PRODUCTION PT TMMIN DENGAN METODE SIX SIGMA Muhammad Kholil (1) , Rudini Mulya (2) Program Studi Teknik Industri Universitas Mercubuana Jakarta Email: 1) m.kholil@mercubuana.ac.id, 2) rudinimenteri@gmail.com
ABSTRACT
PT TMMIN is one the manufactur company engaged in the automotive, in the manufactur process is certainly a company to use auxiliary energy such as electricity energy for the process continues to run its use was not the least because many production machine that consume electrical energy is very large. With increasing energy consumption is increasing every years and the issue of global warming is more intense sound the company take steps to control and optimize energy consumption by increasing the level of efficiency in the production of each division To optimize energy use , researcher used the six sigma method consist of five stages, stage is known as DMAIC (define, measure, analyze, improvement, control ) Define is explain the mapping process of SIPOC and defining CTQ, measure steps explain the result of measurement the effisiensi value production of energy consumption, in the analyze steps research use pareto diagram and fishbone diagram then the improve phase using FMEA with improvement recommendations. And the last control step will be made check list to monitored and corrected if a deviation occurs in the process or in the implementation of six sigma project.
Keyword : global warming, efficiency, six sigma DMAIC
I. PENDAHULUAN Dengan semakin bertambahnya industri pada era globalisasi ini, isu pencemaran lingkungan yang terjadi di berbagai belahan dunia pun semakin di perhatikan oleh kalangan berbagai konfrensi tingkat dunia dilakukan untuk mengatasi isu lingkungan ini dan mengharapkan kerjasama dari Negara-negara di dunia untuk menjaga lingkungan. Salah satu hal energi yang digunakan oleh manusia adalah penggunaan energi Listrik energy listrik merupakan suatu faktor 2
penunjang yang sangat penting bagi perkembangan secara menyeluruh suatu bangsa. Pada kenyataanya menurut data dari energy information administration konsumsi energi listrik di Indonesia pada tahun 2006 adalah sebesar 1109,71 miliyar kilowatt/jam jauh lebih kecil dibandingkan dengan Jepang yang mengkonsumsi sekitar 982,46 miliar kilowatt/jam. Apakah ini berarti Indonesia lebih hemat dari jepang? Apakah ini berarti Indonesia lebih hemat dari Thailand? Apakah ini berarti Indonesia lebih kekurangan energi dibandingkan dengan Malaysia? Tentu saja Belum tentu lihat grafik penggunaan energi listrik perkapita berikut
Berdasarkan grafik diatas Indonesia memiliki intentitas energi yang paling tinggi. Hal ini menunjukkan bahwa untuk menghasilkan satu satuan produksi atau jasa, Indonesia membutuhkan energi yang paling banyak. Dengan demikian terlihat dengan demikian terlihat bagaimana rendahnya efektifitas dan efisiensi penggunaan energi di Indonesia (sumber blue print pengolaan energi nasional) Hal ini memaksa perusahaan untuk bekerja keras untuk memberikan pelayanan yang terbaik bagi pelanggannya. Kondisi ini menyebabkan produsen berada di bawah tekanan luar biasa untuk meningkatkan efisiensi dan kualitas sekaligus biaya. Hal ini telah menyebabkan banyak organisasi untuk menerapkan Toyota Production System (TPS), atau dikenal dengan Lean manufakturing (liker,2004; Womack,2003). Jadi, tampaknya menjadi penting untuk memperoleh pemahaman tentang bagaimana TPS berkaitan dengan metode lain untuk meningkatkan sistem manufaktur termasuk green manufacturing dan analisis pencapaian target green manufacturing dengan metode six sigma
2. EFISIEN Produktivitas merupakan nisbah atau rasio antara hasil kegiatan (output, keluaran) dan segala pengorbanan (biaya) untuk mewujudkan hasil tersebut 3
