Note: These State Priority Goals are a subset of the entire set of NC RttT State Goals, as described in the initial NC RttT Application and as modified by this State DSW. The Priority Goals subset parallels the set of goals against which all participating LEAs and charter schools have been required to set targets. The complete set of NC RttT State Goals includes the Priority Goals, plus the "Other State Goals" found on the tab of that name.
Measure % of All Students Proficient - Grade 4 Reading (State End of Grade test; a proxy for NAEP Grade 4 Reading) % of All Students Proficient - Grade 4 Math (State End of Grade test; a proxy for NAEP Grade 4 Math) % of All Students Proficient - Grade 8 Reading (State End of Grade test; a proxy for NAEP Grade 8 Reading) % of All Students Proficient - Grade 8 Math (State End of Grade test; a proxy for NAEP Grade 8 Math)
83.0%
85.0%
87.0%
89%*
91.0%*
69.5%
72.5%
75.5%
78.5%*
81.5%*
83.9%
86.9%
89.9%
92.9%*
95.9%*
2. Graduation Rates**
74.2%
76%
79%
82%
85%
** Targets for this measure have been updated since the initial RttT application to reflect actual, rather than projected, 2009-10 baseline data; the targets are now more ambitious.
3. College Readiness
1,004 (64%)
1,005 (66%)
57.6% (10.4%)
60% (11%)
62% (13%)
64% (15%)
66% (17%)
*** Language for these three goals has been modified or added since the initial RttT application to more clearly identify the specific indicator/data being referenced and/or to reflect policy updates. Legislation passed in 2011 requires the administration of the ACT statewide, which impacts the representativness of the SAT as a college readiness measure. The State will request the ACT be included as a measure for college readiness and will establish targets in the fall of 2012.
4. College Enrollment
66.0%
67%
68%
70%
72%
**** The 2010-11 target for this measure has been updated (increased) since the initial RttT application to reflect actual, rather than projected, 2009-10 baseline data (NCES, 2008).
NAEP Math Grade 8 a. NAEP Reading Grade 4 White Black Hispanic Asian/Pacific Island American Indian Economically Disadvantaged Not Economically Disadvantaged Students with Disabilities Students without Disabilities White Black Hispanic Asian/Pacific Island American Indian Economically Disadvantaged Not Economically Disadvantaged Students with Disabilities Students without Disabilities White Black Hispanic Asian/Pacific Island American Indian Economically Disadvantaged Not Economically Disadvantaged Students with Disabilities Students without Disabilities White Black Hispanic Asian/Pacific Island
American Indian Economically Disadvantaged Not Economically Disadvantaged Students with Disabilities Students without Disabilities 2. NAEP Achievement Gap a. NAEP Reading Grade 4 White-Black Gap White-Hispanic Gap White-Asian Gap White-American Indian Gap Non ED-ED Gap Non-SWD-SWD Gap White-Black Gap White-Hispanic Gap White-Asian Gap White-American Indian Gap Non ED-ED Gap Non-SWD-SWD Gap White-Black Gap White-Hispanic Gap White-Asian Gap White-American Indian Gap Non ED-ED Gap Non-SWD-SWD Gap White-Black Gap White-Hispanic Gap White-Asian Gap White-American Indian Gap Non ED-ED Gap Non-SWD-SWD Gap
White Black Hispanic Asian/Pacific Island American Indian Economically Disadvantaged Students with Disabilities
White
1063
1065
1067
1071
1075
Black
855
862
871
880
889
Hispanic Asian/Pacific Island American Indian Economically Disadvantaged Students with Disabilities
White Black Hispanic Asian/Pacific Island American Indian Economically Disadvantaged Students with Disabilities
White Black Hispanic Asian/Pacific Island American Indian Economically Disadvantaged Students with Disabilities University of North Carolina (16 campuses)**
** The baseline figure has been updated (decreased) since the initial RttT application to reflect actual 2009-10 data; targets have been adjusted (made more ambitious) accordingly.
N/A 7% 5% 2% 8% 6% N/A 3.5% N/A N/A 8% 7% 6% 5% 5.5% 7.5% 10% 8% 12% 10%
67.0%
60%
56%
52%
48%
***Legislation passed in 2011 requires the administration of the ACT statewide, which impacts the representativness of the SAT as a college readiness measure. The State will request the ACT be included as a measure for college readiness and will establish targets in the fall of 2012.
$234,105,144
Aligned with SBE Goal
234,105,144.00
Fund Source Fiscal Year R/N?
Plan/Timeline for Implementation Governor's Office: Conduct monthly meetings of Governor's Education Transformation Commission, which brings together a variety of stakeholder to provide oversight and recommendations for NC RttT Implementation.
Key Personnel Governor's Advisor for Education Transformation (Bill Harrison), RttT Budget Analyst (Chris Jones), and 2 RttT Internal Auditors
Budget
149,740
Initiatives implemented as designed; any significant modifications requested reviewed by Governor's Office.
RttT
2010-11
Continuously monitor implementation through meetings and other communication with DPI staff, other State agency partners, LEA partners, and non-governmental implementation partners.
Objective 1: Ensure that all NC RttT initiatives are implemented effectively, with fidelity to original application, and in alignment with NC's strategic policy mandate for public education.
479,518
Monitor DPI processes for obtaining, disbursing, and reporting on use of federal funds to ensure that NC RttT implementation complies with all applicable laws and regulations. 5 Bill Harrison, Governor's Education Transformation Commission: Convene Commission for monthly Martez Hill, Dawn meetings to review planning and implementation, Shepherd Pope offer guidance, and consider implications for State policy, including any possible modifications that should be considered. No Audit Exceptions; reports submitted (as required) on time, approved by USED
RttT RttT
2011-12 2012-13
N N
490,110
N N N N N N N
At least monthly, stakeholders updated, offered opportunity to provide guidance regarding implementation.
421,968 1,455,699
RttT
Objective 2: Ensure that NC RttT implementation is managed purposefully, in a coordinated manner, to ensure timely, effective completion of all deliverables and attainment of targeted outcomes; and timely, complete reporting to the US Department of Education.
1,500,492
RttT
2012-13
1,817,518
RttT
2013-14
Page 1 of 72
$234,105,144
Aligned with SBE Goal
234,105,144.00
Fund Source Fiscal Year R/N?
Key Personnel
Budget
Create effective identity, messaging, and narrative tools to explain and support transitions to new curriculum essential standards, new school accountability model and new student assessments. Key Deliverables include: identity materials, story-board for explaining the changes fueled by Race to the Top funds, development criteria to ensure fidelity to identity and change story to enable development of shared vision and goals with statewide education community.
25,000
RttT
2011-12
Vanessa Jeter, Michael Yarbrough, NCDPI Communications Website posted - Sept staff 2010 Vanessa Jeter, Michael Yarbrough, NCDPI Videos developed and Communications ready for distribution staff December 2010 Vanessa Jeter, Michael Yarbrough, NCDPI Communications Materials distributed: staff March 2012
RttT
2010-11
Develop an introductory video for stakeholders to make them aware of impending changes to standards, accountability model, assessments, and teacher eval system.
8,000
RttT
2011-12
Development and production of print materials produced to introduce NC's RttT plan to local school communities. Distribution to each school district and charter.
25,000
RttT
2011-12
Objective 3: Ensure effective communications on Race to the Top implementation, particularly around new standards, assessment and accountability, and technology initiatives
4
Toolkits : March 2012 Teachers identified: Feb 2012. Regional READY Build cadre of teacher and principal ambassadors meetings held with in each school to help communicate the reasons teacher and mechanisms for the changes underway in representatives and curriculum, accountability and educator evaluation. principals: March Participants will include at least 2 teachers per Vanessa Jeter, 2012. school, each school principal and superintendent. Michael Email and Social Key Deliverables Include: Toolkits, regional Yarbrough, NCDPI media connections: READY meeting logistics, email/listserve and Communications March 2012 - Aug social media links staff 2014 Vanessa Jeter, Create and distribute teacher calendars for the Michael 2011-12 school year that embed information about Yarbrough, NCDPI key RttT deadlines and other professional Communications Calendars delivered by development initiatives. August 2011 staff.
150,000
RttT
2011-12
1,000
RttT
2011-12
Page 2 of 72
$234,105,144
Aligned with SBE Goal
234,105,144.00
Fund Source Fiscal Year R/N?
Key Personnel
Budget
Create parent resource podcasts about new standards, new student assessments and new accountability model to distribute online and via social media Fall 2012 along with an online guide for parents.
80,000
RttT
2012-13
Creating a 'concierge service' at DPI to enhance Vanessa Jeter, Concierge staff communication with LEAs and schools . DPI staff Angela Quick, selection, training, will be linked with personnel in each of the LEAs Rebecca Garland, collaborative tool and and Charter Schools. DPI staff will be trained in Philip Price, June marketing of service to customer services, DPI services, key areas and Atkinson and DPI be completed by work of the agency, etc Staff December 2012.
10,000
RttT
2012-13
Materials created and distributed to describe and Vanessa Jeter, explain new standards and accountability model Michael and the Instructional Improvement System (IIS) to Yarbrough, NCDPI educators, parents, business leaders and Communications Developed and government officials. staff. distributed; June 2013
394,000
RttT
2012-13
Develop teacher and principal online resource with content management system to facilitate idea/resource exchange to optimize shared knowledge and to build collaboration across schools and districts and to showcase best practices
147,000
RttT
2012-13
Materials created and distributed to describe and Vanessa Jeter, explain new standards and accountability model Michael and the Instructional Improvement System (IIS) to Yarbrough, NCDPI Communications Developed and educators, parents, business leaders and staff. distributed; June 2014 government officials.
160,000
RttT
2013-14
Page 3 of 72
$234,105,144
Aligned with SBE Goal
234,105,144.00
Fund Source RttT RttT RttT Fiscal Year R/N?
Key Personnel
Budget
Employ a Cloud Services Manager at DPI throughout project. Hire should be completed no later than 01/31/2011
N N N
(A)(2) NC Cloud
Objective 1: Develop a blueprint for modern technology infrastructure based on high reliability, availability, performance, and efficiency.
Contract with The Friday Institute at North Carolina State University to develop the infrastructure blueprint by 05/01/2011. Manage the implementation of the project through 2014. Deliver NCLTI training.
Philip Price, Neill Kimrey, Cloud Manager, Jerry Bunn, Friday Institute
148,031 Contract In Place by 12/01/2010 Blueprint developed by 05/01/2011 Project Complete Late 2014 138,396
RttT RttT
2013-14 2010-11
N N
796,389 2,115,645
RttT RttT
2011-12 2012-13
N N
750,000
RttT N/A
2013-14 2011-12
N N
(A)(2) NC Cloud
Contract with MCNC to carryout LEA Infrastructure Site Surveys by 01/01/2011. Site surveys complete by 03/31/2011.
Contract in place by 01/01/2011 Philip Price, Neill Kimrey, Cloud Site surveys complete Manager, Jerry by 03/31/2011 Bunn, Friday Institute
N/A
Page 4 of 72
$234,105,144
Aligned with SBE Goal
234,105,144.00
Fund Source N/A Fiscal Year R/N?
Key Personnel
Budget N/A
DPI and The Friday Institute shall develop an advisory and governance structure to facilitate LEA collaboration during the planning stages of the NC Ed Cloud project. Initial advisory structure developed by 03/01/2011
2010-11
(A)(2) NC Cloud
Objective 3: Collaborate with LEAs to develop 5 and implement a deployment and operating plan for the NC Education Cloud.
DPI will assist LEAs with modifying State, District, and School Technology Plans to incorporate the Infrastructure Blueprint. All plans amended by 01/01/2013.
Philip Price, Neill Kimrey, Cloud Manager, Jerry Bunn, Friday Institute
2011-12 N N
(A)(2) NC Cloud
Objective 4: Provide technical engineering and systems administration expertise to districts and charters in support of infrastructure and systems migrations. 5
Contract with MCNC to provide technical assistance to LEAs during migration to Philip Price, Neill the NC Ed Cloud in years 2-4. Contract in Kimrey, Cloud place by 01/01/2012. MCNC will finish Manager, Jerry migrations by 07/01/2014. Bunn, Friday
Institute, MCNC
Plans modified by 01/01/2013 Contract in place by 01/01/2012 Migrations complete by 07/01/2014 MCNC continues Sustainment support
N/A 374,653
N/A
RttT
2012-13 2011-12 N
425,347
RttT
2012-13
400,000
RttT
2013-14
Page 5 of 72
$234,105,144
Aligned with SBE Goal
234,105,144.00
Fund Source Fiscal Year R/N?
Key Personnel
Budget
Implement Learning Object Repository (LOR), Learning Management Systems (LMS), Curriculum Content, eLearning Portal Personalization (eLNC), and Web Collaboration Components: Plan, Execute and Build, Procure, Deploy and Operate. Deploy a digital card catalog platform that supports search, contribution, and management functions associated with digital learning content. Support provisioning of content and teachercourse-student data into learning management systems used in NC LEAs (including the NC IIS).
$0.00
RttT
2011-12
13,764,802
RttT
2012-13
Implement Identity and Access Management (IAM) and Data Integration: Plan, execute, build, procure, deploy, and operate. Integrate student, teacher, and parent data from Student Information System (SIS) and HR systems; automate user account creation; support use of LEA credentials to access cloud-based services.
Philip Price, Neill Kimrey, Cloud Manager, Jerry Bunn, Friday Institute
Fully implement the LOR /LMS/eLNC/Content/ Web/Collaboration Intiatives Plan & Define the IAM and data integration services Identify a vendor(s) IAMand integration servicdes that meets the K12 needs
3,168,951 $0.00
RttT
2013-14 2011-12
N N
RttT
900,000
RttT
2012-13
(A)(2) NC Cloud
300,000
RttT
2013-14
Page 6 of 72
$234,105,144
Aligned with SBE Goal
234,105,144.00
Fund Source Fiscal Year R/N?
Key Personnel
Budget
Contract for Cloud Enterprise and Business Services such as Mobile Device Management (MDM), Managed Hosted VOIP, i-Series Migration, Data IntegrationManaged Service(DI-MS), Application Performance Management (APM), AMTR 3.0, and Cloud Managment Services (CMS) : Plan, execute, build, procure, deploy, and operate. Migrate LEA enterprise IT infrastructure to cloudbased and service oriented model. In general, transition server and appliance hardware into private sector data centers managed under X-as-a-service contractual agreements.
$0.00 10,599,569
RttT RttT
2011-12 2012-13
Identify vendor(s) and implement the MDM, VOIP, DI-MS,APM, ISeries migration, AMTR 3.0, and CMS.
500,235
RttT
2013-14
2010-11 Activities: Establish and hire Policy Analyst postion By March 2011, contract to begin process evaluation assessing the progress in developing and implementing the RttT initiatives (ongoing) ALL Interim Process & Implementation Evaluation Reports (for multiple initiatives) $ 32,246 RttT 2010-11
Martez Hill, Elizabeth Cunningham, By June 2011, develop logic models and theories of SERVE Center at action, begin data collection at the state and local level, UNC-Greensboro 1st Stage and assess progress and process as initially Longitudinal developed. Database By June 2011, begin to design and organize database for future formative assessments, to be conducted in years 2 & 3.
Page 7 of 72
$234,105,144
Aligned with SBE Goal
234,105,144.00
Fund Source Fiscal Year R/N?
Key Personnel
Budget
2011-12 Activities: By September 2011, design instruments to collect data from teachers and principals: surveys, interview protocols, and focus group protocols. By October 2011, "assess feasibility of using" hightech recording systems designed to record teachers practice (to assess instructional practices after participating in professional development). By December 2011, develop and work with DPI to collect data on RttT program participation. By December 2012, develop baseline estimates of the distribution of higher-quality teachers and school leaders, revised from initial RttT proposal estimates.
ALL
Tasks and reports completed according to Martez Hill, timelines in the June Elizabeth 2012 evaluation Cunningham/Step $ workplan hen Jackson, SERVE Center at 2nd Stage UNC-Greensboro Longitudinal Database
3,934,946
RttT
2011-12
Page 8 of 72
$234,105,144
Aligned with SBE Goal
234,105,144.00
Fund Source Fiscal Year R/N?
Key Personnel
Budget
(A)(2) Evaluation
Objective EVAL 1: Conduct evaluations of all RttT initiatives to inform continuous improvement and future policy and funding decisions.
2012-13 Activities: By August 2012, conduct baseline of analysis of local education expenditures in preparation for cost analyses, which will specifically include the technology initiative. By October 2012, produce formative assessments of the "promising practices" that received the highest priority in 2011-12, including professional development. ALL
Tasks and reports completed Martez Hill, By May 2013, conduct a local education agency cost according to Stephen Jackson, timelines in the June $ assessment SERVE Center at 2012 evaluation o Examine the expenditure patterns and UNC-Greensboro workplan implementation of local education agency expenditures and activities. By February 2013, produce formative assessments of the efforts to transform the lowest-performing schools. Revisit initiative implementation (ongoing). Continue to obtain and manage longitudinal data for assessing program outcomes (ongoing).
2,750,779
RttT
2012-13
Page 9 of 72
$234,105,144
Aligned with SBE Goal
234,105,144.00
Fund Source Fiscal Year R/N?
Key Personnel
Budget
FY 2013-2014 Activities: By October 2013, complete assessment and provide feedback on "promising practices." By January 2014, conduct an overall cost and sustainability analysis of the RttT initiatives. By July 2014, develop estimates of trends and changes in the distribution of higher-quality teachers and school leaders. ALL
Tasks and reports Martez Hill, completed By September 2014, assess the preliminary impacts of Stephen Jackson, according to the highest-priority initiatives, including professional SERVE Center at timelines in the June 2012 evaluation development, efforts to turn around the lowest UNC-Greensboro workplan performing schools, and initiatives to increase the supply and equitable distribution of high quality teachers and leaders. By September 2014, conduct an analysis of the local expenditure patterns associated with the greatest improvements in student achievement, student on-time progress and graduation, and increasing quality of teachers and school leaders.
2,731,438
RttT
2013-14
Page 10 of 72
$234,105,144
Aligned with SBE Goal
234,105,144.00
Fund Source Fiscal Year R/N?
Key Personnel
Budget
N/A
1 and 2
Create a plan and strategy to locate the best resources aligned to the Common Core State Standards.
Inventory of resources available of the NC Curriculum Website as compared to other states in the CCSS.
State
2010-11
1 and 2
*Completion and Publication by April 2011; *Ongoing Field Feedback *Evaluation Team Reports
N/A
State
2010-11
Page 11 of 72
$234,105,144
Aligned with SBE Goal
234,105,144.00
Fund Source Fiscal Year R/N?
Key Personnel
Budget
1 and 2
*Completion and Publication by due Angela Quick, Develop and Publish date June 2012; Maria Pitre-Martin, *Ongoing Field Content Specific Formative Assessment (including Tracey Greggs, Feedback examples of Assessment Tasks and Curriculum Staff *Evaluation Team Items) Reports
N/A
State
2011-12
Page 12 of 72
$234,105,144
Aligned with SBE Goal
234,105,144.00
Fund Source Fiscal Year R/N?
Key Personnel
Budget
Objective 1: Develop and disseminate instructional resources to help educators develop a deep understanding of the new standards in an effort to increase student outcomes.
1 and 2
*Completion and Publication by April 2011; *Ongoing Field Feedback *Evaluation Team Reports
N/A
State
2010-11
1 and 2
*Completion and Publication by June 2012; *Ongoing Field Feedback *Evaluation Team Reports
N/A
State
2011-12
Page 13 of 72
$234,105,144
Aligned with SBE Goal
234,105,144.00
Fund Source Fiscal Year R/N?
Key Personnel
Budget
1 and 2
N/A
State
2011-12
1 and 2
N/A
State
2012-13
1 and 2
Angela Quick, *Completion and Maria Pitre-Martin, Publication by June Tracey Greggs, 2012 Curriculum Staff
N/A
State
2011-12
1 and 2
Angela Quick, Collaborate with local districts to Maria Pitre-Martin, develop and publish Learning Experiences/Lesson Tracey Greggs, Plan Curriculum Staff examples (for selected standards)
*Completion and Publication by Nov 2012; *Ongoing Field Feedback *Evaluation Team Reports
N/A
State
2012-13
1 and 2
Collaborate with local districts to develop and publish Pacing Guide examples (for selected standards)
*Completion and Publication by Nov 2012; *Ongoing Field Feedback *Evaluation Team Reports
N/A
State
2012-13
1 and 2
Develop and Publish Additional Curricular Tools and Resources requested by districts (for selected standards)
*Completion and Angela Quick, Publication by Aug. Maria Pitre-Martin, 2012; *Ongoing Field Tracey Greggs, Feedback Curriculum Staff *Evaluation Team Reports
N/A
State
2012-13
2013-14
Page 14 of 72
$234,105,144
Aligned with SBE Goal
234,105,144.00
Fund Source Fiscal Year R/N?
