MEMORIA DESCRIPTIVA





NDICE


1. NOMBRE DEL PROYECTO ........................................................................................................ 2
2. UBICACIN DEL PROYECTO .................................................................................................... 2
3. OBJETIVOS ................................................................................................................................. 2
4. DESCRIPCIN DEL PROYECTO ............................................................................................... 2
5. SITUACIN ACTUAL ................................................................................................................... 5
6. MAPA DE LA ZONA ..................................................................................................................... 6
7. ARQUITECTURA ......................................................................................................................... 7
8. ESTUDIO DE MECNICA SE SUELOS ...................................................................................... 8
9. DISEO GEOMTRICO ............................................................................................................ 17
10. DISEO DE ESTRUCTURAS.................................................................................................... 24
11. INSTALACIONES SANITARIAS ................................................................................................ 47
12. INSTALACIONES ELCTRICAS ............................................................................................... 51
13. PRESUPUESTO Y METRADOS ............................................................................................... 54
14. VALOR REFERENCIAL DE EJECUCIN DE OBRA ................................................................ 55
15. PLAZO DE EJECUCIN ............................................................................................................ 55











2

MAYO DEL 2014
1. NOMBRE DEL PROYECTO

CREACIN DEL COMPLEJO RECREACIONAL MUNICIPAL DE HUAYCAN - CLUB DE LA
FAMILIA

2. UBICACIN DEL PROYECTO

Regin : Lima
Provincia : Lima
Distrito : Ate Vitarte
Zona : 06
Sub Zona : 3
Ubicacin : Comunidad Urbana Autogestionaria de Huaycn


3. OBJETIVOS

Los principales objetivos del proyecto, son los que detallamos a continuacin:

Promover la creacin de zonas recreacionales tanto deportivos como sociales.

Contar con una adecuada distribucin territorial destinadas para servicios pblicos, con
amplios espacios y fcil acceso, con servicios bsicos.

Se contar con mobiliario y equipamiento urbano que posibiliten su uso y disfrute seguro y
adecuado.

Poder satisfacer las necesidades de la mayor cantidad de habitantes de la comunidad de
Huaycn, con infraestructuras adecuadas de recreacin y esparcimiento as como de un
mobiliario urbano adecuado, iluminacin, arborizacin y vegetacin.

4. DESCRIPCIN DEL PROYECTO

El proyecto destinado para la construccin del complejo est situado en una zona tranquila,
poco transitada y fcil acceso, en el rea del terreno existen zonas casi plana y zonas de
cortes pronunciados, el proyecto ocupara el total del terreno libre aprovechando los cortes
pronunciados para la construccin de algunas instalaciones.
El proyecto comprende la construccin de instalaciones de esparcimiento que alentaran
actividades recreativas, ofreciendo clidos ambientes y una diversidad de servicios.




3

El proyecto se compone de las siguientes instalaciones y ambientes:

Atrio de ingreso y boletera
Administracin
Estacionamientos
Tpico
Vestidores- duchas y terraza con servicio de comidas
reas verdes
Anfiteatro
Sala de exposicin
Zonas de Parrillas
Alameda principal
Patio de Comidas
Restaurante
Gimnasio (vestidores y sauna) y salones de aerbicos
Canchas multideportivas
Una (01) Cancha de futbol de grass sinttico
rea de juegos para nios
Piscinas recreativas, piscina semiolimpica.
Mdulos de Servicios Higinicos.

Los espacios de cada ambiente cuentan con la suficiente rea para brindar la suficiente
comodidad y confort al pblico asistente.
El ingreso principal es por la agencia municipal, habr un nico ingreso y egreso vehicular al
centro recreacional, con un estacionamiento con un rea aproximada de 5515.86 m2.
Cada ambiente est conectado a una alameda principal adoquinada la cual empieza a partir
del ingreso al complejo recreacional y contar con bancas ornamentales, as como tambin
contara con papeleras y tachos de basura.
Tambin se contempla la construccin de una pileta principal la cual se encuentra ubicada
entre los ingresos al restaurante y la zona de piscinas.
Cabe sealar que el acceso a la zona de piscinas y a los campos deportivos estar sujeto a
un cobro de ingreso para poder as costear el mantenimiento de las instalaciones del
complejo recreacional.




4


5. SITUACIN ACTUAL

El terreno del proyecto cuenta con un rea total aproximada de 61418.69 m2 equivalente a
6.14 Hectreas que en su gran mayora es terreno baldo ya que actualmente existen slo
dos losas deportivas y una cancha de ftbol de tierra con un rea aproximada de 14306.00
m2, todas en psimo estado de conservacin las cuales sern reubicadas en el proyecto
nuevo y 47112.69 m2 de terreno baldo en desuso que no traen ningn beneficio para la
comunidad de Huaycn.