(input, masukan) (Kussriyanto, 1984, p.1). Input bisa mencakup biaya produksi (production cost) dan biaya peralatan (equipment cost). Sedangkan output bisa terdiri dari penjualan (sales), earnings (pendapatan), market share, dan kerusakan (defects) (Gomes,1995, p.157).. Efektif adalah serangkaian kegiatan yang dilakukan secara tepat dan sebaik-baiknya serta memberikan hasil sesuai dengan yang diharapkan sedangkan efisien adalah tuntutan untuk mengoptimalkan penggunaan sumber daya (memaksimalkan output , pendapat atau profit atau meminimalkan input atau biaya, limbah serta dampak negatif) konsep umum produktivitas adalah suatu perbandingan antara keluaran (output) dan masukan (input) persatuan waktu yang meningkatkan nilai ekonomis Konsep efisien dalam dalam kegiatan produksi di dalam aktivitas perusahaan adalah perbandingan antara GSPH (gross stroke per hours) dengan SPH (stroke per hours) Rumus untuk nilai GSPH
Untuk SPH
Dan nilai efisien
3. SIX SIGMA
Pemecahan masalah (problem solving) adalah aktivitas yang melibatkan perubahan suatu keadaan yang sedang berlangsung supaya berlangsung sebagaimana seharusnya Pemecahan masalah ( problem solving ) adalah aktivitas yang melibatkan perubahan suatu keadaan yang sedang berlangsung sebagaimana seharusnya. Bertahun-tahun lalu, Juran mengidendtifikasikan terobosan sebagai pencapaian suatu tingkat perbaikan yang membawa perusahaan ke tingkatan yang belum pernah dicapainya para pemimpin revolusi kualitas Edward deming, Josep Juran, Philip Crosby menawarkan beberapa metodologi khusus beberapa 4
perbedaan dibandingkan yang lain mereka memiliki tema yang sama Ide tema tersebut adalah metodologi penyelesaian utama yang digunakan six sigma yaitu DMAIC ( define, measure, analyze, improvement and control ) Alat alat yang digunakan untuk mengumpulkan dan mendokumentasikan ide-ide dari tim yang akan melakukan perbaikan peralatan ini meliputi 1. Diagram pohon digunakan untuk menunjukan hubungan atau hirarki dari ide-ide hasil brainstorming pendekatan ini dapat digunakan untuk menghubungkan kebutuhan-kebutuhan pelanggan 2. VOC dan CTQ, VOC (voice of Customer) mendeskripsikan suara pelanggan pada setiap proses yang sudah diidentifikasi pada SIPOC, CTQ (critical To Quality) menerjemahkan suara pelanggan ke dalam pengukuran performasi dengan target yang jelas. 3. Peta Proses Tingkat Tinggi, Diagram ini biasanya digunakan pada tahap define dan merupakan metode yang praktis untuk menggambarkan proses bisnis mayor dan mengidentifikasi ukuran-ukuran serta faktor-faktor yang berpengaruh
4. FlowChart Flowchart digunakan untuk menunjukan detail-detail sebuah proses, meliputi tugas dan prosedur, jalur alternatif, poin-poin keputusan, dan pengerjaan ulang. Flowchart dapat dianggap sebagai peta saat ini yang menunjukan bagaimana kerja proses pada saat ini; atau sebagai peta seharusnya yang menunjukan bagaimana proses seharusnya bekerja. Tingkat detail akan bervariasi, tergantung sasarannya
5 Fishbone Diagram (Diagram Sebab Akibat) 5
Fishbone diagram merupakan suatu diagram yang dapat menunjukan penyebab-penyebab dari kecacatan utama yang terjadi. Penyebabpenyebab tersebut biasanya ditinjau dari beberapa faktor, yaitu machine, material, method, measurement, dan environment. Faktor-faktor tersebut akan dianalisa sehingga dapat diketahui apakah faktor-faktor tersebut mempengaruhi atau menyebabkan kecacatan utama yang terjadi atau tidak. Diagram sebab akibat sering disebut Ishikawa Diagram karena diagram ini diperkenalkan oleh Dr. Kaoru Ishikawa (1943)
4 Metodologi Penelitian
6
5. Pengolahan Data
A. Tahap Define