Key Personnel
Budget
(B)(3) Objective 2: Develop and publish a Standards communication schedule that identifies and opportunities to build knowledge among Assessment teachers, staff, and administrators.
Angela Quick, Neill Kimrey, Kayla Identify districts and schools to meet with and Siler, Melanie schedule meetings to discuss use of online Honeycutt, Cynthia assessments (successes, lessons learned, needs, Sartain etc)
Meetings scheduled and on the calendar for all identified by Dec 2010
State
2010-11
Angela Quick, Neill Kimrey, Kayla Outline finalized by Siler, Melanie March 2011 Honeycutt, Cynthia Sartain Organize findings and outline Best Practices Guide
State
2010-11
Angela Quick, Neill Kimrey, Kayla Draft submitted for Siler, Melanie review by April 2011 Honeycutt, Cynthia Sartain Complete Initial draft of Best Practices Guide
State
2010-11
Angela Quick, Neill Kimrey, Kayla Document approved Siler, Melanie and posted by June Honeycutt, Cynthia 2011 Sartain Finalize Best Practices Guide and publish to the website
State
2010-11
Angela Quick, Neill Kimrey, Kayla Complete State Board Siler, Melanie presentation by Honeycutt, Cynthia August 2011 Sartain
(B)(3) Standards
State
2011-12
Page 15 of 72
$234,105,144
Aligned with SBE Goal
234,105,144.00
Fund Source Fiscal Year R/N?
Key Personnel
Budget
Standards assessment Best Practices Guide, which will and address issues of scheduling, financial Assessment planning, and technical requirements.
Angela Quick, Neill Kimrey, Kayla Siler, Melanie Honeycutt, Cynthia Sartain
Present Best Practices Guide to LEAs/Charter Schools through conferences and regional meetings and update as needed
State
2011-12
Present Best Practices Guide to LEAs/Charter Schools through conferences and regional meetings and update as needed
Angela Quick, Neill Kimrey, Kayla Siler, Melanie Honeycutt, Cynthia Sartain
State
2012-13
Present Best Practices Guide to LEAs/Charter Schools through conferences and regional meetings and update as needed
Angela Quick, Neill Kimrey, Kayla Siler, Melanie Honeycutt, Cynthia Sartain
State
2013-14
Page 16 of 72
$234,105,144
Aligned with SBE Goal
234,105,144.00
Fund Source Fiscal Year R/N?
Key Personnel
Budget
(B)(3) Objective 4: Provide professional development Standards on the new standard course of study and and Assessment related assessments.
1 and 2
ERD, PDI Team, Contractors, Collaborate on the development and Angela Quick, implementation of online professional development Maria Pitre-Martin, modules and LEA Planning Institutes Tracey Greggs, Curriculum Staff
2010-11
See D(5) See D(5) RttT
N N N
Launch CEDARS P-13 Data Warehouse (make registration and access available online to all LEAs and charter schools) by May 2011, and operate going forward.
CEDARS P-13 Data Warehouse available online to all LEAs and charter schools by May 2011.
Other Federal
R R R R R
Page 17 of 72
$234,105,144
Aligned with SBE Goal
234,105,144.00
Fund Source Fiscal Year R/N?
Key Personnel
Budget
State Publish NC School Report Card and other associated Accountability reports and web-tools featuring end-of-grade and end-of-course test scores, participation rates, graduation rates. Angela Quick, Tammy Howard, Ken Barbour, Traci Tillis Publish on DPI website in accordance with established annual schedules.
2011-12
(C)(2) Objective 1: Continue providing data and State information products that stakeholders can Longitudinal use to inform their decisions regarding policy Data and services.
State
2012-13
State
2013-14
Page 18 of 72
$234,105,144
Aligned with SBE Goal
234,105,144.00
Fund Source State State State State State State State State State State State State Fiscal Year R/N?
Key Personnel
Budget
Provide data files to NC Education Research Data Center in accordance with established calendars Karl Pond (multiple delivery dates over course of year). Provide data files to Employment Security Commission for Common Follow-up System in accordance with established calendars (multiple delivery dates over course of year).
Karl Pond
Provide data files to Education Value-Added Assessment System (EVAAS) in accordance with Karl Pond, Kris Knower established calendar and as needed for ad hoc analyses.
2010-11 2011-12 2012-13 2013-14 2010-11 2011-12 2012-13 2013-14 2010-11 2011-12 2012-13 2013-14
R R R R R R R R R R R R
Page 19 of 72
$234,105,144
Aligned with SBE Goal
234,105,144.00
Fund Source State State State Fiscal Year R/N?
Key Personnel
Budget
Ensure that all LEAs and Charter Schools have access to EVAAS data.
Kris Knower
Statewide EVAAS license in place. All LEAs and charters enabled with access to EVAAS.
R R R
State
2013-14
Deliver training to all LEAs and charter schools, per above training plan (by April 30, 2010).
(C)(2) State Objective 2: Provide professional development Longitudinal on CEDARS business intelligence tools and how Data to produce annual and longitudinal reports.
Training complete for 2 people per LEA and 1 person per Charter (approx 330 users trained) by April 30, 2011.
200,000
-
2,5 Deliver professional development webinars Karl Pond, and sessions at CEDARS various conferences Operational Team throughout year (dates TBD).
N N R
Support use of CEDARS longitudinal data warehouse through webinars and sessions at various annual Statewide and regional conferences and technical assistance events.
State
2012-13
2,5
2,5
See Section (D)(5) Professional Development for deliverables on data literacy training
State
2013-14
June 2010 - October 2010 and June 2011 December 2011; Conduct meetings with potential vendors to learn about products on the market and catalogue tool features
N/A
2010-11
N/A
2010-11
Page 20 of 72
$234,105,144
Aligned with SBE Goal
234,105,144.00
Fund Source Fiscal Year R/N?
Key Personnel
Budget
Setup IIS advisory groups (Stakeholder and User) from external stakeholders to refine vision for the IIS and offer guidance and feedback to the project team
36,000
RttT
2011-12
36,000
RttT
2012-13
36,000
RttT
2013-14
N/A
2010-11
November 2010: Develop Leadership Groups for IIS, including IIS Leadership to provide input into IIS
Workgroup meetings held regularly Project Sponsor; Project Director Workgroup meetings held regularly
N/A
2011-12
N/A
2012-13
N/A
2013-14
Page 21 of 72
$234,105,144
Aligned with SBE Goal
234,105,144.00
Fund Source Fiscal Year R/N?
Key Personnel
Budget
N/A
2014-15
23,191
RttT
2010-11
Team established by August 2011 Team established by August 2011 Team established by August 2011 Project Director
Other Federal
2010-11
290,708 -
2011-12
Develop core IIS Team: Project Director, Project Coordinator, Project Manager, NC FALCON Coordinator and allot associated costs
2011-12
Maintain staff
319,385
RttT
2012-13
Maintain staff
Other Federal
2012-13
Page 22 of 72
$234,105,144
Aligned with SBE Goal
234,105,144.00
Fund Source Fiscal Year R/N?
Key Personnel
Budget
Maintain staff
355,409
2013-14
Maintain staff
2013-14
Develop supplemental IIS Team: Functional Specifications Analysts, Systems Engineer, QA Analyst, Content Lead, Content QA, Database Administrator, Business Analyst and allot associated costs
RttT
2011-12
RttT RttT
2012-13 2013-14
N R
Planning RFP completed by Feb. 2011. Focus groups held, ideas documented, vision shared with leadership; Draft business specifications and technical requirements Hire IIS Planning vendor (CELT), Develop project Project Director & documented plan, communications plan; gather information Financial Business about vision, specifications, and requirements, Services RFP. Assist in evaluating RFP.
28,750
RttT
2010-11
Focus groups conducted; Business Specifications and Technical Requirements completed; RFP and Implementation Plan completed Evaluation process completed; Vendor selected
310,000
RttT
2011-12
Page 23 of 72
$234,105,144
Aligned with SBE Goal
234,105,144.00
Fund Source Fiscal Year R/N?
Key Personnel
Budget
MClass licensed Work with CUACS to 1. align curriculum and learning content, assessment content, and professional development content to the North Carolina Standard Course of Study (NCSCS), 2. load or register all content to the Learning Object Repository, 3. register the content in the Learning Registry.
2,355,223
RttT
2011-12
Content processes established; IIS content prepared for entry or registry in the LOR and Learning Registry
135,000
RttT
2011-12
540,000
RttT
2012-13
Alignment of content to NCSCS and registry in LOR and Learning Registry Project Director, CELT, & NewSouth Technologies
540,000
RttT
2013-14
NewSouth Progress toward Begin Contiguration and Installation of IIS software Technologies & IIS system configuration & Components Vendor installation
2,877,796
RttT
2012-13
Page 24 of 72
$234,105,144
Aligned with SBE Goal
234,105,144.00
Fund Source Fiscal Year R/N?
Key Personnel
Budget
Page 25 of 72
$234,105,144
Aligned with SBE Goal
234,105,144.00
Fund Source Fiscal Year R/N?
Key Personnel
Budget
2,000,000
RttT
2013-14
2,000,000
RttT
2013-14
1,764,520
RttT
2013-14
1,000,000
RttT
2013-14
371,216
RttT
2013-14
108,320
RttT
2013-14
Page 26 of 72
$234,105,144
Aligned with SBE Goal
234,105,144.00
Fund Source Fiscal Year R/N?
Key Personnel
Budget
1,000,000
RttT
2013-14
NewSouth Progress toward Technologies & IIS system configuration & Vendor installation
RttT
2013-14
897,449
RttT
2012-13
897,449
RttT
2013-14
Page 27 of 72
$234,105,144
Aligned with SBE Goal
234,105,144.00
Fund Source Fiscal Year R/N?
Key Personnel
Budget
Track usage statistics for IIS; Work with evaluation team to determine what data to capture to explore stakeholder use and satisfaction with the tool.
Evaluation plans (See section A2) Fees paid for LEAs and Charters so they can access the IIS for the 2013 - 2014 school year Fees paid for LEAs and Charters so they can access the IIS for the 2013 - 2014 school year
--
RttT
2013-14
Objective 2: Purchase tools for which LEAs can subscribe via the IIS.
Pay licensing and subscription fees for LEAs and Project Sponsor & Charters to use the IIS modules Project Director
955,361
RttT
2012-13
3,000,000
RttT
2013-14
Objective 3: Provide professional development and communications to prepare the teachers, students, parents and administrators for implementing the IIS.
Project Sponsor, Project Director, Project Coordinator, IIS Strategy defined and Leadership approved
TBD
RttT
2012-13
Establish Managing Change team to help LEAs prepare for and transition to IIS.
Project Sponsor, Project Director, Project Coordinator, IIS Leadership Team established
TBD
RttT
2012-13
Engage LEAs in Managing Change exercises to prepare teachers, students, parents and administrators for the implementation of IIS
TBD
RttT
2012-13
Page 28 of 72
$234,105,144
Aligned with SBE Goal
234,105,144.00
Fund Source Fiscal Year R/N?
Key Personnel
Budget
Continue to engage LEAs in Managing Change exercises to prepare teachers, students, parents and administrators for the implementation of IIS
TBD
RttT
2013-14
Continue to engage LEAs in Managing Change exercises to prepare teachers, students, parents and administrators for the implementation of IIS
Create Data Guide to help educators better use data to inform education
Managing Change Team Team established Project Director, Project Coordinator, Systems Published data guide Accounting Project Director, Project Coordinator, Systems Accounting
TBD
RttT
2014-15
20,000
RttT
2012-13
Create second Data Guide that inform educators on best practices of how to use the IIS and the data contained therein to improve educational outcomes.
10,850
RttT
2013-14
See Section D5 regarding professional development. Objective 4: Provide professional development through data coaches.
Page 29 of 72
$234,105,144
Aligned with SBE Goal
234,105,144.00
Fund Source Fiscal Year R/N?
Key Personnel
Budget
Expand alternative licensure programs for educators such as the NC Guilford County Schools Alternative Certification Track, Collaboration for Orchestration Regional Education, Charlotte-Mecklenburg Schools' Lateral Entry Assistance Program for Career and Technical Education (CTE) and New Leaders for New Schools
Lynne Johnson, New Project Coordinator, Elissa Brown, Statewide Evaluation Committee, Alternative Licensure Providers
State
2010-11
Lynne Johnson, New Project Coordinator, Elissa Brown, Statewide Evaluation Committee, Alternative Licensure Providers
State
2011-12
2.4
Lynne Johnson, New Project Coordinator, Elissa Brown, Statewide Evaluation Committee, Alternative Licensure Providers
State
2012-13
Lynne Johnson, New Project Coordinator, Elissa Brown, Statewide Evaluation Committee, Alternative Licensure Providers
State
2013-14
Page 30 of 72
$234,105,144
Aligned with SBE Goal
234,105,144.00
Fund Source Fiscal Year R/N?
Key Personnel
Budget
Utilize vacancy reports, equity plans and Teacher Working Conditions survey for strategic staffing planning
Lynne Johnson, New Project Coordinator, Elissa Brown, IHE Publish white paper by Partners June 2014. Lynne Johnson, New Project Coordinator, Elissa Convene task force Brown, IHE and meet quarterly Partners during 2012-13 Lynne Johnson, New Project Coordinator, Elissa Convene task force Brown, IHE quarterly during 2013Partners 14
State
2011-12
Utilize vacancy reports, equity plans and Teacher Working Conditions survey for strategic staffing planning
State
2012-13
Utilize vacancy reports, equity plans and Teacher Working Conditions survey for strategic staffing planning
State
2012-14
Increased number of teacher candidates prepared to teach in high-needs regions and in high-needs content areas
State
2010-11
(D)(1) Alternative Objective 2: Improve educator pipeline for Certification high-need content and specialty areas.
Lynne Johnson, New Project Coordinator, Elissa Brown, IHE Partners Increased number of teacher candidates prepared to teach in high-needs regions and in high-needs content areas
State
2011-12
Increased number of teacher candidates prepared to teach in high-needs regions and in high-needs content areas
State
2012-13
Increased number of teacher candidates prepared to teach in high-needs regions and in high-needs content areas
State
2013-14
Page 31 of 72
$234,105,144
Aligned with SBE Goal
234,105,144.00
Fund Source Fiscal Year R/N?
Key Personnel
Budget
Create evaluation instruments and processes for classifications that are not classroom teachers or school based administrators. These include instructional technology teachers and media coordinators, guidance counselors, school psychologists, social workers. Design optional instruments for speech pathologists, school nurses, occupational therapists, and physical thearapists. Continue development of evaluation instruments and processes for classifications that are not classroom teachers or school based administrators. These include instructional technology teachers and media coordinators, guidance counselors, school psychologists,social workers. Design optional instruments for speech pathologists, school nurses, occupational therapists, and physical thearapists. Pilot evaluation instruments for classifications that are not classroom teachers or school based administrators. These include instructional technology teachers and media coordinators, guidance counselors, school psychologists, social workers. Optional evaluation instruments available for use by LEAs and Charters.
RFP issued by June 30, 2011 $0 Vendor in place by September 1, 2011. Draft rubrics and processes developed for 9 new instruments for each of the identified classifications by June 30, 2012 $182,372
RttT
2010-11
RttT
2011-12
Pilot completed and State Board adopted instruments by June 30, 2013.
$273,558
RttT
2012-13
(D)(2) Teacher and Objective 1: Implement teacher and principal Principal evaluation processes statewide. Evaluation
5 piloted evaluation insturments required for use by LEAs and Charters operational. Optional evaluation instruments available for use by LEAs and Charters.
$25,000
RttT
2013-14
Jennifer Preston, Elizabeth Colbert, McRel All LEAs and Charters e $792,019
RttT
2010-11
Jennifer Preston, Elizabeth Colbert, All LEAs and Charters use online tool McRel $1,205,025
RttT
2011-12
Page 32 of 72
$234,105,144
Aligned with SBE Goal
234,105,144.00
Fund Source Fiscal Year R/N?
Key Personnel
Budget
Jennifer Preston, Elizabeth Colbert, All LEAs and Charters use online tool McRel $1,421,063 Jennifer Preston, Elizabeth Colbert, All LEAs and Charters use online tool McRel $1,421,063
RttT
2012-13
RttT
2013-14
(D)(2) Teacher and Objective 2: Add explicit student growth data component to teacher and principal evaluation Principal Evaluation processes.
Developed 6th standard to the Teacher Evaluation Process and an 8th standard for the Principal Rebecca Garland, Evaluation Process for Measures of Student Growth (by 2010-2011 school year) Jennifer Preston
RttT
2010-11
Standards added to the instrument and fully implemented in Adopted and implemented 6th standard to the evaluation processes Teacher Evaluation Process and an 8th standard for the Principal Evaluation Process for Measures Rebecca Garland, for the 11-12 school of Student Growth by 2011-12 school year. Jennifer Preston year
$0
RttT
2011-12
Develop and implement compensation model for compensation of certified personnel in the lowestachieving schools.
DPI Educator Recruitment & Development, Finance & Business Services, District & School Transformation
Compensation Model in place and compensation supplied to eligible staff for 2010-2011
$0
RttT
2010-11
Page 33 of 72
$234,105,144
Aligned with SBE Goal
234,105,144.00
Fund Source Fiscal Year R/N?
Key Personnel
Budget
(D)(2) Objective 4: Determine and develop Teacher and compensation models, including Principal implementation of compensation models in Evaluation the lowest-achieving schools.
DPI Educator Recruitment & Development, Finance & Business Implement compensation model for compensation Services, District & School of certified personnel in the lowest-achieving Transformation schools. DPI Educator Recruitment & Development, Finance & Provide bonuses for classroom teachers whose Business Services, District & students have achieved higher than expected growth and continue with compensation model in School Transformation place for all other personnel.
Compensation Model in place and compensation supplied to eligible staff for 2011-2012
$2,070,393
RttT
2011-12
Bonuses paid based on expected growth and compensation model still being implemented
$4,422,364
RttT
2012-13
Provide bonuses for classroom teachers whose students have achieved higher than expected growth and continue with compensation model in place for all other personnel.
DPI Educator Recruitment & Development, Finance & Business Services, District & School Transformation
Bonuses paid based on expected growth and compensation model still being implemented
$9,323,610
RttT
2013-14
Establish 52 teacher workgroups to produce item specifications and vet items for assessments for untested courses (travel and substitutes)
$845,880
RttT
2011-12
(D)(2) Teacher and Objective 2: Add explicit student growth data component to teacher and principal evaluation Principal Evaluation processes.
Engage vendor to generate items for assessments Tammy Howard, for untested courses. Contractor
Assessment items generated by June 30, 2012. $1,315,480 Remainder of assessment items generated by June 30, 2013. $1,315,480 Validity and Reliability of assessments established by September 2012. $200,000 Pilot Student Survey conducted by June 30, $1,000,000 2012
RttT
2011-12
RttT
2012-13
Engage North Carolina Technical Advisors on the design process of Measures of Student Learning and the educator effectiveness model Pilot Student Surveys during 2011-2012 to determine how best to integrate this tool into the teacher effectiveness process
Tammy Howard
RttT
2012-13
Jennifer Preston
RttT
2011-12
Page 34 of 72
$234,105,144
Aligned with SBE Goal
234,105,144.00
Fund Source Fiscal Year R/N?
Key Personnel
Budget
(D)(2) Objective 3: Create the Educator Effectiveness Teacher and Workgroup to develop long-term system for Principal integrating student growth data into Evaluation evaluations for all teachers and principals.