En el estudio topogrfico, se realiz el levantamiento total del terreno en el cual se elaboraron
28 ejes con sus respectivos perfiles longitudinales, en los cuales se determina que el terreno
es relativamente llano con pendientes que varan entre 4% y 6% en casi todos los ejes y con
una pendiente de 17% en algunos tramos de los , las cuales sern mejoradas haciendo
cortes y rellenos necesarios para darle un mejor uso a toda la superficie del proyecto.

Cabe sealar que los lados noreste y sureste del terreno del proyecto, colindan con la Zona
Arqueolgica de Pariachi.













5



6. MAPA DE LA ZONA

MACROLOCALIZACIN DEL PROYECTO
GRAFICO N1




6

GRAFICO N2 DISTRITO DE ATE SEGN ZONAS









Fuente: Boletn Estadstico Noviembre 2011 - Distrito de Ate: Perfil Demogrfico - Edad y Gnero

GRAFICO N3
ZONA 06: - PARIACHI - HORACIO ZEBALLOS -HUAYCAN

Fuente: Boletn Estadstico Noviembre 2011 - Distrito de Ate: Perfil Demogrfico - Edad y Gnero
GRAFICO N4 UBICACIN DEL PROYECTO
Zona 1
Zona 2
Zona 3
Zona 4
Zona 5
Zona 6
Ubicacin del
proyecto



7


Fuente: Google Maps
En los anexos se presenta el plano de localizacin del PIP


7. ARQUITECTURA

El proyecto del complejo recreativo municipal Alfonso Barrantes de Huaycan prev maximizar el
uso del espacio, dividiendo la parcela en tres reas, cada una de ellas dedicada a un uso y con
vistas a la zona arqueolgica de Huaycan.

Las plazas y veredas sern los componentes ordenadores de la zona, dividindola en 5 sectores
:

1) Zona estacionamiento vehicular:
La zona de estacionamiento est conformada por un pavimento flexible, veredas y su
correspondiente equipamiento (farolas, jardinera y tachos). Cuenta con un rea total de 5,187m
2
y
dispone de 130 estacionamientos: vehculos menores (121) y autobuses (8). Se encuentra
debidamente aislada del trnsito de otros vehculos.


2) Ingreso boletera :
Acompaando a la boletera se dispone primero de una plaza de acceso y posteriormente una
plaza de distribucin interior las dos con un piso diseado de adoqun de concreto . La zona
dispondr de un espacio de correspondiente equipamiento (faros, jardinera, tachos y sealizacin)






8

3) rea de piscinas :
Est conformada por una piscina semiolmpica, una piscina para nios con un bao propio,
una piscina para adultos, todas ellas con sus correspondientes terrazas. Adems un edificio que
contiene vestidores, duchas y terraza- snack y, un cuarto de mquinas. La zona dispondr del
equipamiento necesario para su utilizacin (duchas, tachos, faros, hamacas...)

4) rea de deporte :
Contiene una cancha deportiva de grass sinttico y cuatro canchas deportivas multiusos de
concreto, todas ellas con sus correspondientes tribunas y servicios higinicos, un gimnasio con
vestidores, servicios higinicos, salas de ejercicios aerbicos y dos salas de baile. La zona
dispondr del equipamiento necesario para su utilizacin (tachos de basura, faros, bebederos...)



5) rea recreativa:
Esta zona de uso recreacional se compone de una alameda principal pavimentada que marca el
recorrido. Encontramos la administracin, el tpico, una pileta, un anfiteatro con su correspondiente
servicios higinicos, dos mdulos de baos, un rea infantil con mdulos de juegos para nios, una
sala de exposicin (incluye sala de exposicin, sala de preparacin y servicios higinicos), un
restaurante con su patio de comidas y servicio higinicos y una zona de parrillas para disfrute
pblico. La zona dispondr del equipamiento necesario para su utilizacin (tachos de basura, faros,
sealizacin, bancas, parrillas, mesas, ...)

6) Paisajismo
En las diferentes zonas del proyecto se dispondr de reas verdes con csped y diferentes
tipos de plantas y rboles. Creando una armona entre edificacin y vegetacin que ayuden a
disponer de un complejo atractivo para su utilizacin.

7) Obras complementarias
Se dispondr de un muro perimtrico a lo largo de la parcela y diferentes muros de separacin
interior de las zonas. Por ltimo, se debe tener en cuenta la creacin de una red general de agua y
desage y una red elctrica general subterrnea.


8. ESTUDIO DE MECNICA SE SUELOS


8.1 GENERALIDADES
Se procedi a efectuar el Estudio de Suelos Creacin del Complejo Recreativo Municipal
Alfonso Barrantes Lingan Club de la Familia Huaycan Ate Lima, con la finalidad de
determinar la composicin de los mismos.
En tal sentido, se han efectuado trabajos de exploracin de campo, evaluacin geomecanica
y ensayos de laboratorio necesarios para determinar el perfil estatigrafico del rea en estudio.

