Build-Up Rates

Road Furnitures - Guardrails

Heading Removal, Dismantle and Replace of Damage Components Item No. Page No.

Desc. Removal, dismantle and dispose the damaged guardrail beam. (a) 29

a) Machinery Cost

i) Pick-up truck (3.0T) for carring,materials, workers and tools :-

1 x 1 day @ RM 150.00 per day = RM 150.00 per day

ii) Backhoe operation, overhead cost incl. maintenance cost :-

1 x 1 day @ RM 270.00 per day = RM 270.00 per day

iii) Tipper truck (6-wheeler) operation, overhead cost incl. maintenance cost :-

1 x 1 day @ RM 250.00 per day = RM 250.00 per day

iv) Miscellaneous items (e.g. oxy-cutter,crowbar, hammer and hardware tools)

Allow a est. sum for 1 day @ RM 100.00 per day = RM 100.00 per day

v) Sub - Total Overall Cost for Machinery = RM 770.00 per day

Productivity of Work : 91 m per day

Machinery Cost per Metre : RM 770.00 / 91 m = RM 8.51 per m

b) Workmen & Manpower Cost

i) Ganger daily basic salary :-

1 x 1 day @ RM 65.00 per day = RM 65.00 per day

ii) General Worker daily basic salary :-

5 x 1 day @ RM 38.00 per day = RM 190.00 per day

iii) Sub - Total Overall Cost for Workmen & Manpower = RM 255.00 per day

Productivity of Work : 91 m per day

Manpower Cost per Metre : RM 255.00 / 91 m = RM 2.82 per m

c) Total Machinery + Workmen & Manpower Cost = RM 11.33 per m

so, ADD Profit & Overhead : 15% = RM 1.70 per m

Total Rate per Unit = RM 13.02 per m

Maintenance Of Guardrail And Crush Cushion Guardrail - Page 1 / 31


Build-Up Rates
Road Furnitures - Guardrails

PROPOSED RATE RM 13.00 per m

Heading Removal, Dismantle and Replace of Damage Components


Item No. Page No.
Removal, dismantle & dispose the damaged End Wing or Fish Tail (Terminal end Type
Desc.
1) (bi) 29

a) Machinery Cost

i) Pick-up truck (3.0T) for carring,materials, workers and tools :

1 x 1 day @ RM 150.00 per day = RM 150.00 per day

ii) Miscellaneous items (e.g. oxy-cutter,crowbar, hammer and hardware tools):

Allow sum (per day) = RM 100.00 per day

iii) Sub - Total Cost for Machinery = RM 250.00 per day

Productivity of Work : 33 nos. per day


Machinery Cost per no. : RM 250.00 / 33 nos. = RM 7.69 per no.

b) Workmen & Manpower Cost

I) Ganger daily basic salary :-

1 x 1 day @ RM 65.00 per day = RM 65.00 per day

ii) General Worker daily basic salary :-

4 x 1 day @ RM 38.00 per day = RM 152.00 per day

iii) Sub - Total Cost for Workmen & Manpower = RM 217.00 per day

Productivity of Work : 33 nos. per day

Manpower Cost per no. : RM 217.00 / 33 nos. = RM 6.68 per no.

c) Total Machinery + Workmen & Manpower Cost = RM 14.37 per m

so, ADD Profit & Overhead : 15% = RM 2.16 per m

Total Rate per Unit = RM 16.52 per m

PROPOSED RATE RM 16.50 per m

Maintenance Of Guardrail And Crush Cushion Guardrail - Page 2 / 31


Build-Up Rates
Road Furnitures - Guardrails

Remove, Dismantle and Replace of Damaged Components Item b ii, page 29

Removal, dismantle and dispose the damaged Terminal Anchorage Unit Type 2)

A) MACHINERY

I) Pick-up truck (3.0T) for carring,materials, workers and tools :

1 x 1 Day @ RM 150.00 per Day = RM 150.00 per Day

ii) Miscellaneous items (e.g. oxy-cutter,crowbar, hammer and hardware tools):

Allow sum (per day) = RM 100.00 per Day

Tota = RM 250.00 per Day

Productivity Per Day : 17 NO

Machinery Cost Per NO : RM 250.00 / 17 = RM 14.71 per No.

