Professional Documents
Culture Documents
1
Factory of Yeast and Alcohol, MK-7000 Bitola, Republic of Macedonia
2
Faculty of Technology and Metallurgy, Ss Cyril and Methodius University,
P. O. Box 580, MK-1001 Skopje, Republic of Macedonia
3
Faculty of Technology, University of Nis, Serbia,
Abstract: Rapid increasing of energy prices all over the world and concern for the
environmental impacts are the reasons which stimulate developement of new methods for
energy conservation measures in chemical industry. This paper presents a research on the case
study of plant for ethanol and yeast production. For the purpose of research, physical model of
the plant is recognized as steady state and divided in energy subsystems, which are separately
optimized by the use of heuristic rules. Data extraction phase is limited only on the streams
which connect the subsystems. The use of Pinch analysis enabled the synthesis of new heat
exchanger network, which improve the energy and economic parameters of the plant.
Key words: process integration, heat exchanger network synthesis, pinch technology,
chemical industry, yeast fermentation plant.
1. INTRODUCTION
∗
Coresponding author: A. Anastasovski, E-mail: *AleksandarA@mt.net.mk
Process integration can be broadly categorized into mass [2] and energy(heat)
integration [3, 4]. The energy integration deals with the global allocation, generation, and
exchange of energy throughout the process [3, 5]. On the other side, mass integration is a part
of process integration which has aim to minimize outgoing material compounds through
material streams via change of its concentrations. This kind of integration uses mass transfer
phenomena for compound concentration changes with mass exchangers using processes such
as absorption, adsorption, extraction, ion exchange, leaching and striping.
The implementation of PI methods can lead to significant energy savings and waste
reduction (primary wastewater minimization). Some of research centers [6] reported that “PI
is probably the best approach that can be used to obtain significant energy and water savings
as well as pollution reductions for different kind of industries”.
2. PINCH ANALYSIS
One of the most extensively studied and single most important industrial application area for
process integration is Heat Exchanger Network Synthesis (HENS). Principal aspect of HENS
can be found in the fact that most industrial processes involve transfer of heat, either from one
process stream to another process stream (interchanging) or from a utility stream to a process
stream. Consequently, target in any industrial process design is to maximize the process-to-
process heat recovery and to minimize the utility requirements. To meet this goal, industrial
cost-effective HEN (consisting of one or more heat exchangers that collectively satisfy the
energy conservation task), is of particular importance.
Pinch technology presents a simple HENS method based on the I Law and some
constrains originate from II Law of Thermodynamic. Pinch Technology is originally
developed as a tool for the design of energy-efficient heat-exchange networks during the late
1970s and early 1980s, in response to the sharp increase in the price of energy. Since then,
Pinch technology based techniques have found application in a wide range of fields, including
distillation column profiling, low-temperature process design, batch process integration,
emissions targeting and water and wastewater minimization.
As an introduction to the concepts of Pinch technology, it is instructive to consider a
simple heat exchanger presented in Fig. 1a. Temperature-enthalpy (T-H) diagrams shown in
the Fig. 1b and Fig. 1c, are used to present the change of thermodynamic parameters of hot
and cold streams, which passes through exchanger.
For heat-exchange between two fluids, thermodynamic equilibrium is established when
a zero temperature difference (temperature driving-force) exists between the fluids
exchanging energy. This situation (Fig. 1b) corresponds to the maximum possible level of
heat-recovery (which minimizes the amount of external utilities) but requires a heat-
exchanger of infinite heat-exchange area, and therefore capital cost.
To make the design feasible and to have the heat exchanger of a finite size, there has to
be some positive temperature difference between the hot and the cold stream at each point
along the exchanger. Graphically, in T-H diagram, the ΔTmin > 0 can be obtained by
horizontal moving the cold curve in H positive direction, until the temperature difference at
the cold end of the exchanger reaches some minimum desired value. By this operation, the
size of the overlapping zone is reduced and the amount of utility duties is increased. So, this is
the price to be paid for having a feasible process.
Figure 1. Thermodynamic analyze of single heat exchanger
In the case of HENS task (energy system involve more than a two streams) the essential
task is to represent the all individual heat sources (hot streams) and all heat sinks (cold
streams) on a single diagram, and on that way determine the minimum utility duties for the
entire system. Such a diagram, called Pinch diagram, state as the most important tool in Pinch
technology, which provides the framework for creation a feasible heat exchange network.
