You are on page 1of 1

PROJECT TITLE :

N
Q

THE CONSTRUCTION AND COMPLETION OF MAIN INFRASTRUCTURE WORKS AT MUARA SELATAN, KUALA TERENGGANU CITY CENTRE (KTCC), TERENGGANU DARUL IMAN FOR THE EAST COAST ECONOMIC REGION DEVELOPMENT COUNCIL (ECERDC)

OWNER :

3.25

3.25 1.25
3.25

3.25

CLIENT :

EAST
ECONOMIC

COAST

REGION

PROJECT MANAGER :

CONSULTING ENGINEER :

IKTISAS INGENIEURS SDN BHD


303 & 304, Lorong Selangor, Pusat Bandar Melawati, Taman Melawati, 53100 Kuala Lumpur. Tel : 03-4108 6193 Fax : 03-4108 6195 e-mail : project_iisb@yahoo.com website : www.iktisas.com

.........................................................................................................

IR. WAN AHMAD NIZAR BIN ZAKARIA


I hereby certify that these works have been designed by me in accordance with sound engineering practice and I take full responsibility for the design and proper performance of the same

DRAWING TITLE :

ROADWORKS ROAD 1 CH0.00 - CH300.00 : ROAD LAYOUT PLAN (INTERIM)


DESIGNED BY : ZAMRI CHECKED BY : IR. SHAHRIMAN SCALE : 1 : 500 DRAWN BY : IDRIS DATE : NOV 2012 ACAD FILE :

REVISION

DESCRIPTION

DATE

DRAWING NUMBER:

14 DISEMBER 2012 CONSTRUCTION DRAWING


FILENAME: D:\PROJECT\Kuala Terengganu City Centre (KTCC) 331\Construction\Muara Selatan\Layout KTCC 261112\KTCC MS rev Road1+existing 271112.dwg 12/07/12 08:47

ECER/INFIN/KTCC-MS/IISB/C&S/CN/ RD/R1/01/00

CONTRACTORS MUST CHECK ALL DIMENSIONS. ONLY FIGURED DIMENSIONS ARE TO BE USED. ALL DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO THE E.R. FOR CONFIRMATION BEFORE PROCEEDING WITH THE WORKS.

You might also like