PROJECT: DRAWINGSPREPARED FOR: DRAWINGSPREPARED BY: HuntingtonBeach, California Poseidon Seawater Desalination Project PO SE I D O N E SO U R C E S R Posei don Resour c es Cor por at i on 3760 Kilroy Airport Way, Suite 260, Long Beach, CA 90806, USA ADMINISTRATION BUILDING FLOOR PLAN ELECTRICAL ROOM BREAK ROOM WOMENS MENS COVERED PATIO ENCLOSURE OFFICE OPEN OFFICE CONTROL SHOP TRASH OFFICE OFFICE LABORATORY OFFICE FOYER 7 5 '-9 " 158'-0" 6. 7. PARKING STALL PER SITE PLAN 7'-0" MINIMUM CLEAR WIDTH PLANTER LANDSCAPE PER LANDSCAPE DRAWINGS 12" WIDE CURB ADJACENT TO END STALL EIFS SYTEM STOREFRONT WINDOW SYSTEM LINE OF CANOPY ABOVE (SHOWN DASHED) KEYNOTES 1. 2. 3. 4. 5. 1 TYP. 2 3 4 TYP. 5 TYP. 5 TYP. 7 6 6 7 6 7 7 6 6 7 7 6 5 TYP. 5 TYP.