GENERAL A Access & scaffolding (optional) 1 L.S. B Lifting Equipment & mobile crane (optional) 1 L.S. C Field survey 1 L.S. D Detailed Design / Construction / Buider's Work drawings 1 L.S. E Co-ordination with Civil Contractor 1 L.S. F Supervision / Safety works 1 L.S. G As-built drawings and documentation 1 L.S.
H Testing and commissionig 1 L.S. J Supply of commissioning spares 1 L.S. K Training of personnel 1 L.S. MECHANICAL WORKS L Supply & install water suply piping for all plumbing works in toilets block 1 L.S. M Suply, install & connect water supply piping from toilets block to the water supply mains, including tapping in. 1 L.S. N Supply & install piping for all drainage works in toilets block (optional) 1 L.S. P Supply, install & connect drainage piping from the toilets block to foul water manhole no. FW5 (optional) 1 L.S. Q Supply, install & connect drainage piping from new location of relocated machineries to new toilet gully trap (optional) 1 L.S. To Collection DHS. 1 of 4 ORIGINAL BOQ ITEM DESCRIPTION QTY UNIT UNIT COST TOTAL MECHANICAL WORKS (Contd..) A Supply & install extension to the potable water piping ring in CMF 1 L.S. B Supply & install extension to the compressed air piping ring in CMF 1 L.S. C Reroute existing buried 2" potable water piping as shown in drawings 1 L.S. D Reroute existing buried 4" compressed air piping as shown in drawings 1 L.S. E Supply & install rainwater collection tray and piping (optional) 1 L.S. F Supply & install 100L glass lined, electric water heater 2 Item 2,750.00 G Supply & install complete 3.0 Ton cooling water system including 300 gallon water storage tank 1 L.S. H Suply & install 2.5 Ton split unit A/C 1 Item J Supply & install 2.0 Ton split unit A/C 1 Item K Supply & install 800 m3/hr extraction fan 1 Item L Supply & install ducting system for toilet air extraction system 1 Item M Relocate existing mortar mixer and brick saw machine 1 L.S. N Relocate existing emergency eye wash and drinking fountain 1 L.S. P Supply & install new drinking water fountain (optional) 1 Item To Collection DHS. 2 of 4 ORIGINAL BOQ ITEM DESCRIPTION QTY UNIT UNIT COST TOTAL MECHANICAL WORKS (Contd..) A Supply & install new emergency eye wash (optional) 1 Item B Supply & install new electric shutter door (optional) 1 Item ELECTRICAL WORKS B Conduct study using CYME software as mentioned in item 3.4.12 of project particular specification. (optional) 1 Item C Measure that total harmonic distortion of the 5618/1 LV board as mentioned in item 3.4.11 of project particular specification. (optional) 1 L.S. D Design, supply, install, test & commission lighting & small power DB as mentioned in item 3.4.5 of project particular specification. 1 L.S. E Design, supply, install, test & commission high bay light as mentioned in item 3.4.6 of project particular specification. 1 L.S. 19,988.00 F Design, supply, install, test & Commission LED high bay light as mentioned in item 3.4.17 of project particular specification (optional) 1 L.S. G Design, supply, install, test & commission fire alarm system as mentioned in item 3.4.7 of project particular specification (optional) 1 L.S. H Design, supply, install, test & commission voice & data systen as mentioned in item 3.4.8 of project particular specification. 1 L.S. J Modufy the existing spare space in the right hand side of LV board 5618/1 including all necessary materials as mentioned in item 3.4.9 of project particular specification. 1 L.S. K Design, supply, & install necessary cable tray/ladder as required. 1 L.S. To Collection DHS. 3 of 4 ORIGINAL BOQ ITEM DESCRIPTION QTY UNIT UNIT COST TOTAL ELECTRICAL WORKS (Contd..) A Design, Supply & Install necessary cable tray / ladder as required 1 L.S. A Lay necessary grounding cables as required & connect the same to the existing system. 1 L.S. B Design, supply, install, test & commission suitable circuit breakers, cables and materials to provide power supply to new shutter door as mentioned in item 3.4.15 project particular specification. 1 L.S. C Extend existing power supply and provide new socket outlets for relocated equipments as mentiond in item 3.4.16 of project particular specification 1 L.S. Collection Sub-total page 1 Sub-total page 2 Sub-total page 3 Sub-total page 4 4 of 4