At centre
4.70 X ( Fixing moments at face -
(b) Due to triangular portion =
0.05 X
)
-
6.00
0.15
Fixing moments at centre =
(a) Due to rectangular portion
2.28
=
0.22
X
=
27.84
Span AB (Top Horizontal Slab)
Moments in t-m Reinforcement required
At face 7.34 t-m (hogging) A
t
= 21.53
Cm
2
Provide 20 mm bars @ 14.0 cm c/c
At centre 4.65 t-m (sagging) A
t
= 13.65
Cm
2
Provide 20 mm bars @ 23.0 cm c/c
Distribution Provide 10 mm bars @ 17.0 cm c/c
Span CD (Bottom Horizontal Slab)
Moments in t-m Reinforcement required
At face 8.95 t-m (hogging) A
t
= 26.26
Cm
2
Provide 20 mm bars @ 11.0 cm c/c
At centre 5.68 t-m (sagging) A
t
= 16.67
Cm
2
Provide 20 mm bars @ 18.0 cm c/c
Distribution Provide 10 mm bars @ 17.0 cm c/c
Span AD (vertical wall)
Moments in t-m Reinforcement required
At face 5.21 t-m (hogging) A
t
= 15.28
Cm
2
Provide 20 mm bars @ 20.0 cm c/c
At centre 0.19 t-m (sagging) A
t
= -0.56
Cm
2
Provide 20 mm bars @ -561.0 cm c/c
Distribution Provide 10 mm bars @ 17.0 cm c/c
Hench 200 mm Provide 10 mm bars @ 17.0 cm c/c
corner Provide 10 mm bars @ 17.0 cm c/c
Nominal steel shall also be provided on the outer face of the walls for the condition when there is
no water in the drain and barrels are running full. The details of reinforcement are shown below
20 mm f @ 14.0 cm c/c
20 mm f @ 14 cm c/c
10 mm f @ 17.0 cm c/c
A
20 mm f @ 23 cm c/c
B E
C.C. M - 20
20 mm f @
-561
cm c/c 8 mm f @ 17.0 cm c/c
3.50
20 mm f @
20
cm c/c
D F 0.30
C
20 mm f @ 11 cm c/c
clear cover = 5.00 cm
20 mm f @ 18 cm c/c
0.30 3.50 m 0.30 3.50 0.30
0.30
DETAILS OF REINFORCEMENT IN BARREL
20 mm f @14.0 cm c/c
10 mm f @ 17.0 cm c/c
20 mm f @ 23 cm c/c
20 18 cm c/c
10 mm bars @
20
20
cm c/c
17 cm c/c
10 mm bars @ 17 cm c/c
20 18 cm c/c
20 11 cm c/c
10 mm bars @
17 cm c/c
3.50 0.30 0.30
3
.
5
0
mm f @
mm f @
mm f @
mm f @