The initial step, in constructing the pinch diagram∗, is the creation of Composite Curves
(CC), which represents all available (Hot Composite Curve, HCC) or required (Cold
Composite Curve, CCC) heat inside the energy system. The construction of CC (either HCC
or CCC not both) is presented on Fig. 2. and it consists of four steps:
1) Plotting of all process streams, on a single T-H diagram, with notation that T-axis is
absolute and the H-axis is relative. In the case of HCC the streams should be plotted in
T positive direction, since in the case of CCC the direction is opposite. Streams are
shifted (along H-axis) in the position which does not enable the overlapping of its
enthalpy changes.
∗
In this paper we present only graphical tools for Pinch diagram. In the case of making software this operation
can be performed by the use of Tabular Approach and Temperature-Interval Diagram (TID)
Figure 2. Construction of composite curve
Final Pinch diagram is made by plotting the CC curves together, on the same T-H axes
(Fig. 3). To represent feasible heat exchange from hot to cold streams, the hot composite
curve should lie completely above the cold composite curve.
For heat recovery systems with a specified value for the minimum allowable approach
temperature ( ΔTmin ), important feature of Pinch diagram is the ability to identify the
maximum recoverable heat (or minimum consumption of utilities) without designing the
HEN. In addition, besides the performance target of energy consumption, it is also possible to
set the target for Minimum Total Heat Transfer Area(Amin) and Minimum Number of Units
(Nmin) before the design phase is started. Performance targets, together with economical
parameters (cost of utilities, cost equations for heat exchangers, payback time, interest rate,
operating time per year…), can be combined in order to estimate the Total Annual Cost (TAC)
of design. Further, the performance target can be calculate for different values of ΔTmin , in
order to identify a good starting value for the level of heat recovery. This exercise of pre-
optimization (Ahmad and Linnhoff, 1990) [7] has been referred as "Super-Targeting".
The pinch divides the process into two separate subsystems, which are in enthalpy
balance with the corresponding utility. Above the pinch, only the hot utility is required and
below the pinch, only the cold utility is required. Hence, for an optimum design, no heat
should be transferred across the pinch. This is known as the key concept in Pinch Technology
which is expressed through the rules that form the basis for practical network design:
1. Don't transfer heat across the pinch (Fig. 7a);
2. Don't use a cold utility above the pinch (Fig. 7b).
3. Don't use a hot utility below the pinch (Fig. 7c);
Violation of any of the above rules results in higher utility requirements, presented as
Qtr on the Fig 7.
1. Data Extraction phase, the main goal of this phase is to identify the process streams inside
the flowsheet of plant and potential utilities, which could be used for building the new, or
retrofitting the existing, heat exchanger network. This is a primal and maybe the most
important step in pinch design and it can be described more like art than science. Data that
has been inappropriately extracted for a physical model of the plant usually leads to
results which can disturb overall mass and energy balance of the final solution or might
suggest that there is no scope for energy savings.
Figure 8. Flowchart of Pinch technology
2. Targeting phase, where is possible to quantify targets for minimum utility consumption,
minimum number of units and minimum area ahead of the actual design stage. This phase
is used to determine the optimum level of heat recovery or the optimum ΔTmin value, by
balancing energy and capital costs.
3. Design phase, where an initial heat exchanger network, that satisfies the previously
defined performance target, is established. The design starts where the process is most
constrained, at the pinch, and is carried out separately above and below pinch. ΔTmin is the
agreed minimum approach temperature for each heat exchanger, and exchangers are
placed between streams such that this requirement is fulfilled. To achieve this, stream
splitting may be necessary. The duty of each heat exchanger is made as large as possible
in order to minimize the number of units in the design. Utility exchangers are placed on
streams which do not meet the target temperatures, when using only process exchangers.
4. Optimization, the maximum energy recovery HEN from the initial design is simplified
and improved economically. The strict decomposition at the Pinch normally results in
networks with at least one unit more than the minimum number, as well as a few units of
inappropriate small area∗. By manipulating with Heat Load Loops, Heat Load Paths,
stream splitting and restoring ΔTmin the final solution is is improved in order to achieve a
more cost optimal HEN.
In this paper, yeast fermentation plant has been examined (Fig.9). Phisical model of the
plant is presented on Fig. 10.
∗
Even though extensions such as the Driving Force Plot and the Remaining Problem Analysis help the engineer
to also minimize total heat transfer area, Total Annual Cost is not necessarily at its minimum, and some final
optimization is required.
For the purpose of energy integration plant is divided to A, B, C, D, E and F
subsystems. Subsystems represent :
• “A”-preparing of raw materials,
• “B”-drying stage of fresh yeast.
• “C”-distillery part of the plant,
• “D”-process of separation of yeast by filtration
• “E” and “F” fermentation units, centrifugation and yeast cream storage tanks.