Develop and validate a student academic growth factor and develop longer-term system for integrating student growth data into teacher and principal evaluations for all teachers and principals (including new growth measured through the new assessments developed for untested courses). Project Sponsors Design and develop RLA models in consultation with independent experts including establishing objectives, time lines, implementation plan and evaluation processes. Ensure RLA design will engage participants in addressing issues similar to those they will face on the job, working through relevant data, problem identification, consideration of alternative solutions, and decision-making. Conduct RLA startup including additional design consultation, faculty selection and establishment. Jan 2011 - Jun 2011
Growth factor validated as reliable measure for using student growth to evaluate teacher effectiveness. Long-term system in place for integrating growth measure into all teacher and principal evaluations.
$300,000
RttT
2011-12
Start Northeast Regional Leadership Academy and begin planning for Sandhills, Piedmont-Triad Leadership Academies. $40,465
RttT
2010-11
Start Northeast Regional Leadership Academy and begin planning for Sandhills, Piedmont-Triad Leadership Academies. $4,000
RttT
2010-11
Page 35 of 72
$234,105,144
Aligned with SBE Goal
234,105,144.00
Fund Source Fiscal Year R/N?
Plan/Timeline for Implementation Refine Design of RLA models in consultation with independent experts including refining implementation plan and evaluation processes.
Key Personnel
Budget
(D)(3) Regional Teacher & Objective 1: Develop and implement regional Leader leadership academies to recruit, prepare, and Effectivenes support highly-effective principals. s
Recruit and select new principals in( Cohort 2) 75 candidates Jun 2011 - Jun 2012 Lynne Johnson, Project Coordinator Launch RLAs for Cohort 1 July 2011 Conduct RLAs (Cohort 1, Year 1) focusing on acquiring skills and abilities that allow principals to lead transformational change within low-performing schools with a focus on effective instructional leadership and improving student outcomes. July 2011 - July 2012 Recruit and select new principals in Cohort 3 (75 candidates) Jun 2011 - Jun 2012 Lynne Johnson, Project Coordinator Conduct RLAs (Cohort 1, Year 2) July 2012 - July 2013 Launch RLAs for Cohort 2 July 2012 Conduct RLAs (Cohort 2, Year 1) July 2012 - July 2013 Lynne Johnson, Project Coordinator Conduct RLAs (Cohort 2, Year 2) July 2013 - Aug 2014 Launch RLAs for Cohort 3 July 2013 Conduct RLAs (Cohort 3, Year 1) July 2013 - July 2014 Lynne Johnson, Project Coordinator
RttT
2011-12
Continue Northeast Regional Leadership Academy and begin Sandhills, PiedmontTriad Leadership Academies. Cohort 3 participants selected by May 2012. $2,039,054
RttT
2011-12
RttT
2012-13
RttT
2013-14
Page 36 of 72
$234,105,144
Aligned with SBE Goal
234,105,144.00
Fund Source Fiscal Year R/N?
Key Personnel
Budget
(D)(3) Regional Teacher & Objective 2: Increase the number of highlyLeader qualified teachers in low-income rural areas Effectivenes and low-performing urban schools. s
Enable expansion of Teach for America (by 340 over the next four years)
Lynne Johnson, Jennifer Preston, Teach For America Lynne Johnson, Project Coordinator, Teach For America Lynne Johnson, Project Coordinator, Teach For America Lynne Johnson, Project Coordinator, Teach For America
$0
RttT
2010-11
$2,288,400
RttT
2011-12
$2,498,500
RttT
2012-13
$2,582,500
RttT
2013-14
Develop a North Carolina Teacher Corps to recruit in-state talent for high-need schools not served by TFA (to begin 2011-2012 school year)
$0
RttT
2010-11
(D)(3) Regional Teacher & Objective 2: Increase the number of highlyLeader qualified teachers in low-income rural areas Effectivenes and low-performing urban schools. s
Use 2011- 2012 as an intense planning and recruitment year; Hire a Statewide Program Director, Statewide Program Consultant, and Statewide Program Assistant to support the work of the NC Teacher Corps.
Planning completed Lynne Johnson, and first cohort of Jennifer Preston, Corps members Theresa Perry recruited by June 2012
$271,002
RttT
2011-12
Begin NC Teacher Corps - first cohort of 100 participants begin working in districts by beginning of 2012-2013 school year
First cohort of 100 Corps members begins working with low-performing schools in Aug. 2012
R $1,957,299
RttT
2012-13
Expand NC Teacher Corps - additional 150 participants by beginning of 2013-2014 school year
Increase number of Corps members to 250 total in lowperforming schools by Aug. 2013 $2,871,699
RttT
2013-14
Page 37 of 72
$234,105,144
Aligned with SBE Goal
234,105,144.00
Fund Source Fiscal Year R/N?
Key Personnel
Budget
Develop comprehensive, three-year induction support program for novice teachers in lowachieving schools through contract with UNC General Administration
Lynne Johnson, Program planning Jennifer Preston, completed by June UNC GA 2011
$0
RttT
2010-11
(D)(3) Regional Teacher & Objective 2: Increase the number of highlyLeader qualified teachers in low-income rural areas Effectivenes and low-performing urban schools. s
Lynne Johnson, Jennifer Preston, Project Initiate Induction Support Program in SBE Regions Coordinator, UNC 1, 2, 3 and 6 GA
Novice teachers in the initial 4 regions participating in the induction support program $2,055,728
RttT
2011-12
Implement Induction Support Program in all SBE Lynne Johnson, regions (to serve all eligible novice teachers in the Project lowest-achieving schools in local area cohorts Coordinator, UNC each year) GA
Novice teachers in all 8 regions participating in the induction support program $2,596,789
RttT
2012-13
Novice teachers in all 8 regions participating in the induction support program $3,122,370
RttT
2013-14
Page 38 of 72
$234,105,144
Aligned with SBE Goal
234,105,144.00
Fund Source Fiscal Year R/N?
Key Personnel
Budget
Contract with vendor to produce customized hiring and retention plans for DST partnership districts, including training on: *incentives and strategies to ensure equitable distribution of highly effective teachers within urban districts *incentives and strategies to attract highly effective teachers to rural schools. *collaborating with possible partners in encouraging or supporting additional strategic staffing initiatives. Train and support LEAs in the implementation of recruitment and hiring plans. Conduct regional workshops on strategic staffing initiatives. *Decrease vacancy rates in low-performing schools. *Increase equitable distribution of highly effective teachers. $125,000
RttT
2011-12
(D)(3) Regional Teacher & Objective 3: Provide regional workshops and Leader consultation to LEAs about strategic staffing Effectivenes strategies. s
Provide technical support and onsite visits to support LEA retention and hiring plans.
*Decrease vacancy rates in low-performing schools. *Increase equitable distribution of highly effective teachers. $62,500
RttT
2012-13
Provide technical support and onsite visits to support LEA retention and hiring plans.
*Decrease vacancy rates in low-performing schools. *Increase equitable distribution of highly effective teachers. $62,500
RttT
2013-14
Lynne Johnson, Pat Ashley, Jennifer Preston, Provide every new teacher who chooses to work in Alessandro the lowest-achieving schools regardless of her or Montanari, Project Coordinator his point of entry (through TFA, through the NC Teacher Corps, through lateral entry, or through traditional routes) with a voucher that can be used for either: - Forgiveness of student loans - Tuition for obtaining a Master's degree - Housing - Any combination of the above
$1,045,762
RttT
2011-12
$1,045,762
RttT
2012-13
$1,045,762
RttT
2013-14
Page 39 of 72
$234,105,144
Aligned with SBE Goal
234,105,144.00
Fund Source Fiscal Year R/N?
Key Personnel
Budget
Increase availability of highly effective math and science teachers to students who are at risk of failure in core math and science courses by developing and delivering a new virtual blended STEM course model to address the needs of these students. Develop blended courses in which onsite teachers share teaching duties with more experienced, historically effective online teachers, again with a focus on serving students in the lowest-achieving schools.
Identify school districts/low achieving schools for target deployment of services by December 1, 2010.
Three school districts identified and committed by December 1, 2010 Identification and commitment of two replacement school districts and by January 2012 Related artifacts and process maps compiled by June 30, 2011.
State
2010-11
Ross White, Identify 2 replacement school districts for target deployment of services (replacing districts selected John Brim, and initially that withdrew) by January 2012 NCVPS Staff
Collaboratively determine the new virtual delivery model's teaching and learning approach, and the support, and coaching needs for all identified schools and staff by June 30, 2011.
State
2011-12
State
2010-11
Page 40 of 72
$234,105,144
Aligned with SBE Goal
234,105,144.00
Fund Source RttT Fiscal Year R/N?
Key Personnel
Budget
N N N N
$ Project Director in place by January 2012 $ and EC Specialist in place by March 2012. $
98,746.00
202,253.00 240,560.00
Plan and develop the first 3 new virtual blended STEM courses that will be piloted in the identified schools by July 2012.
Contractors hired, prepared, and placed from July 2011 through July 2012. 3 virtual blended STEM courses developed by July 2012
767,837.00
RttT
2011-12
Pilot the first 3 new virtual blended STEM courses in school year 2012-13.
(D)(3) Regional Teacher & Objective 2: Increase the number of highlyLeader qualified teachers in low-income rural Effectivene areas and low-performing urban schools. ss
Ross White, John Brim, Project Director, EC Instructional Specialist and contractors
777,660.00
RttT
2012-13
Pilot 3 additional new virtual blended STEM courses in school year 2012-13; Continue delivering previous 3 virtual blended STEM courses.
3 pilot virtual blended STEM courses delivered to 450 students; 3 previously established virtual blended STEM courses delivered to 360 students
Develop 2 additional new virtual blended STEM courses for a project total of 8 by July 2014. Continue delivering previously developed 6 virtual blended STEM courses beginning August 2014.
2 additional virtual blended STEM courses developed by July 2014; 6 previously established virtual blended STEM courses delivered to 720 students beginning August 2014.
891,206.00
RttT
2013-14
State
2010-11
Page 41 of 72
$234,105,144
Aligned with SBE Goal
234,105,144.00
Fund Source Fiscal Year R/N?
Key Personnel
Budget
Ross White, John Brim, Project Director, Collaboratively determine support and coaching EC Instructional needs for all staff and contractors regarding professional development, device deployment, and Specialist and related needs. School and
$ $ $ $ $
R R R R N
State RttT
Procure and deploy blended resources and devices, and provide appropriate training and support for intial 3 pilot virtual blended STEM courses by June 2012
Devices and blended classroom resources purchased and training provided by June 2012
1,234,691
RttT
2011-12
Procure and deploy blended resources and devices, and provide appropriate training and support for additional 3 pilot virtual blended STEM courses by June 2013 Procure and deploy blended resources and devices, and provide appropriate training and support for 6 virtual blended STEM courses by June 2014
Ross White, John Brim, Project Director, EC Instructional Specialist and contractors
Devices purchased and training provided by June 2013 Devices purchased and training provided by June 2014
995,189.00
RttT
2012-13
Indirect Cost
$ $
765,080.00 121,489
RttT
RttT
2013-14 2011-12
Indirect Cost Indirect Cost (D)(4) Teacher Objective 1: Link teacher and principal Effectivenes effectiveness to preparation programs s and using student growth measures. Student Growth 2 (D)(4) Teacher Effectivenes s and Student Growth Objective 2: Expand Educator Evaluation Process to include assessment of NC independent colleges and university preparation programs. 2 Lynne Johnson, Elissa Brown, Jennifer Preston, Project Coordinator Expand data links to include preparation programs, educators and outcomes
$ $
175,885 185,427
RttT RttT
2012-13 2013-14
Create Educator Effectiveness Group and begin study and strategic planning.
N N N N
N N N N
Page 42 of 72
$234,105,144
Aligned with SBE Goal
234,105,144.00
Fund Source State Fiscal Year R/N?
Key Personnel
Budget
2010-11
Objective 3: Publish an Educator Preparation Program report card that rates effectiveness of programs based on student achievement and growth criteria.
Develop report card similar to our ABCs Report Card to include information about teacher and leader preparation programs, including outcome measures.
Report card and summary data developed and available by Fall of 2012 and each subsequent year
State
2011-12
State
2012-13
2 and 2.4
State
2013-14
Page 43 of 72
$234,105,144
Aligned with SBE Goal
234,105,144.00
Fund Source Fiscal Year R/N?
Key Personnel
Budget
Objective 4: Review and approve Educator Preparation Program revisions to ensure participants become effective teachers, principals and superintendents.
Review re-visioned undergraduate and graduate education preparation programs, rubrics and electronic evidences for State Board approval
IHE partners, SBE, Statewide Evaluation Committee, Lynne Johnson, Elissa Brown
N N N
2 and 2.4 Expand productivity goals based upon workforce analysis to develop a strategic plan to address university teacher recruitment effort. Objective 5: Launch UNC Teacher Recruitment Initiative to develop strategic plan for coordinating teacher recruitment efforts. 2 and 2.4 Lynne Johnson, Elissa Brown, Initiative developed Jennifer Preston, and launched by Project June 2012. Coordinator, IHE Partners IHE partners, SBE, Statewide Evaluation Committee, Lynne Johnson, Elissa Brown
State State
2013-14 2010-11
N N
State State
2011-12 2012-13
N N
2 and 2.4
Develop an alternative teacher certification track for science and math majors attending participating campuses.
State
2013-14
Page 44 of 72
$234,105,144
Aligned with SBE Goal
234,105,144.00
Fund Source Fiscal Year R/N?
Key Personnel
Budget
Design needs assessment plan with a focus both on near-term assessment of PD needs in transitioning to new standards, data-literacy and the use of the teacher evaluation tool as well as longer term Lynne Johnson, objectives around the use of new Instructional Yvette Stewart, Improvement System. RttT Professional Development Conduct Diagnostic Needs Assessment. Leaders (PDI Team)
Needs assessment Plan developed by Feb 1, 2011 Needs Assessment conducted in fall and spring.
State
2010-11
(D)(5) Professional Objective 1: Conduct ongoing professional Developmen development needs assessments. t
Lynne Johnson, Yvette Stewart, RttT Professional Development Leaders (PDI Team); Jeni Corn (RttT Evaluation Team) Lynne Johnson, Yvette Stewart, RttT Professional Development Leaders (PDI Team); Jeni Corn (RttT Evaluation Team)
Analysis completed by RttT Evalution Team twice a year (December and June) Needs Assessment conducted in fall and spring.
State
2011-12
Analysis completed by RttT Evalution Team twice a year (December and June)
Needs Assessment Lynne Johnson, conducted in fall and Yvette Stewart, spring. RttT Professional Development Analysis completed by Leaders (PDI RttT Evalution Team Team); Jeni Corn twice a year (RttT Evaluation (December and June) Team)
State
2012-13
State
2013-14
Page 45 of 72
$234,105,144
Aligned with SBE Goal
234,105,144.00
Fund Source RttT RttT RttT RttT RttT Fiscal Year R/N?
Key Personnel
Budget
(D)(5) Professional Objective 2: Identify, evaluate, and as Developmen needed, develop professional development t resources..
Design data literacy training focusing on using data to improve instruction including establishing contracts as necessary.
Lynne Johnson, Yvette Stewart, RttT Professional Development leaders Lynne Johnson, Yvette Stewart, RttT Professional Development leaders
Completion of PD trainings according to annual PD calendar, August - June Completion of PD trainings according to annual PD calendar, August - June
N N N N N
N N N N N N
Design training to ensure teachers and leaders can achieve the objectives related to transitioning to new standards and assessments found on p.64 and 65 of NC RttT including establishing contracts as necessary.
2011-12 2012-13
Recruit Professional Development Leaders and Module Developers for PDI Team
437,572.00
RttT
2013-14
(D)(5) Professional Objective 3: Recruit, prepare, and support Developmen Professional Development Leaders and t Module Developers
2 2 2
Employ Professional Development Leaders and Module Developers for PDI Team (including salaries, fringe benefits, travel, equipment, supplies and other (communications)} Employ Professional Development Leaders and Module Developers for PDI Team Employ Professional Development Leaders and Module Developers for PDI Team
Lynne Johnson, Yvette Stewart Lynne Johnson, Yvette Stewart Lynne Johnson, Yvette Stewart
Team hired by April 1, 2011 and ongoing as needed $532,337 {See Design and Execution Targets throughout D(5)} {See Design and Execution Targets throughout D(5)} $2,511,991 $2,552,092
N N N
Page 46 of 72
$234,105,144
Aligned with SBE Goal
234,105,144.00
Fund Source Fiscal Year R/N?
Key Personnel
Budget
2 2
Employ Professional Development Leaders and Module Developers for PDI Team
$3,063,008
RttT
N N N
N/A N/A
Develop new professional development modules including facilitative modules to populate the professional development repository focusing on supporting transition to new standards (64-65 in NC RttT)
Find, design and/or add resources to the Professional Development Learning Repository ensuring they meet rigorous standards of quality.
Lynne Johnson, Yvette Stewart, RttT Professional Development Leaders , IIS Team
N/A
2013-14
Begin development of modules. Development of 7 modules by Nov. 2011 Development of 9 Lynne Johnson, additional modules by Yvette Stewart, June 2012 RttT Professional Development Leaders, TOPS, LearnNC Development of 8 additional modules by June 2013
$0
RttT
2010-11
Develop new professional development modules including facilitative modules to populate the professional development repository focusing on supporting transition to new standards and data literacy (69-70, 99-101 in NC RttT) Develop new professional development modules including facilitative modules to populate the professional development repository focusing on supporting transition to new standards (64-65 in NC RttT) and data literacy and the use of the instructional improvement system (69-70, 99-101 in NC RttT) Develop new professional development modules including facilitative modules to populate the professional development repository focusing on supporting transition to new standards and data literacy and the use of the instructional improvement system (69-70, 99-101 in NC RttT) Maintain and support the web-based professional development modules, including assistance for users
$635,882
RttT
2011-12
(D)(5) Professional Objective 4: Support the effective use of Developmen technology-enabled eLearning to extend t professional development opportunities.
$907,468
RttT
2012-13
$891,586
RttT
2013-14
*Customers Service Lynne Johnson, Survey Data Yvette Stewart, *Uptime and Module Developers Availability of Modules $0
RttT
2010-11
Page 47 of 72
$234,105,144
Aligned with SBE Goal
234,105,144.00
Fund Source Fiscal Year R/N?
Key Personnel
Budget
Maintain and support the web-based professional development modules, including assistance for users
Lynne Johnson, Yvette Stewart, TOPS, Module Developers Lynne Johnson, Yvette Stewart, Module Developers, TOPS, LearnNC Lynne Johnson, Yvette Stewart, Module Developers, TOPS, LearnNC
RttT
2011-12
Maintain and support the web-based professional development modules, including assistance for users
*Customers Service Survey Data *Uptime and Availability of Modules $250,000 *Customers Service Survey Data *Uptime and Availability of Modules $250,000
RttT
2012-13
Maintain and support the web-based professional development modules, including assistance for users
RttT
2013-14
Design and plan LEA Planning Institutes to ensure LEA PD leaders can achieve objectives on page 193 of NC RttT.
Lynne Johnson, Yvette Stewart, Maria Pitre-Martin, Neill Kimrey, Tracey Greggs, RttT Professional Development Leaders, Kenan Fellows Program, Jeni Corn (RttT Design completed by Evaluation Team) May 2011
RttT
2010-11
(D)(5) Professional Objective 5: Conduct planning institutes for Developmen LEA Leadership Teams. t
Lynne Johnson, Yvette Stewart, Maria Pitre-Martin, Neill Kimrey, Tracey Greggs, RttT Professional Development Leaders, Kenan Fellows Program, Jeni Corn (RttT Conduct LEA Planning Institutes in June - July 2011 Evaluation Team)
*Survey data from participants *Evaluation of LEA Professional Development Action Plan
RttT
2011-12
Page 48 of 72
$234,105,144
Aligned with SBE Goal
234,105,144.00
Fund Source Fiscal Year R/N?
Key Personnel
Budget
Lynne Johnson, Yvette Stewart, Maria Pitre-Martin, Neill Kimrey, Tracey Greggs, RttT Professional Development Leaders, Kenan Fellows Program, Jeni Corn (RttT Conduct LEA Planning Institutes in June - July 2012 Evaluation Team)
*Survey data from participants *Evaluation of LEA Professional Development Action Plan
RttT
2012-13
Page 49 of 72
$234,105,144
Aligned with SBE Goal
234,105,144.00
Fund Source Fiscal Year R/N?
