RED DE ALCANTARILLADO "SALITRAL DE CARRERA"

VILLA DE RAMOS, S.L.P.

TRAMO
POZO

13
12
2
1
6
17
3
4
5
7
11
9
10
16
15
8

POZO

12
2
1
6
17
8
4
7
7
10
9
10
15
15
8
14

LONGITUD

LOTES

PROPIA

TRIBUTARIA

ACUM.

(m)

(m)

(m)

49.19
45.18
16.85
35.72
51.63
51.63
35.11
58.73
18.25
43.99
30.72
73.80
20.17
90.24
41.84
27.35

0.00
49.19
94.37
111.22
146.94
198.57
0.00
35.11
0.00
112.09
0.00
30.72
260.60
0.00
371.01
663.04

49.19
94.37
111.22
146.94
198.57
250.20
35.11
93.84
18.25
156.08
30.72
104.52
280.77
90.24
412.84
690.39

PROPIOS

TRIB

POB

HARMON

ACUM.
(hab)

9.00
4.00
0.00
5.00
14.00
12.00
11.00
16.00
3.00
4.00
5.00
8.00
3.00
12.00
5.00
2.00

0.00
9.00
13.00
13.00
18.00
32.00
0.00
11.00
0.00
30.00
0.00
5.00
47.00
0.00
62.00
111.00

9.00
13.00
13.00
18.00
32.00
44.00
11.00
27.00
3.00
34.00
5.00
13.00
50.00
12.00
67.00
113.00

45
65
65
90
160
220
55
135
15
170
25
65
250
60
335
565

G A S T O S

COEF. DE

3.8
3.8
3.8
3.8
3.8
3.8
3.8
3.8
3.8
3.8
3.8
3.8
3.8
3.8
3.8
3.8

MIN (l/s)

ELEV. BROCAL

MED (l/s)

MED

MAX. INST.

MAX. EXT.

INICIAL

FINAL

CALC.

P/CALC.

CALC.

ESPEC.

P/CALC.

(l/s)

(l/s)

(msnm)

(msnm)

0.08
0.12
0.12
0.17
0.30
0.41
0.10
0.25
0.03
0.31
0.05
0.12
0.46
0.11
0.62
1.05

1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50

0.04
0.06
0.06
0.08
0.15
0.20
0.05
0.13
0.01
0.16
0.02
0.06
0.23
0.06
0.31
0.52

1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50

1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50

5.70
5.70
5.70
5.70
5.70
5.70
5.70
5.70
5.70
5.70
5.70
5.70
5.70
5.70
5.70
5.70

11.40
11.40
11.40
11.40
11.40
11.40
11.40
11.40
11.40
11.40
11.40
11.40
11.40
11.40
11.40
11.40

1856.540
1856.440
1856.370
1856.290
1856.110
1855.860
1856.480
1856.222
1855.828
1855.920
1856.400
1856.190
1855.707
1856.230
1855.669
1855.590

1856.440
1856.370
1856.290
1856.110
1855.860
1855.590
1856.222
1855.920
1855.920
1855.707
1856.190
1855.707
1855.669
1855.669
1855.590
1855.480

RED DE ALCANTARILLADO "SALITRAL DE CARRERA"


VILLA DE RAMOS, S.L.P.

TRAMO
POZO

POZO

LONGITUD

LOTES

PROPIA

TRIBUTARIA

ACUM.

(m)

(m)

(m)

PROPIOS

TRIB

POB

(hab)

G A S T O S

COEF. DE
HARMON

ACUM.

MED (l/s)

MED

CALC.

P/CALC.

MIN (l/s)
CALC.

ESPEC.

P/CALC.

ELEV. BROCAL
MAX. INST.

MAX. EXT.

INICIAL

FINAL

(l/s)

(l/s)

(msnm)

(msnm)

RED DE ALCANTARILLADO "SALITRAL DE CARRERA"


VILLA DE RAMOS, S.L.P.

TRAMO
POZO

13
12
2
1
6
17
3
4
5
7
11
9
10
16
15
8

POZO

12
2
1
6
17
8
4
7
7
10
9
10
15
15
8
14

TUBO LLENO

CONDICIONES DE TRABAJO

PENDIENTE

PENDIENTE

TERRENO

PLANTILLA

VEL.

GASTO

Y MIN

(MILESIMAS)

(MILESIMAS)

(cm)

(m/s)

(l/s)

(cm)

2.0
1.5
4.7
5.0
4.8
5.2
7.4
5.1
-5.0
4.8
6.8
6.5
1.9
6.2
1.9
4.0

2.0
2.0
3.5
5.0
4.8
5.2
7.4
5.1
2.0
2.0
6.8
6.5
2.0
6.2
2.0
3.6

25.0
25.0
25.0
25.0
25.0
25.0
25.0
25.0
25.0
25.0
25.0
25.0
25.0
25.0
25.0
25.0

0.79
0.78
1.04
1.24
1.22
1.27
1.50
1.25
0.78
0.78
1.45
1.42
0.78
1.38
0.78
1.06

38.73
38.41
51.10
60.97
59.77
62.11
73.64
61.58
38.41
38.41
71.01
69.48
38.41
67.73
38.41
51.81

3.36
3.38
2.95
2.72
2.74
2.69
2.49
2.70
3.38
3.38
2.53
2.56
3.38
2.59
3.38
2.93

DIAM.