B) WORKMEN & MANPOWER

I) Ganger :

1 x 1 Day @ RM 65.00 per Day = RM 65.00 per Day

ii) General Worker :

4 x 1 Day @ RM 38.00 per Day = RM 152.00 per Day

RM 217.00 per Day

Productivity Per Day : 17 NO

Workmen Cost Per NO : RM 217.00 / 17 = RM 12.76 per No.

TOTAL MACHINERY +WORKMEN & MANPOWER COST = RM 27.47 per No.

:- ADD P&O : 15% = RM 4.12 per No.

TOTAL RATE PER UNIT = RM 31.59 per No.

Say; RM 31.60 per No.

Remove, Dismantle and Replace of Damaged Components Item b iii, page 29

Removal, dismantle and dispose the damaged 90 degrees Twist Unit Type 3

A) MACHINERY

Maintenance Of Guardrail And Crush Cushion Guardrail - Page 3 / 31


Build-Up Rates
Road Furnitures - Guardrails

I) Pick-up truck (3.0T) for carring,materials, workers and tools :

1 x 1 Day @ RM 150.00 per Day = RM 150.00 per Day

ii) Miscellaneous items (e.g. oxy-cutter,crowbar, hammer and hardware tools):

Allow sum (per day) = RM 100.00 per Day


Tota = RM 250.00 per Day

Productivity Per Day : 17 NO

Machinery Cost Per NO : RM 250.00 / 17 = RM 14.71 per No.

B) WORKMEN & MANPOWER

I) Ganger :

1 x 1 Day @ RM 65.00 per Day = RM 65.00 per Day

ii) General Worker :

4 x 1 Day @ RM 38.00 per Day = RM 152.00 per Day

= RM 217.00 per Day

Productivity Per Day : 17 NO

Workmen Cost Per NO : RM 217.00 / 17 = RM 12.76 per No.

TOTAL MACHINERY +WORKMEN & MANPOWER COST = RM 27.47 per No.

:- ADD P&O : 15% = RM 4.12 per No.

TOTAL RATE PER UNIT = RM 31.59 per No.

Say; RM 31.60 per No.

Remove, Dismantle and Replace of Damaged Components Item b iv, page 29

Removal, dismantle and dispose the damaged Terminal 1 : 6 / Sloping End Unit Type 4

A) MACHINERY

I) Pick-up truck (3.0T) for carring,materials, workers and tools :

1 x 1 Day @ RM 150.00 Per day RM 150.00

ii) Miscellaneous items (e.g. oxy-cutter,crowbar, hammer and hardware tools):

Allow sum (per day) RM 100.00

Total RM 250.00

Productivity Per Day : 17 NO

Machinery Cost Per NO : RM 250.00 / 17 = RM 14.71 per No.

Maintenance Of Guardrail And Crush Cushion Guardrail - Page 4 / 31


Build-Up Rates
Road Furnitures - Guardrails

B) Workmen

I) Ganger :
1 x 1 Day @ RM 65.00 Per day RM 65.00

ii) General Worker :

4 x 1 Day @ RM 38.00 Per day RM 152.00

RM 217.00

Productivity Per Day : 17 NO

Workmen Cost Per NO : RM 217.00 / 17 = RM ###

Row cost Pe = RM ###

ADD: P& O : 15% = RM ###

Rate Per NO. = RM ###

Take RM ###

Maintenance Of Guardrail And Crush Cushion Guardrail - Page 5 / 31


Build-Up Rates
Road Furnitures - Guardrails

ROAD FURNITURES

MAINTENANCE OF GUARDRAIL AND CRASH CUSHION

Remove, Dismantle and Replace of Damaged Components Item c, page 29

Removal, dismantle and dispose the damaged guardrail post

A) MACHINERY

I) Pick-up truck (3.0T) for carring,materials, workers and tools :