Key Personnel
Budget
Plan and Conduct 4 Distinguished Leadership in Practice (DLP) Principal Institutes in SY 2010-11
*Survey data from participants *Student achievement of the students of principal's attending Lynne Johnson, Yvette Stewart, institute (year after NCASA, LEARN NC participation)
Begin 4 new cohorts (with a total of approximately 200 principals and 50 assistant principals) by April 2011.
591,750
RttT
2010-11
*Survey data from participants *Student achievement of the students of principal's attending Lynne Johnson, Yvette Stewart, institute (year after NCASA, LEARN NC participation)
Begin 4 new cohorts (with a total of approximately 150 principals and 50 assistant principals) by April 2012.
591,750
RttT
2011-12
*Survey data from participants *Student achievement of the students of principal's attending Lynne Johnson, Yvette Stewart, institute (year after NCASA, LEARN NC participation)
Begin 4 new cohorts (with a total of approximately 150 principals and 50 assistant principals) by April 2013.
591,750
RttT
2012-13
Page 50 of 72
$234,105,144
Aligned with SBE Goal
234,105,144.00
Fund Source Fiscal Year R/N?
Key Personnel
Budget
*Survey data from participants *Student achievement of the students of principal's attending Lynne Johnson, Yvette Stewart, institute (year after NCASA, LEARN NC participation)
Begin 4 new cohorts (with a total of approximately 150 principals and 50 assistant principals) by April 2014.
591,750
RttT
2013-14
Lynne Johnson, Yvette Stewart, Maria Pitre-Martin, Neill Kimrey, Tracey Greggs, RttT Professional Development Train and coach educators (onsite and remote) Leaders, Jeni Corn throughout 8 regions of the state supporting transition to new standards (64-65 in NC RttT) April (RttT Evaluation Team) 2011 - June 2011 Lynne Johnson, Yvette Stewart, Maria Pitre-Martin, Neill Kimrey, Tracey Greggs, RttT Train and coach educators (onsite and remote) Professional throughout 8 regions of the state supporting Development transition to new standards (64-65 in NC RttT) and Leaders, Jeni Corn data literacy (69-70, 99-101 in NC RttT) July 2011 - (RttT Evaluation Team) June 2012 Lynne Johnson, Yvette Stewart, Maria Pitre-Martin, Neill Kimrey, Train and coach educators (onsite and Tracey Greggs, RttT remote)throughout 8 regions of the state supporting Professional transition to new standards (64-65 in NC RttT) and Development Leaders, Jeni Corn data literacy and the use of the instructional improvement system (69-70, 99-101 in NC RttT) (RttT Evaluation Team) July 2012 - June 2013
* Training conducted according to annual PD calendar *Survey data from participants *Evaluation Team Results
8,600
RttT
2010-11
(D)(5) Professional Objective 7: Work with LEAs to ensure that Developmen effective and appropriate professional t development is available to all teachers.
* Training conducted according to annual PD calendar *Survey data from participants *Evaluation Team Results
4,986,908
RttT
2011-12
* Training conducted according to annual PD calendar *Survey data from participants *Evaluation Team Results
5,258,494
RttT
2012-13
Page 51 of 72
$234,105,144
Aligned with SBE Goal
234,105,144.00
Fund Source Fiscal Year R/N?
Key Personnel
Budget
Lynne Johnson, Yvette Stewart, Maria Pitre-Martin, Neill Kimrey, Train and coach educators (onsite and Tracey Greggs, RttT remote)throughout 8 regions of the state supporting Professional transition to new standards (64-65 in NC RttT) and Development Leaders, Jeni Corn data literacy and the use of the instructional improvement system (69-70, 99-101 in NC RttT) (RttT Evaluation Team) July 2013 - June 2014
* Training conducted according to annual PD calendar *Survey data from participants *Evaluation Team Results
5,108,493
Identify TALAS (Turning Around Lowest-Achieving Pat Ashley, Ann Schools) Schools (111 in lowest 5% of NC schools). Osburn 5.4 Pat Ashley , DST Leadership, TALAS School & District Leadership
RttT
2013-14
State
2010-11
Collaboratively determine support and coaching needs for all identified TALAS schools. 2.4;5.4
Intitial completed by June 30, 2011; ongoing as needed through end of grant State
2010-11
Page 52 of 72
$234,105,144
Aligned with SBE Goal
234,105,144.00
Fund Source Fiscal Year R/N?
Key Personnel
Budget
20% of hires by Jan. 2011, 35% by Apr. 2011, and 75% by July 2011. Initial reform model plans completed. Maintain coaching staff. Provide ongoing services and continue model implementation. Hire, prepare, maintain, and strategically place coaches (School Transformation Coaches, Instructional Review Coaches, Instructional Coaches) to serve 111 TALAS elementary, middle and high schools in lowest 5% of NC schools. (E)(2) Lowest Achieving Schools Objective 1: Turnaround Lowest 5% of conventional elementary, middle, and high schools (111) based on 2009-10 Performance Composite and grade span. Ensure selection of USED reform model and subsequent development of an RttT-aligned change plan and implementation map focused on Pat Ashley, DST Leadership, and academic improvement by each TALAS school. DST staff Analyze student performance data annually to recommend adjustments to school implementation of USED reform model and/or district support to school(s). Subsequently, make any necessary adjustments to DST support. Provide customized professional development and on-site coaching for leadership and instruction according to identified needs.
370,574
RttT
2010-11
Provide ongoing services and continue $ reform model implementation through June 30, 2014 to be documented by DST coaching staff by $ reviewing and recording progress during on-site support, annual benchmarking based on student progress indicators, and followed by refinements and adjustments to plan. Complete the remaining 25% of initial hires by July 2012 and maintain coaching staff throughout grant. All reform models implemented by August 2014.
2,874,569
RttT
2011-12
3,926,641
RttT
2012-13
1.1;2.4;2.3;3.1;3.2;3.5;4.2 ;5.4
4,735,718
RttT
2013-14
Page 53 of 72
$234,105,144
Aligned with SBE Goal
234,105,144.00
Fund Source Fiscal Year R/N?
Key Personnel
Budget
Provide Comprehensive Needs Assessment (CNA) and follow-up (determining resources, professional development - unpacking CNA report) for 111 TALAS schools
Pat Ashley, Shane Goodrum, Susan CNAs completed Silver, and DST September 2010 CNA March 2012 Team/Trained DPI Staff
$ $
118,584 919,862
RttT RttT
2010-11 2011-12
N N
Page 54 of 72
$234,105,144
Aligned with SBE Goal
234,105,144.00
Fund Source Fiscal Year R/N?
Key Personnel
Budget
Identify the TALAS (Turning Around LowestAchieving Schools) High Schools with graduation rates under 60% (9 identified). 5.4
2010-11
Collaboratively determine support and coaching needs for all 9 TALAS high schools with graduation rates under 60%.
2.4;5.4
Intitial completed by June 30, 2011; Ongoing as needed through end of grant
State
2010-11
Page 55 of 72
$234,105,144
Aligned with SBE Goal
234,105,144.00
Fund Source Fiscal Year R/N?
Key Personnel
Budget
20% of hires by Jan. 2011, 35% by Apr. 2011, and 75% by July 2011. Initial reform model plans completed. Maintain coaching staff. Ongoing services provided and continue model implementation.
103,761
RttT
2010-11
Objective 2: Turnaround Conventional high schools with a 4-year cohort graduation rate below 60% in 2009-10 and either 2008-09 or 2007-08.
Hire , prepare, maintain, and strategically place coaches (School Transformation Coaches, Instructional Review Coaches, Instructional Coaches) to serve 9 TALAS high schools with graduation rates under 60%. Ensure selection (by each high school with a graduation rate of under 60%) of either Turnaround, Closure, Restart, or Transformation model and subsequent development of an RttTaligned change plan and implementation map focused on academic improvement. Analyze student performance data annually to recommend adjustments to school implementation of USED reform model and/or district support to school(s). Subsequently, make any necessary adjustments to DST support.
Provide ongoing services and continue reform model implementation through June 30, 2014 to be documented by DST coaching staff by reviewing and $ recording progress during on-site support, annual $ benchmarking based on student progress indicators, and followed by refinements and adjustments to plan. Complete the remaining 25% of initial hires by July 2012 and maintain coaching staff throughout the grant. All reform models implemented by August 2014.
804,879
RttT
2011-12 2012-13
N N
1,189,891
RttT
Provide customized professional development and on-site coaching for leadership, instruction, and support services according to identified needs.
1.1;2.4;2.3;3.1;3.2;3.5;4.2 ;5.4
1,435,066
RttT
2013-14
Page 56 of 72
$234,105,144
Aligned with SBE Goal
234,105,144.00
Fund Source Fiscal Year R/N?
Key Personnel
Budget
Provide Comprehensive Needs Assessment (CNA) and follow-up (determining resources, professional development - unpacking CNA report) for 9 TALAS high schools with graduation Pat Ashley, Shane rates under 60%. Goodrum, Susan CNAs completed Silver, and DST September 2010 CNA March 2012 Team/Trained DPI Staff
44,469
RttT
2010-11
2.4
344,948
RttT
2011-12
Identify TALAS (Turning Around Lowest-Achieving Pat Ashley, Ann Schools) 10% of lowest achieving districts (12 Osburn districts) 5.4
2010-11
Collaboratively develop plan for support and additional coaching needs (school and instructional coaching). Pat Ashley , DST Leadership, TALAS District Leadership
2.4;5.4
207,522
RttT
2010-11
Page 57 of 72
$234,105,144
Aligned with SBE Goal
234,105,144.00
Fund Source Fiscal Year R/N?
Key Personnel
Budget
Hire , prepare, maintain, and strategically place coaches(District Tranformation Coaches) to serve the lowest achieving 10% of districts (12 districts) . (E)(2) Lowest Achieving Schools Objective 3: Turnaround lowest-achieving districts with a 2009-10 LEA Performance Composite below 65%. Provide customized professional development and on-site coaching for leadership and instruction in TALAS identified districts. Pat Ashley, DST Collaborate with district to successfully implement Leadership, and their local Detailed Scope of Work. Collaborate on DST staff other planning and implementation needed to ensure improvement in student achievement and on-time graduation rates. Analyze student performance data annually to recommend adjustments to school implementation of USED reform model and/or district support to school(s). Subsequently, make any necessary adjustments to DST support. Provide ongoing services; all district DSW performance measure attained for 2011-12
518,804
RttT
2010-11
$5,634,156
RttT
2011-12
Provide ongoing services; all district DSW performance measure attained for 2012-13
$6,782,380 RttT 2012-13
All DSW performance measures attained and no school with a performance composite or graduation rate below 60% proficient by June 30, 2014
$8,179,876 $ 118,584 RttT RttT 2013-14
N N
2010-11
Page 58 of 72
$234,105,144
Aligned with SBE Goal
234,105,144.00
Fund Source Fiscal Year R/N?
Key Personnel
Budget
Provide Comprehensive Needs Assessment (CNA) and follow-up (determining resources, professional development - unpacking CNA report) for all TALAS districts and the schools in those districts.
Pat Ashley, Shane Goodrum, Susan CNAs completd Silver, and DST September 2010 CNA June 30, 2012 Team/Trained DPI Staff
2.4
919,863
RttT
2011-12
Page 59 of 72
$234,105,144
Aligned with SBE Goal
234,105,144.00
Fund Source Fiscal Year R/N?
Key Personnel
Budget
Objective 1: Provide technical assistance and professional development to support the implementation of the Common Core in Mathematics and the new Essential Standards in Science.
See Sections B(3), Objective 1 and D(5), Objectives 1-7 regarding planned professional development to support the implementation of the Common Core in Mathematics and the new Essential Standards in Science.
Objective 2: Complete the development of the elementary science and math concentration modules.
See Sections B(3) and D(5) regarding development of elementary science and math curriculum support tools and materials.
Contract with NC New Schools Project to develop a network of Anchor and Affinity Network schools to serve as laboratory, localized sites of focus, and professional development hubs, and test-sites for innovative policy, practices and partnerships, anchored by four schools for innovation and a set of Affinity Network schools for scaling.
RttT
2010-11
Page 60 of 72
$234,105,144
Aligned with SBE Goal
234,105,144.00
Fund Source Fiscal Year R/N?
Key Personnel
Budget
RttT
2010-11
RttT
2011-12
Implement a STEM web portal that networks Elementary, Middle, and High Schools; and Rebecca Payne, provides tools including professional learning NC STEM, NC New community modules, learning resources, and Schools Project practices and partnerships that can be searched by economic development and education region. (P)(2) STEM Initiatives Objective 3: Provide technical assistance to LEAs and RESA organizations around the planning and implementation of STEM high schools for individual LEAs or regions.
250,000 TBD
RttT State
2011-12 2012-13
Maintain and expand web portal and increase number of schools participating
TBD State
2013-14
Page 61 of 72
$234,105,144
Aligned with SBE Goal
234,105,144.00
Fund Source Fiscal Year R/N?
Key Personnel
Budget
Begin collaboration with partners to frame and refine a State SBE, DPI, LEAs, STEM Strategic Plan, Define the required attributes of a STEM school or JOBS Commission, including the program in collaboration with SBE/DPI, LEAs, JOBS NC STEM, NC NSP, attributes.
N/A
2010-11
250,000
RttT
2011-12
Contract with NC School of Science and Math to develop curriculum in each of NC's identified four STEM pillar areas for implementation in the Anchor and Affinity Network Schools
520,000
RttT
2012-13
255,000 RttT
2013-14
Page 62 of 72
$234,105,144
Aligned with SBE Goal
234,105,144.00
Fund Source Fiscal Year R/N?
Plan/Timeline for Implementation Anchor STEM High Schools: Develop/establish 4 anchor schools by August 2011. Work with strategic partners to: a) build support for STEM education and b) guide development of policy that supports STEM education.
Key Personnel
Budget
Rebecca Payne, 2 additional Anchor Schools identified. NC New Schools Identify partners to Project support network. Rebecca Payne, Identify partners to NC New Schools support network Project Rebecca Payne, Identify partners to NC New Schools support network Project
RttT
2010-11
110,119
RttT
2011-12
193,196
RttT
2012-13
4,1
169,874
RttT
2013-14
Page 63 of 72
$234,105,144
Aligned with SBE Goal
234,105,144.00
Fund Source Fiscal Year R/N?
Key Personnel
Budget
Instructional Coaching: Provide highly qualified educational leaders to work on-site with classroom teachers at each anchor school based on determined need. (range of 27-70 days)
Provide services to 3 schools (total of 35 days) Provide services to 4schools (total of 150 days)
RttT
2010-11
Rebecca Payne, provided prior to list of NC New Schools schools being approved. Project
Provide services to 4 schools (total of 126 days) Provide services to 4 schools (total of 126 days)
69,647
RttT
2011-12
100,397 81,092
RttT
2012-13 2013-14
R R
RttT
Page 64 of 72
$234,105,144
Aligned with SBE Goal
234,105,144.00
Fund Source Fiscal Year R/N?
Plan/Timeline for Implementation Leadership Institute for High School Redesign: Provide intensive and sustained professional development for principals in the anchor schools to support their development as effective leaders based on determined need. Also, take each principal on one study visit to a national model school .
Key Personnel
Budget
RttT
2010-11
Rebecca Payne, Provide leadership NC New Schools coaching services to 4 principals (total of 36 Project
days)
20,511
RttT
2011-12
29,568
Provide leadership coaching services to 4 principals (total of 36 days) Teaching for Results: Provide teachers in the anchor schools with purposeful, researched-based professional development that is aligned with the training that principals receive. Teachers will have access to "Critical Friends Group," facilitated Peer School Reviews, as well as other programs. Provide services to 3 schools (total of 130 days) includes services prior to schools list being approved. Provide services to 4 schools (total of 360 days)
RttT
2012-13
4.2
23,882
RttT
2013-14
RttT
2010-11
Objective 4: Work with partners to support the development of a small set of anchor/model STEM high schools that will serve as laboratory schools and sites for professional development around projectbased learning.
67,289
RttT
2011-12
96,999
RttT
2012-13
2.2
78,348
RttT
2013-14
Page 65 of 72
$234,105,144
Aligned with SBE Goal
234,105,144.00
Fund Source Fiscal Year R/N?
Plan/Timeline for Implementation Residencies in Model Schools: Provide oneweek residencies in national-model schools for staff from each of the anchor schools.
Key Personnel
Budget
Rebecca Payne, Teachers from 3 NC New Schools anchor schools will participate in the Project
residency.
15,113
RttT
2011-12
2.1, 4.2
Extended employment: Extend teachers' salaries into the summer, so that they can develop and review STEM project based units of study, review curriculum, attend professional development, create and implement additional STEM opportunities, participate in worked based learning internships and other as approved.
Teachers from 4 anchor schools will participate in the residency. Teachers from 4 anchor schools will participate in the residency.
21,786
RttT
2012-13
17,597
RttT
2013-14
Identify participants by May 15. Agree Rebecca Payne, upon schedule and NC New Schools goals by June 1. Report progress and Project lessons learned by Aug 15.
22,526
RttT
2011-12
165,471 2 345,983
RttT
2012-13 2013-14
R R
RttT
Page 66 of 72
$234,105,144
Aligned with SBE Goal
234,105,144.00
Fund Source Fiscal Year R/N?
Plan/Timeline for Implementation Equipment for Classrooms: Support technology purchases to outfit classrooms to support STEM education in the anchor schools.
Key Personnel
Budget
RttT
2010-11
RttT
2011-12
NC DPI will review and approve STEM Rebecca Payne, equipment request for each school All NC New Schools schools will have Project purchased equipment in place by August 2014.
150,000
RttT
2012-13
RttT
2013-14
See Section (D)(3), Objective 2: Expand access to highly Effective STEM courses through new Virtual & Blended model
Objective 6: Focus on recruiting highlyqualified /highly-effective teachers in STEM areas in hard-to-staff communities.
See Section D(3), Objective 2:(Expand access to highly Effective STEM courses through new Virtual & Blended model) and 3 regarding Strategic Staffing Initiatives.
Page 67 of 72
$234,105,144
Aligned with SBE Goal
234,105,144.00
Fund Source Fiscal Year R/N?
Plan/Timeline for Implementation Support work with Affinity Network schools. Work with strategic partners to: a) build support for STEM education and b) guide development of policy that supports STEM education.
Key Personnel
Budget
Rebecca Payne, Recruit, interview and NC New Schools select 3 additional Project Affinity Network
schools by Aug 15, 2011.
RttT
2010-11
428,922
RttT
2011-12
652,757
RttT
2012-13
4,1 Instructional Coaching: Provide highly qualified educational leaders to work on-site with classroom teachers in the Affinity Network schools based on determined need. . (range of 27-70 days)
541,068
RttT
2013-14
RttT
2010-11
270,267
RttT
2011-12
389,595
RttT
2012-13
314,683
RttT
2013-14
Page 68 of 72
$234,105,144
Aligned with SBE Goal
234,105,144.00
Fund Source Fiscal Year R/N?
Plan/Timeline for Implementation Leadership Institute for High School Redesign: Provide intensive and sustained professional development for principals in the Affinity Network schools to support their development as effective leaders based on determined need. Also, take each principal on one study visit to a national model school.
Key Personnel
Budget
RttT
2010-11
Provide leadership
Rebecca Payne, coaching services to NC New Schools 13 principals (total of 62 days) Project
includes services prior to schools list being approved. Provide leadership coaching services to 16 principals (total of 144 days) Provide leadership coaching services to 16 principals (total of 144 days) Teaching for Results - Provides selected teachers in the Affinity Network schools purposeful, researched-based professional development aligned with training principals receive. Teachers will have access to "Critical Friends Group," facilitated Peer School Reviews, as well as other programs. Provide services to 1 schools (total of 20 days) includes services prior to schools list being approved Provide services to 15 schools (total of 815 days)
79,215
RttT
2011-12
114,190
RttT
2012-13
4.2
92,233
RttT
2013-14
RttT
2010-11
Rebecca Payne, NC New Schools includes services prior Project to schools list being
approved Provide services to 16 schools (total of 1,480 days)
261,929
RttT
2011-12
377,576
RttT
2012-13
304,974
RttT
2013-14
Page 69 of 72
$234,105,144
Aligned with SBE Goal
234,105,144.00
Fund Source Fiscal Year R/N?