8.1.1 Antecedentes



9

------------


8.1.2 Objetivo del Estudio

El presente estudio tiene por objetivo principal la determinacin de las caractersticas
geotcnicas del suelo de fundacin hasta el lmite de la profundidad activa y determinar los
parmetros necesarios para el anlisis de cimentacin de las obras del proyecto de Creacin
del Complejo Recreativo Municipal Alfonso Barrantes Lingan - Club de la Familia Huaycan
Ate Lima.

En tal sentido, se ha efectuado trabajos de exploracin de campo, evaluacin geomtrica y
ensayos de laboratorio necesarios para determinar el perfil estratigrfico del rea de estudio.


8.1.3 Ubicacin del rea de Estudio

El proyecto tiene la siguiente ubicacin geogrfica:

Provincia y Dpto : Lima
Distrito : Ate.
Centro Poblado : Huaycan

El terreno en estudio se encuentra ubicada en la parte baja del centro poblado en mencin y
presenta una superficie plana, est ubicado en las faldas de cerros rocosos de origen gneo,
cubierto por suelos residuales coluviales y aluviales de diferentes espesores. Las reas
colindantes cuentan con servicios de agua potable y alcantarillado; adems servicios de
alumbrado pblico y domiciliario.

8.1.4 Normatividad

El presente Estudio de Suelos con Fines de Cimentacin esta en concordancia con la Norma
E-050 de Suelos y Cimentaciones del Reglamento Nacional de Edificaciones.

8.1.5 Descripcin del rea de Estudio

El rea en estudio donde se va a ejecutar el proyecto de Creacin del Complejo
Recreacional Municipal de Huaycan - Club de la Familia, se encuentra ubicada en la
Comunidad Urbana Autogestionaria de Huaycn abarcando un rea de 61418.69 m2.

8.2 GEOLOGA DEL TERRENO

8.2.1 Geologa




10

En el rea de estudio se han identificado unidades estratigrficas, cuyas edades fluctan
cretceo y cuaternario reciente, sobresaliendo en grandes tramos intrusiones plutnicas tipo
dioritas, granodiaoritas y tonalitas, que se encuentran cortando a derrames volcnicos mas
modernos.
Se han encontrado las siguientes unidades formacionales:

Rocas Intrusivas (grano-dioritas), que son rocas acidas formadas por cuarzo, plagioclasa,
ortosa (en menor proporcin), fenocristales de anfboles y con frecuencia hornblenda, roca de
transicin entre el granito y la diorita.

En el rea estudiada los afloramientos de rocas plutnicas se encuentran espaciados
formando cuerpos de tamao y forma diferentes, constituyen una unimasiva cratonizada,
como resultado de un plutonismo mltiple, desde faces de gabro dioritas hasta los granitos
alcalinos de modo que la cobertura volcnico sedimentaria solo constituye un delgado techo
colgante del macizo del batolito de la costa.

Presenta cierta intemperizacin y oxidacin superficial; pero a mayor profundidad el macizo
se muestra sano y duro. As mismo se pudo observar diaclasamientos leves e todo el tramo
evaluado.

Volcanico Quilmana (Kms-q), normalmente est constituido por una secuencia volcnico
sedimentaria, con predominancia de rocas volcnicas hacia la parte superior.
A lo largo del batolito han sido metamorfisados, constituyendo una meta-andesita de color
oscuro, dura y en parte silicificada; tal como se puede observar en la comunidad de Huaycan
y Santa Clara.
Litologicamente est constituido por derrames andesiticos masivos poco estratificados, de
textura porfiritica destacando los fenos plangioclasa en una pasta fina o microcristalina de
coloracin gris verdosa y en menor proporcin doleritas y diabasas-

Depsitos aluviales pleistocenicos (Qp-al), se encuentran formando el cono deyectivo del
rio Rmac; tambin se han incluido dentro de estos depsitos las acumulaciones aluviales
desrticas provenientes de quebradas y r afluentes ahora secos y desrticos. En muchas de
ellas, cuando las lluvias han sido abundantes en los contrafuertes andinos, se han producido
corrientes lodosas y huaycos.

En el rea de estudio estos depsitos estn cubiertos por otros depsitos resientes coliviales,
provenientes de la disgregacin de afloramientos rocosos volcnicos.

8.2.2 Geomorfologa.
Los rasgos gemorfologicos presentes en el rea son el resultado del proceso tectnico y
plutnico, sobre impuestos por los procesos de geodinmica, que han moldeado el rasgo
morfoestructural de la regin.