1 x 1 Day @ RM 150.00 Per day RM 150.00

ii) Backhoe :

1 x 1 Day @ RM 270.00 Per day RM 270.00

iii) Miscellaneous items (e.g. oxy-cutter,crowbar, hammer and hardware tools):

Allow sum (per day) RM 100.00

Total RM 520.00

Productivity Per Day : 27 NO

Machinery Cost Per NO : RM 520.00 / 27 = RM ###

B) Workmen

I) Ganger :

1 x 1 Day @ RM 65.00 Per day RM 65.00

ii) General Worker :


3 x 1 Day @ RM 38.00 Per day RM 114.00

RM 179.00

Productivity Per Day : 27 NO

Workmen Cost Per NO : RM 179.00 / 27 = RM ###

Row cost Pe = RM ###

ADD: P& O : 15% = RM ###

Rate Per NO. = RM ###

Maintenance Of Guardrail And Crush Cushion Guardrail - Page 6 / 31


Build-Up Rates
Road Furnitures - Guardrails

Take RM ###

Maintenance Of Guardrail And Crush Cushion Guardrail - Page 7 / 31


Build-Up Rates
Road Furnitures - Guardrails

ROAD FURNITURE

MAINTENANCE OF GUARDRAIL AND CRASH CUSHION

Remove, Dismantle and Replace of Damaged Components Item d, page 29

Dismantle and removed existing damaged nose yellow

A) MACHINERY

I) Backhoe

1 x 1 Day @ RM 270.00 Per day RM 270.00

ii) Miscellaneous

Allow sum (per day) RM 150.00

iii) Pick-up truck (3.0T) for carrying, materials, workers and tools :

1 x 1 Day @ RM 280.00 Per day RM 280.00

Total RM 700.00

Productivity Per Day : 6 NO

Machinery Cost Per NO : RM 700.00 / 6 = RM ###

B) Workmen

I) Ganger :

1 x 1 Day @ RM 65.00 Per day RM 65.00

ii) General Worker :


3 x 1 Day @ RM 38.00 Per day RM 114.00

RM 179.00

Productivity Per Day : 6 NO

Workmen Cost Per NO : RM 179.00 / 6 = RM ###

Row cost Pe = RM ###

ADD: P& O : 15% = RM ###

Rate Per NO. = RM ###

Maintenance Of Guardrail And Crush Cushion Guardrail - Page 8 / 31


Build-Up Rates
Road Furnitures - Guardrails

Take RM ###

Maintenance Of Guardrail And Crush Cushion Guardrail - Page 9 / 31


Build-Up Rates
Road Furnitures - Guardrails

ROAD FURNITURE

MAINTENANCE OF GUARDRAIL AND CRASH CUSHION

Remove, Dismantle and Replace of Damaged Components Item e, page 29

Dismantle and removed existing damaged cartridge

A) MACHINERY

I) Backhoe

1 x 1 Day @ RM 270.00 Per day RM 270.00

ii) Miscellaneous

Allow sum (per day) RM 150.00

iii) Pick-up truck (3.0T) for carrying, materials, workers and tools :

1 x 1 Day @ RM 150.00 Per day RM 150.00

Total RM 570.00

Productivity Per Day : 3 NO

Machinery Cost Per NO : RM 570.00 / 3 = RM ###

B) Workmen

I) Ganger :

1 x 1 Day @ RM 65.00 Per day RM 65.00

ii) General Worker :