In the first part of research, every subsystem has been optimized separately and after
that, possible heat integration of the plant has been performed taking into consideration the
outlet and inlet streams of each subsystems. More detailed flowsheets of sybsystems are
presented on Fig 10.
In the subsystem “A” there is the need of hot water (Shw) for fermentation feed solutions
preparing such as molasses solution and feeding salt`s solutions. In the subsystem “B” there is
the need for hot air for drying (S26) and also this subsystems have outlet waste stream of hot
air (S22) which can be used for air heating of production hall. Subsystem with waste high
energy content streams (S14, S15) is subsystem “C”. Subsystem which needs cooling utility is
subsystem “D”. There is the need for cold washing water (S21 - S20). Subsystems “E” and “F”
have no interesting streams for heat integration. Thermodynamic parameters of streams which
conect the subsistems are presented in Table 1. For the purpose of creating the pinch design
task, data exstraction phase is based on the selection of streams with higher and lower
temperatures then the average ambient temperature. The streams are bold in Table 1.
The quantity of energy which is consisted in outlet waste energy streams, can be
compared as money value and is 1074.00 MJ/h (low pressure steam has price of 14.66
EUR/GJ – at the moment of calculation), so it is about 136000.00 EUR/year. Cost of cooling
in the process, where S19 is waste cold stream, is more then about 1100.00 EUR/year. So the
total cost is approximately 137100.00 EUR/year.
Table 1. Characteristics of process streams
Targeting of previously defined HENS tasks is based on the stream data presented in
Table 2.
Stream Flow Tinlet Ttarget Heat capacity Conductivity Density Viscosity Pressure
(m3/h) (oC) (oC) (kJ/kgK) (W/mK) (kg/m3) (cP) (bar)
S5 5 5 90 4.187 0.6 1000 1.2 6.00
SHWHS 8 20 60 4.187 0.6 1000 1.2 3.00
S14 3.94 106 25 4.2 0.8 625.15 1.5 1.25
S15 1.3 105 25 4.204 0.8 584 1.5 1.21
S26 11000 35 90 1 2.9 10-2 4.1 10-3 2 10-2 2.00
Total heat exchange area calculation is based on Eq. (1) as sum of heat exchange area
for enthalpy intervals determined on composite curves [5, 10].
n intervals
1 ⎛ hot streams qi cold streams qi ⎞
Anetwork = ∑ ⎜ ∑ + ∑ ⎟ (1)
k =1 ΔTLM ,k ⎝ i hi i hi ⎠
Number of heat exchange units is determined by Eq (2).
N u ,min = ( N A − 1) + ( N B − 1) (2)
The economical estimation is based on Eq.(3) and Eq.(4). Operating cost represents cost
for utility using and they are calculated with Eq.(5), as well as total annual costs, Eq.(6).
c
⎛A ⎞
Capital Costs Index = a + b ⎜ exchange ⎟ ⋅ Shell (3)
⎝ Shell ⎠
PL
⎛ ROR ⎞
⎜1 + ⎟
⎝ 100 ⎠
Anualized Factor = (4)
PL
OC = UChu .Qhu ,min + UCcu .Qcu ,min (5)
TAC = Annualized factor ⋅ CC+OC (6)
For the project it is proposed its life to be 5 years with 10% pay back. The utilities
present in the system are low pressure steam with cost of 14.66 EUR/GJ and cold water (cold
utility). The initial ΔTmin for starting with pinch analysis is adopted to be 10oC. That value is
random and designer chooses it. With that value start all calculations of pinch analysis
algorithm.
Targeting results are obtained by the use of HX-NET software [10]. HX-NET software
generates and draws composite curves which are presented in APENDIX 1, capital costs,
number of heat exchanger units and heat exchange area for different values of ΔTmin.
Heat exchange area is determined as constant value for ∆Tmin range of 1- 200C.
Calculations for ∆Tmin higher then 200C are not determined by software. Operating costs
have similar function with the same ∆Tmin constant range. This happened because increasing
of ∆Tmin, increase hot and cold utility. Increasing come under 200C and that is the reason for
increasing of operational costs to very high values. Optimal value of ∆Tmin is every value in
range between 1- 200C, because that range has constant value which represents minimum
costs, minimum heat exchange area and minimum number of heat exchangers. Value of
∆Tmin is used the initial value of 100C. Minimum number of heat exchangers is 5.
After performing pinch analysis using HX-NET, the HEN could be designed. Using
pinch technology rules for HEN design, the designer can make many alternatives for different
combinations of connecting heat exchanger units. This software warns the user when some of
pinch technology rules are broken.