Tahap define merupakan tahap awal dalam implementasi six sigma. Pada tahap ini peneliti mendefinikan rencana-rencana dan tindakan yang harus dilakukan untuk melaksanan peningkatan kualitas. Tujuannya adalah untuk mengetahui kondisi dan permasalahan secara lebih mendalam dari sisi penggunaan energy listrik di area production line C o
1. What ( apa tujuan dari proyek six sigma dan apa targetnya?) Tujuan proyek ini adalah untuk mengoptimalkan penggunaan energy listrik dengan cara meningkatkan nilai effisiensi dari aktivitas proses produksi di line C o (manual operation) 2. Why (mengapa proyek tersebut yang dipilih?) Proyek tersebut dipilih karena diarea tersebut dioperasikan secara manual, di dalam aktivitas produksi terdapat beberapa aktivitas (non value added) seperti prepare produksi , break, line problem (line stop) yang dapat memepengaruhi nilai effisiensi produksi,mesin C o terdiri dari 4 mesin yang dioperasikan oleh 4 orang operator masing-masing mesin 1 operator selain itu setiap operator memegang peranan yang sangat penting mulai dari start mesin (awal produksi) sampai mesin off, terkait dengan pengoptimalan penggunaan energy listrik penulis berusaha untuk mencari aktivitas apa dalam produksi yang tidak produktif lalu dilakukan perbaikan guna mencapai penggunaan energy listrik yang optimal di sesuai dengan salah satu visi dan tujuan dari perusahaan untuk menjadi perusahaan manufactur yang ramah lingkungan 3. Where (dimana proyek tersebut dilaksanakan?) Pelaksanaan proyek dilakukan pada proses produksi line C o line ini memproduksi part part iner (small part) , line C o sendiri diproduksi secara manual artinya proses perpindahan material dari satu proses ke proses lain masih menggunakan tenaga manusia line C o berbeda dengan line A o yang sudah menggunakan tenaga robot 4. When (Kapan proyek tersebut akan dilakukan?) Data yang di peroleh oleh peneliti adalah data penggunaan energy listrik pada bulan februari 2012 namun hasil analisa dapat tetap bisa dipakai sebagai bahan pertimbangan tahun berikutnya . dan arena perusahaan belum menerapkan six sigma sehingga proyek ini hanya sebagai usulan 5. Who (Siapa yang harus bertanggung jawab dalam proyek?) Metode six sigma melibatkan banyak pihak mulai dari Executive Leader Unit SHE (safety healt and environment), Champions (Manager), Master Black Black ( Penasihat Tim), Black Belts ( Tim six sigma), hingga Green Belts (Operator). Namun kunci keberhasilan ada pada Black Belts maka harus disusun sebuah tim yang berasal dari orang-orang yang professional dan memahami six sigma. 6. How (Bagaimana Proyek tersebut akan dilaksanakan?) Pelaksanaan akan dimulai dengan perhitungan penggunaan energy listrik saat ini kemudian menghitung effisiensi produksi yang dilakukan selama bulan februari setelah itu mengukur nilai C o yang dihasilkan lalu dilakukan perbaikan pada CTQ yang potensial dengan metode Fishbone
7
Pemetaan Proses Pada pemetaan proses digunakan alat bantu diagram sipoc atau pada peta tingkat tinggi tujuan pembuatan diagram adalah untuk mengidentifikasikan proses yang sedang diamati, input dan output proses tersebut, serta pemasok dan pelangganya. Diagram Sipoc untuk konsumsi energy listrik dapat dilihat pada table Tabel 4.4 SIPOC Suplier Input Proses Output Customer PLN Listrik Produksi Kwh Management Utility Effisiensi CO 2 Environment