11

Entre las formas estructurales que han controlado el modelado de la regin cabe mencionar
el anticlinal de Lima y los bloques fallados como productos del dislocamiento regional. As
mismo, la erosin, la incisin por drenaje principalmente del rio Rmac.
La zona de estudio, correspondiente a la unidad geomorfolgica de valles y quebradas,
comprenden a los valles del Rmac; as como a las quebrada afluentes y a las que discurren
directamente al mar, las que permanecen secas la mayor parte del ao, discurriendo agua
solo en pocas de fuertes precipitaciones en el sector andino. Debido a ello presentan un
clima seco con piso cubierto de depsitos coluviales y materiales de poco transporte,
provenientes de las estribaciones de la cordillera occidental.
El rea en estudio presenta algn riesgo geolgico potencial. Segn el mapa de geodinmica
externa del Per (INGEMENTE 1991), en esta zona del distrito de Huaycan se pueden
producir fenmenos geolgicos que pueden poner en peligro la seguridad de obras civiles. La
zona presenta fuertes pendientes y fisuramientos estructurales que podran hacerse
inestables ante un movimiento telrico.



8.2.3 Sismicidad

De acuerdo al Nuevo Mapa de Zonificacin Ssmica del Per, segn la nueva Norma Sismo
Resistente (NTE E-030), se concluye que el rea en estudio se encuentra dentro de la zona
de Alta Sismicidad (Zona 3), existiendo la posibilidad de que ocurran sismos de intensidades
tan considerables como VIII a IX en la escala Mercalli Modificada. Luego tenemos que en
base a los ensayos realizados se recomienda adoptar en los Diseos Sismo-Resistentes, los
siguientes parmetros:

Factor de zona : Z = 0.40
Factor de amplificacin del suelo : S = 1.40
Periodo que define la Plataforma del espectro : Tp = 0.90




8.3 TRABAJOS DE CAMPO

Prospecciones.
Con la finalidad de definir el perfil estratigrfico del rea de estudio, se ejecutaron 15
perforaciones a cielo abierto (calicatas) de una profundidad de 1.50 m, distribuidos
convenientemente en el terreno
As mismo se tomaron muestras de los diferentes estratos de suelos encontrados, las que
fueron identificadas y etiquetadas para su posterior anlisis en el laboratorio.
Adems, se extrajo muestras representativas de los suelos, a la profundidad de 1,00 m, el
mismo que es representativo del material granular aluvional predomnate en el rea de
estudio, para el ensayo de CBR, corte directo en condiciones no drenado no consolidado y



12

para los respectivos anlisis qumicos de sales, cloruros y sulfatos, considerados agresivos al
concreto y acero. Estos resultados obtenidos en estos ensayos sern utilizados como
parmetros de diseo cuando se requiera cimentar sobre ellos.

Registro de excavaciones
Paralelamente a la toma de muestras se realiz el registro visual de cada una de las
prospecciones anotndose las caractersticas de los tipos de suelos encontrados, tales como
espesor, humedad, compacidad, forma, textura, dureza de los materiales ptreos, tamao
mximo de los fragmentos rocosos encontrados, color permeabilidad, etc.

8.4 Ensayos de Laboratorio
Con la finalidad de determinar las caractersticas fisco-mecanicas y qumicas de los
materiales obtenidos en campo, se han seguido las Normas Tecnicas Peruanas (NTP) y
ASTM, las mismas que a continuacin se detallan:

Ensayos Estndar
- Contenido de Humedad Natural NTP 339.127(98)
- Anlisis Mecnico por Tamizado NTP 339.128(99)
- Limite Liquido NTP 339.129(99)
- Limite Plstico NTP 339.129(99)
- Peso especifico
- Clasificacin AASHTO NTP 339.134(99)
- Clasificacin SUCS NTP 339.135(99)

Ensayos Especiales
- Corte Directo ASTM D-3080
- Proctor modificado NTP 339.141(99)
- Relacion de Soporte CBR NTP 339.145(99)

Ensayos Qumicos
- Determinacin del contenido de sulfatos ASTM D-516
- Determinacin del contenido de cloruros ASTM D-512




8.5 TRABAJO DE GABINETE
Con los datos de la evaluacin superficial, informacin de la fase de exploracin y resultados
de los ensayos del laboratorio se procedi a la elaboracin del presente informe tcnico

8.5.1 DESCRIPCION GEOTECNICA
La zona de estudio esta conformada geolgicamente por afloramientos de rocas intrusivas
(gabro-dioritas), y suelos coluviales y residuales prevenientes de la disgregacin del macizo
rocoso acumulados en las laderas aluvionales.



13

Toda el rea en estudio se encuentra cubierto por material de desmonte (desechos de
construccin), con diferentes espesores, con presencia de basura, restos orgnicos, bolsas
plsticas.

