Lk F Fk

10000
D65E D85A
0.59 0.65
Lk m 3.4 3.7
F m/Jam 2775 2700
Fk 0.63 0.65
Ha/Jam
TP = , Ha/Jam
Simbol Satuan Keterangan
Alat
Lebar Kerja
Kecepatan Maju
Faktor Koreksi
TP
Taksiran Produksi
Alat
1 Ripping + Dozing
TD x TR , m3/Jam
TD + TR
2 Ripping
Lk x P x J x 60 x Fk , m3/Jam atau ;
J/F + J/R + Z
Lk x P x J x 60 x Fk , m3/Jam
CTd
3 Dozing
Kb x 60 x Fk , m3/Jam atau;
J/F + J/R Z
Kb x 60 x Fk , m3/Jam
CTd
D65E D85A Cat D7R
1 2 3 4 5 6
Lk Lebar Kerja Ripper m 1.90 2.00 2.00
P Panjang Penetrasi m 0.25 0.30 0.40
J Jarak Kerja m 25.00 25.00 25.00
F Kec. Maju ( = F1 x 0.75) m/min 46.00 45.00 45.00
R Kec. Mundur (= R2 x 0.85) m/min 120.00 110.00 155.00
Z Fixed Time min 0.10 0.10 0.10
Tf Waktu maju min 0.54 0.56 0.56
Tr Waktu mundur min 0.21 0.23 0.16
CTd Cycle time min 0.85 0.88 0.82
Fk Faktor Koreksi 0.63 0.63 0.70
Rf Ripper Factor 1.00 1.00 1.00
SF Swell Factor 0.80 0.80 0.80
dr Density material ton/bcm 2.10 2.10 2.10
Kb Kap. Blade Lcm 3.72 4.13 5.89
Bcm 2.98 3.30 4.71
Ton/Jam 6.25 6.94 9.90
TP Taksiran Kap. Prod. Gabungan (OB) Lcm 111.00 125.59 199.41
Bcm 88.80 100.47 159.53
Ton/Jam 186.48 210.99 335.01
Ton/thn 1,009,951 1,142,703 1,814,406
TR Taksiran Kap. Prod. Ripping Lcm 526.97 642.25 1028.35
Bcm 421.57 513.80 822.68
Ton/Jam 885.30 1078.99 1727.62
Ton/thn 4,794,792 5,843,792 9,356,795
TD
TR =
=
Aternatif
Satuan Keterangan Simbol
TP =
TR =
TD =
TD Taksiran Kap. Dozing Lcm 140.62 156.11 247.38
Bcm 112.49 124.89 197.90
Ton/Jam 236.23 262.27 415.60
Ton/thn 1,279,448 1,420,463 2,250,881
TPrb Target Produksi Batubara ton/thn 240,000 240,000 240,000
MR Mining Recovery 0.95 0.95 0.95
SR Stripping Ratio 7 7 7
Tprob Target Produksi OB ton/thn 1,768,421 1,768,421 1,768,421
nD Jumlah Alat "Bulldozer" 1.38 1.24 0.79
nDnyata Jumlah Alat "Bulldozer" 1 1 1
C x 60 x Fk , m3/Jam
CTL
PC 400-6 Cat 330 PC 1250
1 3 4 5 6
C Kapasitas Alat Muat per cyclus Lcm 2.1 2.4 6.4
Bcm 1.785 2.04 5.44
Ton 3.7485 4.284 11.424
Fk Faktor Koreksi 0.95 0.95 0.95
CT CT alat muat min 0.70 0.70 0.37
Wh Jam kerja pertahun Jam/thn 5416 5416 5416
SF Swell Factor 0.85 0.85 0.85
dr Density Material 2.10 2.10 2.10
TP Taksiran Kapasitas Produksi Lcm/Jam 119.70 136.80 364.80
Bcm/Jam 101.75 116.28 310.08
Ton/Jam 251.37 287.28 766.08
Ton/thn 1,361,420 1,555,908 4,149,089
TPrb Target Produksi Batubara ton/thn 480,000 480,000 480,000
MR Mining Recovery 0.95 0.95 0.95
SR Stripping Ratio 8 8 8
Tprob Target Produksi OB ton/thn 4,042,105 4,042,105 4,042,105
nL Jumlah Alat "Excavator" 2.97 2.60 0.97
nLnyata Jumlah Alat "Excavator" 3 3 1
Alat Muat
TP =
2
Simbol Keterangan
Satuan
No Uraian Kegiatan Alat Type Juml. Alat
A Land Clearing & Pengupasan Bulldozer 2
Penutup Excavator 1
Dump Truck 5
B Penggalian dan Pengangkutan Excavator Cat 330 L 1
Batubara PC 200 1
Dump Truck Nissan CWA 5
DT Izuzu 7
C Kegiatan Lain (pembuatan & Bulldozer D9R 1
perawatan jalan, Pemompaan air Grader Cat 710 1
tambang, stock pile, penyiraman Generator 250 Kva 1
jalan, penerangan, dll) Pompa air 1
Well Loader Komatzu D85E-2 1
Tanki Air 1
Lampu Tambang 5
Mobil Operasi L 200 3
Bis Karyawan 1
Tangki BBM 1
C x 60 x Fk , m3/Jam
CTL
PC 200 Cat 320
1 2 3 4 5
C Kapasitas Alat Muat per cyclus Lcm 0.9 1.4
