3
1.5000
0.6000
0.0600
0.0750
OH
OH
OH
OH
pekerja
tukang batu
kepala tukang
mandor
489,660.00
35,000.00
42,500.00
45,000.00
42,500.00
52,500.00
25,500.00
2,700.00
3,187.50
83,887.50
573,547.50
Pd.5.b
1.0000
1.2000
163.0000
0.5220
m3
m3
kg
m3
1.5000
0.6000
0.0600
0.0750
OH
OH
OH
OH
pekerja
tukang batu
kepala tukang
mandor
430,935.00
35,000.00
42,500.00
45,000.00
42,500.00
52,500.00
25,500.00
2,700.00
3,187.50
83,887.50
514,822.50
NO
SNI
KODE
KOEF
4
1.0000
500.0000
156.0000
0.3300
5
m3
m3
kg
m3
HARGA BAHAN/
JUMLAH
UPAH
6
7
8=4x7
Pasang Pondasi Rolag Trashraam Bata Merah 1 Pc : 3 Ps
bata merah
400.00
200,000.00
semen / PC
1,320.00
205,920.00
pasir pasang
137,500.00
45,375.00
4.5000
1.5000
0.1500
0.2250
OH
OH
OH
OH
pekerja
tukang batu
kepala tukang
mandor
Pd.7
SAT.
URAIAN PEKERJAAN
JUMLAH TOTAL
9
451,295.00
35,000.00
42,500.00
45,000.00
42,500.00
157,500.00
63,750.00
6,750.00
9,562.50
237,562.50
688,857.50
IV
DT 91-0009
2007
PEKERJAAN DINDING
D.1
1.0000
150.0000
26.5500
0.0930
m2
bh
kg
m3
60,000.00
35,046.00
12,787.50
0.6000
0.2000
0.0200
0.0300
OH
OH
OH
OH
pekerja
tukang batu
kepala tukang
mandor
21,000.00
8,500.00
900.00
1,275.00
107,833.50
35,000.00
42,500.00
45,000.00
42,500.00
31,675.00
139,508.50
D.4
1.0000
75.0000
14.3700
0.0400
m2
bh
kg
m3
30,000.00
18,968.40
5,500.00
0.3000
0.1000
0.0100
0.0150
OH
OH
OH
OH
pekerja
tukang batu
kepala tukang
mandor
10,500.00
4,250.00
450.00
637.50
54,468.40
35,000.00
42,500.00
45,000.00
42,500.00
15,837.50
70,305.90
D.5
1.0000
75.0000
6.5000
0.0500
m2
bh
kg
m3
30,000.00
8,580.00
6,875.00
0.3000
0.1000
0.0100
0.0150
OH
OH
OH
OH
pekerja
tukang batu
kepala tukang
mandor
10,500.00
4,250.00
450.00
637.50
45,455.00
35,000.00
42,500.00
45,000.00
42,500.00
15,837.50
61,292.50
V
DT 91-0010
2007
PEKERJAAN PLESTERAN
PL.1
1.0000 m2
6.5000 kg
0.0194 m3
Plesteran 1 Pc : 3 Ps
semen/PC
pasir pasang
0.4000
0.2000
0.0200
0.0200
pekerja
tukang batu
kepala tukang
mandor
1,320.00
137,500.00
8,580.00
2,667.50
35,000.00
42,500.00
45,000.00
42,500.00
14,000.00
8,500.00
900.00
850.00
11,247.50
OH
OH
OH
OH
24,250.00
35,497.50
PL.2
1.0000 m2
7.1860 kg
0.0280 m3
Plesteran 1 Pc : 8 Ps di aci PC
semen/PC
pasir pasang
0.3000
0.1500
0.0150
0.0150
pekerja
tukang batu
kepala tukang
mandor
1,320.00
137,500.00
9,485.52
3,850.00
35,000.00
42,500.00
45,000.00
42,500.00
10,500.00
6,375.00
675.00
637.50
13,335.52
OH
OH
OH
OH
18,187.50
31,523.02
PL.3
1.0000 m2
6.3400 kg
0.0120 m3
0.2000
0.1500
0.0150
0.0100
pekerja
tukang batu
kepala tukang
mandor
1,320.00
137,500.00
8,368.80
1,650.00
35,000.00
42,500.00
45,000.00
42,500.00
7,000.00
6,375.00
675.00
425.00
10,018.80
OH
OH
OH
OH
14,475.00
24,493.80
NO
SNI
KODE
3
PL.4
KOEF
SAT.