Los suelos naturales (granulare) presentan un horizonte continuo, y estn conformados por
arenas de grano medio con piedras angulares de tamaos medianos y fragmentos de roca de
hasta 0.80m de tamao (Aisladamente se observa rocas de mayor tamao). Estos suelos se
encuentran compactos y secs, de color marrn claro a beige oscuro, no plsticos permeables.
Con poc presencia de sales solubles. Origen aluvional.
Clasificados en el laboratorio como A-1-a, A-1-b
No se apreci humedecimiento en las paredes laterales de las calicatas efectuada ni
filtraciones de agua.

Estas calicatas denominadas: C-1, C-2, C-3, C-4, C-5, C-6, C-7, C-8, C-9, C-10, C-11, C-
12, C-13, C-14, C-15, fueron convenientemente ubicados en el Asentamiento Humano
Huaycan.



8.5.2 CAPACIDAD SOPORTE DEL SUELO SUBRASANTE
Para establecer la capacidad de soporte del terreno de fundacin (sub rasante), se han
efectuado los respectivos ensayos de CBR (California Bearing Ratio) que son un ndice del
comportamiento de soportabilidad de los suelos.


CALCULO DE LA CAPACIDAD PORTANTE
Para determinar la capacidad portante admisible de los suelos de fundacin de las estructuras
proyectadas segn el tipo de fundacin suelos relativamente blandos se consideraron las
ecuaciones de Terzaghi modificadas por Vesic:

Qh = c* Nc*Sc*ic+yo*Dr*Nq*Sq*iq+1/2*B*Y1*Ny*Sy*iy

Los parametros utilizados en los clculos de la cimentacin de muros sobre estos tipos de
suelos, se tomaron del ensayo de corte directo efectuado al material arenoso predominante en
estos lugares evaluados, en condicin disturba remoldada
Se efectu 03 ensayos de corte directo a las muestras de suelo (reproducindose el el
laboratorio sus condiciones de densidad y hmeda in situ). Dicha muestra se extrajo de la
siguiente calicata.

CALICATA C-4 C-9 C-15
MUESTRA N M-1 M-1 M-1
PROFUNDIDAD, m 0,30 - 3.00 0,30 - 3.00 0,30 - 3.00
CLASIFICACION SUCS GP-GM SP-SM GW-GM



14

PROF. DE MUESTREO, m 1.00 1.00 1.00

Cabe indicarse que sobre estos suelos granulares gravas areno-limosos que predominan en los
tramos evaluados, se cimentaran las estructuras proyectadas sobre el terreno previamente
nivelado y compactado debidamente
As mismo, se presenta a continuacin el resumen del ensayo de Corte Directo efectuado, donde
se indican las condiciones de ensayo y los resultados de ngulo de friccin interna y cohesin
del espcimen

Angulo de Friccin = 32.9
Cohesin = 0.00 kg/cm2


N DE MUESTRA 0.1 0.2 0.3
CONTENIDO DE
HUMEDAD
% 6.4 6.3 6.4
DENSIDAD HUMEDA g/cm3 1.777 1.776 1.776
DENSIDAD SECA g/cm3 1.670 1.671 1.670
ESFUERZO NORMAL kg/cm2 0.4 0.8 1.6

Los parmetros utilizados, tales como, factores de carga, de forma, densidad, ngulo de friccin
y cohesin, as como los valores obtenidos de capacidad portante para distintas profundidad de
desplante y anchos de base de las zapatas propuestas, se muestran en las siguientes pginas,
tanto para zapatas cuadradas como para rectangulares, tituladas: ANALISIS DE LA
CAPACIDAD ULTIMA CIMENTACION SUPERFICIAL

8.6 ANALISIS QUIMICO
Los resultados de los anlisis qumicos, efectuados a la muestra de suelo representativa del area
de estudio, arrojan los siguientes valores:

RESULTADOS DE ANALISIS QUIMICOS
Calicata C-4 C-9 C-15
Contenidos de sulfatos % 0,0211 0,0512 0,0481
Contenidos de cloruros % 0,0012 0,0009 0,003
Sales solubles totales % 0,4224 0,688 0,6022






15

Exposicin a
Sulfatos
Sulfatos soluble
en agua,
presente en el
suelo como
SO4% en peso
Sulfato en
Agua p.p.m
Cemento
tipo
Relacin
agua/cemento
mximo
Despreciable 0,00 - 0,10 0 - 150 I
Moderado 0,10 - 0,20 150 -1500 II 0.5
Severo 0,20 - 2.00 1500 - 10000 V 0.45
Muy Severo sobre 2.00 sobre 10000
V ms
Puzolana
0.45

De acuerdo al cuadro de Exposicin a sulfatos, dichos valores se encuentran por debajo de
los lmites mximos permisibles de agresividad al concreto, debindose utilizar por lo tanto,
cemento Portland tipo I y/o cemento Portland Puzolanico tipo II en la fabricacin del concreto
hidrulico.


