ITEM DESCRIPTION QTY UNIT UNIT COST TOTAL


GENERAL
A Access & scaffolding (optional) 1 L.S.
B Lifting Equipment & mobile crane (optional) 1 L.S.
C Field survey 1 L.S.
D Detailed Design / Construction / Buider's Work drawings 1 L.S.
E Co-ordination with Civil Contractor 1 L.S.
F Supervision / Safety works 1 L.S.
G As-built drawings and documentation 1 L.S.

H Testing and commissionig 1 L.S.
J Supply of commissioning spares 1 L.S.
K Training of personnel 1 L.S.
MECHANICAL WORKS
L Supply & install water suply piping for all plumbing works
in toilets block
1 L.S.
M Suply, install & connect water supply piping from toilets
block to the water supply mains, including tapping in.
1 L.S.
N Supply & install piping for all drainage works in toilets block
(optional)
1 L.S.
P Supply, install & connect drainage piping from the toilets
block to foul water manhole no. FW5 (optional)
1 L.S.
Q Supply, install & connect drainage piping from new location
of relocated machineries to new toilet gully trap (optional)
1 L.S.
To Collection DHS.
1 of 4
ORIGINAL BOQ
ITEM DESCRIPTION QTY UNIT UNIT COST TOTAL
MECHANICAL WORKS (Contd..)
A
Supply & install extension to the potable water piping ring in
CMF 1 L.S.
B
Supply & install extension to the compressed air piping ring
in CMF 1 L.S.
C
Reroute existing buried 2" potable water piping as shown in
drawings 1 L.S.
D
Reroute existing buried 4" compressed air piping as shown in
drawings 1 L.S.
E
Supply & install rainwater collection tray and piping
(optional) 1 L.S.
F Supply & install 100L glass lined, electric water heater 2 Item 2,750.00
G
Supply & install complete 3.0 Ton cooling water system
including 300 gallon water storage tank 1 L.S.
H Suply & install 2.5 Ton split unit A/C 1 Item
J Supply & install 2.0 Ton split unit A/C 1 Item
K Supply & install 800 m3/hr extraction fan 1 Item
L
Supply & install ducting system for toilet air extraction
system 1 Item
M Relocate existing mortar mixer and brick saw machine 1 L.S.
N Relocate existing emergency eye wash and drinking fountain 1 L.S.
P Supply & install new drinking water fountain (optional) 1 Item
To Collection DHS.
2 of 4
ORIGINAL BOQ
ITEM DESCRIPTION QTY UNIT UNIT COST TOTAL
MECHANICAL WORKS (Contd..)
A Supply & install new emergency eye wash (optional) 1 Item
B Supply & install new electric shutter door (optional) 1 Item
ELECTRICAL WORKS
B
Conduct study using CYME software as mentioned in item
3.4.12 of project particular specification. (optional) 1 Item
C
Measure that total harmonic distortion of the 5618/1 LV
board as mentioned in item 3.4.11 of project particular
specification. (optional) 1 L.S.
D
Design, supply, install, test & commission lighting & small
power DB as mentioned in item 3.4.5 of project particular
specification. 1 L.S.
E
Design, supply, install, test & commission high bay light as
mentioned in item 3.4.6 of project particular specification. 1 L.S. 19,988.00
F
Design, supply, install, test & Commission LED high bay
light as mentioned in item 3.4.17 of project particular
specification (optional) 1 L.S.
G
Design, supply, install, test & commission fire alarm system
as mentioned in item 3.4.7 of project particular specification
(optional) 1 L.S.
H
Design, supply, install, test & commission voice & data
systen as mentioned in item 3.4.8 of project particular
specification. 1 L.S.
J
Modufy the existing spare space in the right hand side of LV
board 5618/1 including all necessary materials as mentioned
in item 3.4.9 of project particular specification. 1 L.S.
K
Design, supply, & install necessary cable tray/ladder as
required. 1 L.S.
To Collection DHS.
3 of 4
ORIGINAL BOQ
ITEM DESCRIPTION QTY UNIT UNIT COST TOTAL
ELECTRICAL WORKS (Contd..)
A
Design, Supply & Install necessary cable tray / ladder as
required 1 L.S.
A
Lay necessary grounding cables as required & connect the
same to the existing system. 1 L.S.
B
Design, supply, install, test & commission suitable circuit
breakers, cables and materials to provide power supply to
new shutter door as mentioned in item 3.4.15 project
particular specification. 1 L.S.
C
Extend existing power supply and provide new socket
outlets for relocated equipments as mentiond in item 3.4.16
of project particular specification 1 L.S.
Collection
Sub-total page 1