DISEO Y CONSTRUCCION DE CARRETERAS

SOLUCIONARIO DE EXAMEN PARCIAL


SEMESTRE : 2009-I
PREGUNTA: 01
Si = 4.5%
Se = -2.5%
Piv = 2+600 : 123.876 msnm
A = (4.5-(-2.5)) = 7%

Cota Piv = (123.876+(2.5/100)*(2600-2230))=133.126


Dp = 160 mt: asumo que Dp>L ===> L=2Dp - (404/A)
L = 2x160 - 404/7 = 262.28 => 265.00 mt >160 cumple

Cota Pcv = 133.126 - (4.5/100)x132.5 = 127.164

h = (133.126 - 128.489)/2 = 2.319

Cota Ptv = 133.126 - (2.5/100)x132.5 = 129.814

Cota "B" = 128.489 + 2.319 = 130.808

Ecuacion de la curva : Y = 2.319*(X/132.5)2

Estacion
Pcv

Piv

Ptv

Punto
2+
2+
2+
2+
2+
2+
2+
2+
2+
2+
2+
2+
2+
2+
2+
2+
2+

97.5
100
120
140
160
180
200
220
230
240
260
280
300
320
340
360
362.5

Y
0
2.5
22.5
42.5
62.5
82.5
102.5
122.5
132.5
122.5
102.5
82.5
62.5
42.5
22.5
2.5
0

0.000
0.001
0.067
0.239
0.516
0.899
1.388
1.982
2.319
1.982
1.388
0.899
0.516
0.239
0.067
0.001
0.000

Cota
Tgte
127.164
127.277
128.177
129.077
129.977
130.877
131.777
132.677
133.127
132.877
132.377
131.877
131.377
130.877
130.377
129.877
129.814

Cota
Curva
127.164
127.276
128.110
128.838
129.461
129.977
130.389
130.694
130.808
130.894
130.989
130.977
130.861
130.638
130.310
129.876
129.814

Del grafico 403-01: seingresa con la Longitud de 265 mt y A = 7%

Velocidad de diseo: entre 70 y 80 kph:Vd=80 kph