Figure 11. Designed of HEN – alternative-1 / Figure 12. Designed of HEN – alternative-2
variation -2 (Shwhs – hot water heating system)
In this work two alternatives of possible HEN are made (Figs.11 and Fig.12).
Alternative-1 (Fig. 11), also presented on HX-NET designed grid diagram (Fig.23) has two
variations. These variations are made to use some of the already installed equipment.
There are a few questions on how to use some streams, such as separated steam from
condensate at different pressures (SS-outlet, S23, S24,SW), and what could be made with outlet hot
air stream (S22). It is proposed to use injector to take separated steam (phase separation) back
to the main plant inlet utility stream, as well as condensate to bring back to steam boilers with
pumps. Hot air stream S22 could be used for air conditioning of plant hall, before filtrating by
air filters. A great part of the energy is used for heating cold water (hot water for process
needs), also heating rooms and production halls (hot water heating system, Shwhs), so the way
of solving this case has to be focused on minimizing costs for preparing hot water for this
purposes.
Figure 13. Grid diagram for new HEN designed with HX-NET (alternative -1/ variation -1)
The final results obtained for the both alternatives are shown in Tables 3 and 4. The unit
E-111 has the same performances in both alternatives. In the alternative-2 heat exchanger E-
103 enables using the heat of the waste streams S14, S15, to S5 more efficient, because inlet
temperature of S5 into E-110 is higher (47.3 oC by First Law of Thermodynamics). In this
alternative, with installation of E-103, increase number of heat exchangers, so it indicates that
could be increase capital costs. The sum of energy which will be transferred in both
alternatives is the same quantity. New HEN designed for alternative No. 2 consist closed loop
of heat exchangers, which is not permitted by pinch technology rules. Heating streams are
different (steam and waste stream) and couldn’t be mixed, also stream Shwhs is closed circular
stream with different energy needs and couldn’t be mixed with S5. This alternative shows
some imperfections of Pinch technology.
One of the most important calculations for optimization i.e. determination which
alternative is better for its realization as a project, is economical calculations. For that purpose
the CAPCOST software has been used [12]. To estimate equipment cost the bar module
method determined using data for heat exchange area, operating pressure and construction
material, has been used. CEPCI index for 2006 is 516.8 [13]. CAPCOST software use module
costing technique, which is common technique to estimate the cost of a new chemical plant.
Such cost estimation is accepted as the best for making preliminary cost estimation. With this
estimation, sum of direct and indirect costs is given as multiplication of purchased cost of
equipment for base conditions (using the most common material, and operating near ambient
pressures) and multiplication factor (for specific conditions) representing Bar Module Cost.
The results of equipment costs estimated by CAPCOST software are given in the Table 5.
Production costs presented by the energy, which is saved with this integration, are given
in the Table 6.
The sum of equipment cost is 117 400.00 $ and the bar module cost is 566300.00 $,
which means that the sum of direct and indirect costs for new plant is 566 300.00 $. For
economical calculation taxes for profit are assumed to be 42%.
In the alternative -1/variation -1, heat exchanger network uses three already installed
heat exchangers and two new heat exchangers: E-109, E-110 and E-111 are not installed, and
instead of them use already installed R-1, hot water tank with direct injection of steam on it,
and existing heat exchangers H-2 and H-3 (Fig.10). The alternative -1/ variation- 2, uses two
already installed heat exchangers H-2 and H-3. The alternative-2 is similar to alternative-1/
variation - 1 upgraded with another new heat exchanger E-103 (Fig. 12).
No discount and discount cash flow for plant 5 years life time are given in Fig. 14.
During the plant life time the amount of no discount cash flow is the same for every year
except for the last, where the end value of the plant is included. Depreciation of the plant is
calculated with Straight Line Depreciation Method [14], which means equal depreciation
amount per year. Using interest rate for depreciation of money discount cash flow plot can be
calculated, and it is presented in Figure 9a, also. This calculation can be used for obtaining
cumulative no discount and discount cash flow (Fig. 15). In the year of investment cash flows
are negative, because there is no income profit. In the first year of plant life, there is incoming
profit which leads to positive value of cash flow. At the end of plant life, the value is positive
since it contents salvage and working capital. Using the cumulative cash flow (Fig 15) the
economical parameters can be determined. These parameters are based for decision making
which project is better. Using these plots, it could be determined the values of ROROI (Rate
Of Return Of Interest) which is 30.31%, as well as CCP=1.515 (Cumulative Cash Position).
The value of NPV (Net Present Value) at the end of plant life with 8 % interest is 115155.00 $
and PVR (Present Value Rate) is 1.2 (Table 7).