Plan/Timeline for Implementation Residencies in Model Schools - One week residencies in national-model schools for staff from each of the Affinity Network schools.
Key Personnel
Budget
2.1, 4.2
Teachers from 12 affinity network schools will Rebecca Payne, participate in the NC New Schools residency. Project Teachers from 16 affinity network schools will participate in the residency. Teachers from 16 affinity network schools will participate in the residency.
57,546
RttT
2011-12
82,954
RttT
2012-13
67,003
RttT
2013-14
Page 70 of 72
$234,105,144
Aligned with SBE Goal
234,105,144.00
Fund Source Fiscal Year R/N?
Plan/Timeline for Implementation Extended employment: Extend teachers' salaries into the summer, so that they can develop and review STEM project based units of study, review curriculum, attend professional development, create and implement additional STEM opportunities, participate in worked based learning internships and other as approved.
Key Personnel
Budget
Identify participants by May 15. Agree Rebecca Payne, upon schedule and NC New Schools goals by June 1. Project Report progress and lessons learned by Aug 15.
90,105
RttT
2011-12
661,884
RttT
2012-13
2
Equipment for Classrooms: Support technology purchases to outfit classrooms to support STEM education in the Affinity Network schools. NC DPI will review and approve STEM Rebecca Payne, equipment request for each school All NC New Schools schools will have Project purchased equipment in place by August 2014.
1,383,934
RttT
2013-14
RttT
2010-11
510,000
5.2
2011-12 2012-13
2013-14
N N
N
Page 71 of 72
$234,105,144
Aligned with SBE Goal
234,105,144.00
Fund Source Fiscal Year R/N?
Key Personnel
Budget
Objective 8: Provide new opportunities for students in the lowest-achieving schools and districts to attend schools that will better support their achievement and successful graduation and lead them to college and career readiness.
Review of STEM Anchor and Affinity Schools model for consideration of additional opportunities for students in the lowest-achieving schools and districts.
2012-13 2013-14
See Section (D)(3), Objective 2: Expand access to highly Effective STEM courses through new Virtual & Blended model
$ $ $ $
Page 72 of 72
NC Race to the Top (RttT) State Detailed Scope of Work (DSW) A2 RttT Management
Total RttT Funding Budgeted (over four years):
NC RttT Initiative (Section)
$7,947,939
Aligned with
7,947,939
SBE Goal
Plan/Timeline for Implementation Governor's Office: Conduct monthly meetings of Governor's Education Transformation Commission, which brings together a variety of stakeholder to provide oversight and recommendations for NC RttT Implementation.
Key Personnel
Budget
Fund Source
Fiscal Year
R/N?
Governor's Advisor for Education Transformation (Bill Harrison), RttT Budget Continuously monitor implementation through Analyst (Chris meetings and other communication with DPI Jones), and 2 RttT Internal Auditors staff, other State agency partners, LEA partners, and non-governmental implementation partners.
149,740
Initiatives implemented as designed; any significant modifications requested db No iAudit Exceptions; reports submitted (as required) on time, approved by USED
RttT
2010-11
Objective 1: Ensure that all NC RttT initiatives are implemented effectively, with fidelity to original application, and in alignment with NC's strategic policy mandate for public education.
RttT
2011-12 2012-13 2013-14 2010-11 2011-12 2012-13 2013-14 2010-11 2011-12 2012-13
N N N N N N N N N N
Monitor DPI processes for obtaining, disbursing, and reporting on use of federal funds to ensure that NC RttT implementation complies with all applicable laws and regulations. 5 Bill Harrison, Governor's Education Transformation Martez Hill, Dawn Commission: Convene Commission for Shepherd Pope monthly meetings to review planning and implementation, offer guidance, and consider implications for State policy, including any possible modifications that should be considered.
RttT
RttT
At least monthly, stakeholders updated, offered opportunity to provide guidance regarding implementation.
RttT
RttT
RttT
5
June Atkinson, Adam Levinson, Jack Stone, Manage implementation of NC RttT, including: Vanessa Jeter, development and modification (as needed) of Rebecca Garland, a detailed scope of work and accompanying Angela Quick, Neill Kimrey, detailed budgets that comply with USED Lynne Johnson, requirements; more detailed work plans for Pat Ashley, managing each initiative; project administrative processes and structures, and Maria Pitre-Martin, Philip Price, meeting cadences required to manage and track progress against deliverables outlined in Martez Hill, Ross White the scope of work; and communication (including reporting) with various stakeholders (at State, local, and federal levels) to ensure transparency regarding NC RttT Implementation.
RttT
Objective 2: Ensure that NC RttT implementation is managed purposefully, in a coordinated manner, to ensure timely, effective completion of all deliverables and attainment of targeted outcomes; and timely, complete reporting to the US Department of Education.
USED requirements met (including monthly status reports); RttT initiatives implemented on time & within budget; outcomes achieved.
421,968
RttT
1,455,699
RttT
1,500,492
RttT
1,817,518
RttT
2013-14
Create effective identity, messaging, and narrative tools to explain and support transitions to new curriculum essential standards, new school accountability model and new student assessments. Key Deliverables include: identity materials, story-board for explaining the changes fueled by Race to the Top funds, development criteria to ensure fidelity to identity and change story to enable development of shared vision and goals with statewide education community.
Develop NC RttT Website Develop an introductory video for stakeholders to make them aware of impending changes to standards, accountability model, assessments, and teacher eval system.
Vanessa Jeter, Michael Delivery of Yarbrough, Materials by Dec. Contractor 2011 Michael Yarbrough, NCDPI Website posted Communications Sept 2010 Vanessa Jeter, Videos developed Michael Yarbrough, NCDPI and ready for Communications distribution staff December 2010
25,000 -
RttT
2011-12
RttT
2010-11
8,000
RttT
2011-12
Vanessa Jeter, Development and production of print Michael Yarbrough, NCDPI materials produced to introduce NC's RttT plan to local school communities. Distribution Communications staff to each school district and charter. ambassadors in each school to help communicate the reasons and mechanisms Vanessa Jeter, for the changes underway in curriculum, Michael accountability and educator evaluation. Yarbrough, NCDPI Participants will include at least 2 teachers Communications per school, each school principal and staff superintendent.
Materials distributed: March 2012 2012 Teachers identified: Feb 2012. Regional READY meetings held with teacher
25,000
RttT
2011-12
150,000
RttT
2011-12
Objective 3: Ensure effective communications on Race to the Top implementation, particularly around new standards, assessment and accountability, and technology initiatives
4
Create and distribute teacher calendars for the 2011-12 school year that embed information about key RttT deadlines and other professional development initiatives.
1,000
RttT
2011-12
Create parent resource podcasts about new Vanessa Jeter, standards, new student assessments and new Michael accountability model to distribute online and Yarbrough, NCDPI Communications Podcasts posted via social media Fall 2012 along with an staff, contractor by October 2012 online guide for parents. Creating a 'concierge service' at DPI to enhance communication with LEAs and Vanessa Jeter, schools . DPI staff will be linked with Angela Quick, personnel in each of the LEAs and Charter Rebecca Garland, Schools. DPI staff will be trained in customer Philip Price, June services, DPI services, key areas and work of Atkinson and DPI the agency, etc Staff Concierge staff selection, training, collaborative tool and marketing of service to be completed by December 2012.
80,000
RttT
2012-13
10,000
RttT
2012-13
Materials created and distributed to describe Vanessa Jeter, and explain new standards and accountability Michael Yarbrough, NCDPI Developed and model and the Instructional Improvement System (IIS) to educators, parents, business Communications distributed; June staff. 2013 leaders and government officials. Develop teacher and principal online resource with content management system to facilitate idea/resource exchange to optimize shared knowledge and to build collaboration across schools and districts and to showcase best practices
394,000
RttT
2012-13
147,000
RttT
2012-13
Materials created and distributed to describe Vanessa Jeter, and explain new standards and accountability Michael Yarbrough, NCDPI Developed and model and the Instructional Improvement System (IIS) to educators, parents, business Communications distributed; June staff. 2014 leaders and government officials.
$ $ $ $
RttT
2013-14
NC Race to the Top (RttT) State Detailed Scope of Work (DSW) A2 Cloud
Total RttT Funding Budgeted (over four years):
NC RttT Initiative (Section)
$34,639,376
Aligned with SBE Goal
34,639,376.00
Fund Source RttT RttT RttT Fiscal Year R/N?
Key Personnel
Budget
Employ a Cloud Services Manager at DPI throughout project. Hire should be completed no later than 01/31/2011
N N N
(A)(2) NC Cloud
Objective 1: Develop a blueprint for modern technology infrastructure based on high reliability, availability, performance, and efficiency.
Philip Price, Neill Kimrey, Cloud Contract with The Friday Institute at North Manager, Jerry Bunn, Friday Carolina State University to develop the Institute infrastructure blueprint by 05/01/2011.
148,031 Contract In Place by 12/01/2010 Blueprint developed by 05/01/2011 Project Complete Late 2014
RttT
2013-14
138,396
RttT
2010-11
Manage the implementation of the project through 2014. Deliver NCLTI training.
796,389
RttT
2011-12
2,115,645 750,000
N N N
(A)(2) NC Cloud
Contract with MCNC to carryout LEA Infrastructure Site Surveys by 01/01/2011. Site surveys complete by 03/31/2011.
Philip Price, Neill Kimrey, Cloud Manager, Jerry Bunn, Friday Institute
N/A
DPI and The Friday Institute shall develop an advisory and governance structure to facilitate LEA collaboration during the planning stages of the NC Ed Cloud project. Initial advisory structure developed by 03/01/2011
(A)(2) NC Cloud Objective 3: Collaborate with LEAs to develop and implement a deployment and operating plan for the NC Education Cloud.
N/A
N/A
2010-11
Philip Price, Neill Kimrey, Cloud Manager, Jerry Initial advisory structure in place Bunn, Friday by 03/01/2011 Institute
DPI will assist LEAs with modifying State, District, and School Technology Plans to incorporate the Infrastructure Blueprint. All plans amended by 01/01/2013.
5
N/A
N/A
N 2011-12 N
N/A
N/A
2012-13
(A)(2) NC Cloud
Objective 4: Provide technical engineering and systems administration expertise to districts and charters in support of infrastructure and systems migrations.
Contract with MCNC to provide technical assistance to LEAs during migration to Contract in place by 01/01/2012 the NC Ed Cloud in years 2-4. Contract in Philip Price, Neill place by 01/01/2012. MCNC will finish Kimrey, Cloud Migrations migrations by 07/01/2014.
Manager, Jerry Bunn, Friday Institute, MCNC complete by 07/01/2014 MCNC continues Sustainment support
374,653
RttT
2011-12
425,347
RttT
2012-13
400,000
RttT
2013-14
Implement Learning Object Repository (LOR), Learning Management Systems (LMS), Curriculum Content, eLearning Portal Personalization (eLNC), and Web Collaboration Components: Plan, Execute and Build, Procure, Deploy and Operate. Deploy a digital card catalog platform that supports search, contribution, and management functions associated with digital learning content. Support provisioning of content and teacher-course-student data into learning management systems used in NC LEAs (including the NC IIS).
5
$0.00
RttT
2011-12
13,764,802
RttT
2012-13
3,168,951
RttT
2013-14
(A)(2) NC Cloud
Implement Identity and Access Management (IAM) and Data Integration: Plan & Define the IAM and data Plan, execute, build, procure, deploy, and integration operate. Integrate student, teacher, and services parent data from Student Information System (SIS) and HR systems; Identify a automate user account creation; support Philip Price, Neill Kimrey, Cloud vendor(s) IAMand use of LEA credentials to access cloudintegration Manager, Jerry based services. servicdes that
Bunn, Friday Institute
meets the K12 needs Fully implement the IAM and data integration services
$0.00
RttT
2011-12
900,000
RttT
2012-13
300,000
RttT
2013-14
Contract for Cloud Enterprise and Business Services such as Mobile Device Management (MDM), Managed Hosted VOIP, i-Series Migration, Data Integration-Managed Service(DI-MS), Application Performance Management (APM), AMTR 3.0, and Cloud Managment Services (CMS) : Plan, execute, build, procure, deploy, and operate. Migrate LEA enterprise IT infrastructure to cloud-based and service oriented model. In general, transition server and appliance hardware into private sector data centers managed under X-as-a-service contractual agreements.
Plan & Define the MDM, VOIP, DIMS,APM, I-Series migration, AMTR 3.0, and CMS. infrastructure Plan & Define the AMTR 3.0
$0.00 10,599,569
RttT RttT
2011-12 2012-13
Identify vendor(s) and implement the MDM, VOIP, DI-MS,APM, ISeries migration, AMTR 3.0, and CMS. $ $ $ $
RttT
2013-14
NC Race to the Top (RttT) State Detailed Scope of Work (DSW) A2 Eval
Total RttT Funding Budgeted (over four years):
NC RttT Initiative (Section)
$9,449,409
Aligned with SBE Goal
9,449,409
Fund Source Fiscal Year R/N?
Key Personnel
Budget
2010-11 Activities: Establish and hire Policy Analyst postion By March 2011, contract to begin process evaluation assessing the progress in developing and implementing the RttT initiatives (ongoing) Martez Hill, Elizabeth Cunningham, By June 2011, develop logic models and theories of SERVE Center at action, begin data collection at the state and local level, UNC-Greensboro and assess progress and process as initially developed. By June 2011, begin to design and organize database for future formative assessments, to be conducted in years 2 & 3.
ALL
32,246
RttT
2010-11
2011-12 Activities: By September 2011, design instruments to collect data from teachers and principals: surveys, interview protocols, and focus group protocols. By October 2011, "assess feasibility of using" hightech recording systems designed to record teachers practice (to assess instructional practices after participating in professional development). By December 2011, develop and work with DPI to collect data on RttT program participation. By December 2012, develop baseline estimates of the distribution of higher-quality teachers and school leaders, revised from initial RttT proposal estimates.
ALL
Tasks and reports completed according to Martez Hill, timelines in the Elizabeth June 2012 Cunningham/Step evaluation hen Jackson, workplan SERVE Center at UNC-Greensboro 2nd Stage Longitudinal Database
3,934,946
RttT
2011-12
2012-13 Activities: By August 2012, conduct baseline of analysis of local education expenditures in preparation for cost analyses, which will specifically include the technology initiative. Objective EVAL 1: Conduct evaluations of all RttT initiatives to inform continuous improvement and future policy and funding decisions. ALL By October 2012, produce formative assessments of the "promising practices" that received the highest priority in 2011-12, including professional development. Martez Hill, By May 2013, conduct a local education agency cost Stephen Jackson, assessment SERVE Center at o Examine the expenditure patterns and UNC-Greensboro implementation of local education agency expenditures and activities. By February 2013, produce formative assessments of the efforts to transform the lowest-performing schools. Revisit initiative implementation (ongoing). Continue to obtain and manage longitudinal data for assessing program outcomes (ongoing).
(A)(2) Evaluation
Tasks and reports completed according to timelines in the June 2012 evaluation workplan
2,750,779
RttT
2012-13
FY 2013-2014 Activities: By October 2013, complete assessment and provide feedback on "promising practices." By January 2014, conduct an overall cost and sustainability analysis of the RttT initiatives. By July 2014, develop estimates of trends and changes in the distribution of higher-quality teachers and school leaders. ALL
Martez Hill, By September 2014, assess the preliminary impacts of Stephen Jackson, the highest-priority initiatives, including professional SERVE Center at development, efforts to turn around the lowest UNC-Greensboro performing schools, and initiatives to increase the supply and equitable distribution of high quality teachers and leaders. By September 2014, conduct an analysis of the local expenditure patterns associated with the greatest improvements in student achievement, student on-time progress and graduation, and increasing quality of teachers and school leaders.
Tasks and reports completed according to timelines in the June 2012 evaluation workplan
2,731,438
RttT
2013-14
$ $ $ $
NC Race to the Top (RttT) State Detailed Scope of Work (DSW) B3 Transition to New Standards and Assessments
Total RttT Funding Budgeted (over four years):
NC RttT Initiative (Section)
$0
Aligned with SBE Goal
Key Personnel
Budget
Angela Quick, Maria Pitre-Martin, Tracey Greggs, Curriculum Staff Create a plan and strategy to locate the best resources aligned to the Common Core State Standards.
1 and 2
Inventory of resources available of the NC Curriculum Website as compared to other states in the CCSS.
N/A
State
2010-11
1 and 2
*Completion and Publication by Angela Quick, April 2011; Maria Pitre-Martin, *Ongoing Field Tracey Greggs, Feedback Curriculum Staff *Evaluation Team Reports
N/A
State
2010-11
1 and 2
*Completion and Publication by due Angela Quick, Develop and Publish date June 2012; Maria Pitre-Martin, *Ongoing Field Content Specific Formative Assessment (including Tracey Greggs, Feedback examples of Assessment Tasks and Curriculum Staff *Evaluation Team Items) Reports *Completion and Publication by Angela Quick, April 2011; Maria Pitre-Martin, Develop and Publish *Ongoing Field Tracey Greggs, Feedback Crosswalk Documents (per course or grade level) Curriculum Staff *Evaluation Team Reports *Completion and Publication by Angela Quick, June 2012; Maria Pitre-Martin, Develop and Publish *Ongoing Field Tracey Greggs, Feedback Glossary of Terms (per course or grade level) Curriculum Staff *Evaluation Team Reports *Completion and Publication by Angela Quick, Feb. 2012; Develop and Publish Maria Pitre-Martin, *Ongoing Field Tracey Greggs, Graphic Organizer (per course or grade Feedback Curriculum Staff level) *Evaluation Team Reports
N/A
State
2011-12
1 and 2
N/A
State
2010-11
Objective 1: Develop and disseminate instructional resources to help educators develop a deep understanding of the new standards in an effort to increase student outcomes.
1 and 2
N/A
State
2011-12
1 and 2
N/A
State
2011-12
1 and 2
*Completion and Publication by Angela Quick, Aug. 2012; Maria Pitre-Martin, *Ongoing Field Tracey Greggs, Feedback Curriculum Staff *Evaluation Team Reports Angela Quick, *Completion and Maria Pitre-Martin, Publication by Tracey Greggs, June 2012 Curriculum Staff
N/A
State
2012-13
1 and 2
N/A
State
2011-12
1 and 2
1 and 2
*Completion and Publication by Angela Quick, Collaborate with local districts to Nov 2012; Maria Pitre-Martin, develop and publish Learning Experiences/Lesson *Ongoing Field Tracey Greggs, Plan Feedback Curriculum Staff *Evaluation Team examples (for selected standards) Reports *Completion and Publication by Angela Quick, Collaborate with local districts to develop and Nov 2012; Maria Pitre-Martin, publish Pacing Guide examples (for selected *Ongoing Field Tracey Greggs, standards) Feedback Curriculum Staff *Evaluation Team Reports *Completion and Publication by Angela Quick, Aug. 2012; Maria Pitre-Martin, *Ongoing Field Tracey Greggs, Feedback Curriculum Staff *Evaluation Team Reports
N/A
State
2012-13
N/A
State
2012-13
2012-13
1 and 2
Develop and Publish Additional Curricular Tools and Resources requested by districts (for selected standards)
N/A
State
2013-14
(B)(3) Objective 2: Develop and publish a Standards and communication schedule that identifies Assessment opportunities to build knowledge among teachers, staff, and administrators.
Identify districts and schools to meet with and schedule meetings to discuss use of online assessments (successes, lessons learned, needs, etc)
Objective 3: Develop and publish an online assessment Best Practices Guide, which will address issues of scheduling, financial planning, and technical requirements.
