You are on page 1of 4

ANALISIS DE PRECIOS UNITARIOS

EMPRESA:

N PARTIDA:
FECHA:

OBRA:
UBICACIN:
CONTRATANTE:
DESCRIPCION DE LA PARTIDA:

UNIDAD:

CANTIDAD:

RENDIMIENTO:

240

CODIGO:

MATERIALES
N

DESCRIPCION

UNIDAD

CANTIDAD

PRECIO (Bs.)

DESP. (%)

VP420

kgf

9.24
13.28
7.08
0.42
0.3
5

60
60
60
60
12
456

1
1
1
1
1
1

TOTAL MATERIALES:

EQUIPOS
N

DESCRIPCION

1
2
3
4
5

CANTIDAD

1
1
1
3
1

andamio tubular
compresor atlas

PRECIO (Bs.)

91204
22854
502000
880
210217

DESP. (%)

0.0053
0.0054
0.002
0.0035
0.005234

TOTAL EQUIPOS:

MANO DE OBRA
N

DESCRIPCION

CANTIDAD

JORNAL

BONO(50%UT)

TOT.BONO

2
2
1
1
4

169.23
134.95
176.48
215.88
126.04

63.5
63.5
63.5
63.5
63.5

SUB TOTAL MANO DE OBRA:

127
127
63.5
63.5
254
0
0
0
0
0
0
0
Bs. F 635.00

505.15% FCAS:
TOTAL MANO DE OBRA:
COSTO DIRECTO SUBTOTAL "A":

19% ADMINISTRACION Y GASTOS GENERALES:


SUBTOTAL "B":

12% IMPREVISTO Y UTILIDAD:


PRECIO UNITARIO (Bs.):

TOTAL (Bs.)

554.4
796.8
424.8
25.2
3.6
2280
0
0
0
0
0
0
0
4084.8

4084.8

TOTAL (Bs.)

483.38
123.41
1,004.00
9.24
1,100.28
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,720.31

TOT. JORNAL

11.33

338.46
269.9
176.48
215.88
504.16
0
0
0
0
0
0
0
Bs. F 1,504.88
############
############ Bs. F 53.96
###########
RACION Y GASTOS GENERALES:
788.52
4938.61
592.63
PRECIO UNITARIO (Bs.):
5531.24

You might also like