You are on page 1of 11

Week 

Report 
Summary of 
significant work of 
the week 

Supervisor’s Comments
Daily Log 

Week  1  Date  27 January 2008 

Summary of significant work of the week 
The  first week  I’m tried  to get use for this new  work  environment.  Trying to  get  know  of the boss, the 
staff, and the work place. Basically, they are two staff that I will work together. That is en. Jamari and En. 
Khalid. They taught me what to do and monitor me incases I need help and information because I’m still 
new and under training program. En. Khalid said he was a senior of my college. He said he was on the 
first batch before he continues to Cosmopoint. Look s like a can ask him for an advise for my training as 
he and I are from the same college. 

Supervisor’s Comments 

Signature  Date 

Trainee 

Supervisor  Official Stamp
Daily Log 

Week  2  Date  3 February 2008 

Summary of significant work of the week 
This week En. Jamari give me a Scanner for me to work. He also teaches me the correct method on how 
to  create a same and round border. This week  most  of my task  are repairing and  converting En, Jamari 
design  from  vertical  alignment  to  horizontal.    This  because  for  the  second  edition  of  Perak  Halal,  Pn. 
Zahariah  wants  all  design  dimensions  in  horizontal  as  it  less  consumes  space.  So  this  week  a  have  to 
switching  between  comps  as  for  new  product  design  it  will  be  done  in  my  laptop and  the  other  on  the 
desktop. 
Also this week I learn that there are 3 dimensions for listing order placement. They are :
·  50mm x 35mm (RM150.00) Color
·  50mm x 50mm (RM200.00) Color
·  50mm x 70mm (RM250.00) Color 
My  work  for  this  department  is  to  design  an  order  placement  base  on  above  dimension  mention  for 
classifies listing of Perak Halal Directory. 

Supervisor’s Comments 

Signature  Date 

Trainee 

Supervisor  Official Stamp
Daily Log 

Week  3  Date  10 February 2008 

Summary of significant work of the week 
Nothing new to learn this week. But there a sure a lot of work and I start to get used to it. This week most 
of the designs are for the RM 250.00 listing and there are only 4 days of work because of the Chinese 
New Year. 

Supervisor’s Comments 

Signature  Date 

Trainee 

Supervisor  Official Stamp
Daily Log 

Week  4  Date  17 February 2008 

Summary of significant work of the week 
This week work same like the last 2 week that designing the listing placement and resizing the old design. 
It’s also my first work evaluation, all the work that finish will be print with it product and dimension only 
for  the  manager  to  evaluate  the  artwork  either  its  need  to  be  repaired  or  not.  Then  I  learn  that  for 
advertisement design that been done by En. Jamari under Half Page and Full Page will be redesign to RM 
200 and RM250 listing dimension format as it will also be put in the classified directory. 

Supervisor’s Comments 

Signature  Date 

Trainee 

Supervisor  Official Stamp
Daily Log 

Week  5  Date  24 February 2008 

Summary of significant work of the week 
This  week  is  the  second  artwork  evaluation,  since  the  manager  want  to  look  at  my  work.  Most  of  the 
week  is  about  repairing  artwork  that  have  been  evaluate  and  artwork  that  have  been  complete  will  be 
submit to the their company for their confirmation of the design. I’m also learn a lot from the manager as 
she taught me how to create a better design. 

Supervisor’s Comments 

Signature  Date 

Trainee 

Supervisor  Official Stamp
Daily Log 

Week  6  Date  2 March 2008 

Summary of significant work of the week 
This week much of my work is about  redesign my previous artwork and converting an advertisement to 
the listing size like listed below :
·  Quarter page : 50mm x 35mm (RM500.00) Color
·  Half page       : 50mm x 50mm (RM800.00) Color
·  Full page        : 70mm x 65mm (RM1500.00) Color 

Since all my artwork not completely been evaluated. I’m not allowed to take a new task and must  wait 
until all done. The manager gives a collection of flyer, pamphlet, booklet and material for me to revised 
and take an example of their work.  She also wants me to do a revision on other magazine and books. 

Supervisor’s Comments 

Signature  Date 

Trainee 

Supervisor  Official Stamp
Daily Log 

Week  7  Date  9 March 2008 

Summary of significant work of the week 
This  week  I’m  repaired  all  my  artwork  for  printing  and  compile  it  with  its  form  Then  for  and 
advertisement listing design, I have to change all previous quarter page and half page size format. There 
has been a miss communication and understanding so this is the new or the exactly the correct format for 
the advertisement listing :
·  Quarter page                        : 50mm x 50mm
·  Half page & Full page  : 70mm x 65mm 

There will be no more Rm150 (50mm x 35mm) design for advertisement listing. 

Supervisor’s Comments 

Signature  Date 

Trainee 

Supervisor  Official Stamp
Daily Log 

Week  8  Date  16 March 2008 

Summary of significant work of the week 
This week most of my task is about repairing and redesigning all artwork that have been evaluated. It’s 
also my third work evaluation. This week I noticed that there are lot of miss spelling and typing error in 
my artwork after it was printed. Furthermore, there are also an artwork that I didn’t print even thought I 
finish it already.  Then I realized that I have to synchronized and manage my work to maintain my quality 
of work. 

Supervisor’s Comments 

Signature  Date 

Trainee 

Supervisor  Official Stamp
Daily Log 

Week  9  Date  23 March 2008 

Summary of significant work of the week 
After synchronized and manage my work files, I have created a data base for all listing that I have work 
with. With the database, I can access or search for my file much faster than before. Plus its also contain 
the status all of my work. So I know which work that has been finish, pending or still in progress. I’m 
also creating a backup file for the work that have been evaluated and completely finish. 

Supervisor’s Comments 

Signature  Date 

Trainee 

Supervisor  Official Stamp
Daily Log 

Week  10  Date  29 March 2008 

Summary of significant work of the week 
This is the last and the final week of my 10 weeks of industrial training. For this week, I try to complete 
all unfinished worked and take time to gather some information about the company. All this information 
will be written in my report. I’m also updating my database and make a backup copy of all my work and 
kept it for later revisions. 

Supervisor’s Comments 

Signature  Date 

Trainee 

Supervisor  Official Stamp

You might also like