URAIAN PEKERJAAN
4
5
1.0000 m2
9.3000 kg
0.0180 m3
HARGA BAHAN/
UPAH
6
7
Plesteran Beton 1 Pc : 2 Ps Tebal 15 mm
semen
1,320.00
pasir pasang
137,500.00
0.2000
0.1500
0.0150
0.0100
pekerja
tukang batu
kepala tukang
mandor
JUMLAH
JUMLAH TOTAL
8=4x7
12,276.00
2,475.00
14,751.00
OH
OH
OH
OH
35,000.00
42,500.00
45,000.00
42,500.00
7,000.00
6,375.00
675.00
425.00
14,475.00
29,226.00
VI
DT 91-0011
2007
PEKERJAAN KAYU
KY.1
1.0000
15.0000
1.5000
5.0000
0.2500
m3
OH
OH
OH
OH
gantungan pyan
tukang kayu
tukang kepala
pekerja
mandor
45,000.00
47,500.00
35,000.00
42,500.00
675,000.00
71,250.00
175,000.00
10,625.00
6,232,000.00
16,200.00
6,855,200.00
2,430.00
931,875.00
1.1000 m3
0.1500 kg
kayu kruing
paku
6,857,630.00
7,789,505.00
KY.2
1.0000
1.2000
1.2500
1.0000
m3
m3
kg
kg
6.0000
20.0000
2.0000
0.3000
OH
OH
OH
OH
pekerja
tukang kayu
kepala tukang
mandor
11,718,000.00
20,250.00
15,300.00
11,753,550.00
35,000.00
45,000.00
45,000.00
42,500.00
210,000.00
900,000.00
90,000.00
12,750.00
1,212,750.00
12,966,300.00
KY.7
1.0000 m2
0.0120 m3
0.1500 kg
0.1000
0.1000
0.0100
0.0050
pekerja
tukang kayu
kepala tukang
mandor
6,232,000.00
16,200.00
74,784.00
2,430.00
35,000.00
45,000.00
45,000.00
42,500.00
3,500.00
4,500.00
450.00
212.50
77,214.00
OH
OH
OH
OH
8,662.50
85,876.50
KY.8
1.0000 m2
0.0120 m3
0.1500 kg
0.1000
0.1000
0.0100
0.0050
pekerja
tukang kayu
kepala tukang
mandor
117,180.00
2,430.00
119,610.00
OH
OH
OH
OH
35,000.00
45,000.00
45,000.00
42,500.00
3,500.00
4,500.00
450.00
212.50
8,662.50
128,272.50
KY.11
1.0000
1.1000
15.0000
5.6000
m3
m3
kg
kg
4.0000
12.0000
1.2000
0.2000
OH
OH
OH
OH
pekerja
tukang kayu
kepala tukang
mandor
10,741,500.00
302,400.00
90,720.00
11,134,620.00
35,000.00
45,000.00
45,000.00
42,500.00
140,000.00
540,000.00
54,000.00
8,500.00
742,500.00
11,877,120.00
KY.13
1.0000
1.1000
15.0000
5.6000
m3
m3
kg
kg
4.0000
12.0000
1.2000
0.2000
OH
OH
OH
OH
pekerja
tukang kayu
kepala tukang
mandor
6,855,200.00
302,400.00
90,720.00
7,248,320.00
35,000.00
45,000.00
45,000.00
42,500.00
140,000.00
540,000.00
54,000.00
8,500.00
742,500.00
7,990,820.00
NO
SNI
KODE
3
KY.14
KOEF
SAT.
4
5
1.0000 m3
1.1000 m3
8.0000 kg
URAIAN PEKERJAAN
6
Pasang konsol kayu kruing
kayu kruing
baut, beugel
HARGA BAHAN/
UPAH
7
JUMLAH
JUMLAH TOTAL
8=4x7
6,232,000.00
20,160.00
6,855,200.00
161,280.00
35,000.00
45,000.00
45,000.00
42,500.00
210,000.00
810,000.00
81,000.00
12,750.00
7,016,480.00
6.0000
18.0000
1.8000
0.3000
OH
OH
OH
OH
pekerja
tukang kayu
kepala tukang
mandor
1,113,750.00
8,130,230.00
KY.17
1.0000 m2
0.0600 m3
0.1500 kg
0.5000
2.0000
0.2000
0.0250
pekerja
tukang kayu
kepala tukang
mandor
585,900.00
2,430.00
588,330.00
OH
OH
OH
OH
35,000.00
45,000.00
45,000.00
42,500.00
17,500.00
90,000.00
9,000.00
1,062.50
117,562.50
705,892.50
KY.17.a
1.0000 m2
0.0220 m3
0.1500 kg
0.5000
2.0000
0.2000
0.0250
pekerja
tukang kayu
kepala tukang
mandor
9,765,000.00
16,200.00
214,830.00
2,430.00
35,000.00
45,000.00
45,000.00
42,500.00
17,500.00
90,000.00
9,000.00
1,062.50
217,260.00
OH
OH
OH
OH
117,562.50
334,822.50
KY.22
1.0000
0.0140
0.2500
0.0500
m2
m3
lbr
kg
Bikin daun pintu rangka kayu bengkirai tb 3,5 cm panil multiplek tb 9mm
kayu bengkirai
9,765,000.00
136,710.00
mulitplek
151,500.00
37,875.00
paku
16,200.00
810.00
2.5000
7.5000
0.7500
0.1250
OH
OH