Present Best Practices Guide to LEAs/Charter Schools through conferences and regional meetings and update as needed
Angela Quick, Neill Kimrey, Kayla Siler, Melanie Honeycutt, Cynthia Sartain Angela Quick, Neill Kimrey, Kayla Siler, Melanie Honeycutt, Cynthia Sartain Angela Quick, Neill Kimrey, Kayla Siler, Melanie Honeycutt, Cynthia Sartain Angela Quick, Neill Kimrey, Kayla Siler, Melanie Honeycutt, Cynthia Sartain Angela Quick, Neill Kimrey, Kayla Siler, Melanie Honeycutt, Cynthia Sartain Angela Quick, Neill Kimrey, Kayla Siler, Melanie Honeycutt, Cynthia Sartain Angela Quick, Neill Kimrey, Kayla Siler, Melanie Honeycutt, Cynthia Sartain
Meetings scheduled and on the calendar for all identified by Dec 2010
State
2010-11
State
2010-11
State
2010-11
State
2010-11
Complete State Board presentation by August 2011 Sessions on Online Assessments at scheduled conferences in 2011 Sessions on Online Assessments at scheduled conferences in 2012
State
2011-12
State
2011-12
Present Best Practices Guide to LEAs/Charter Schools through conferences and regional meetings and update as needed
Angela Quick, Neill Kimrey, Kayla Siler, Melanie Honeycutt, Cynthia Sartain Sessions on Online Assessments at scheduled conferences in 2013
State
2012-13
Present Best Practices Guide to LEAs/Charter Schools through conferences and regional meetings and update as needed
State
2013-14
(B)(3) Objective 4: Provide professional Standards and development on the new standard course of Assessment study and related assessments.
1 and 2
ERD, PDI Team, Contractors, Collaborate on the development and Angela Quick, implementation of online professional Maria Pitre-Martin, development modules and LEA Planning Institutes Tracey Greggs, Curriculum Staff
N N N
2013-14
$ $ $ $
NC Race to the Top (RttT) State Detailed Scope of Work (DSW) C2 State Data Use
Total RttT Funding Budgeted (over four years):
NC RttT Initiative (Section)
$0
Aligned with SBE Goal
Key Personnel
Budget
Launch CEDARS P-13 Data Warehouse (make registration and access available online to all LEAs and charter schools) by May 2011, and operate going forward.
CEDARS P-13 Data Warehouse available online to all LEAs and charter schools by May 2011.
700,000 Other Federal State State State State State State State State State State State State State State State State State State State State State State
Publish NC School Report Card and other associated Accountability reports and web-tools featuring end-of-grade and end-of-course test scores, participation rates, graduation rates.
Publish on DPI Angela Quick, website in Tammy Howard, accordance with Ken Barbour, Traci established Tillis annual schedules. All files delivered in accordance with established schedule.
2010-11 2011-12 2012-13 2013-14 2010-11 2011-12 2012-13 2013-14 2010-11 2011-12 2012-13 2013-14 2010-11 2011-12 2012-13 2013-14 2010-11 2011-12 2012-13 2013-14 2010-11 2011-12 2012-13
R R R R R R R R R R R R R R R R R R R R R R R
Objective 1: Continue providing data and information products that stakeholders can use to inform their decisions regarding policy and services.
Provide data files to NC Education Research Data Center in accordance with established calendars Karl Pond (multiple delivery dates over course of year).
Provide data files to Employment Security Commission for Common Follow-up System in accordance with established calendars (multiple delivery dates over course of year).
Karl Pond
Provide data files to Education Value-Added Assessment System (EVAAS) in accordance with Karl Pond, Kris established calendar and as needed for ad hoc Knower analyses.
Ensure that all LEAs and Charter Schools have access to EVAAS data.
Kris Knower
Statewide EVAAS license in place. All LEAs and charters enabled with access to EVAAS.
State
2013-14
Deliver training to all LEAs and charter schools, per above training plan (by April 30, 2010).
(C)(2) Objective 2: Provide professional State development on CEDARS business intelligence Longitudinal tools and how to produce annual and Data longitudinal reports.
Training complete for 2 people per LEA and 1 person per Charter (approx 330 users trained) by April 30, 2011.
200,000
Other Federal
2010-11
2,5 Deliver professional development Karl Pond, webinars and CEDARS sessions at Operational Team various conferences throughout year (dates TBD).
N R R
Support use of CEDARS longitudinal data warehouse through webinars and sessions at various annual Statewide and regional conferences and technical assistance events.
2,5
2,5
State
2013-14
See Section (D)(5) Professional Development for deliverables on data literacy training
$ $ $ $
900,000 900,000
NC Race to the Top (RttT) State Detailed Scope of Work (DSW) State Required Activities C3 Instructional Improvement System
Total RttT Funding Budgeted (over four years):
Required RttT Activity ("For all LEAs/Charters, the State will")
25,008,281
25,008,281
Budget
Fund Source
Fiscal Year
R/N?
June 2010 - October 2010 and June 2011 - December 2011; Conduct meetings with potential vendors to learn about products on the market and catalogue tool features
Met with applicable vendors and documented tool features IIS workgroup members assigned 8/10/2010 Workgroup meetings held quarterly; Vision document published Workgroup meetings held quarterly Workgroup meetings held quarterly Workgroups developed by November 2010 Workgroup meetings held regularly Workgroup meetings held regularly Workgroup meetings held regularly Workgroup meetings held regularly Team established by August 2011 Team established by August 2011 Team established by August 2011 Team established by August 2011 Maintain staff Maintain staff Maintain staff Maintain staff Team established by June 2012 Maintain staff
N/A
2010-11
N/A
2010-11
Setup IIS advisory groups (Stakeholder and User) from external stakeholders to refine vision for the IIS and offer guidance and feedback to the project team
Y Y N
N/A N/A N/A N/A N/A RttT Other Federal RttT Other Federal RttT Other Federal RttT Other Federal RttT RttT
2010-11 2011-12 2012-13 2013-14 2014-15 2010-11 2010-11 2011-12 2011-12 2012-13 2012-13 2013-14 2013-14 2011-12 2012-13
N N N N N R R R R R R R R R N
November 2010: Develop Leadership Groups for IIS, including IIS Leadership to provide input into IIS
Develop core IIS Team: Project Director, Project Coordinator, Project Manager, NC FALCON Coordinator and allot associated costs
Project Director
Develop supplemental IIS Team: Functional Specifications Project Director, Analysts, Systems Engineer, QA Analyst, Content Lead, Project Coordinator Content QA, Database Administrator, Business Analyst & Project Manager and allot associated costs
Maintain staff
1,329,670
RttT
2013-14
Page 1 of 5
12/31/2012
NC Race to the Top (RttT) State Detailed Scope of Work (DSW) State Required Activities C3 Instructional Improvement System
Total RttT Funding Budgeted (over four years):
Required RttT Activity ("For all LEAs/Charters, the State will")
25,008,281
25,008,281
Budget
Fund Source
Fiscal Year
R/N?
Hire IIS Planning vendor (CELT), Develop project plan, Project Director & communications plan; gather information about vision, Financial Business specifications, and requirements, RFP. Assist in evaluating Services RFP.
Planning RFP completed by Feb. 2011. Focus groups held, ideas documented, vision shared with leadership; Draft business specifications and technical requirements documented
28,750
RttT
2010-11
Focus groups conducted; Business Specifications and Technical Requirements completed; RFP and Implementation Plan completed Evaluation process completed; Vendor selected
310,000
RttT
2011-12
2,355,223
RttT
2011-12
Work with CUACS to 1. align curriculum and learning content, assessment content, and professional development content to the North Carolina Standard Course of Study (NCSCS), 2. load or register all content to the Learning Object Repository, 3. register the content in the Learning Registry.
Content processes established; IIS content prepared for entry or registry in the LOR and Learning Registry Alignment of content to NCSCS and registry in LOR and Learning Registry Alignment of content to NCSCS and registry in LOR and Learning Registry
135,000
RttT
2011-12
540,000
RttT
2012-13
540,000
RttT
2013-14
Page 2 of 5
12/31/2012
NC Race to the Top (RttT) State Detailed Scope of Work (DSW) State Required Activities C3 Instructional Improvement System
Total RttT Funding Budgeted (over four years):
Required RttT Activity ("For all LEAs/Charters, the State will")
25,008,281
25,008,281
Aligned with Plan/Timeline for Implementation SBE Goal Begin Contiguration and Installation of IIS software Components Modify/Configure IIS software as needed to meeting NC requirements NewSouth Technologies & IIS Vendor NewSouth Technologies & IIS Vendor NewSouth Technologies & IIS Vendor NewSouth Technologies & IIS Vendor Project Director; NewSouth Technologies & IIS Vendor Project Director; NewSouth Technologies & IIS Vendor Project Director; NewSouth Technologies & IIS Vendor Project Director; NewSouth Technologies & IIS Vendor Project Director; NewSouth Technologies & IIS Vendor Project Director; NewSouth Technologies & IIS Vendor Project Director; NewSouth Technologies & IIS Vendor Project Director; NewSouth Technologies & IIS Vendor NewSouth Technologies & IIS Vendor Project Sponsor, Project Director, NewSouth Technologies Project Sponsor, Project Director, NewSouth Technologies Key Personnel
Budget
Fund Source
Fiscal Year
R/N?
2,877,796
RttT
2012-13
2,000,000
RttT
2013-14
2,000,000
RttT
2013-14
1,764,520
RttT
2013-14
1,000,000
RttT
2013-14
371,216
RttT
2013-14
108,320
RttT
2013-14
1,000,000
RttT
2013-14
RttT
2013-14
897,449
RttT
2012-13
897,449
RttT
2013-14
Page 3 of 5
12/31/2012
NC Race to the Top (RttT) State Detailed Scope of Work (DSW) State Required Activities C3 Instructional Improvement System
Total RttT Funding Budgeted (over four years):
Required RttT Activity ("For all LEAs/Charters, the State will")
25,008,281
25,008,281
Budget
Fund Source
Fiscal Year
R/N?
Objective 2: Purchase tools for which LEAs can subscribe via the IIS.
5
Track usage statistics for IIS; Work with evaluation team to determine what data to capture to explore stakeholder use Project Director, Evaluation plans (See and satisfaction with the tool. Project Coordinator section A2) Fees paid for LEAs and Charters so they can access the IIS for the 2013 - 2014 school year Pay licensing and subscription fees for LEAs and Charters Project Sponsor & Fees paid for LEAs to use the IIS modules Project Director and Charters so they can access the IIS for the 2013 - 2014 school year Project Sponsor, Project Director, Project Coordinator, Strategy defined and IIS Leadership approved Project Sponsor, Project Director, Project Coordinator, IIS Leadership Team established Managing Change Team Managing Change Team Managing Change Team
--
RttT
2013-14
955,361
RttT
2012-13
3,000,000
RttT
2013-14
Objective 3: Provide professional development and communications to prepare the teachers, students, parents and administrators for implementing the IIS.
TBD
RttT
2012-13
Establish Managing Change team to help LEAs prepare for and transition to IIS. Engage LEAs in Managing Change exercises to prepare teachers, students, parents and administrators for the implementation of IIS Continue to engage LEAs in Managing Change exercises to prepare teachers, students, parents and administrators for the implementation of IIS Continue to engage LEAs in Managing Change exercises to prepare teachers, students, parents and administrators for the implementation of IIS
RttT
2012-13
Team established
RttT
2012-13
Team established
RttT
2013-14
Team established
RttT
2014-15
Create Data Guide to help educators better use data to inform education
20,000
RttT
2012-13
Create second Data Guide that inform educators on best practices of how to use the IIS and the data contained therein to improve educational outcomes.
Project Director, Project Coordinator, Published second data guide Systems Accounting
See Section A2 RttT Management regarding communications around IIS. See Section D5 regarding professional development. See Section D5 regarding professional development.
10,850
RttT
2013-14
Page 4 of 5
12/31/2012
NC Race to the Top (RttT) State Detailed Scope of Work (DSW) State Required Activities C3 Instructional Improvement System
Total RttT Funding Budgeted (over four years):
Required RttT Activity ("For all LEAs/Charters, the State will")
25,008,281
25,008,281
Budget
Fund Source
Fiscal Year
R/N?
51,941
2011-12: $ 3,552,308 2012-13: $ 6,990,598 2013-14: $ 14,413,434 Total Budget for Required RttT Activities: $ 25,008,281
Page 5 of 5
12/31/2012
Aligned with Plan/Timeline for Implementation SBE Goal Expand alternative licensure programs for educators such as the NC Guilford County Schools Alternative Certification Track, Collaboration for Orchestration Regional Education, CharlotteMecklenburg Schools' Lateral Entry Assistance Program for Career and Technical Education (CTE) and New Leaders for New Schools Key Personnel
Budget
Fund Source
Fiscal Year
R/N?
Lynne Johnson, New Project Coordinator, Elissa Brown, Statewide Evaluation Committee, Alternative Licensure Providers Lynne Johnson, New Project Coordinator, Elissa Brown, Statewide Evaluation Committee, Alternative Licensure Providers Lynne Johnson, New Project Coordinator, Elissa Brown, Statewide Evaluation Committee, Alternative Licensure Providers Lynne Johnson, New Project Coordinator, Elissa Brown, Statewide Evaluation Committee, Alternative Licensure Providers
State
2010-11
State
2011-12
2.4
State
2012-13
State
2013-14
Lynne Johnson, New Utilize vacancy reports, equity plans and Project Coordinator, Publish white Teacher Working Conditions survey for Elissa Brown, IHE paper by June strategic staffing planning Partners 2014. Lynne Johnson, New Utilize vacancy reports, equity plans and Project Coordinator, Teacher Working Conditions survey for Elissa Brown, IHE strategic staffing planning Partners Convene task force and meet quarterly during 2012-13
State
2011-12
State
2012-13
Lynne Johnson, New Utilize vacancy reports, equity plans and Project Coordinator, Convene task Teacher Working Conditions survey for Elissa Brown, IHE force quarterly strategic staffing planning Partners during 2013-14
State
2012-14
Increased number of teacher candidates prepared to teach Lynne Johnson, New in high-needs Project Coordinator, regions and in highneeds content Elissa Brown, IHE areas Partners Increased number of teacher candidates prepared to teach Lynne Johnson, New in high-needs Project Coordinator, regions and in highneeds content Elissa Brown, IHE areas Partners Increased number of teacher candidates prepared to teach Lynne Johnson, New in high-needs Project Coordinator, regions and in highneeds content Elissa Brown, IHE areas Partners Increased number of teacher candidates prepared to teach Lynne Johnson, New in high-needs Project Coordinator, regions and in highneeds content Elissa Brown, IHE areas Partners Total Budget for Required Activities in 2010-11: $ 2011-12: $ 2012-13: $ 2013-14: $ Total Budget for Required RttT Activities: $
State
2010-11
Objective 2: Improve educator pipeline for high-need content and specialty areas.
State
2011-12
State
2012-13
State
2013-14
NC Race to the Top (RttT) State Detailed Scope of Work (DSW) D2 Educator Eval Tool
Total RttT Funding Budgeted (over four years):
NC RttT Initiative (Section)
$5,320,100
Aligned with SBE Goal
5,320,100
Fund Source Fiscal Year R/N?
Key Personnel
Budget
Create evaluation instruments and processes for classifications that are not classroom teachers or school based administrators. These include instructional technology teachers and media coordinators, guidance counselors, school psychologists, social workers. Design optional instruments for speech pathologists, school nurses, occupational therapists, and physical thearapists.
$0
RttT
2010-11
Continue development of evaluation instruments and processes for classifications that are not classroom teachers or school based administrators. These include instructional technology teachers and media coordinators, guidance counselors, school psychologists,social workers.
Vendor in place by September 1, 2011. Draft rubrics and processes developed for 9 new instruments for each of the identified classifications by June 30, 2012 $182,372
(D)(2) Teacher and Objective 1: Implement teacher and principal Principal evaluation processes statewide. Evaluation
Lynne Johnson, Design optional instruments for speech Jennifer Preston, pathologists, school nurses, occupational therapists, and physical thearapists. Contractor Pilot evaluation instruments for classifications that are not classroom teachers or school based administrators. These include instructional technology teachers and media coordinators, guidance counselors, school psychologists, social workers.
Optional evaluation instruments available for use by LEAs and Charters.
RttT
2011-12
5 piloted evaluation insturments required for use by LEAs and Charters operational. Optional evaluation instruments available for use by LEAs and Charters.
Pilot completed and State Board adopted instruments by June 30, 2013. All LEAs and Charters implement required evaluation instruments.
$273,558
RttT
2012-13
$25,000
RttT
2013-14
RttT
2010-11
Jennifer Preston, Elizabeth Colbert, McRel Jennifer Preston, Elizabeth Colbert, McRel
All LEAs and Charters use online tool All LEAs and Charters use online tool
$1,205,025 $1,421,063
RttT
2011-12 2012-13
N N
RttT
Jennifer Preston, All LEAs and Elizabeth Colbert, Charters use online tool McRel Standards for measuring
$1,421,063
RttT
2013-14
2 Objective 2: Add explicit student growth data component to teacher and principal evaluation processes.
Developed 6th standard to the Teacher Evaluation growth Process and an 8th standard for the Principal Rebecca Garland, developed by the Evaluation Process for Measures of Student Growth (by 2010-2011 school year) Jennifer Preston June 30, 2011. $0
RttT
2010-11
Standards added to the instrument and fully implemented in Adopted and implemented 6th standard to the evaluation Teacher Evaluation Process and an 8th standard for the Principal Evaluation Process for Measures Rebecca Garland, processes for the of Student Growth by 2011-12 school year. Jennifer Preston 11-12 school year $0 Total Budget for Required Activities in 2010-11: 2011-12: 2012-13: 2013-14: $ $ $ $ 792,019 1,387,397 1,694,621 1,446,063
5,320,100
RttT
2011-12
NC Race to the Top (RttT) State Detailed Scope of Work (DSW) D2 Performance Incentives
Total RttT Funding Budgeted (over four years):
NC RttT Initiative (Section)
$15,991,459
Aligned with SBE Goal
15,816,367
Fund Source Fiscal Year R/N?
Key Personnel
Budget
(D)(2) Objective 4: Determine and develop Teacher and compensation models, including Principal implementation of compensation models in Evaluation the lowest-achieving schools.
DPI Educator Recruitment & Development, Finance & Business Develop and implement compensation model for Services, District compensation of certified personnel in the lowest- & School achieving schools. Transformation DPI Educator Recruitment & Development, Finance & Business Implement compensation model for compensation Services, District of certified personnel in the lowest-achieving & School schools. Transformation DPI Educator Recruitment & Development, Finance & Provide bonuses for classroom teachers whose Business students have achieved higher than expected Services, District growth and continue with compensation model in & School place for all other personnel. Transformation DPI Educator Recruitment & Development, Finance & Provide bonuses for classroom teachers whose Business students have achieved higher than expected Services, District growth and continue with compensation model in & School place for all other personnel. Transformation
Compensation Model in place and compensation supplied to eligible staff for $0 2010-2011
RttT
2010-11
Compensation Model in place and compensation supplied to eligible staff for $2,070,393 2011-2012
RttT
2011-12
Bonuses paid based on expected growth and compensation model still being $4,422,364 implemented
RttT
2012-13
Bonuses paid based on expected growth and compensation model still being $9,323,610 implemented
RttT
2013-14
$ $ $ $
NC Race to the Top (RttT) State Detailed Scope of Work (DSW) D2 Educator Effectiveness
Total RttT Funding Budgeted (over four years):
NC RttT Initiative (Section)
$4,976,840
Aligned with SBE Goal
4,976,840
Fund Source Fiscal Year R/N?
Key Personnel
Budget
Establish 52 teacher workgroups to produce item specifications and vet items for assessments for untested courses (travel and substitutes)
s provided by workgroups for assessments for untested courses $845,880 Assessment items generated by June 30, 2012. $1,315,480 assessment items generated by $1,315,480 Validity and Reliability of assessments established by September 2012. $200,000 Pilot Student Survey conducted by June 30, 2012 $1,000,000
Growth factor validated as reliable measure for using student growth to evaluate teacher effectiveness. Long-term system in place for integrating growth measure into all teacher and principal evaluations. $300,000
RttT
2011-12
Engage vendor to generate items for assessments Tammy Howard, for untested courses. Contractor
RttT RttT
2011-12 2012-13
N N
Objective 2: Add explicit student growth data component to teacher and principal evaluation processes.
Engage North Carolina Technical Advisors on the design process of Measures of Student Learning and the educator effectiveness model
Tammy Howard
RttT
2012-13
Pilot Student Surveys during 2011-2012 to determine how best to integrate this tool into the teacher effectiveness process
Jennifer Preston
RttT
2011-12
Objective 3: Create the Educator Effectiveness Workgroup to develop longterm system for integrating student growth data into evaluations for all teachers and principals.