3 x 1 Day @ RM 38.00 Per day RM 114.00

RM 179.00

Productivity Per Day : 3 NO

Workmen Cost Per NO : RM 179.00 / 3 = RM ###

Row cost Pe = RM ###

ADD: P& O : 15% = RM ###

Rate Per NO. = RM ###

Maintenance Of Guardrail And Crush Cushion Guardrail - Page 10 / 31


Build-Up Rates
Road Furnitures - Guardrails

Take RM ###

Maintenance Of Guardrail And Crush Cushion Guardrail - Page 11 / 31


Build-Up Rates
Road Furnitures - Guardrails

ROAD FURNITURE

MAINTENANCE OF GUARDRAIL AND CRASH CUSHION

Remove, Dismantle and Replace of Damaged Components Item f, page 29

Dismantle and removed existing beam panel

A) MACHINERY

I) Backhoe

1 x 1 Day @ RM 270.00 Per day RM 270.00

ii) Miscellaneous

Allow sum (per day) RM 150.00

iii) Pick-up truck (3.0T) for carrying, materials, workers and tools :

1 x 1 Day @ RM 150.00 Per day RM 150.00

Total RM 570.00

Productivity Per Day : 5 NO

Machinery Cost Per NO : RM 570.00 / 5 = RM ###

B)

I) Ganger :

1 x 1 Day @ RM 65.00 Per day RM 65.00

ii) General Worker :


3 x 1 Day @ RM 38.00 Per day RM 114.00

RM 179.00

Productivity Per Day : 5 NO

Workmen Cost Per NO : RM 179.00 / 5 = RM ###

Row cost Pe = RM ###

ADD: P& O : 15% = RM ###

Rate Per NO. = RM ###

Maintenance Of Guardrail And Crush Cushion Guardrail - Page 12 / 31


Build-Up Rates
Road Furnitures - Guardrails

Take RM ###

Maintenance Of Guardrail And Crush Cushion Guardrail - Page 13 / 31


Build-Up Rates
Road Furnitures - Guardrails

ROAD FURNITURES

MAINTENANCE OF GUARDRAIL AND CRASH CUSHION

Realigning of existing (line & level) Item g, page 29

Realign and straighten the line of existing guardrail including correct the level and verticality position of
existing guardrail post.

A) MACHINERY

I) Pick-up truck (3.0T) for carring,materials, workers and tools :

1 x 1 Day @ RM 150.00 Per day RM 150.00

ii) Hydraulic jack

1 x 1 Day @ RM 100.00 Per day RM 100.00

iii) Backhoe :

1 x 1 Day @ RM 270.00 Per day RM 270.00

Total RM 520.00

Productivity Per Day : 97 M

Machinery Cost Per M : RM 520.00 / 97 = RM ###

B) Workmen

I) Ganger :

1 x 1 Day @ RM 65.00 Per day RM 65.00

ii) General Worker :

5 x 1 Day @ RM 38.00 Per day RM 190.00

RM 255.00

Productivity Per Day : 97 M

Workmen Cost Per M : RM 255.00 / 97 = RM ###

Row cost Pe = RM ###

ADD: P& O : 15% = RM ###

Maintenance Of Guardrail And Crush Cushion Guardrail - Page 14 / 31


Build-Up Rates
Road Furnitures - Guardrails

Rate Per M = RM ###

Take RM ###

Maintenance Of Guardrail And Crush Cushion Guardrail - Page 15 / 31


Build-Up Rates
Road Furnitures - Guardrails

ROAD FURNITURES

MAINTENANCE OF GUARDRAIL AND CRASH CUSHION

Realigning of existing (line & level) Item h, page 29

Supply and replace missing delinator piece on guardrail

A) MATERIAL

I) G.I strip, c/w, clip, washer, bolt and nuts (supply price/Set) = RM ###

B) MACHINERY

I) Pick-up truck (3.0T) for carrying materials, workers , tools and equipments :

1 x 1 Day @ RM 150.00 per day RM 150.00

ii) Miscellaneous items (Temporary traffic signs, cleaning tools and equipments)