OH
OH
pekerja
tukang kayu
kepala tukang
mandor
175,395.00
35,000.00
45,000.00
45,000.00
42,500.00
87,500.00
337,500.00
33,750.00
5,312.50
464,062.50
639,457.50
KY.25
1.0000 m2
0.0400 m3
0.5000 kg
403,200.00
7,650.00
1.0000
2.5000
0.2500
0.0500
pekerja
tukang kayu
kepala tukang
mandor
35,000.00
112,500.00
11,250.00
2,125.00
410,850.00
OH
OH
OH
OH
35,000.00
45,000.00
45,000.00
42,500.00
160,875.00
571,725.00
KY.27
1.0000 m2
0.0240 m3
0.3000 kg
0.8000
2.0000
0.2000
0.0400
pekerja
tukang kayu
kepala tukang
mandor
241,920.00
4,590.00
246,510.00
OH
OH
OH
OH
35,000.00
45,000.00
47,500.00
42,500.00
28,000.00
90,000.00
9,500.00
1,700.00
129,200.00
375,710.00
KY.33
1.0000 m'
0.0108 m3
0.1000 kg
0.0100
0.2000
0.0250
0.0050
pekerja
tukang kayu
kepala tukang
mandor
105,462.00
1,620.00
107,082.00
OH
OH
OH
OH
35,000.00
45,000.00
45,000.00
42,500.00
350.00
9,000.00
1,125.00
212.50
10,687.50
117,769.50
KY.33.a
1.0000 m'
0.0108 m3
0.1000 kg
0.0100
0.2000
0.0250
0.0050
pekerja
tukang kayu
kepala tukang
mandor
67,305.60
1,620.00
68,925.60
OH
OH
OH
OH
35,000.00
45,000.00
45,000.00
42,500.00
350.00
9,000.00
1,125.00
212.50
10,687.50
79,613.10
NO
SNI
KODE
3
KY.35
KOEF
SAT.
URAIAN PEKERJAAN
4
5
1.0000 m'
0.0050 m3
0.0500 kg
6
Pasang papan sirip
kayu kruing
paku
0.1000
0.1000
0.0100
0.0500
pekerja
tukang kayu
kepala tukang
mandor
HARGA BAHAN/
UPAH
7
JUMLAH
JUMLAH TOTAL
8=4x7
6,232,000.00
16,200.00
31,160.00
810.00
35,000.00
45,000.00
45,000.00
42,500.00
3,500.00
4,500.00
450.00
2,125.00
31,970.00
OH
OH
OH
OH
10,575.00
42,545.00
VII
DT 91-0008
2007
PEKERJAAN BETON
B.1
1.0000
247.0000
0.6210
0.7400
215.0000
m3
kg
m3
m3
ltr
1.6500
0.2750
0.0280
0.0830
OH
OH
OH
OH
pekerja
tukang batu
kepala tukang
mandor
326,040.00
155,250.00
144,300.00
3,655.00
629,245.00
35,000.00
42,500.00
45,000.00
42,500.00
57,750.00
11,687.50
1,260.00
3,527.50
74,225.00
703,470.00
B.2
1.0000
326.0000
0.6514
0.7622
215.0000
m3
kg
m3
m3
ltr
1.6500
0.2500
0.0250
0.0800
OH
OH
OH
OH
pekerja
tukang batu
kepala tukang
mandor
430,320.00
162,857.14
148,633.33
3,655.00
745,465.48
35,000.00
42,500.00
45,000.00
42,500.00
57,750.00
10,625.00
1,125.00
3,400.00
72,900.00
818,365.48
B.3
1.0000
371.0000
0.5983
0.7756
215.0000
m3
kg
m3
m3
ltr
1.6500
0.2500
0.0250
0.0800
OH
OH
OH
OH
pekerja
tukang batu
kepala tukang
mandor
489,720.00
149,571.43
151,233.33
3,655.00
794,179.76
35,000.00
42,500.00
45,000.00
42,500.00
57,750.00
10,625.00
1,125.00
3,400.00
72,900.00
867,079.76
B.4
1.0000
406.0000
0.5863
0.7600
215.0000
m3
kg
m3
m3
ltr
1.6500
0.2500
0.0300
0.0800
OH
OH
OH
OH
pekerja
tukang batu
kepala tukang
mandor
535,920.00
146,571.43
148,200.00
3,655.00
834,346.43
35,000.00
42,500.00
45,000.00
42,500.00
57,750.00
10,625.00
1,350.00
3,400.00
73,125.00
907,471.43
B.6
1.0000 kg
1.0500 kg
0.0150 kg
15,000.00
16,800.00
15,750.00
252.00
0.0070
0.0070
0.0007
0.0004
pekerja
tukang besi
kepala tukang
mandor
35,000.00
45,000.00
47,500.00
42,500.00
245.00
315.00
33.25
17.00
16,002.00
OH
OH
OH
OH
610.25
16,612.25
B.7
1.0000
0.0020
0.0100
3.0000
0.4500
4.0000
0.0060
0.0090
m'
m3
kg
kg
kg
kg
m3
m3
976,500.00
16,200.00
15,000.00
16,800.00
1,320.00
250,000.00
195,000.00
1,953.00
162.00
45,000.00
7,560.00
5,280.00
1,500.00
1,755.00
63,210.00
NO
SNI
KODE
KOEF
4
0.1800
0.0200
0.0200
0.0200
0.0060
0.0090
SAT.
