Project: Proposed Residential House

Location of the Project: Brgy. San Joaquin, Calbayog City


1. DIRECT COST
Qtty. Unit Unit Cost
I. Excavation
A. Cleaning & Grabbing 98.75 m
2
B. Staking
C. Excavation 19.89 m
3
D. Structural Backfill & Compaction 6.97 m
3
II. Structural Concrete
E. Scaffolding Columns 2858 bd. ft.
F. Scaffolding Beams 360.18 bd. ft.
G. Scaffolding for Concrete Slab 511.875 bd. ft.
H. Floor Slab Forms 640 bd. ft.
I. RSB Footing (16 mm ) 198.828 kgs.
J. RSB Column (16 mm ) 511.272 kgs.
K. Concreting Footing 4.5615 m
3
L. RSB Wall Footing (10 mm ) 77.742 kgs.
M. Concrete Wall Footing 4.1 m
3
N. Forms Columns 38
O. Concreting Columns 7.56 m
3
P. Forms Beams 18
Q. RSB Beams (16 mm ) 1287.65 kgs.
R. RSB Beams (12 mm ) 724.608 kgs.
S. Concreting Beams 4.123 m
3
T. Concreting Slab 11.569 m
3
U. RSB Stirrups (10 mm ) 327.01 kgs.
V. RSB CHB Wall bars (10 mm ) 503.472 kgs.
W. RSB Ground Slab (10 mm ) 222.12 kgs.
X. RSB 2nd Floor Slab 1569.65 kgs.
Y. Tie wires (1.6 mm ) 11.44 kgs.
III. Masonry Works
Z. CHB for Walls (10x20x40) 1359 pcs.
A1. Cement Mortar
A11. Cement 57 bags
A12. Sand 4.73 m
3
A2. Plastering
A21. Cement 42 bags
A22. Sand 3.5 m
3
IV. Plumbing & Water Connections
A3. Plumbing Works 1 L.S.
V. T&B
A4. Toilet 1 L.S.
VI. Septage
A5. Septic Vault 1 L.S.
VII. Thermal & Moisture Protection
A6. G.I. Sheet
A61. 32" x 6' Corrugated G.I. Sheet 256 ft
2
A62. 32" x 8' Corrugated G.I. Sheet 341.33 ft
2
A7. Rivets 3 kgs.
A8. G.I. Washer 8 kgs.
A9 Plain G.I. Strap on 2"x3" Purlins (32" x 6') 32 ft
2
B1. Lead Washers 7 kgs.
B2. Gutter (36" x 8" Plain Sheet) 48 ft
2
B3. Flashing (32" x 6' Plain Sheet) 128 ft
2
B4. Ridge roll 20 ft
2
B5. Truss (6" x 2" x 10") 22 pcs.
B6. Ordinary Plywood for Ceiling
VIII. Tile Work
B7. Mosaic Floor Tiles for Bathroom (20 x 20 cm) 34 pcs.
B8. 20 x 20 cm Wall Glazed Tiles 240 pcs.
B9. Cement Mortar & Joint Filler
B91. Ordinary Cement 2 bags
B92. White Cement 6.3 kgs.
C1. Internal Bead (20 cm) 65 pcs.
C2. Capping 42 pcs.
C3. Marble Tiles (30 x 60 cm) 725 pcs.
IX. Painting Works
C4. Neutralizer & Water Solution 12.35 gal.
C5. One quart of Neutralizer & Water Solution 4.3 gal.
C6. Concrete Primer Sealer 10.5 gal.
C7. Acrylic Latex Paint Primer 7 gal.
C8. Acrylic Gloss Latex Paint for Final Coating 12 gal.
C9. Surface Primer 17.5 gal.
D1. Acrylic Roof Shield Paint 3 gal.
D2. Wood Primer 3 gal.
D3. Quick Drying Enamel 1.5 gal.
D4. Paint Thinner 1.5 gal.
D5. Roller Brush w/ Tray 6 pcs.
D6. 4" Paint Brush 6 pcs.
D7. 2" Paint Brush 6 pcs.
Amount Methods Foreman Carpenters Steelman Laborers Output/Day
Manual Cleaning 1 1 98.75
Manual Staking 1 1
Manual Excavation 1 5
Compacting Equip. 1 5
Manual Installation 1 3 1
Manual Installation 1 3 1
Manual Installation 1 3 1
Manual Installation 1 3 1
Manual Installation 1 4 1
Manual Installation 1 4 1
Manual Pouring 1 1
Manual Installation 1 2 1
Manual Pouring 1 1
Manual Installation 1 3 1
Manual Pouring 1 1
Manual Installation 1 3 1
Manual Installation 1 4 1
Manual Installation 1 4 1
Manual Pouring 1 1
Manual Pouring 1 1
Manual Installation 1 2 1
Manual Installation 1 2 1
Manual Installation 1 4 1
Manual Installation 1 4 1
Manual Installation 1 3 1
Manual Installation 1 1
Mix Manually 1 1
Mix Manually 1 1
Mix Manually 1 1
Mix Manually 1 1
Manual Installation 1 1
Manual Installation 1 1
Manual Installation 1 1
Manual Installation 1 1
Manual Installation 1 1
Manual Installation 1 1
Manual Installation 1 1
Manual Installation 1 1
Manual Installation 1 1
Manual Installation 1 1
Manual Installation 1 1
Manual Installation 1 1
Manual Installation 1 4 1
3
Manual Installation 1 1
Manual Installation 1 1
Mix Manually 1 1
Mix Manually 1 1
Manual Installation 1 1
Manual Installation 1 1
Manual Installation 1 1
Apply Manually 1 1
Apply Manually 1 1
Apply Manually 1 1
Apply Manually 1 1
Apply Manually 1 1
Apply Manually 1 1
Apply Manually 1 1
Apply Manually 1 1
Apply Manually 1 1
Apply Manually 1 1
1
1
1
Duration (days)