Allow sum : RM 80.00

C) WORKMEN & MANPOWER

I) General worker

3 x 1 Day @ RM 38.00 per day RM 114

Total RM 344.00

Productivity Per day : 43 NO


Workmen Cost Per No. : RM 344.00 / 43 = RM ###

Raw cost per No. = RM ###

ADD : P&O : 15% = RM ###

Rate Per No. = RM ###

Take RM ###

Maintenance Of Guardrail And Crush Cushion Guardrail - Page 16 / 31


Build-Up Rates
Road Furnitures - Guardrails

ROAD FURNITURES

MAINTENANCE OF GUARDRAIL AND CRASH CUSHION

Installation of New Sections Item a, page 30

Supply and install galvanised new guardrail beams

A) MATERIAL

I) Guardrail (supply price/M) : RM 35.00

ii) Transportation(per M) : RM 10.00

iii) Material cost (per M) : = RM ###

B) MACHINERY

I) Pick-up truck (3.0T) for carrying, materials, workers and tools :

1 x 1 Day @ RM 150.00 Per day RM 150.00

ii) Miscellaneous items (e.g. oxy-cutter, crowbar, hammer and hardware tools):

Allow sum (per day) RM 100.00

Total RM 250.00

Productivity Per Day : 71 M

Machinery Cost Per M : RM 250.00 / 71 = RM ###

C) WORKMEN & MANPOWER

I) Ganger :

1 x 1 Day @ RM 65.00 Per day RM 65.00

ii) General Worker :

5 x 1 Day @ RM 38.00 Per day RM 190.00

RM 255.00

Productivity Per Day : 71 M

Workmen Cost Per M : RM 255.00 / 71 = RM ###

Maintenance Of Guardrail And Crush Cushion Guardrail - Page 17 / 31


Build-Up Rates
Road Furnitures - Guardrails

Row cost Per M = RM ###

ADD: P& O : 15% = RM ###

Rate Per M = RM ###

Take RM ###

Maintenance Of Guardrail And Crush Cushion Guardrail - Page 18 / 31


Build-Up Rates
Road Furnitures - Guardrails

ROAD FURNITURE

MAINTENANCE OF GUARDRAIL AND CRASH CUSHION

Installation of New Sections Item b i, page 30

Supply and install galvanised End wing or Fish Tail (Terminal unitType 1)

A) MATERIAL

I) Terminal End Type l (supply price/No) RM 58.00

ii) Transportation(per No) : RM 5.00

iii) Material cost (per No) : : = RM ###

B) MACHINERY

I) Pick-up truck (3.0T) for carrying, materials, tools and equipments :

1 x 1 Day @ RM 150.00 Per day RM 150.00

ii) Miscellaneous items (e.g. oxy-cutter, crowbar, hammer and hardware tools):

Allow sum (per day) RM 100.00

Total RM 250.00

Productivity Per Day : 29 NO

Machinery Cost Per No : RM 250.00 / 29 = RM ###

C) WORKMEN & MANPOWER

I) Ganger :

1 x 1 Day @ RM 65.00 Per day RM 65.00

ii) General Worker :

5 x 1 Day @ RM 38.00 Per day RM 190.00

RM 255.00

Productivity Per Day : 29 NO

Workmen Cost Per No : RM 190.00 / 29 = RM ###

Maintenance Of Guardrail And Crush Cushion Guardrail - Page 19 / 31


Build-Up Rates
Road Furnitures - Guardrails

Row cost Per = RM ###

ADD: P& O : 15% = RM ###

Rate Per NO. = RM ###

Take RM ###

Maintenance Of Guardrail And Crush Cushion Guardrail - Page 20 / 31


Build-Up Rates
Road Furnitures - Guardrails

ROAD FURNITURE

MAINTENANCE OF GUARDRAIL AND CRASH CUSHION

Installation of New Sections Item b ii, page 30

Supply and install galvanised Terminal anchorage unit Type 2

A) MATERIAL

i) Terminal anchorage unit Type 2 (supply price/No) RM 380.00

ii) Transportation(per No) : RM 5.00

iii) Material cost (per No) : : = RM ###

B) MACHINERY

I) Pick-up truck (3.0T) for carrying, materials, tools and equipments :