Develop and validate a student academic growth factor and develop longer-term system for integrating student growth data into teacher and principal evaluations for all teachers and principals (including new growth measured through the new assessments developed for untested courses). Project Sponsors
RttT
2011-12
$ $ $ $
NC Race to the Top (RttT) State Detailed Scope of Work (DSW) D3 Leadership Academies
Total RttT Funding Budgeted (over four years):
NC RttT Initiative (Section)
$18,608,809
Aligned with SBE Goal
18,608,809
Fund Source Fiscal Year R/N?
Plan/Timeline for Implementation Design and develop RLA models in consultation with independent experts including establishing objectives, time lines, implementation plan and evaluation processes. Ensure RLA design will engage participants in addressing issues similar to those they will face on the job, working through relevant data, problem identification, consideration of alternative solutions, and decision-making. Establish a meaningful Professional Learning Community within RLA Cohorts. Recruit and select new principals for Cohort 1 (25 candidates) ensuring applicants have the expertise, commitment and disposition to lead transformative change in a low-performing school. Jan 2011 - Jun 2011
Key Personnel
Budget
2
Conduct RLA startup including additional design consultation, faculty selection and establishment. Jan 2011 - Jun 2011
Start Northeast Regional Leadership Academy and begin planning for Sandhills, Piedmont-Triad Leadership Academies. $40,465 Start Northeast Regional Leadership Academy and begin planning for Sandhills, Piedmont-Triad Leadership Academies. $4,000
RttT
2010-11
2 (D)(3) Regional Teacher & Objective 1: Develop and implement regional Leader leadership academies to recruit, prepare, and Effectiveness support highly-effective principals.
Refine Design of RLA models in consultation with independent experts including refining implementation plan and evaluation processes.
RttT
2010-11
Recruit and select new principals in( Cohort 2) 75 Lynne Johnson, Project candidates Jun 2011 - Jun 2012 Coordinator Launch RLAs for Cohort 1 July 2011 Conduct RLAs (Cohort 1, Year 1) focusing on acquiring skills and abilities that allow principals to lead transformational change within lowperforming schools with a focus on effective instructional leadership and improving student outcomes. July 2011 - July 2012 Recruit and select new principals in Cohort 3 (75 Lynne Johnson, Project candidates) Jun 2011 - Jun 2012 Coordinator
$400,000
RttT
2011-12
$2,039,054
RttT
2011-12
Conduct RLAs (Cohort 1, Year 2) July 2012 - July 2013 Launch RLAs for Cohort 2 July 2012 Conduct RLAs (Cohort 2, Year 1) July 2012 - July 2013 Conduct RLAs (Cohort 2, Year 2) July 2013 - Aug 2014 Launch RLAs for Cohort 3 July 2013 Conduct RLAs (Cohort 3, Year 1) July 2013 - July 2014 Lynne Johnson, Project Coordinator Lynne Johnson, Project Coordinator
$7,958,842
RttT
2012-13
2013-14
NC Race to the Top (RttT) State Detailed Scope of Work (DSW) D3 Teach for America
Total RttT Funding Budgeted (over four years):
NC RttT Initiative (Section)
$7,369,400
Aligned with SBE Goal
7,369,400
Fund Source Fiscal Year R/N?
Key Personnel
Budget
Enable expansion of Teach for America (by 340 over the next four years)
$0
RttT
2010-11
(D)(3) Regional Teacher & Objective 2: Increase the number of highlyqualified teachers in low-income rural areas Leader Effectiveness and low-performing urban schools.
Lynne Johnson, Project Coordinator, Teach For America Lynne Johnson, Project Coordinator, Teach For America
$2,288,400
RttT
2011-12
RttT
2012-13
RttT
2013-14
$ $ $ $
NC Race to the Top (RttT) State Detailed Scope of Work (DSW) D3 NC Teacher Corps
Total RttT Funding Budgeted (over four years):
NC RttT Initiative (Section)
$5,100,000
Aligned with SBE Goal
5,100,000
Fund Source Fiscal Year R/N?
Key Personnel
Budget
Develop a North Carolina Teacher Corps to recruit in-state talent for high-need schools not served by TFA (to begin 2011-2012 school year)
$0
RttT
2010-11
Use 2011- 2012 as an intense planning and recruitment year; Hire a Statewide Program Director, Statewide Program Consultant, and Statewide Program Assistant to support the work of the NC Teacher Corps.
Planning completed and first cohort of Lynne Johnson, Corps members Jennifer Preston, recruited by June Theresa Perry 2012
$271,002
RttT
2011-12
Objective 2: Increase the number of highlyqualified teachers in low-income rural areas and low-performing urban schools.
Begin NC Teacher Corps - first cohort of 100 participants begin working in districts by beginning of 2012-2013 school year
First cohort of 100 Corps members begins working with lowperforming schools in Aug. 2012 $1,957,299
R
RttT
2012-13
Expand NC Teacher Corps - additional 150 participants by beginning of 2013-2014 school year
Increase number of Corps members to 250 total in lowperforming schools by Aug. 2013
RttT
2013-14
NC Race to the Top (RttT) State Detailed Scope of Work (DSW) D3 Induction Support
Total RttT Funding Budgeted (over four years):
NC RttT Initiative (Section)
$7,774,887
Aligned with SBE Goal
7,774,887
Fund Source Fiscal Year R/N?
Key Personnel
Budget
Develop comprehensive, three-year induction support program for novice teachers in lowachieving schools through contract with UNC General Administration
Lynne Johnson, Program planning Jennifer Preston, completed by $0 June 2011 UNC GA
RttT
2010-11
(D)(3) Regional Teacher & Objective 2: Increase the number of highlyLeader qualified teachers in low-income rural areas Effectiveness and low-performing urban schools.
Lynne Johnson, Jennifer Preston, Project Initiate Induction Support Program in SBE Regions Coordinator, UNC 1, 2, 3 and 6 GA
Novice teachers in the initial 4 regions participating in the induction support program $2,055,728
RttT
2011-12
Implement Induction Support Program in all SBE Lynne Johnson, regions (to serve all eligible novice teachers in Project the lowest-achieving schools in local area cohorts Coordinator, UNC GA each year)
Novice teachers in all 8 regions participating in the induction support program $2,596,789
RttT
2012-13
Novice teachers in all 8 regions participating in the induction support program $3,122,370 $ $ $ $ 2,055,728 2,596,789 3,122,370
7,774,887
RttT
2013-14
NC Race to the Top (RttT) State Detailed Scope of Work (DSW) D3 Strategic Staffing
Total RttT Funding Budgeted (over four years):
NC RttT Initiative (Section)
$3,387,286
Aligned with SBE Goal
3,387,286
Fund Source Fiscal Year R/N?
Key Personnel
Budget
Contract with vendor to produce customized hiring and retention plans for DST partnership districts, including training on: *incentives and strategies to ensure equitable distribution of highly effective teachers within urban districts *incentives and strategies to attract highly effective teachers to rural schools. *collaborating with possible partners in encouraging or supporting additional strategic staffing initiatives. Train and support LEAs in the implementation of recruitment and hiring plans. Conduct regional workshops on strategic staffing initiatives. *Decrease vacancy rates in low-performing schools. *Increase equitable distribution of highly effective teachers. *Decrease vacancy rates in low-performing schools. *Increase equitable distribution of highly effective teachers. *Decrease vacancy rates in low-performing schools. *Increase equitable distribution of highly effective teachers.
$125,000
RttT
2011-12
Objective 3: Provide regional workshops and consultation to LEAs about strategic staffing strategies.
Provide technical support and onsite visits to support LEA retention and hiring plans.
$62,500
RttT
2012-13
Provide technical support and onsite visits to support LEA retention and hiring plans.
$62,500
RttT
2013-14
$1,045,762
RttT
2011-12
Provide every new teacher who chooses to work in the lowest-achieving schools regardless of her or his point of entry (through TFA, through the NC Teacher Corps, through lateral entry, or through traditional routes) with a voucher that can be used for either: - Forgiveness of student loans - Tuition for obtaining a Master's degree - Housing - Any combination of the above
Lynne Johnson, Pat Ashley, Jennifer Preston, Alessandro Montanari, Project Coordinator
$1,045,762
RttT
2012-13
$1,045,762
RttT
2013-14
$ $ $ $
NC Race to the Top (RttT) State Detailed Scope of Work (DSW) D3 NC Virtual Public Schools
Total RttT Funding Budgeted (over four years):
NC RttT Initiative (Section)
$6,456,023
Aligned with SBE Goal
6,456,023
Fund Source Fiscal Year R/N?
Key Personnel
Budget
Increase availability of highly effective math and science teachers to students who are at risk of failure in core math and science courses by developing and delivering a new virtual blended STEM course model to address the needs of these students. Develop blended courses in which onsite teachers share teaching duties with more experienced, historically effective online teachers, again with a focus on serving students in the lowest-achieving schools.
Identify school districts/low achieving schools for target deployment of services by December 1, 2010.
Three school districts identified and committed by December 1, 2010 Identification and commitment of two replacement school districts and by January 2012 Related artifacts and process maps compiled by June 30, 2011.
$ $
State
2010-11
Identify 2 replacement school districts for target deployment of services (replacing districts selected initially that withdrew) by January 2012 Collaboratively determine the new virtual delivery model's teaching and learning approach, and the support, and coaching needs for all identified schools and staff by June 30, 2011.
State
2011-12
98,746.00
$
Establish management team for project by hiring 2 time-limited employees: Project Director by January 2012 and Exceptional Children's Ross White, John Instructional Specialist by March 2012 (salary, Brim and Jack benefits and travel) . Stone Project Director in place by January 2012 and EC Specialist in place $ by March 2012.
202,253.00
N N N N
240,560.00
RttT
2013-14
Plan and develop the first 3 new virtual blended STEM courses that will be piloted in the identified schools by July 2012.
Contractors hired, prepared, and placed from July 2011 through July 2012. 3 virtual blended STEM courses developed by July 2012 $
767,837.00
RttT
2011-12
Pilot the first 3 new virtual blended STEM courses in school year 2012-13.
Ross White, John Brim, Project Director, EC Instructional Specialist and contractors
777,660.00
RttT
2012-13
Objective 2: Increase the number of highly-qualified teachers in low-income rural areas and low-performing urban schools.
Pilot 3 additional new virtual blended STEM courses in school year 2012-13; Continue delivering previous 3 virtual blended STEM courses.
3 pilot virtual blended STEM courses delivered to 450 students; 3 previously established virtual blended STEM courses delivered to 360 students
Develop 2 additional new virtual blended STEM courses for a project total of 8 by July 2014. Continue delivering previously developed 6 virtual blended STEM courses beginning August 2014.
2 additional virtual blended STEM courses developed by July 2014; 6 previously established virtual blended STEM courses delivered to 720 students beginning August 2014. $
891,206.00
RttT
2013-14
Collaboratively determine support and coaching needs for all staff and contractors regarding professional development, device deployment, and related needs.
Ross White, John Brim, Project Director, EC Instructional Specialist and School and District Leadership
$ $ $ $
N R R R
Initial determination by June 30, 2011; feedback cycle repeated every six months
State
2013-14
RttT
2010-11
Procure and deploy blended resources and devices, and provide appropriate training and support for intial 3 pilot virtual blended STEM courses by June 2012
Devices and blended classroom resources purchased and training provided by June 2012
1,234,691
RttT
2011-12
Procure and deploy blended resources and devices, and provide appropriate training and support for additional 3 pilot virtual blended STEM courses by June 2013
995,189.00
RttT
2012-13
Procure and deploy blended resources and devices, and provide appropriate training and support for 6 virtual blended STEM courses by June 2014
Ross White, John Brim, Project Director, EC Instructional Specialist and contractors
765,080.00
RttT
2013-14
Indirect Cost Indirect Cost Indirect Cost Total Budget for Required Activities in 2010-11: 2011-12: 2012-13: 2013-14:
$ $ $ $ $ $ $
$0
Aligned with SBE Goal
Key Personnel
Budget
(D)(4) Teacher Objective 1: Link teacher and principal Effectiveness effectiveness to preparation programs and Student using student growth measures. Growth 2 (D)(4) Teacher Effectiveness and Student Growth Objective 2: Expand Educator Evaluation Process to include assessment of NC independent colleges and university preparation programs. 2 (D)(4) Teacher Effectiveness and Student Growth
Create Educator Effectiveness Group and begin study and strategic planning.
N N N
Lynne Johnson, Elissa Brown, Jennifer Preston, Project Coordinator Expand data links to include preparation programs, educators and outcomes
N N N N N N N N
Objective 3: Publish an Educator Preparation Program report card that rates effectiveness of programs based on student achievement and growth criteria. 2 and 2.4
Develop report card similar to our ABCs Report Card to include information about teacher and leader preparation programs, including outcome measures.
Report card and summary data Lynne Johnson, developed and Elissa Brown, available by Fall Jennifer Preston, of 2012 and Project each Coordinator subsequent year
State State
N N N N
Objective 4: Review and approve Educator Preparation Program revisions to ensure participants become effective teachers, principals and superintendents. 2 and 2.4
Review re-visioned undergraduate and graduate education preparation programs, rubrics and electronic evidences for State Board approval
IHE partners, SBE, Statewide Evaluation Committee, Lynne Johnson, Elissa Brown
State State
State
2013-14
Expand productivity goals based upon workforce analysis to develop a strategic plan to address university teacher recruitment effort. Objective 5: Launch UNC Teacher Recruitment Initiative to develop strategic plan for coordinating teacher recruitment efforts. 2 and 2.4
Lynne Johnson, Elissa Brown, Jennifer Preston, Project Coordinator, IHE Partners IHE partners, SBE, Statewide Evaluation Committee, Lynne Johnson, Elissa Brown
N N N
2 and 2.4
Develop an alternative teacher certification track for science and math majors attending participating campuses.
State
2013-14
NC Race to the Top (RttT) State Detailed Scope of Work (DSW) D5 Professional Development
Total RttT Funding Budgeted (over four years):
NC RttT Initiative Required RttT Activity ("For all LEAs/Charters, the State will")
$ 37,027,995
Aligned with SBE Goal Plan/Timeline for Implementation
33,285,045
Fund Source Fiscal Year R/N?
Design needs assessment plan with a focus both on near-term assessment of PD needs in transitioning to new standards, dataliteracy and the use of the teacher evaluation tool as well as longer term objectives around the use of new Instructional Improvement System. Conduct Diagnostic Needs Assessment.
Lynne Johnson, Yvette Stewart, RttT Professional Needs assessment Development Leaders Plan developed by (PDI Team) Feb 1, 2011 Needs Assessment conducted in fall and spring.
State
2010-11
Lynne Johnson, Yvette Stewart, RttT Professional Analysis completed by RttT Development Leaders Evalution Team twice a year (PDI Team); Jeni Corn (December and June) (RttT Evaluation Team)
State
2011-12
Lynne Johnson, Yvette Stewart, RttT Professional Analysis completed by RttT Evalution Team twice a year Development Leaders (PDI Team); Jeni Corn (December and June) (RttT Evaluation Team)
Needs Assessment
State State
2012-13
2013-14
76,048.00 RttT
2010-11 N
358,856.00 RttT
2011-12 N
364,585.00 RttT
2012-13 N
437,573.00 RttT
Design data literacy training focusing on using data to improve instruction including establishing contracts as necessary. Lynne Johnson, Yvette Stewart, RttT Professional Development leaders Completion of PD trainings according to annual PD calendar, August - June
2013-14 N
76,048.00 RttT
2010-11
358,856.00 RttT
2011-12
364,585.00 RttT
2012-13
Page 1 of 5
12/31/2012
NC Race to the Top (RttT) State Detailed Scope of Work (DSW) D5 Professional Development
Total RttT Funding Budgeted (over four years):
NC RttT Initiative Required RttT Activity ("For all LEAs/Charters, the State will")
$ 37,027,995
Aligned with SBE Goal Plan/Timeline for Implementation
33,285,045
Fund Source Fiscal Year R/N?
437,573.00 RttT
Design training to ensure teachers and leaders can achieve the Lynne Johnson, Yvette objectives related to transitioning to new standards and assessments Stewart, RttT Professional found on p.64 and 65 of NC RttT including establishing contracts as Development leaders necessary. Completion of PD trainings according to annual PD calendar, August - June
2013-14
2010-11
N N
76,049.00
358,856.00
2011-12
364,585.00
2012-13
Recruit Professional Development Leaders and Module Developers for PDI Team
437,572.00
Lynne Johnson, Yvette Stewart Team hired by April 1, 2011 and ongoing as needed {See Design and Execution Targets throughout D(5)} {See Design and Execution Targets throughout D(5)} {See Design and Execution Targets throughout D(5)} $532,337
RttT RttT
2013-14 2010-11
N
N
(D)(5) Objective 3: Recruit, prepare, and support Professional Professional Development Leaders and Module Development Developers
2 2 2
Employ Professional Development Leaders and Module Developers for PDI Team Employ Professional Development Leaders and Module Developers for PDI Team Employ Professional Development Leaders and Module Developers for PDI Team
Lynne Johnson, Yvette Stewart Lynne Johnson, Yvette Stewart Lynne Johnson, Yvette Stewart
N N N
Increase total number of professional development resources each year. Lynne Johnson, Yvette Find, design and/or add resources to the Professional Development Stewart, RttT Professional Learning Repository ensuring they meet rigorous standards of Development Leaders , IIS quality. Team
N/A N/A
2011-12 2012-13
N N
N/A
2013-14
Page 2 of 5
12/31/2012
NC Race to the Top (RttT) State Detailed Scope of Work (DSW) D5 Professional Development
Total RttT Funding Budgeted (over four years):
NC RttT Initiative Required RttT Activity ("For all LEAs/Charters, the State will")
$ 37,027,995
Aligned with SBE Goal Plan/Timeline for Implementation
33,285,045
Fund Source Fiscal Year R/N?
Develop new professional development modules including facilitative modules to populate the professional development repository focusing on supporting transition to new standards (6465 in NC RttT)
$0
RttT
2010-11
Develop new professional development modules including facilitative modules to populate the professional development repository focusing on supporting transition to new standards and data literacy (69-70, 99-101 in NC RttT) Develop new professional development modules including facilitative modules to populate the professional development repository focusing on supporting transition to new standards (6465 in NC RttT) and data literacy and the use of the instructional improvement system (69-70, 99-101 in NC RttT) Develop new professional development modules including facilitative modules to populate the professional development repository focusing on supporting transition to new standards and data literacy and the use of the instructional improvement system (69-70, 99-101 in NC RttT) Maintain and support the web-based professional development modules, including assistance for users Maintain and support the web-based professional development modules, including assistance for users
Lynne Johnson, Yvette Stewart, RttT Professional Development of 9 additional Development Leaders, modules by June 2012 TOPS, LearnNC
$635,882
RttT
2011-12
Objective 4: Support the effective use of technology-enabled eLearning to extend professional development opportunities.
2 2 2
Development of 8 additional modules by June 2013 Development of 8 additional modules by June 2014 *Customers Service Survey Data *Uptime and Availability of Modules *Customers Service Survey Data *Uptime and Availability of Modules
N N N
Lynne Johnson, Yvette Stewart, Module Developers Lynne Johnson, Yvette Stewart, TOPS, Module Developers
RttT
2011-12
Maintain and support the web-based professional development modules, including assistance for users Maintain and support the web-based professional development modules, including assistance for users
Lynne Johnson, Yvette Stewart, Module Developers, TOPS, LearnNC Lynne Johnson, Yvette Stewart, Module Developers, TOPS, LearnNC
*Customers Service Survey Data *Uptime and Availability of Modules *Customers Service Survey Data *Uptime and Availability of Modules
$250,000
RttT
2012-13
$250,000
RttT
2013-14
Design and plan LEA Planning Institutes to ensure LEA PD leaders can achieve objectives on page 193 of NC RttT.
Lynne Johnson, Yvette Stewart, Maria PitreMartin, Neill Kimrey, Tracey Greggs, RttT Professional Development Leaders, Kenan Fellows Program, Jeni Corn (RttT Design completed by May Evaluation Team) 2011
RttT
2010-11
Page 3 of 5
12/31/2012
NC Race to the Top (RttT) State Detailed Scope of Work (DSW) D5 Professional Development
Total RttT Funding Budgeted (over four years):
NC RttT Initiative Required RttT Activity ("For all LEAs/Charters, the State will")
$ 37,027,995
Aligned with SBE Goal Plan/Timeline for Implementation
33,285,045
Fund Source Fiscal Year R/N?