5
OH
OH
OH
OH
OH
OH
URAIAN PEKERJAAN
6
pekerja
tukang batu
tukang kayu
tukang besi
kepala tukang
mandor
HARGA BAHAN/
UPAH
7
35,000.00
42,500.00
45,000.00
45,000.00
45,000.00
42,500.00
JUMLAH
8=4x7
6,300.00
850.00
900.00
900.00
270.00
382.50
JUMLAH TOTAL
9
9,602.50
72,812.50
B.8
1.0000
0.0030
0.0200
3.6000
0.0500
5.5000
0.0090
0.0150
m'
m3
kg
kg
kg
kg
m3
m3
2,929.50
324.00
54,000.00
840.00
7,260.00
2,250.00
2,925.00
70,528.50
0.2970
0.0330
0.0330
0.0330
0.0100
0.0150
OH
OH
OH
OH
OH
OH
pekerja
tukang batu
tukang kayu
tukang besi
kepala tukang
mandor
32,500.00
42,500.00
45,000.00
45,000.00
45,000.00
42,500.00
9,652.50
1,402.50
1,485.00
1,485.00
450.00
637.50
15,112.50
85,641.00
B.9
1.0000
0.0400
0.4000
0.0150
0.3500
3.0000
m2
m3
kg
m3
lbr
btg
976,500.00
16,200.00
976,500.00
58,300.00
15,400.00
39,060.00
6,480.00
14,647.50
20,405.00
46,200.00
126,792.50
0.6600
0.3300
0.0330
0.0330
OH
OH
OH
OH
pekerja
tukang kayu
kepala tukang
mandor
35,000.00
45,000.00
47,500.00
42,500.00
23,100.00
14,850.00
1,567.50
1,402.50
40,920.00
167,712.50
B.10
1.0000
0.4000
0.0150
2.0000
m2
kg
m3
btg
16,200.00
976,500.00
15,400.00
6,480.00
14,647.50
30,800.00
51,927.50
0.2500
0.1700
0.0020
0.0013
OH
OH
OH
OH
pekerja
tukang kayu
kepala tukang
mandor
35,000.00
45,000.00
47,500.00
42,500.00
8,750.00
7,650.00
95.00
55.25
16,550.25
68,477.75
B.11
1.0000 m2
0.0220 m3
0.4000 kg
21,483.00
6,480.00
0.5000
0.0500
0.2000
0.0100
tukang kayu
tukang kepala
pekerja
mandor
22,500.00
2,375.00
7,000.00
425.00
27,963.00
OH
OH
OH
OH
45,000.00
47,500.00
35,000.00
42,500.00
32,300.00
60,263.00
VIII 03-3436-2002 PEKERJAAN PENUTUP ATAP
PA.1
1.0000
0.0750
0.0080
0.1500
0.0080
m2
OH
OH
OH
OH
25.0000 bj
PA.5
1.0000 m2
25.0000 bj
3,375.00
380.00
5,250.00
340.00
3,400.00
9,345.00
85,000.00
94,345.00
780.00
9,345.00
19,500.00
28,845.00
NO
SNI
KODE
3
PA.7
KOEF
4
1.0000
0.2000
0.0200
0.4000
0.0020
SAT.