Diagram sipoc terdiri dari supplier input,process,output,customer penjelasan dari masing-masing adalah sebagai berikut 1. Supplier Supplier adalah unit yang bertindak sebagai pemasok dan yang bertugas memas4ok energy listrik ke PT Toyota adalah PLN 2 I nput Utility menjalankan fungsinya yaitu melakukan pemeliharaan dan pencatatan konsumsi energy listrik di tiap tiap divisi produksi lalu bagian utility memberikan informasi kepada pihak management SHE (safety healt and environment) 1 Proces Department produksi yang di masing-masing divisi yang bertindak sebagai pengguna energy listrik harus selalu menjaga kelangsungan produksi dengan cara mengurangi pemborosan energi mengoptimalkan pemakaian energi (effisiensi) 4 Output Output dari hasil produksi adalah berupa KWH yang nantinya akan terecord setiap harinya dan akan terdata pada laporan tiap bulannya dari data tersebut dapat disimpulkan seberapa effisiensi penggunaan energi yang digunakan dari tiap-tiap divisi 5 Costumer Data Kwh yang sudah ada terdata akan menjadi tagihan biaya yang akan dibayar kesuplier (PLN) selain itu sesuai dengan visi dari perusahaan 8
yang ingin menjadi persuhaan yang green manufacturing perusahaan hasrus lebih mencanangkan progam progam green kepada masing masing divisi
B Tahap Measure Perhitungan GSPH ,SPH dan Effisiensi produksi Sebelum menghitung GSPH dan SPH kita harus mengetahui data produksi terlebuh dahulu seperti data Produksi seperti : materi al energy ecolog y labor SHE (safety healt and environment) Proses produksi plant Effisiensi prroduksi Kondisi dunia customer pusat Global warming Green manufacturin g Site Karawang plant Divisi produksi plant maintenan ce quality Utility dst 9
1. Jumlah produksi (output) 2. Waktu produksi yang digunakan 3. Waktu line stop yang terjadi selama aktivitas produksi
Tabel 4.5 Produksi Line Co tgl konsumsi energi line Co/hari (kwh) jumlah produksi (unit) Waktu produksi (menit) plan Actual Plan Actual 1 2.421 1.2754 12.735 1.266,1 1.203,7 2 2.380 1.2400 12.288 1.240,6 1.180,4 3 2.340 1.1770 11.752 1.085,3 1.093 4 1.218 5.250 5.242 489,0 483,6 6 2.117 10.620 10.604 981,0 986 7 2.069 11.201 11.198 1.050,2 1.024 8 2.171 10.350 10.278 968,0 1.017 9 2.113 10.790 10.700 1.006,3 983 10 2.176 11.720 11.704 1.052,2 1.012,6 11 1.183 11.610 11.574 1.064,1 1.021,1 12 1.435 10.970 11.022 1.011,1 969,4 13 2.002 10.850 10.070 925,3 911,4 14 2.225 10.980 11.165 1.048,7 1.034 15 2.195 11.710 11.708 1.069,5 1.037,9 16 2.273 12.175 12.151 1.086,8 1.055 17 2.251 11.771 11.771 1.088,1 1.087 18 1.221 5.816 5.818 530,7 512,7 19 1.257 5.52 5.521 499,0 488 20 2.161 10.75 10.682 1.007.8 977,7 21 2.255 11.634 11.633 1.051,1 1.026,4 22 2.245 11.882 11.782 1.094,6 1.076.9 23 2.287 11.781 11.774 1.107,6 1.087,4 24 2.301 11.586 11.553 1.042,5 1.064,4 27 2.204 11.026 11.027 988,6 1.067 28 2.331 11.715 11.717 1.055,7 1.074,2 29 2.238 11.085 11.078 999,1 973,6 Sumber data produksi line C o bulan februari Dalam kegiatan produksi ada beberapa aktivitas produksi yang dapat mempengaruhi nilai effisiensi, nilai efisiensi adalah perbandingan antara output dengan input yang keluarkan, berikut adalah data line stop yang bisa memepengaruhi besarnya nilai effisiensi produksi
10
Tabel 4.6 Jenis line stop di dalam aktivitas produksi No Jenis line stop Keterangan 1 Mesin problem line stop 2 Quality 3 Dies 4 Others 5 Istirahat Planning stop 6 Prepare production
Berikut adalah data line stop yang terjadi pada bulan februari 2012 adalah sebagai berikut : Tabel 4.7 Waktu line stop line C o Bulan februari 2012 tgl TOTAL line stop (menit) prepare mesin Quality die other Total line stop 1 5 5 0 60 0 70 2 20 28,5 0 42 0 90,5 3 18 25 0 42 12 97 4 14 8 0 13.5 0 35.5 5 0 0 0 0 0 0 6 18 23,5 0 38 0 79,5 7 23 6.5 0 24,5 0 54 8 34 0 0 9 0 43 9 16 18 0 26 0 60 10 24 3.5 0 17 0 44,5 11 18 7,5 0 13 0 38,5 12 8 7 0 12 0 27 13 39 14 0 19,5 2 74.5 14 23 4 0 30 0 57 15 26 6 0 16 2.5 50,5 16 15 22 0 10 0 47 17 30 35 0 18,5 0 83,5 18 15 0 0 10 0 25 19 10 16 0 0 0 26 20 25 4 0 25 0 54 21 17 3 0 27 0 47 22 14 33 0 16 0 63 23 25 3 0 34 0 62 24 44 1.5 0 48 2 95,5 27 35 2 0 59,5 0 96,5 11
28 23 12 0 43 0 78 29 27 8 0 21 0 56