1 x 1 Day @ RM 150.00 Per day RM 150.00

ii) Miscellaneous items (e.g. oxy-cutter, crowbar, hammer and hardware tools):

Allow sum (per day) RM 100.00

Total RM 250.00

Productivity Per Day : 80 NO

Machinery Cost Per No : RM 250.00 / 80 = RM ###

C) WORKMEN & MANPOWER

I) Ganger :

1 x 1 Day @ RM 65.00 Per day RM 65.00

ii) General Worker :

5 x 1 Day @ RM 38.00 Per day RM 190.00

RM 255.00

Productivity Per Day : 80 NO

Workmen Cost Per No : RM 255.00 / 80 = RM ###

Maintenance Of Guardrail And Crush Cushion Guardrail - Page 21 / 31


Build-Up Rates
Road Furnitures - Guardrails

Row cost Per = RM ###

ADD: P& O : 15% = RM ###

Rate Per NO. = RM ###

Take RM ###

Maintenance Of Guardrail And Crush Cushion Guardrail - Page 22 / 31


Build-Up Rates
Road Furnitures - Guardrails

ROAD FURNITURE

MAINTENANCE OF GUARDRAIL AND CRASH CUSHION

Installation of New Sections Item b iii, page 30

Supply and install galvanised 90 degrees Twist Unit Type 3

A) MATERIAL

I) Twist unit type 3 (supply price/No) RM 550.00

ii) Transportation(per No) : RM 5.00

iii) Material cost (per No) : : = RM ###

B) MACHINERY

I) Pick-up truck (3.0T) for carrying, materials, tools and equipments :

1 x 1 Day @ RM 150.00 Per day RM 150.00

ii) Miscellaneous items (e.g. oxy-cutter, crowbar, hammer and hardware tools):

Allow sum (per day) RM 100.00

Total RM 250.00

Productivity Per Day : 9 NO

Machinery Cost Per No : RM 250.00 / 9 = RM ###

C) WORKMEN & MANPOWER

I) Ganger :

1 x 1 Day @ RM 65.00 Per day RM 65.00

ii) General Worker :

5 x 1 Day @ RM 38.00 Per day RM 190.00

RM 255.00

Productivity Per Day : 9 NO

Workmen Cost Per No : RM 255.00 / 9 = RM ###

Maintenance Of Guardrail And Crush Cushion Guardrail - Page 23 / 31


Build-Up Rates
Road Furnitures - Guardrails

Row cost Per = RM ###

ADD: P& O : 15% = RM ###

Rate Per NO. = RM ###

Take RM ###

Maintenance Of Guardrail And Crush Cushion Guardrail - Page 24 / 31


Build-Up Rates
Road Furnitures - Guardrails

ROAD FURNITURE

MAINTENANCE OF GUARDRAIL AND CRASH CUSHION

Installation of New Sections Item b iv, page 30

Supply and install galvanised Terminal section 1:6 / Sloping End Type 4

A) Material

I) Terminal Anchorage Type 4 (supply price/No) RM 158.00

ii) Transportation(per No) : RM 5.00

iii) Material cost (per No) : : = RM ###

B) Machinery.