Conformacin del Subsuelo

En el sector de las calicatas C-1, C-2, C-3, C-4, C-5, C-7, C-8, C-9, C-11, C-12, C-14, C-15,
se encontr material de relleno, desmonte, piedra de hasta 10, trozos de ladrillos, cascotas,
arenas gruesas, material granular, restos orgnicos, arena pobremente graduada con
presencia de material limoso, con gravas, arenas y finos limosos.


En el sector de las calicatas C-6, C-10, se encontr material de relleno, desmonte piedra de
hasta 20, trozos de ladrillo, cascotas, arenas gruesa combinado con material granular,
presencia de residuos orgnicos, bolsas y botellas plsticas.

En el sector de las calicatas C-2, C-5, C-7, C-8 C-9, C-10, C-12, C-14, C-15, se encontr
grava limosa bien gradada, con gravas sub angulosas, arenas, finos limosos, no plsticos.


En el sector de las calicatas C-3, C-4, C-6, C-11, C-13, se encontr gravas mal gradadas, con
pocos finos no plsticos, con gravas, arenas y finos, no plsticos, de color marrn claro a
beige. Mediante compactos a compactos, secos



__________________________________________________________________________







16




Se ejecutaron 3 ensayos de Corte Directo, los que se resumen en el siguiente
cuadro:

CALICATA C-4 C-9 C-15
MUESTRA N M-1 M-1 M-1
PROFUNDIDAD, m 0,30 - 3.00 0,30 - 3.00 0,30 - 3.00
CLASIFICACION SUCS GP-GM SP-SM GW-GM
PROF. DE MUESTREO, m 1.00 1.00 1.00
ANGULO DE FRICCION 32.9 29.2 31.1
COHESION kg/cm2 0.00 0.01 0.02


La profundidad mnima de desplante de la base de las estructura proyectada con
respecto a la superficie del terreno, ser de:

Df= 1.00


La capacidad portante de estos suelos blandos gravas areno-limosos, se determin en base a
su ngulo de friccin interna y sus caractersticas fsico-mecnicas naturales, empleado las
ecuaciones de Terzaghi modificadas por Vesic, siendo estas las mostradas en los anexos
anteriores: ANALISIS DE LA CAPACIDAD ULTIMA CIMENTACION ARTIFICIAL

En las paredes de las calicatas no se observ humedecimiento ni presencia de la napa
fretica



17


De acuerdo a los resultados de los anlisis qumicos, se utilizara cemento Portland normal
tipo I, en la preparacin del concreto en los cimientos.



8.8 BILBIOGRAFA

Norma E-050, Suelos y Cimentaciones.
Norma E-030, Diseo Sismoresistente
Braja M. Das/ Principios de Ingeniera de Cimentaciones. 4 Ediccin 1999
Rico Castillo / La Ingeniera de Suelos, Vol. 1 y 2. 1 edicin 1998
Peck/Hanson/ Thornburn: Ingeniera de Cimentaciones
Roy Whitlow / Fundamentos de Mecnica de Suelos. 1 edicin 2000
Manuel Delgado Vargas / Ingeniera de Cimentaciones/ 2da edicin 1999
Juarez Badillo - Rico Rodrguez: Mecnica de Suelos, Tomos I, II.
Karl Terzaghi / Ralph B. Peck: Mecnica de suelos en la ingeniera Prctica.
Segunda Edicin 1973
Ing. Carlos Crespo : Mecnica de suelos y Cimentaciones
T. William Lambe / Robert V. Whitman. Primera Edicin 1972.
Reglamento Nacional de Construcciones - CAPECO. Quinta. Edicin 2003.
RNC Normas de Diseo Sismo Resistente.
Alva Hurtado J.E., Meneses J. y Guzmn V. (1984), "Distribucin de Mximas
Intensidades Ssmicas Observadas en el Per", V Congreso Nacional de Ingeniera
Civil, Tacna, Per.
Cimentaciones de Concreto Armado en Edificaciones - ACI American Concrete
Institute. Segunda Edicin 1998.
Geotecnia para Ingenieros, Principios Bsicos. Alberto J. Martinez Vargas /
CONCYTEC 1990.



9. DISEO GEOMTRICO


Las Municipalidad Distrital de Ate, dentro de sus Plan de Desarrollo Concertado (PDC) y Plan
Estratgico Institucional (PEI). Se plantea Mejorar y ampliar la cobertura de asistencia social
de calidad a la poblacin vulnerable, adems de Implementar e Institucionalizar la prctica
masiva de diversas disciplinas deportivas y con ello nace el Proyecto de Inversin Publica
Creacin del Complejo Recreativo Municipal Alfonso Barrantes de Huaycan, Distrito de Ate
Lima Lima, dentro de su programa de inversin para satisfacer las necesidades existentes y
futuras en dicha zona.