Dari semua data diatas maka didapat nilai dari GSPH (gross stroke per hours) dan SPH (stroke per hours) agar nanti bisa dilihat berapa nilai efisiensi yang didapat dari setiap aktivitas produksi Rumus GSPH adalah
Pihak managemen perusahaan sendiri mempunyai target efisiensi di setiap line produksi, dari data yang penulis dapat dari Central control Romm (CCR) produksi di line C o target effisiensinya adalah 96 % sedangkan jika dirata-ratakan efisiesi produksi di line C o masih berada pada 93,3 % berikut adalah table dan grafik effisiensi produksi terhadap target effisiensi dari management : Tabel 4.9 Efisiensi produksi Vs Target efisiensi tgl konsumsi energi line c o
B Perhitungan C o yang dihasilkan Produksi Line C o
Berdasarkan data yang di dapat dari sumber (www.astra.toyota.co.id) dijelaskan bahwa aliran listrik yang digunakan Toyota karawang di supply oleh PLTU . ( sumber blog at wordpress.com supply listrik dengan pembangkit tenaga uap) energi panas yang terdapat pada batu bara adalah 6150 kwh/ton walaupun generator menggunakan panas batu bara secara sangat effisien, tetapi penggunaannya masih dibatasi oleh hokum thermodinamik. Kira kira hanya 40% energi panas batubara yang dapat diubah menjadi listrik jadi listrik yang dihasilkan oleh 1 ton batu bara adalah 0,4 x 6150 atau 2640 jadi kalau dihitung secara matematis penggunaan batu bara per kwh adalah 1000/2640000 = 0,378 kg atau 378 gram. sedangkan pembakaran dari batu bara itu sendiri dalam 1000 kg batu bara menghasilkan 2500kg karbon dioksida persatuan energi. 1 kg menghasilkan 2,5 kgCo2 ( Sumber esdikimia.worldpress.com)
E CO2 = emisi CO 2
A = data aktifitas (kWh listrik) FE = 0.945 kg CO2/kWh
Sehingga dapat dihitung jumlah karbon yang dihasilkan di dalam aktivitas produksi line Co adalah sebagai berikut : Tabel 4.10 Emisi CO 2 yang dihasilkan dari aktivitas produksi line C o
tgl konsumsi energi line A (kwh) FE Kg Co2/kwh E CO2 Eff (%) 1 2.421 0,945 2.287,8 92,9 2 2.380 0,945 2.249,1 92,3 3 2.340 0,945 2.211,3 91,1 4 1.218 0,945 1.151,0 92,7 6 2.117 0,945 2.000,5 91,9 7 2.069 0,945 1.955,2 94,7 E CO2 = A x FE
3 TahapAnalisis Analisis Diagram pareto Analisis diagram pareto dipilih karena berguna untuk menentukan permasalahan utama yang dihadapi sehingga penyelesaiannya lebih effisien dan efektif dalam kegiatan produksi ada beberapa data line stop (table 5.1) dan waktu line stop dar iaktivitas kegiatan produksi di line Co selama bulan februari 2012 (tabel5.2)yang menyebabkan produksi terhenti artinya tidak menghasilkan produk namun konsumsi energi terus terpakai (non value added) sebagai berikut :
No Jenis line stop Keterangan 1 Mesin problem line stop 2 Quality 3 Dies 4 Others 5 Istirahat Planning stop 6 Prepare production
dari data diatas jika di paretokan dalam satu bulan produksi akan terlihat seperti pada diagram (gambar 5.1) berikut Tabel 5.2 Data Line Stop line C o
16
Gambar5.1 Diagram total line stop line C o bulanfebruari 2012
Analisa Diagram SebabAkibat
a. Faktor Manusia (Man) Penyebab prepare mesin yang terlalu lama adalah skill/pengetahuan operator yang kurang. Hal ini dapat terjadi karenakan adanya operator baru dan jarangnya pelatihan .Penyebab kedua adalah tenaga kerja dari manajement lain yang kurang mengerti dengan effisiensi penggunaan energi . b. Faktor Metode (Method) Penyebab pertama adalah tidak ada standar waktu warm up mesin produksi efeknya operator tidak mengerti berapa waktu yang tepat untuk menyalakan mesin (prepare produksi). Penyebab keduanya adalah tidak adanya penugasan tanggung jawab atau yang bertindak sebagai PIC (personal in charge) Penyebab lainnya adalah tenaga kerja dari manajement lain yang bekerja kurang pengawasan sehingga terjadi penyimpangan waktu warm up mesin c. Faktor Bahan baku (Material) Dalam hal ini Listrik adalah bahan baku