ANG. MIN

1.50
1.50
1.40
1.34
1.35
1.34
1.28
1.34
1.50
1.50
1.30
1.30
1.50
1.31
1.50
1.40

V MIN

Y MAX

(m/s)

(cm)

0.38
0.38
0.46
0.52
0.52
0.53
0.60
0.53
0.38
0.38
0.59
0.58
0.38
0.57
0.38
0.47

9.29
9.33
8.02
7.32
7.40
7.25
6.65
7.28
9.33
9.33
6.77
6.85
9.33
6.94
9.33
7.97

ELEV. PLANTILLA

ANG. MAX

2.62
2.63
2.41
2.29
2.30
2.28
2.17
2.28
2.63
2.63
2.19
2.20
2.63
2.22
2.63
2.40

Colchn en tubera

V MAX

INICIAL

FINAL

INICIAL

(m/s)

(msnm)

(msnm)

(m)

FINAL
(m)

0.69
0.68
0.84
0.95
0.94
0.96
1.09
0.96
0.68
0.68
1.06
1.04
0.68
1.03
0.68
0.85

1855.790
1855.690
1855.600
1855.540
1855.360
1855.110
1855.730
1855.472
1855.078
1855.041
1855.650
1855.440
1854.954
1855.480
1854.913
1854.830

1855.690
1855.600
1855.540
1855.360
1855.110
1854.840
1855.472
1855.170
1855.041
1854.954
1855.440
1854.957
1854.913
1854.919
1854.830
1854.730

0.500
0.500
0.520
0.500
0.500
0.500
0.500
0.500
0.500
0.629
0.500
0.500
0.503
0.500
0.506
0.510

0.500
0.520
0.500
0.500
0.500
0.500
0.500
0.500
0.629
0.503
0.500
0.500
0.506
0.500
0.510
0.500

RED DE ALCANTARILLADO "SALITRAL DE CARRERA"


VILLA DE RAMOS, S.L.P.

TRAMO
POZO

POZO

PENDIENTE

PENDIENTE

TERRENO

PLANTILLA

(MILESIMAS)

(MILESIMAS)

DIAM.

(cm)

TUBO LLENO

CONDICIONES DE TRABAJO

VEL.

GASTO

Y MIN

(m/s)

(l/s)

(cm)

ANG. MIN

V MIN

Y MAX

(m/s)

(cm)

ANG. MAX

ELEV. PLANTILLA

Colchn en tubera

V MAX

INICIAL

FINAL

INICIAL

FINAL

(m/s)

(msnm)

(msnm)

(m)

(m)

RED DE ALCANTARILLADO "SALITRAL DE CARRERA"


VILLA DE RAMOS, S.L.P.

TRAMO
POZO POZO

13
12
2
1
6
17
3
4
5
7
11
9
10
16
15
8

12
2
1
6
17
8
4
7
7
10
9
10
15
15
8
14

PROFUNDIDAD

ANCHO

VOLUMENES

ZANJA

INICIAL

FINAL

MEDIA

EXC.

PLANTILLA

(m)

(m)

(m)

(m)

(m3)

(m3)

(m3)

0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80

0.75
0.75
0.77
0.75
0.75
0.75
0.75
0.75
0.75
0.88
0.75
0.75
0.75
0.75
0.76
0.76

0.75
0.77
0.75
0.75
0.75
0.75
0.75
0.75
0.88
0.75
0.75
0.75
0.76
0.75
0.76
0.75

0.750
0.760
0.760
0.750
0.750
0.750
0.750
0.750
0.814
0.816
0.750
0.750
0.755
0.750
0.758
0.755

33.45
31.09
11.60
24.29
35.11
35.11
23.87
39.94
13.35
32.23
20.89
50.18
13.79
61.36
28.72
18.71

3.94
3.61
1.35
2.86
4.13
4.13
2.81
4.70
1.46
3.52
2.46
5.90
1.61
7.22
3.35
2.19

27.10
25.26
9.42
19.68
28.44
28.44
19.34
32.36
10.99
26.55
16.92
40.66
11.19
49.71
23.32
15.18

RELLENO

RED DE ALCANTARILLADO "SALITRAL DE CARRERA"


VILLA DE RAMOS, S.L.P.

TRAMO
POZO POZO

PROFUNDIDAD

ANCHO

VOLUMENES

ZANJA

INICIAL

FINAL

MEDIA

EXC.

PLANTILLA

RELLENO

(m)

(m)

(m)

(m)

(m3)

(m3)

(m3)