Lynne Johnson, Yvette Stewart, Maria PitreMartin, Neill Kimrey, Tracey Greggs, RttT Professional Development Leaders, Kenan Fellows Program, Jeni Corn (RttT Evaluation Team) Lynne Johnson, Yvette Stewart, Maria PitreMartin, Neill Kimrey, Tracey Greggs, RttT Professional Development Leaders, Kenan Fellows Program, Jeni Corn (RttT Evaluation Team)
*Survey data from participants *Evaluation of LEA Professional Development Action Plan
RttT
2011-12
*Survey data from participants *Evaluation of LEA Professional Development Action Plan
RttT
2012-13
Begin 4 new cohorts (with a total of approximately 200 principals and 50 assistant principals) by April 2011.
Plan and Conduct 4 Distinguished Leadership in Practice (DLP) Principal Institutes in SY 2010-11
*Survey data from participants *Student achievement of the students of principal's attending institute (year after participation) Begin 4 new cohorts (with a total of approximately 150 principals and 50 assistant principals) by April 2012.
591,750
RttT
2010-11
*Survey data from participants *Student achievement of the students of principal's attending institute (year after participation)
591,750
RttT
2011-12
Begin 4 new cohorts (with a total of approximately 150 principals and 50 assistant principals) by April 2013.
*Survey data from participants *Student achievement of the students of principal's attending institute (year after participation)
591,750
RttT
2012-13
Page 4 of 5
12/31/2012
NC Race to the Top (RttT) State Detailed Scope of Work (DSW) D5 Professional Development
Total RttT Funding Budgeted (over four years):
NC RttT Initiative Required RttT Activity ("For all LEAs/Charters, the State will")
$ 37,027,995
Aligned with SBE Goal Plan/Timeline for Implementation
33,285,045
Fund Source Fiscal Year R/N?
Begin 4 new cohorts (with a total of approximately 150 principals and 50 assistant principals) by April 2014.
Objective 7: Work with LEAs to ensure that effective and appropriate professional development is available to all teachers.
Lynne Johnson, Yvette Stewart, Maria PitreMartin, Neill Kimrey, Tracey Greggs, RttT Train and coach educators (onsite and remote) throughout 8 regions of the state supporting transition to new standards (64-65 in Professional Development NC RttT) and data literacy (69-70, 99-101 in NC RttT) July 2011 Leaders, Jeni Corn (RttT June 2012 Evaluation Team) Lynne Johnson, Yvette Stewart, Maria PitreTrain and coach educators (onsite and remote)throughout 8 Martin, Neill Kimrey, regions of the state supporting transition to new standards (64-65 in Tracey Greggs, RttT NC RttT) and data literacy and the use of the instructional Professional Development improvement system (69-70, 99-101 in NC RttT) July 2012 - June Leaders, Jeni Corn (RttT 2013 Evaluation Team) Train and coach educators (onsite and remote)throughout 8 regions of the state supporting transition to new standards (64-65 in NC RttT) and data literacy and the use of the instructional improvement system (69-70, 99-101 in NC RttT) July 2013 - June 2014 Lynne Johnson, Yvette Stewart, Maria PitreMartin, Neill Kimrey, Tracey Greggs, RttT Professional Development Leaders, Jeni Corn (RttT Evaluation Team)
Lynne Johnson, Yvette Stewart, Maria PitreMartin, Neill Kimrey, Tracey Greggs, RttT Train and coach educators (onsite and remote) throughout 8 Professional Development regions of the state supporting transition to new standards (64-65 in Leaders, Jeni Corn (RttT Evaluation Team) NC RttT) April 2011 - June 2011
*Survey data from participants *Student achievement of the students of principal's attending institute (year after participation) * Training conducted according to annual PD calendar *Survey data from participants *Evaluation Team Results * Training conducted according to annual PD calendar *Survey data from participants *Evaluation Team Results * Training conducted according to annual PD calendar *Survey data from participants *Evaluation Team Results * Training conducted according to annual PD calendar *Survey data from participants *Evaluation Team Results
591,750
RttT
2013-14
8,600
RttT
2010-11
4,986,908
RttT
2011-12
5,258,494
RttT
2012-13
5,108,493
RttT
2013-14
Total Budget for Required Activities in 2010-11: $ 2011-12: $ 2012-13: $ 2013-14: $ Total Budget for Required RttT Activities: $
Page 5 of 5
12/31/2012
NC Race to the Top (RttT) State Detailed Scope of Work (DSW) E2 Turning Around the Lowest-Achieving Schools
Total RttT Funding Budgeted (over four years):
NC RttT Initiative (Section)
$41,980,147
Aligned with SBE Goal
39,230,147.00
Fund Source Fiscal Year R/N?
Key Personnel
Budget
Identify TALAS (Turning Around Lowest-Achieving Pat Ashley, Ann Schools) Schools (111 in lowest 5% of NC schools). Osburn 5.4
State
2010-11
Collaboratively determine support and coaching needs for all identified TALAS schools.
Intitial completed Pat Ashley , DST by June 30, 2011; Leadership, TALAS ongoing as School & District needed through Leadership end of grant State
2.4;5.4
2010-11
Hire, prepare, maintain, and strategically place coaches (School Transformation Coaches, Instructional Review Coaches, Instructional Coaches) to serve 111 TALAS elementary, middle and high schools in lowest 5% of NC schools. Ensure selection of USED reform model and subsequent development of an RttT-aligned change plan and implementation map focused on Pat Ashley, DST academic improvement by each TALAS school. Leadership, and Analyze student performance data annually to DST staff recommend adjustments to school implementation of USED reform model and/or district support to school(s). Subsequently, make any necessary adjustments to DST support. Provide customized professional development and on-site coaching for leadership and instruction according to identified needs.
20% of hires by Jan. 2011, 35% by Apr. 2011, and 75% by July 2011. Initial reform model plans completed. Maintain coaching staff. Provide ongoing services and continue model implementation.
Objective 1: Turnaround Lowest 5% of conventional elementary, middle, and high schools (111) based on 2009-10 Performance Composite and grade span.
370,574
RttT
1.1;2.4;2.3;3.1;3.2;3.5;4.2;5.4
Provide ongoing services and continue reform model implementation through June 30, 2014 to be documented by DST coaching staff by reviewing $ and recording progress during on-site support, annual benchmarking based on student progress indicators, and $ followed by refinements and $
2010-11
2,874,569
RttT
2011-12
3,926,641 4,735,718
RttT RttT
2012-13 2013-14
N N
Provide Comprehensive Needs Assessment (CNA) and follow-up (determining resources, professional development - unpacking CNA report) for 111 TALAS schools
Pat Ashley, Shane Goodrum, Susan CNAs completed Silver, and DST September 2010 CNA March 2012 Team/Trained DPI Staff
118,584
RttT
2010-11
919,862
RttT
2011-12
Identify the TALAS (Turning Around LowestAchieving Schools) High Schools with graduation rates under 60% (9 identified). 5.4
2010-11
Collaboratively determine support and coaching needs for all 9 TALAS high schools with graduation rates under 60%.
2.4;5.4
Intitial completed by June 30, 2011; Ongoing as needed through end of grant
State
2010-11
20% of hires by Jan. 2011, 35% by Apr. 2011, and 75% by July 2011. Initial reform model plans completed. Maintain coaching staff. Ongoing services provided and continue model implementation.
$ 103,761 RttT
2010-11
Objective 2: Turnaround Conventional high schools with a 4-year cohort graduation rate below 60% in 2009-10 and either 2008-09 or 2007-08.
Pat Ashley, DST Leadership, and DST staff Hire , prepare, maintain, and strategically place coaches (School Transformation Coaches, Instructional Review Coaches, Instructional Coaches) to serve 9 TALAS high schools with graduation rates under 60%. Ensure selection (by each high school with a graduation rate of under 60%) of either Turnaround, Closure, Restart, or Transformation model and subsequent development of an RttTaligned change plan and implementation map focused on academic improvement. Analyze student performance data annually to recommend adjustments to school implementation of USED reform model and/or district support to school(s). Subsequently, make any necessary adjustments to DST support.
Provide ongoing services and continue reform model implementation through June 30, 2014 to be documented by DST coaching staff by reviewing and recording progress during on-site support, annual benchmarking based on student progress indicators, and followed by refinements and adjustments to plan. Complete the remaining 25% of initial hires by July 2012 and maintain coaching staff throughout the grant. All reform models implemented by August 2014.
804,879
RttT
2011-12
Provide customized professional development and on-site coaching for leadership, instruction, and support services according to identified needs.
1,189,891
1.1;2.4;2.3;3.1;3.2;3.5;4.2;5.4 Provide Comprehensive Needs Assessment (CNA) and follow-up (determining resources, professional development - unpacking CNA report) for 9 TALAS high schools with graduation rates under 60%. 2.4 Pat Ashley, Shane Goodrum, Susan CNAs completed Silver, and DST September 2010 CNA March 2012 Team/Trained DPI Staff
$
1,435,066 44,469
N N N
344,948
RttT
2011-12
5.4
Identify TALAS (Turning Around Lowest-Achieving Pat Ashley, Ann Schools) 10% of lowest achieving districts (12 Osburn districts)
State
2010-11
2.4;5.4
Collaboratively develop plan for support and additional coaching needs (school and instructional coaching).
Pat Ashley , DST Plan in place by Leadership, TALAS June 30, 2011 District Leadership
207,522
RttT
2010-11
Hire , prepare, maintain, and strategically place coaches(District Tranformation Coaches) to serve the lowest achieving 10% of districts (12 districts) . Provide customized professional development and on-site coaching for leadership and instruction in TALAS identified districts. Collaborate with district to successfully implement their local Detailed Scope of Work. Collaborate on other planning and implementation needed to ensure improvement in student achievement and on-time graduation rates. Analyze student performance data annually to recommend adjustments to school implementation of USED reform model and/or district support to school(s). Subsequently, make any necessary adjustments to DST support. Pat Ashley, DST Leadership, and DST staff
Provide ongoing services; all district DSW performance measure attained for 2011-12
$5,634,156
RttT
2011-12
Objective 3: Turnaround lowest-achieving districts with a 2009-10 LEA Performance Composite below 65%.
Provide ongoing services; all district DSW performance measure attained for 2012-13
$6,782,380
RttT
2012-13
All DSW performance measures attained and no school with a performance composite or graduation rate below 60% proficient by June 30, 2014 1.1;2.4;2.3;3.1;3.2;3.5;4.2;5.4
$8,179,876 RttT 2013-14
1.1;2.4;2.3;3.1;3.2;3.5;4.2;5.4
Provide Comprehensive Needs Assessment (CNA) and follow-up (determining resources, professional development - unpacking CNA report) for all TALAS districts and the schools in those districts.
$ Pat Ashley, Shane Goodrum, Susan CNAs completd Silver, and DST September 2010 CNA June 30, 2012 Team/Trained DPI Staff
118,584
RttT
2010-11
2.4 Total Budget for Required Activities in 2010-11: 2011-12: 2012-13: 2013-14:
919,863
RttT
2011-12
$ $ $ $
NC Race to the Top (RttT) State Detailed Scope of Work (DSW) State Required Activities P2 STEM
Total RttT Funding Budgeted (over four yea $
9,735,235
Aligned with SBE Goal
9,735,235
Budget
Fund Source
Fiscal Year
R/N?
Objective 1: Provide technical assistance and professional development to support the implementation of the Common Core in Mathematics and the new Essential Standards in Science.
See Sections B(3), Objective 1 and D(5), Objectives 1-7 regarding planned professional development to support the implementation of the Common Core in Mathematics and the new Essential Standards in Science.
Objective 2: Complete the development of the elementary science and math concentration modules.
See Sections B(3) and D(5) regarding development of elementary science and math curriculum support tools and materials.
Contract with NC New Schools Project to develop a network of Anchor and Affinity Network schools to serve as laboratory, localized sites of focus, and professional development hubs, and test-sites for innovative policy, practices and partnerships, anchored by four schools for innovation and a set of Affinity Network schools for scaling.
RttT
2010-11
RttT
2010-11
RttT
2011-12
Objective 3: Provide technical assistance to LEAs and RESA organizations around the planning and implementation of STEM high schools for individual LEAs or regions.
Implement a STEM web portal that networks Elementary, Middle, and High Schools; and provides tools Contract implemented Rebecca Payne, including professional with NC STEM. Web portal NC STEM, NC learning community developed by Feb. 2012. New Schools modules, learning resources, Project and practices and partnerships that can be searched by economic Maintain and expand web development and education portal and increase region. number of schools participating
250,000
RttT
2011-12 2012-13
TBD
State
TBD
State
2013-14
Define the required SBE, DPI, LEAs, attributes of a STEM school JOBS or program in collaboration Commission, NC with SBE/DPI, LEAs, JOBS STEM, NC NSP, Commission, NC STEM, and national NCNSP, and national experts. experts
Begin collaboration with partners to frame and refine a State STEM Strategic Plan, including the attributes.
N/A
2010-11
Collaborate with partners to frame, refine and adopt the State STEM Strategic Plan, including the attributes. By December 2012, develop 4 Level I STEM courses
250,000
RttT
2011-12
Contract with NC School of Science and Math to develop curriculum in each of NC's Rebecca Payne, identified four STEM pillar NCSSM, NC NSP areas for implementation in the Anchor and Affinity Network Schools
By June 2013, develop 4 Level II STEM courses 520,000 By Jan. 2014, develop 4 Level III STEM courses By June 2014, develop 4 Level IV STEM courses RttT
2012-13
255,000 RttT
2013-14
Anchor STEM High Schools: Develop/establish 4 anchor Rebecca Payne, 2 Anchor Schools schools by August 2011. NC New Schools Work with strategic partners to: a) build support for STEM education and b) guide development of policy that supports STEM education.
identified.
RttT
2010-11
110,119
RttT
2011-12
Rebecca Payne, Identify partners to NC New Schools support network Project 193,196 Rebecca Payne, Identify partners to NC New Schools support network Project
4,1 RttT
2012-13
169,874
RttT
2013-14
Instructional Coaching: Provide highly qualified educational leaders to work on-site with classroom teachers at each anchor school based on determined need. (range of 27-70 days)
RttT
2010-11
Rebecca Payne, NC New Schools includes 155 days provided prior to list of Project
69,647
RttT
2011-12
100,397
RttT
2012-13
2
Leadership Institute for High School Redesign: Provide intensive and sustained professional development for principals in the anchor schools to support their development as effective leaders based on determined need. Also, take each principal on one study visit to a national model school .
81,092 -
RttT RttT
2013-14 2010-11
R R
Provide leadership coaching services to 4 principals (total of 38 days) includes services prior to schools list being approved.
20,511
RttT
2011-12
29,568
RttT
2012-13
Objective 4: Work with partners to support the development of a small set of anchor/model STEM high schools that will serve as laboratory schools and sites for professional development around project-based learning.
4.2
Teaching for Results: Provide teachers in the anchor schools with purposeful, researched-based professional development that is aligned with the training that principals receive. Teachers will have access to "Critical Friends Group," facilitated Peer School Reviews, as well as other programs.
23,882
RttT
2013-14
Provide services to 3 schools (total of 130 days) includes services prior to schools list being approved.
RttT
2010-11
Rebecca Payne, Provide services to 4 NC New Schools schools (total of 360 days) Project
includes services prior to schools list being approved.
67,289
RttT
2011-12
96,999
RttT
2012-13
2.2
Residencies in Model Schools: Provide one-week residencies in national-model schools for staff from each of the anchor schools.
78,348
RttT
2013-14
Rebecca Payne, schools will participate in NC New Schools the residency. Project
Teachers from 4 anchor schools will participate in the residency.
15,113
RttT
2011-12
21,786
RttT
2012-13
2.1, 4.2
17,597
RttT
2013-14
Extended employment: Extend teachers' salaries into the summer, so that they can develop and review STEM project based units of study, review curriculum, attend professional development, create and implement additional STEM opportunities, participate in worked based learning internships and other as approved.
Identify participants by May 15. Agree upon Rebecca Payne, schedule and goals by NC New Schools June 1. Report progress Project and lessons learned by Aug 15.
22,526 165,471
RttT RttT
2011-12 2012-13
N R
2
Equipment for Classrooms: Support technology NC DPI will review and purchases to outfit classrooms approve STEM equipment Rebecca Payne, to support STEM education in request for each school All NC New Schools the anchor schools. schools will have Project purchased equipment in place by August 2014.
345,983 150,000
R N N N
N
Objective 5: Increase the number of high-level STEM courses in NCVPS. Objective 6: Focus on recruiting highly-qualified /highly-effective teachers in STEM areas in hard-tostaff communities.
5.2
See Section (D)(3), Objective 2: Expand access to highly Effective STEM courses through new Virtual & Blended model
See Section D(3), Objective 2:(Expand access to highly Effective STEM courses through new Virtual & Blended model) and 3 regarding Strategic Staffing Initiatives.
Support work with Affinity Network schools. Work with strategic partners to: a) build support for STEM education and b) guide development of policy that supports STEM education.
RttT
2010-11
Recruit, interview and select 3 additional Affinity Network schools by Aug 15, 2011.
428,922
RttT
2011-12
652,757
RttT
2012-13
4,1
541,068
RttT
2013-14
Instructional Coaching: Provide highly qualified educational leaders to work on-site with classroom teachers in the Affinity Network schools based on determined need. . (range of 27-70 days)
RttT
2010-11
Rebecca Payne, includes 155 days NC New Schools provided prior to list of schools being Project
270,267
RttT
2011-12
389,595
RttT
2012-13
2
Leadership Institute for High School Redesign: Provide intensive and sustained professional development for principals in the Affinity Network schools to support their development as effective leaders based on determined need. Also, take each principal on one study visit to a national model school.
314,683 -
RttT RttT
2013-14 2010-11
R R
Rebecca Payne, NC New Schools includes services prior to schools list being Project
approved. Provide leadership coaching services to 16 principals (total of 144 days) Provide leadership coaching services to 16 principals (total of 144 days)
79,215
RttT
2011-12
114,190
RttT
2012-13
4.2
92,233
RttT
2013-14
Teaching for Results Provides selected teachers in the Affinity Network schools purposeful, researched-based professional development aligned with training principals receive. Teachers will have access to "Critical Friends Group," facilitated Peer School Reviews, as well as other programs.
Provide services to 1 schools (total of 20 days) includes services prior to schools list being approved
RttT
2010-11
Rebecca Payne, schools (total of 815 days) NC New Schools includes services prior to Project
Provide services to 16 schools (total of 1,480 days)
Provide services to 15
261,929
RttT
2011-12
377,576
RttT
2012-13
2
Residencies in Model Schools - One week residencies in national-model schools for staff from each of the Affinity Network schools.
304,974
RttT
2013-14
Teachers from 12 affinity network schools will participate in the residency. Rebecca Payne, NC New Schools Project Teachers from 16 affinity network schools will participate in the residency.
57,546
RttT
2011-12
82,954
RttT
2012-13
2.1, 4.2
67,003
RttT
2013-14
Extended employment: Extend teachers' salaries into the summer, so that they can develop and review STEM project based units of study, review curriculum, attend professional development, create and implement additional STEM opportunities, participate in worked based learning internships and other as approved.
Identify participants by May 15. Agree upon Rebecca Payne, schedule and goals by NC New Schools June 1. Report progress Project and lessons learned by Aug 15.
90,105
RttT
2011-12
661,884
RttT
2012-13
2
Equipment for Classrooms: Support technology purchases to outfit classrooms to support STEM education in the Affinity Network schools. NC DPI will review and
1,383,934 -
2013-14
2010-11 2011-12
N N
Rebecca Payne, approve STEM equipment request for each school All NC New Schools schools will have Project purchased equipment in
place by August 2014.
510,000
RttT
2012-13
5.2 Objective 8: Provide new opportunities for students in the lowest-achieving schools and districts to attend schools that will better support their achievement and successful graduation and lead them to college and career readiness.
Review of STEM Anchor and Affinity Schools model for consideration of additional opportunities for students in the lowest-achieving schools and districts.
RttT
2013-14
2012-13 2013-14
See Section (D)(3), Objective 2: Expand access to highly Effective STEM courses through new Virtual & Blended model