5
m'
OH
OH
OH
OH
URAIAN PEKERJAAN
HARGA BAHAN/
UPAH
6
7
Pas krepus Jatiwangi tak berwarna
tukang batu
42,500.00
tukang kepala
45,000.00
pekerja
35,000.00
mandor
42,500.00
JUMLAH
JUMLAH TOTAL
8=4x7
8,500.00
900.00
14,000.00
85.00
23,485.00
8.0000 kg
0.0320 m3
3.5000 bj
semen / PC
pasir
krepus
1,320.00
137,500.00
16,700.00
10,560.00
4,400.00
58,450.00
73,410.00
96,895.00
PA.9
1.0000 m'
3.6000 kg
0.0300 m3
3.5000 bj
23,485.00
1,320.00
137,500.00
6,900.00
4,752.00
4,125.00
24,150.00
33,027.00
56,512.00
IX
DT 91-0013
2007
PEKERJAAN LANGIT-LANGIT
LL.1
1.0000 m2
1.1000 lbr
0.0100 kg
0.0300
0.0700
0.0070
0.0015
pekerja
tukang kayu
kepala tukang
mandor
23,100.00
162.00
23,262.00
OH
OH
OH
OH
35,000.00
45,000.00
47,500.00
42,500.00
1,050.00
3,150.00
332.50
63.75
4,596.25
27,858.25
LL.2
1.0000
0.4000
0.0400
0.1400
0.0070
m2
OH
OH
OH
OH
45,000.00
47,500.00
35,000.00
42,500.00
18,000.00
1,900.00
4,900.00
297.50
16,200.00
6,232,000.00
12,280.00
3,240.00
43,624.00
12,280.00
25,097.50
0.2000 kg
0.0070 m3
1.0000 m2
paku
kayu kruing 4/6 + 5/7
eternit kerang super
59,144.00
84,241.50
LL.3
1.0000
0.4000
0.0400
0.1400
0.0070
m2
OH
OH
OH
OH
45,000.00
47,500.00
35,000.00
42,500.00
18,000.00
1,900.00
4,900.00
297.50
16,200.00
6,232,000.00
15,540.00
3,240.00
43,624.00
15,540.00
25,097.50
0.2000 kg
0.0070 m3
1.0000 m2
paku
kayu kruing 4/6 + 5/7
eternit atrisco
62,404.00
87,501.50
X
03-
PEKERJAAN SANITASI
S.2
1.0000
1.0000
6.0000
0.0100
unit
bh
kg
m3
1.0000
1.5000
1.5000
0.1600
OH
OH
OH
OH
pekerja
tukang batu
kepala tukang
mandor
134,000.00
1,320.00
137,500.00
134,000.00
7,920.00
1,375.00
35,000.00
42,500.00
45,000.00
42,500.00
35,000.00
63,750.00
67,500.00
6,800.00
143,295.00
173,050.00
316,345.00
S.4
1.0000
1.0000
0.3000
6.0000
0.0100
unit
bh
kg
m3
Memasang Wastafel
wastafel
perlengkapan 30%
pc
pasir pasang
1.0000
1.0000
0.1000
0.1000
OH
OH
OH
OH
pekerja
tukang batu
kepala tukang
mandor
330,000.00
330,000.00
1,320.00
137,500.00
330,000.00
99,000.00
7,920.00
1,375.00
35,000.00
42,500.00
45,000.00
42,500.00
35,000.00
42,500.00
4,500.00
4,250.00
438,295.00
86,250.00
524,545.00
S.5
1.0000 unit
1.0000 bh
0.3000 set
235,000.00
235,000.00
235,000.00
70,500.00
305,500.00
NO
SNI
KODE
KOEF
4
1.0000
1.0000
0.1000
0.1000
SAT.
5
OH
OH
OH
OH
URAIAN PEKERJAAN
6
pekerja
tukang batu
kepala tukang
mandor
HARGA BAHAN/
UPAH
7
35,000.00
42,500.00
45,000.00
42,500.00
JUMLAH
8=4x7
35,000.00
42,500.00
4,500.00
4,250.00
JUMLAH TOTAL
9
86,250.00
391,750.00
S.6
15,000.00
15,000.00
0.0100
0.1000
0.0100
0.0050
35,000.00
42,500.00
45,000.00
42,500.00
350.00
4,250.00
450.00
212.50
15,000.00
OH
OH
OH
OH
pekerja
tukang batu
kepala tukang
mandor
5,262.50
20,262.50
XI
DT 91-0014
2007
1.0000
0.5000
0.0150
0.0190
m'
lbr
kg
m3
0.2000
0.4000
0.0250
0.0100
OH
OH
OH
OH
pekerja
tukang kayu
kepala tukang
mandor
20,000.00
243.00
118,408.00
138,651.00
scrool
46,855.50
35,000.00
45,000.00
47,500.00
42,500.00
7,000.00
18,000.00
1,187.50
425.00
26,612.50
165,263.50
BS.9
1.0000
0.5000
0.0150
0.0190
m'
lbr
kg
m3
0.2000
0.4000
0.0250
0.0013
OH
OH
OH
OH
pekerja
tukang kayu
kepala tukang
mandor
20,000.00
243.00
118,408.00
138,651.00
35,000.00
45,000.00
47,500.00