Figure 15. Cumulative discount and no discount cash flow for alternative-1/variation-1
The economical parameters for the investigated alternatives shown on Table 7 could be
compared to determine the most profitable project. These economical parameters are better if
their values are higher. Alternative -1/variation -1 has the highest rate of return of investment
and net present value at the end of plant life. That means alternative 1/ variation- 1 is the best
case, and then alternative -1/ variation -2 is following. The economical parameters, ROROI,
CCP, NVP and PVR for the alternative-2 are the lowest which means that this alternative is
not acceptable for additional detailed investigation. The values of rate of return, plant life,
depreciation method, CEPCI index, rate of interest, and taxes for all investigated cases are the
same. This helps in decision making in a right way.
6. CONCLUSON
The three investigated cases done by HX-NET software using pinch technology are all
profitable. That confirms calculated economic parameters for each alternative. Comparing the
two alternatives it is obtained that alternative-1/variation-1 is better than alternative-
1/variation-2, while alternative-2 is less profitable than alternative-1. Also is calculated
possibility of using the prepared hot air outlet for hall air conditioning excludes present
heating with hot utility and optimized subsystem “D” with minimum cold utility using for
both alternatives.
This work is proof for saving energy with small investment in production plant. The
pinch technology method gives a clear overall view respect to energy consumption efficiency
in process plants and should be implemented regularly for designing new and investigating
existing plants in order to choose the optimal alternative.
NOMENCLATURE
[1] Lj. Markovska, V. Meshko, R. Kiprijanova, A. Grizo, : Optimal design of shell and tube
heat exchangers. Bulletin of Chemists and Technologists of Macedonia, Vol. 15, No.1 ,
pp. 39-44, 1996.
[2] M.M.El-Halwagi, Pollution Prevention Through Process Integration: Systematic Design
Tools, Academic Press, San Diego (1997)
[3] B.Linnhoff, User guide on process integration for the efficient use of energy, The
Institution of Chemical Engineers, UK, 1994
[4] R.Smith, Chemical Process Design, McGraw Hill, New York, 1995
[5] Introduction to Pinch, available from URL (2007)
http://www.envormntalexpert.com/software/linnhoff/Pinch%20Intro.pdf
[6] Process integration, CANMET Energy Technology Centre (CETC) – Varennes, Canada.
See also http://cetc-varennes.nrcan.gc.ca/en/eb_o.html
[7] Ahmad, S. and Linnhoff, B., SUPERTARGETING: Different Process Structures for
Different Economics, J. of Energy Resourses Technology, 11(3):131-136, 1989
[8] Rašković, P. Industrial energy system optimization based on heat exchanger network
synthesis. Ph.D.Thesis: Mechanical Engineering, University of Niš, 2002
[9] Rašković, P., Ni Pinch-software tool for heat exchanger network synthesis, Computational
engineering in fluid dynamic and energy technology, I professional seminar, Niš, Serbia,
2004.
[10] J. G Mann, Jr , Process Integration: Unifying Concepts, Industrial Applications and
Software Implementation, Ph Dissertation, (1999) available from URL
http://scolar.lib.vt.edu/theses/available/etd-102199-101855/
[11] HX-NET Manual, Ver. 5.0 (2001) HYPROTECH CO.
[12] CAPCOST Manual, Ver. 2 (2002)
[13] CEPCI index data available on URL: http://ca.geocities.com/fhcurry@rogers.com/
[14] Richard Turton, Richard C. Bailie, Wallace B. Whiting, Joseph A. Shaeiwitz,
Analysis, Synthesis and Design of Chemical Processes, Prentice Hall (2002)
APENDIX 1
Figure A1. Hot (red) and cold (blue) Figure A2. Balanced hot (red) and cold (blue)
composite curves for analyzed system composite curves with demand of utilities
(alternative -1/ variation -1) (alternative -1/ variation -1)
Figure A3. Shifted hot (red) and cold (blue) Figure A4. Plot of temperature against
composite curves (alternative -1/ variation -1) enthalpy - grand composite curve (alternative-
1/ variation -1)
Figure A5. Plot of cold driving force in HEN Figure A6. Plot of hot driving force in HEN
(alternative -1/ variation -1) (alternative -1/ variation -1)
Figure A7. Plot of range targets for hot utility Figure A8. Plot of range targets for cold
(alternative -1/ variation -1) utility (alternative -1/ variation -1)
Figure A9. Plot of total heat exchange area for Figure A10. Plot of operating cost index for
different values of Dtmin; (alternative -1/ different values of Dtmin; (alternative -1/
variation -1) variation -1)