I) Pick-up truck (3.0T) for carrying, materials, tools and equipments :

1 x 1 Day @ RM 150.00 Per day RM 150.00

ii) Miscellaneous items (e.g. oxy-cutter, crowbar, hammer and hardware tools):

Allow sum (per day) RM 100.00

Total RM 250.00

Productivity Per Day : 14 NO

Machinery Cost Per No : RM 250.00 / 14 = RM ###

C) WORKMEN & MANPOWER

I) Ganger :

1 x 1 Day @ RM 65.00 Per day RM 65.00

ii) General Worker :

5 x 1 Day @ RM 38.00 Per day RM 190.00

RM 255.00

Productivity Per Day : 14 NO

Workmen Cost Per No : RM 255.00 / 14 = RM ###

Maintenance Of Guardrail And Crush Cushion Guardrail - Page 25 / 31


Build-Up Rates
Road Furnitures - Guardrails

Row cost Per = RM ###

ADD: P& O : 15% = RM ###

Rate Per NO. = RM ###

Take RM ###

Maintenance Of Guardrail And Crush Cushion Guardrail - Page 26 / 31


Build-Up Rates
Road Furnitures - Guardrails

ROAD FURNITURE

MAINTENANCE OF GUARDRAIL AND CRASH CUSHION

Installation of New Sections Item c, page 30

Supply and install galvanised guadrail post complete with packer

A) MATERIAL

I) Guardrail post (supply price / No) RM 87.00

ii) Transportation(per No) : RM 2.00

iii) Material cost (per No) : : = RM ###

B) MACHINERY

I) Pick-up truck (3.0T) for carrying, materials, tools and equipments :

1 x 1 Day @ RM 150.00 Per day RM 150.00

ii) Arrow Rammer :

1 x 1 Day @ RM 300.00 Per day RM 300.00

iii) Miscellaneous items (e.g. oxy-cutter, crowbar, hammer and hardware tools):

Allow sum (per day) RM 100.00

Total RM 550.00

Productivity Per Day : 52 NO


Machinery Cost Per No : RM 550.00 / 52 = RM ###

C) WORKMEN & MANPOWER

I) Ganger :

1 x 1 Day @ RM 65.00 Per day RM 65.00

ii) General Worker :

5 x 1 Day @ RM 38.00 Per day RM 190.00

RM 255.00

Maintenance Of Guardrail And Crush Cushion Guardrail - Page 27 / 31


Build-Up Rates
Road Furnitures - Guardrails

Productivity Per Day : 52 NO

Workmen Cost Per No : RM 255.00 / 52 = RM ###

Row cost Per = RM ###

ADD: P& O : 15% = RM ###

Rate Per NO. = RM ###

Take RM ###

Maintenance Of Guardrail And Crush Cushion Guardrail - Page 28 / 31


Build-Up Rates
Road Furnitures - Guardrails

ROAD FURNITURE

MAINTENANCE OF GUARDRAIL AND CRASH CUSHION

Installation of New Sections Item d, page 30

Supply and replace new yellow nose for the crash cushion inclusive of all necessary preparatory work.

A) MATERIAL

I) Nose Yellow = RM ###

ADD: P& O : 15% = RM ###

Rate Per NO. = RM ###

Take RM ###

Maintenance Of Guardrail And Crush Cushion Guardrail - Page 29 / 31


Build-Up Rates
Road Furnitures - Guardrails

ROAD FURNITURE

MAINTENANCE OF GUARDRAIL AND CRASH CUSHION

Installation of New Sections Item e, page 30

Supply and replace new cartridge for the crash cushion inclusive of all necessary preparatory work.

A) MATERIAL

I) Cartridge = RM ###

ADD: P& O : 15% = RM ###

Rate Per NO. = RM ###

Take RM ###

Maintenance Of Guardrail And Crush Cushion Guardrail - Page 30 / 31


Build-Up Rates
Road Furnitures - Guardrails

ROAD FURNITURE

MAINTENANCE OF GUARDRAIL AND CRASH CUSHION

Installation of New Sections Item g, page 30

Supply and replace new beam panel.

A) MATERIAL

I) Cartridge = RM ###

ADD: P& O : 15% = RM ###

Rate Per NO. = RM ###

Take RM ###

Maintenance Of Guardrail And Crush Cushion Guardrail - Page 31 / 31