42,500.00
7,000.00
18,000.00
1,187.50
53.13
26,240.63
164,891.63
BS.10
1.0000
1.1000
0.0900
0.0300
0.0900
kg
kg
OH
OH
OH
Baut-baut / angkur
baut baja
tukang besi
tukang kepala
pekerja
1.0000
0.2500
0.0100
0.6500
m'
lbr
kg
m1
40,000.00
16,200.00
17,400.00
10,000.00
162.00
11,310.00
0.1500
0.3000
0.0300
0.0080
OH
OH
OH
OH
pekerja
tukang besi
kepala tukang
mandor
35,000.00
45,000.00
47,500.00
42,500.00
5,250.00
13,500.00
1,425.00
340.00
20,160.00
45,000.00
47,500.00
35,000.00
22,176.00
4,050.00
1,425.00
3,150.00
30,801.00
BS.11
21,472.00
20,515.00
41,987.00
XII
03-
1.0000 bh
1.0000 bh
0.0100
0.5000
0.0100
0.0050
pekerja
tukang kayu
kepala tukang
mandor
110,000.00
110,000.00
35,000.00
45,000.00
47,500.00
42,500.00
350.00
22,500.00
475.00
212.50
110,000.00
OH
OH
OH
OH
23,537.50
133,537.50
KK.3
1.0000 bh
1.0000 bh
19,300.00
19,300.00
0.0150
0.1500
0.0150
0.0008
pekerja
tukang kayu
kepala tukang
mandor
35,000.00
45,000.00
47,500.00
42,500.00
525.00
6,750.00
712.50
31.88
19,300.00
OH
OH
OH
OH
8,019.38
27,319.38
NO
SNI
KODE
3
KK.4
KOEF
SAT.
URAIAN PEKERJAAN
4
5
1.0000 set
1.0000 set
HARGA BAHAN/
UPAH
6
7
Pasang Engsel Jendela Kupu-Kupu
engsel jendela
15,000.00
0.0100
0.1000
0.0100
0.0050
pekerja
tukang kayu
kepala tukang
mandor
JUMLAH
JUMLAH TOTAL
8=4x7
15,000.00
15,000.00
OH
OH
OH
OH
35,000.00
45,000.00
47,500.00
42,500.00
350.00
4,500.00
475.00
212.50
5,537.50
20,537.50
KK.6
1.0000 bh
1.0000 bh
0.0150
0.1500
0.0150
0.0008
pekerja
tukang kayu
kepala tukang
mandor
6,000.00
6,000.00
35,000.00
45,000.00
47,500.00
42,500.00
525.00
6,750.00
712.50
31.88
6,000.00
OH
OH
OH
OH
8,019.38
14,019.38
KK.8
1.0000 bh
1.0000 bh
0.0200
0.2000
0.0200
0.0010
pekerja
tukang kayu
kepala tukang
mandor
8,400.00
8,400.00
35,000.00
45,000.00
47,500.00
42,500.00
700.00
9,000.00
950.00
42.50
8,400.00
OH
OH
OH
OH
10,692.50
19,092.50
KK.9
1.0000 bh
1.0000 bh
0.0600
0.6000
0.0600
0.0030
pekerja
tukang kayu
kepala tukang
mandor
275,000.00
275,000.00
35,000.00
45,000.00
47,500.00
42,500.00
2,100.00
27,000.00
2,850.00
127.50
275,000.00
OH
OH
OH
OH
32,077.50
307,077.50
KK.11
1.0000 m2
1.1000 bh
75,000.00
82,500.00
0.0150
0.1500
0.0150
0.0008
pekerja
tukang kayu
kepala tukang
mandor
35,000.00
45,000.00
47,500.00
42,500.00
525.00
6,750.00
712.50
31.88
82,500.00
OH
OH
OH
OH
8,019.38
90,519.38
XIII
DT 91-0012
2007
1.0000
26.5000
10.4000
0.0450
1.6200
m2
bh
kg
m3
kg
0.2500
0.1200
0.0120
0.0125
OH
OH
OH
OH
pekerja
tukang batu
kepala tukang
mandor
1,900.00
1,320.00
137,500.00
8,100.00
50,350.00
13,728.00
6,187.50
13,122.00
35,000.00
42,500.00
45,000.00
42,500.00
8,750.00
5,100.00
540.00
531.25
83,387.50
14,921.25
98,308.75
L.8
1.0000
11.8700
10.0000
0.0450
1.5000
m2
bh
kg
m3
kg
0.2600
0.1300
0.0130
0.0130
OH
OH
OH
OH
pekerja
tukang batu
kepala tukang
mandor
3,940.00
1,320.00
137,500.00
8,100.00
46,767.80
13,200.00
6,187.50
12,150.00
35,000.00
42,500.00
45,000.00
42,500.00
9,100.00
5,525.00
585.00
552.50
78,305.30
15,762.50
94,067.80
L.11
1.0000
26.5000
9.3000
0.0180
1.9400
m2
bh
kg
m3
kg
1,900.00
1,320.00
137,500.00
8,100.00
50,350.00
12,276.00
2,475.00
15,714.00
80,815.00
NO
SNI
KODE
KOEF
4
0.9000
0.4500
0.0450
0.0450
SAT.