18

En este contexto, como parte de los Estudios del Expediente Tcnico Creacin del Complejo
Recreativo Municipal Alfonso Barrantes de Huaycan, Distrito de Ate Lima Lima, se ha
desarrollado el Levantamiento Topogrfico del rea involucrada, cuyo desarrollo se describe
a continuacin como Estudio Topogrfico. Asimismo, tomando como base al levantamiento
Topogrfico realizado, se ha el levantamiento fsico de la zona, desde puntos geodsicos
establecidos, en forma ms genrica para determinar una posesin relativa de puntos sobre
la superficie para la elaboracin de los planos de las curvas de nivel.



9.1 ESTUDIO TOPOGRAFICO

Los trabajos topogrficos se han realizado con el objeto de obtener la informacin actualizada
de la zona del proyecto para poder desarrollar el estudio de la alternativa arquitectnica
seleccionada y que permita mejorar las condiciones de vida para los habitantes de esta zona.

A continuacin se describe la metodologa aplicada en el desarrollo de las labores de
topografa, cuyas actividades han sido planificadas y estudiadas previamente mediante una
programacin de las labores de campo y las metas a conseguir, permitiendo la realizacin de
trabajos con prontitud y precisin adecuada.

El desarrollo de los trabajos de topografa, han permitido obtener los niveles absolutos y la
posicin real de cada punto tomando en cuenta el sistema de coordenadas planas y
geodsicas, basndonos en mtodos topogrficos convencionales y utilizando equipos de
medicin electrnica.


9.1.1 UBICACIN Y EXTENSIN DEL LEVANTAMIENTO

La zona del levantamiento se encuentra ubicada en Huaycan, frente al colegio Nacional Mixto
de Huaycan y frente al Instituto Superior Tecnolgico, Distrito de Ate, Provincia y
Departamento de Lima

El rea del levantamiento del proyecto, comprende aproximadamente 6.01 Has


9.1.2 SISTEMA DE COORDENADAS

El presente proyecto fue desarrollado y ejecutado con actividades que contemplaron el
desplazamiento de una (02) brigadas Rover o mvil y la puesta en estacin del equipo GNSS-
GPS en los puntos establecidos, localizados cerca del rea del polideportivo, Huaycan, Ate,
Lima el da 12 de Marzo del 2014.
El registro de datos se realiz empleando el Sistema de Posicionamiento Global (GPS),
Mtodo Diferencial Esttico post procesado en el Sistema WGS-84, tomando como base la



19

Estacin de Rastreo Permanente (ERP) de la Ciudad de Lima con codificacin LI01,
perteneciente a la Red Geodsica Geocntrica Nacional (REGGEN), establecido por Instituto
Geogrfico Nacional, ubicado en la azotea del
IGN
En el levantamiento geodsico se utiliz el mtodo del sistema de posicionamiento global
GPS, para obtener los resultados de posicin, los levantamientos geodsicos verticales es de
apoyo cada vez que la superficie circular no es exacta, esta ubicaciones podrn variar segn
tiempo y hora de toma de datos, que se realizaron en la zona de trabajo, cabe mencionar que
en la normas del IGN indica que para que un punto tenga una elevacin confiable se deber
obtener mediante una serie de observaciones que cubran un periodo no menor de 6 meses
en forma continua, para mayor precisin en elevaciones y evitar mayor tiempo de toma datos
con GPS se han enlazado con BMs establecidos por el IGN a los puntos definidos para el
presente proyecto.


Las coordenadas UTM geogrficas del sistema WGS 84 obtenidas a partir del GPS, son
transformadas a las coordenadas Datum UTM 84 esta informacin de los receptores se
transfiri a una computadora para luego ser procesados con el software Topcon Tools v.8 y
ajustadas las altitudes con respecto al nivel medio del
mar con el modelo GEOIDAL EGM2008, el post-proceso de las lnea base formadas
entre el punto base y los puntos rover (TOP-01 y TOP-02) se inicia con la verificacin de la
informacin de campo y la edicin de las sesiones

9.1.3 POLIGONAL CERRADA

Consiste en el levantamiento de una poligonal. Este mtodo se caracteriza por estar
constituida por un conjunto de lneas consecutivas, es una lnea quebrada, constituida por
vrtices (estaciones de la poligonal) y lados que unen dichos vrtices. El levantamiento de la
poligonal comprende la medicin de los ngulos que forman las direcciones de los lados
adyacentes (o los rumbos de estos lados) y las distancias entre los vrtices, realizando la
poligonal en el sistema WGS-84.

Se realiz el reconocimiento del rea de trabajo y se ubic los hitos de la poligonal. En cuanto
a la ubicacin de los hitos se tom los siguientes criterios:
Ubicar los hitos en lugares despejados visible entre los hitos aledaos para su posterior
lectura.
Ubicar los hitos a una distancia no mayor a 150 ml.
Ubicar los hitos en reas de poco trnsito para evitar posibles accidentes con los
transentes.