yang digunakan untuk menghidupkan mesin penyebab pertama adalah listrik shut down akibat mati listrikdan hal tersebut jarang terjadi d. FaktorMesin (Machine) Padafaktor mesin, penyebab pertamaadalah setting mesin yang tidak standar.Penyebab berikutnya adalah kurangnya perawatan/ maintenance dimana perawatan mesin tidak dilakukan setiap hari padahal mesin harus beroperasi 24 jam sehari. Penyebab terakhir adalah kurangnya control pada saat akan memulai produksi sehingga tidak ada control (pengawasan) padawaktu mesin dinyalakan e. Faktor Lingkungan (Environment) Dari factor lingkungan penyebab terjadi penyimpangan warm up mesin yang pertama adalah tidak adanya standar kerja (SOP) sewaktu operator menghidupkan mesin
17
man environment Kurang skill/pengetahuan Tidakada training/pelatihan Operator baru Tidakada training methode machine material Tidakadastandar warm up mesin Warm up mesintidaktepat Tidakada PIC mesin Warm up mesintidak optimal Tidakada SOP Tidakada SOP Tidakadastandar warm up mesin Prepare ulang Tidakadanya slogan di area mesin green campaign 18
2 TahapImprovement Tahapberikutnyadalamimplementasisix sigma adalahtahapimprove. Padatahapiniakandigunakan tools 4M IE sebagaiberikut Tabel5.3 4M IE Problem aspect Item Control Item check point STD actual counter measure Waktu warm up mesintidakstandar Man Training green manufacturing save energi ada sebagian operator belummengerti selainperbekalanteknik operator diberikanilmutentang green manufacturing Awareness rank level medium low-medium Training Machine waktustandar warm up machine SOP tidakada ada tidakada buatstandarwaktu warm up mesin Methode SOP Machine SOP tidakada ada tidakada buat SOP pengoperasianmesin PIC mesin tidakada tidakada ada tidakada buatjadwal PIC mesin Material - - - - - - Environment green campaign campaign tidakada ada tidakada berikaninformasikepada operator untukhematenergi 19
Penulis dibantu dengan operator maintenance produksi telah melakukan percobaan, percobaannya adalah menghidupkan mesin produksi dari mati (off) sampai bias dikatakan siap produksi (ok line) ternyata dari percobaan didapatkan hasil 4 menit jika kita masukan kedalam data produksi makaakan didapat :
Dari table diatas jika kita rata-ratakan terlihat besar effisiensi yang meningkat dari 93.3% menjadi 95,3 % selain itu secara otomatis besar emisi carbon imbas dari penggunaan energi listrik berkurang. Untuk perhitungan CO 2 yang dihasilkan dari aktivitas produksi di line C o penulis mengambil sampel data yang mendekati nilai efisiensi yang ditargetkan yaitu 96% data tersebut adalah Padatanggal 11 februariadapundatanyasebagaiberikut :
Dari data tersebutkitadapatmenghitungpenurunanbesarnya C o yang dihasilkandenganmenghitungkonsumsienergilistrikperrmenitpadaaktivitasproduks iadalahdenganmembagijumlahkonsumsi kwh line dengan total waktuproduksidari data diatasdidapatnilai 1183x 60 = 1021.1 hasilnyaadalah 1.15 kwh, jikakitamasukankedalam data waktu prepare yang di improve makadidapat data sebagaiberikut :
Dari (tabel 5.5) terlihat bahwa terjadi penurunan konsumsi energy setelah melakukan improvement otomatis CO 2 yang dikeluarkan dari aktivita sproduksi juga berubah (tabel 5.6) Tabel5.6 Penurunan emisiCO 2 setelah improvment tgl Konsumsi energi line Co (kwh) FE Kg Co2/kw h E CO2
Penurunan penggunaan listrik (kwh) Konsumsi energies etelah improvement (kwh) E CO2 setelah di Improve 1 2.421 0,945 2.287,8 18,0 2.403,0 2.270,8 22