Bcm 0.72 1.12
Ton 1.512 2.352
Fk Faktor Koreksi 0.95 0.95
CTL CT alat muat min 0.70 0.70
Wh Jam kerja pertahun Jam/thn 2708 2708
SF Swell Factor 0.80 0.80
dr Density Material 2.10 2.10
TP Taksiran Kapasitas Produksi Lcm/Jam 51.30 79.80
Bcm/Jam 41.04 63.84
Ton/Jam 107.73 167.58
Ton/thn 291,733 453,807
TPrb Target Produksi Batubara ton/thn 480,000 480,000
nL Jumlah Alat "Excavator" 1.65 1.06
nLnyata Jumlah Alat "Excavator" 2.00 1.00
Satuan
Alat Muat
TP =
Simbol Keterangan
Produksi Alat Angkut
Jenis Alat : CWA
K x 60 x Fk , m3/Jam atau;
(n x CT) + J/V1 + J/V2 + t1 + t2
K x 60 x Fk , m3/Jam
CTh
Alat Muat
PC 400-6
1 2 3 4
C Kapasitas Alat Gali Lcm 2.1
K Kapasitas Alat Angkut Truck per rit Lcm 10.5
Bcm 8.4
Ton 17.64
Fk Faktor Koreksi 0.95
n Jumlah rit pengisian 5
CT CT alat muat min 0.35
J Jarak angkut m 500
V1 Kec. Angkut m/Jam 300
V2 Kec. Kembali m/Jam 350
t1 Waktu dumping min 0.20
t2 Waktu atur posisi min 0.30
th Waktu Angkut min 1.67
te Waktu Kembali min 1.43
CTh Cycle Time Alat Angkut min 5.35
SF Swell Factor 0.80
dr Density Material 2.10
TP Taksiran Kapasitas Truck (OB) Lcm/Jam 598.50
Bcm/Jam 478.80
Ton/Jam 1256.85
Ton/thn 6,807,100
TPrb Target Produksi Batubara ton/thn 480,000
MR Mining Recovery 0.95
SR Stripping Ratio 8
Tprob Target Produksi OB ton/thn 4,042,105
nH Jumlah Alat "hauling" Batubara 0.59
nHnyata Jumlah Alat "hauling" Batubara 1
Simbol Keterangan
Satuan
TP =
TP =
Unit Solar per Jam Jlh Jam per hr Hr Kerja per bln Harga per ltr Biaya per bln
Satuan (ltr) (Jam) (Hari) (Rp) (Rp)
1 D7R 25 16 23 6,300 57,960,000
2 D9R 25 16 23 6,300 57,960,000
3 Exca 330 25 16 23 6,300 57,960,000
4 Exca 320 25 16 23 6,300 57,960,000
5 Grader MG 710 25 16 23 6,300 57,960,000
6 DT OB 25 16 23 6,300 57,960,000
7 DT Coal 25 16 23 6,300 57,960,000
No
No Unit Sewa per Jam Jlh Jam per hr Hr Kerja per bln Biaya per bln
Satuan (Rp) (Jam) (Hari) (Rp)
1 D7R 275,000 16 23 101,200,000
2 D9R 350,000 16 23 128,800,000
3 Exca 330 350,000 16 23 128,800,000
4 Exca 320 300,000 16 23 110,400,000
5 Grader MG 710 300,000 16 23 110,400,000
6 DT OB 200,000 16 23 73,600,000
7 DT Coal 200,000 16 23 73,600,000
II III IV V VI VII VIII IX X
100 200 400 600 700 1000 1000 1100 1100
50 50 100 125 150 150 200 225 250
_ _ 5 5 5 5 10 10 10
_ _ _ _ 5 5 5 5 10
UB D65E 0.9 0.75 0.56 0.57 0.48 _ _ _ _
D85A 0.95 0.87 0.8 0.74 0.68 0.6 0.6 0.58 0.58
D155A 0.95 0.95 0.9 0.85 0.8 0.75 0.75 0.7 0.7
Pilling D65E 0.75 0.6 0.56 0.5 0.4 _ _ _ _
D85A 0.9 0.8 0.72 0.68 0.6 0.56 0.54 0.52 0.5
D155A 0.9 0.84 0.8 0.76 0.72 0.65 0.62 0.58 0.56
Nilai faktor-faktor tersebut di atas diperoleh dari data-data pengamatan yang diambil sebagai referensi
61 - 90
91 - 120
Faktor Eff. Kerja
Kelas
Diameter
0 - 30
Klasifikasi hutan berdasarkan diameter pohon dan jumlah pohon per hektar
dan faktor eff. Kerja per hektar tumbang "underbrussing & Pilling"
31 - 60
Under Brushing (UB) Pilling (penumpukan)
D65E_6 D85A_18 D65E_6 D85A_18
Time Eff. 0.83 0.83 0.83 0.83
Job Eff. 0.85 0.87 0.85 0.87
Mechanical availability 0.9 0.9 0.9 0.9
Faktor Koreksi 0.63 0.65 0.63 0.65
Effisiensi
Pekerjaan
Keterangan Bulan
Jan Feb. Mar. Apr. Mei Juni Juli Agust. Sept. Okt Nop. Des.
