You are on page 1of 1

Warehouse Management (WM) In the Warehouse Management (WM) Benchmark, a transfer requirement (transaction LB01) is created to put three

materials into stock. This transfer requirement is used to create a transfer order (LT04). Because the number of items per materia l in the transfer requirement exceeds the number that can be placed into one sto rage location, the transfer order has seven line items. The process continues to confirm this transfer order for seven items (LT12). For goods removal, these tr ansactions are called again in the same sequence. Dialog Steps 0. Home page online store 1. Main screen 2. Call Create transfer requirement 3. Enter header data 4. Post transfer requirement 5. Call Create transfer order 6. Create transfer order with reference to transfer requirement 7. Switch to online 8. Place item into stock 9. Place item into stock 10. Place item into stock 11. Post the data 12. Call Confirm transfer order 13. Background processing 14. Call Create transfer requirement 15. Enter data 16. Enter items 17. Call Create transfer order 18. Background processing 19. Call Confirm transfer order 20. Background processing 21. Call /nend 22. Confirm log off

You might also like