Tahap Control Setelah pembuatan rekomendasi perbaikan pada tahap improve selanjutnya adalah tahap control. Ini adalah tahap yang bertujuan untuk mengendalikan proses sehingga berjalan sesuai dengan tujuan awal. Sebab itu diperlukan tindakan tindakansebagaiberikut : 1. Pengadaan training bagi operator terkait dengan Efisiensi penggunaan energi serta produksi yang ramah lingkungan 2. Pembuatan dan perbaikan SOP sebagai acuan operator 3. Pembuatan Checksheet sebagai dokumentasi selama proses apabila proyek sudah berhasil (gambar 5.4) 4. Pembuatan usulan Continus improvement dengan dengan membuat Formulir Perbaikan (gambar 5.5) dengan format sebagai berikut :
Kesimpulan Dari hasil pengolahan data dan analisa yang telah dilakukan pada bab- babsebelumnya , maka peneliti dapat menarik kesimpulan sebagai berikut : 1. Pada bulan februari total pemakaian energy listrik di line produksi C o adalah 53.069 kwh 2. Ada beberapa aktivitas waste di produksi line C o yang dapat mempengaruhi effisiensi produksi meliputi Problem line stop ( dies problem, maintenance problem, prepare production, quality problem ,material and others) 3. Tingkat efisiensi produksi di line Produksi C o adalah sebesar 93,3% sedangkan target perusahaan adalah 96 % 4. Tingkat emisi karbon yang dihasilkan dari penggunaan listrik di line C o dipengaruhi oleh tingkat efisiensi Produksi 5. Melalui perhitungan tingkat efisiensi produksi peneliti dapat melihat bahwa problem line stop dapat mempengaruhi tingkat efisiensi sehingga berpengaruh juga kepada tingkat CO 2 yang dihasilkan 6. Setelah problem line stop di paretokan terlihat bahwa besarnya waktu prepare produksi mendominasi besarnya aktivitas line stop 7. Peneliti melihat bahwa sebagian besar penyebab masalah disebabkan oleh faktor mesin yang tidak mempunyai standar waktu (warm up) dan faktor manusia yang kurang skill / pengetahuan tentang mesin 8. Tingkat effisiensi awal sebelum improve adalah 93.3% setelah dilakukan perbaikan ternyata efisiensi yang bisa dicapai adalah 95,5% 9. Waktu untuk warm up mesin setelah dilakukan perbaikan adalah 8 menit (2 shift) masing-masing shift 4 menit Saran Adapun beberapa saran dari peneliti yang mungkin dapat dijadikan bahan pertimbangan antara lain : 1 Implementasi Six sigma sebaiknya diterapkan pada seluruh aktivitas produksi yang menggunakan energy karena berpotensi menghasilkan gas CO 2
2 Peningkatan dan penambahan pelatihan (training) kepada operator baru sehingga operator bisa memahami lingkungan sekitar tempat kerja yang dihadapi 3 Pembuatan Standart operational Prosedur (SOP) warm up mesin harus dibuat, hal ini terkait dengan effisiensi di dalam aktivitas produksi 4 Harapan penulis Penerapan metode warm up mesin dapat di implementasikan juga di lini produksi Ao (automation).
Rencana akumulasi yang dibuat sederhana: Bagaimana dan mengapa berinvestasi di bidang keuangan dengan membangun rencana akumulasi otomatis yang disesuaikan untuk memanfaatkan tujuan Anda
Pendekatan sederhana untuk SEO: Bagaimana memahami dasar-dasar optimasi mesin pencari dengan cara yang sederhana dan praktis melalui jalur penemuan non-spesialis untuk semua orang
Manajemen waktu dalam 4 langkah: Metode, strategi, dan teknik operasional untuk mengatur waktu sesuai keinginan Anda, menyeimbangkan tujuan pribadi dan profesional
Pendekatan sederhana untuk marketing: Panduan praktis untuk dasar-dasar marketing profesional dan strategi terbaik untuk menargetkan bisnis Anda ke pasar
Pendekatan sederhana untuk analisis teknikal di pasar keuangan: Cara membuat dan menafsirkan grafik analisis teknikal untuk meningkatkan aktivitas trading online Anda
Ekonomi makro menjadi sederhana, berinvestasi dengan menafsirkan pasar keuangan: Cara membaca dan memahami pasar keuangan agar dapat berinvestasi secara sadar berkat data yang disediakan oleh ekonomi makro
Pendekatan sederhana untuk kandil jepang dalam berinvestasi: Panduan pengantar untuk trading kandil dan strategi analisis teknikal yang paling efektif dalam bidang kandil Jepang