Rata-rata Curah Hujan, mm 382 403 400 433 343 266 199 208 276 358 315 356
Rata-rata Jumlah hari hujan, hari 22 20 22 19 18 15 10 11 12 16 19 20
Rata-rata curah hujan terbesar
selama 24 jam 57 66 67 76 69 79 59 59 72 82 57 73
Jumlah hari dalam setahun 365 hari
Jumlah hari hujan 204 Hari
Hari libur resmi 11 Hari
hari tersedia efektif 580 hari
Sumber : Lembaga Metrologi dan Geofisika Kalimantan atimur
Samarinda
SETAHUN
3939
204
816
Tabel 3
Hari Hujan
Diperhitungkan
Jan 31 12 7 19
Feb 28 11 4 17
Mar 31 12 4 19
Apr 30 10 5 20
Mei 31 9 7 22
Jun 30 8 4 22
Jul 31 6 6 25
Agust 31 6 6 25
Sept 30 6 5 24
Okt 31 8 6 23
Nop. 30 10 4 20
Des. 31 11 6 20
Bulan Hari Kalender Hari Libur Waktu Tersedia
( KCFn )
(KCF n+1 + KCFn)
n + ((n+1)-1 = PBP
nH x tL
nL x tH
MF =
Unit Oli per Jam Jlh Jam per hr Hr Kerja per bln Harga per ltr Biaya per bln
Satuan (ltr) (Jam) (Hari) (Rp) (Rp)
1 D7R 0.24 16 23 22,000 1,943,040
2 D9R 0.24 16 23 22,000 1,943,040
3 Exca 330 0.24 16 23 22,000 1,943,040
4 Exca 320 0.24 16 23 22,000 1,943,040
5 Grader MG 710 0.24 16 23 22,000 1,943,040
6 DT OB 0.24 16 23 22,000 1,943,040
7 DT Coal 0.24 16 23 22,000 1,943,040
No
Jn Tn
60
Diameter Jlh Pohon
Pohon,cm Per Ha (Jn) Per Pohon,menit (=Tn)
D65E D85A D65E D85A
31 - 60 50 1 0.4 50 20
61 - 90 - - - - -
91 - 120 - - - - -
Jlh (menit) 50 20
Taksiran Produksi "Filling" per jam, Ha per jam 0.83 0.33
(menit)
Perhitungan "Felling" Untuk Hutan Kelas III
Jn x Tn
TP = , Ha/Jam
Waktu Tumbang
TP = J x Lk x 1.25 x Fk , Ha/Jam atau ;
(J/F + J/R + Z/60) x 10000
TP = J x Lk x 1.25 x Fk x 60 , Ha/Jam
Simbol Keterangan Satuan
D65E D85A D375A
J Jarak kerja m 25 25 25.00
Lk Lebar Kerja m 3.97 4.565 4,60
Fk Faktor Koeksi 0.63 0.65 0.65
F Kec.maju ( = gigi I x 0.75) m/Jam 2775 2700 2700
R Kec.mundur ( = gigi I x 0.85) m/Jam 3995 3655 3650
tf Waktu maju menit 0.01 0.01 0.01
tr Waktu mundur menit 0.01 0.01 0.01
Z Fixed Time menit 0.8 0.8 0.8
CTd Cycle time menit 0.82
TP Taksiran Kapasitas Alat Ha/Jam
CT x 10000
Alat