5
OH
OH
OH
OH
URAIAN PEKERJAAN
6
pekerja
tukang batu
kepala tukang
mandor
HARGA BAHAN/
UPAH
7
35,000.00
42,500.00
45,000.00
42,500.00
JUMLAH
8=4x7
31,500.00
19,125.00
2,025.00
1,912.50
JUMLAH TOTAL
9
54,562.50
135,377.50
L.12
1.0000
1.1000
11.7000
0.0350
m2
bh
kg
m3
0.7000
0.3500
0.0350
0.0350
OH
OH
OH
OH
pekerja
tukang batu
kepala tukang
mandor
97,900.00
1,320.00
137,500.00
107,690.00
15,444.00
4,812.50
35,000.00
42,500.00
45,000.00
42,500.00
24,500.00
14,875.00
1,575.00
1,487.50
127,946.50
42,437.50
170,384.00
L.15
1.0000
0.0130
0.0260
11.0000
2.0000
m2
m3
m3
bh
kg
0.1500
0.0150
0.5000
0.0250
OH
OH
OH
OH
tukang batu
tukang kepala
pekerja
mandor
495,000.00
137,500.00
1,500.00
1,320.00
9,652.50
5,362.50
16,500.00
2,640.00
42,500.00
45,000.00
35,000.00
42,500.00
6,375.00
675.00
17,500.00
1,062.50
34,155.00
25,612.50
59,767.50
L.18
1.0000 m2
0.0050 m3
1.0000 m2
250,000.00
37,800.00
1,250.00
37,800.00
39,050.00
25,612.50
64,662.50
Upah tenaga
L.19
1.0000 m2
0.0050 m3
1.0000 m2
250,000.00
39,500.00
1,250.00
39,500.00
40,750.00
25,612.50
66,362.50
Upah tenaga
L.26
1.0000 m3
580.6000 kg
0.9500 m3
perekat portland 1 : 2
semen / PC
pasir
1,320.00
137,500.00
766,392.00
130,625.00
897,017.00
XIV 03-
-2002
PEKERJAAN PENGECATAN
C.1
1.0000
0.2600
0.1740
0.0600
0.0750
0.2000
m2
kg
ltr
kg
kg
lbr
mengecat kayu 3 x
cat
afduner
plamur
meni
amplas
46,830.00
9,300.00
25,500.00
23,940.00
3,360.00
12,175.80
1,618.20
1,530.00
1,795.50
672.00
0.0750
0.0075
0.0500
0.0025
OH
OH
OH
OH
tukang cat
tukang kepala
pekerja
mandor
45,000.00
47,500.00
35,000.00
42,500.00
3,375.00
356.25
1,750.00
106.25
17,791.50
5,587.50
23,379.00
C.4
1.0000
0.2000
0.2250
0.2500
0.0750
0.0075
0.0500
0.0025
m2
kg
kg
lbr
OH
OH
OH
OH
10,600.00
5,737.50
840.00
3,375.00
356.25
1,750.00
104.13
22,762.88
NO
SNI
KODE
3
C.5
KOEF
4
1.0000
0.3500
0.2250
0.2500
0.0750
0.0075
0.0500
0.0025
SAT.
5
m2
kg
kg
lbr
OH
OH
OH
OH
URAIAN PEKERJAAN
HARGA BAHAN/
UPAH
6
7
mengecat tembok dg Mowilex utk luar ruangan
cat tembok Mowilex
78,200.00
plamur
25,500.00
amplas
3,360.00
tukang cat
45,000.00
tukang kepala
47,500.00
pekerja
35,000.00
mandor
42,500.00
JUMLAH
JUMLAH TOTAL
8=4x7
27,370.00
5,737.50
840.00
3,375.00
356.25
1,750.00
106.25
39,535.00
C.6
1.0000
0.3000
0.2250
0.2500
0.0750
0.0075
0.0500
0.0025
m2
kg
kg
lbr
OH
OH
OH
OH
19,400.00
25,500.00
3,360.00
45,000.00
47,500.00
35,000.00
42,500.00
5,820.00
5,737.50
840.00
3,375.00
356.25
1,750.00
106.25
17,985.00
URAIAN PEKERJAAN
NO
SATUAN
KODE
ANALISA
HARGA SATUAN
PEKERJAAN
HARGA
SATUAN
PEKERJAAN
1
2
3
4
5
1 m3
1 m3
1 m3
1 m3
1 ttk
T.1 Rp. Rp
T.10
Rp
T.13
Rp
T.14
Rp
T.23
Rp
25,437.50
50,775.00
8,479.17
100,895.00
21,210.38
25,437
50,775
8,479
100,895
21,210
1
2
3
4
1 m3
1 m3
1 m3
1 m3
Pd.1 Rp.
Pd.5 Rp.
Pd.5.bRp.
Pd.7 Rp.
Rp
Rp
Rp
Rp
221,996.70
573,547.50
514,822.50
688,857.50
221,996
573,547
514,822
688,857
1 m2
1 m2
1 m2
D.1
D.4
D.5
Rp
Rp
Rp
139,508.50
70,305.90
61,292.50
139,508
70,305
61,292
1 m2
1 m2
1 m2
1 m2
PL.1 Rp. Rp
PL.2 Rp. Rp
PL.3 Rp. Rp
PL.4
Rp
35,497.50
31,523.02
24,493.80
29,226.00
35,497
31,523
24,493
29,226
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
1 m3
1 m3
1 m2
1 m2
1 m3
1 m3
1 m3
1 m2
1 m2
1 m2
1 m2
1 m2
1m'
1m'
1m'
KY.1 Rp.
KY.2
KY.7
KY.8
KY.11
KY.13
KY.14
KY.17
KY.17.a
KY.22 Rp.
KY.25
KY.27
KY.33
KY.33.a
KY.35
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
7,789,505.00
12,966,300.00
85,876.50
128,272.50
11,877,120.00
7,990,820.00
8,130,230.00
705,892.50
334,822.50
639,457.50
571,725.00
375,710.00
117,769.50
79,613.10
42,545.00
7,789,505
12,966,300
85,876
128,272
11,877,120
7,990,820
8,130,230
705,892
334,822
639,457
571,725
375,710
117,769
79,613
42,545
1
2
3
4
5
6
7
8
9
10
1 m3
1 m3
1 m3
1 m3
1 kg
1 m'
1 m'
1 m2
1 m2
1 m2
B.1
B.2
B.3
B.4
B.6
B.7
B.8
B.9
B.10
B.11
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
703,470.00
818,365.48
867,079.76
907,471.43
16,612.25
72,812.50
85,641.00
167,712.50
68,477.75
60,263.00
703,470
818,365
867,079
907,471
16,612
72,812
85,641
167,712
68,477
60,263
1 m2
1 m2
1m'
1 m'
PA.1
Rp
PA.5 Rp. Rp
PA.7
Rp
PA.9 Rp. Rp
94,345.00
28,845.00
96,895.00
56,512.00
94,345
28,845
96,895
56,512
1 m2
1 m2
1 m2
LL.1
Rp
LL.2 Rp. Rp
LL.3 Rp. Rp
27,858.25
84,241.50
87,501.50
27,858
84,241
87,501
316,345.00
524,545.00
391,750.00
20,262.50
316,345
524,545
391,750
20,262
II
III
IV
1
2
3
4
V
VI
VII
1
2
3
4
VIII
IX
1
2
3
4
PEKERJAAN SANITASI
Memasang Closet Jongkok Porcelen
Memasang Wastafel
Memasang Bak Cuci Piring Stainlees
Memasang floor drain
bh
bh
bh
bh
S.2
S.4
S.5
S.6
Rp
Rp
Rp
Rp
URAIAN PEKERJAAN
NO
X
SATUAN
KODE
ANALISA
HARGA SATUAN
PEKERJAAN
HARGA
SATUAN
PEKERJAAN
1
2
3
4
1 m2
1 m2
1 kg
1 m1
BS.8
BS.9
BS.10 Rp.
BS.11 Rp.
Rp
Rp
Rp
Rp
165,263.50
164,891.63
30,801.00
41,987.00
165,263
164,891
30,801
41,987
1
2
3
4
5
6
7
bh
bh
set
bh
bh
bh
1 m2
KK.1
KK.3
KK.4
KK.6
KK.8
KK.9
KK.11
Rp
Rp
Rp
Rp
Rp
Rp
Rp
133,537.50
27,319.38
20,537.50
14,019.38
19,092.50
307,077.50
90,519.38
133,537
27,319
20,537
14,019
19,092
307,077
90,519
1
2
3
4
5
6
7
8
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m3
L.6
L.8
L.11
L.12
L.15
L.18
L.19
L.26
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
98,308.75
94,067.80
135,377.50
170,384.00
59,767.50
64,662.50
66,362.50
897,017.00
98,308
94,067
135,377
170,384
59,767
64,662
66,362
897,017
1
2
3
4
PEKERJAAN PENGECATAN
Mengecat kayu 3 kali
Mengecat tembok dg mowilex utk dalam ruangan
Mengecat tembok dg mowilex utk luar ruangan
Mengecat tembok dg Decolit
1 m2
1 m2
1 m2
1 m2
C.1
C.4
C.5
C.6
Rp
Rp
Rp
Rp
23,379.00
22,762.88
39,535.00
17,985.00
23,379
22,762
39,535
17,985
XI
XII
XIII
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.