Para la monumentacin de los hitos de la poligonal, se realiz la excavacin con las
dimensiones siguientes: Ancho=30 cm. Largo=30 cm. Fondo=25 cm.




20

El hito monumentado es de cemento y agregados con las dimensiones sealadas en la figura
siguiente.





El mtodo usado en esta poligonal es de ngulos y distancia partiendo de un punto conocido
denominado como TOP-01 incluido en la poligonal. Despus se procedi a hacer las lecturas
continuas en sentido horario obteniendo como resultado 09 hitos de poligonal, considerando
que se hizo tres lecturas de ngulos y distancias, siendo el cuadro de datos tcnicos de la
poligonal cerrada los siguientes:


Cuadro top 1
Datos de partida:
-01:




Angulo Acimut de control (TOP-01 A TOP-02): 1442127

NUMERO NORTE (m) ESTE (m) ELEVACION (m)
TOP01 8.671.104.118 300.811.834 574.577



21




Posteriormente, despus de realizar las lecturas de ngulos y distancias correspondiente a
cada sector de poligonal se procedi a realizar el clculo de error
y compensacin de la misma teniendo en cuenta el mtodo de clculo de error que
se adjunta en el Excel.

Cabe mencionar que los errores angulares y lineales se muestran en el cuadro de clculo de
error de la poligonal presentada.

A continuacin se tiene el cuadro por mtodo de ngulos:




NOMBRE NORTE ESTE COTA
GPS-01 8671104.12 300.811.834 574.577
GPS-02 8671023.56 300.728.929 550.785
TOP-03 8671164.55 300.642.289 562.737
TOP-04 8671260.31 300.574.165 561.122
TOP-05 8671350.52 300.656.535 556.044
TOP-06 8671424.73 300.672.581 553.347
TOP-07 8671423.55 300.725.974 550.237
TOP-08 8671355.01 300.770.571 550.785
TOP-09 8671248.38 300.824.682 550.381



22




23

9.1.4 RELLENO TOPOGRAFICO

A partir de la poligonal de apoyo ajustada matemticamente, se ha procedido a efectuar el
levantamiento topogrfico absoluto, utilizando estaciones totales de 5 segundos de precisin,
con capacidad de almacenamiento de hasta 16,000 puntos. Estos fueron transferidos para el
procesamiento y modelamiento digital del terreno de modo que se pueda obtener los planos
de levantamiento topogrfico a la escala 1/500.

El relleno topogrfico ha permitido obtener las diferentes posiciones de los elementos
componentes del rea en estudio tanto en altimetra como en planimetra.


9.1.5 NIVELACIN TOPOGRFICA

Para dichos trabajos se comenz realizando el reconocimiento del terreno as como la
ubicacin de todas las bases que se encuentran dentro de nuestra nivelacin, es decir de
toda la red de bases. Una vez realizado la ubicacin de todas las bases, se analiz cual sera
nuestro punto de inicio, el cual sera el mismo que la llegada para eliminar errores en los
desniveles y hacer la correccin correcta a medida que se avanzaba en la nivelacin, para
dichos trabajos se utiliz el equipo de nivel de ingeniero ATB-4, marca Topcon.

Se parti del punto geodsico TOP-01, en el cual se hizo una lectura en esttico o Post
Proceso.

Las frmulas utilizadas para la obtencin de cotas son de la siguiente manera:
CB = Cota Base
V.At. = Vista Atrs
V. Ad. = Vista Adelante
CC = Cota por Conocer
CC = CB + V.At. - V. Ad. = CC

Las frmulas utilizadas para la obtencin del error de cierres son de la siguiente manera:
CCI = Cota Conocida Ida
CCV = Cota Conocida Vuelta
EC = Error de Cierre
EC = CCI CCV = EC
S VATI = Sumatoria Vista Atrs Ida
S VADI = Sumatoria Vista Adelante Ida
S VATV = Sumatoria Vista Atrs Vuelta
S VADV = Sumatoria Vista Adelante Vuelta
EC = Error de Cierre
EC = ((S VADI - S VATI) - (S VADV - S VATV)) = EC





24


10. DISEO DE ESTRUCTURAS

10.1 GENERALIDADES

La presente memoria de clculo, corresponde al diseo estructural de las obras a ejecutarse
durante la construccin del Complejo Recreativo Municipal de Huaycn, ubicada en Huaycn,
Distrito Ate Vitarte, Provincia Lima, Departamento Lima.

El proyecto contempla la construccin de diversas estructuras de concreto armado y
albailera como mdulos destinados a servicios higinicos, tpico, restaurante, gimnasio,
sala de exposicin, prgolas y mobiliario diverso (bancas, etc.).

Las estructuras han sido diseadas para soportar las cargas a las que se encontrarn
sometidas en su vida til como son: cargas por efectos de gravedad y cargas por efectos
ssmicos. La verificacin de los elementos estructurales se ha realizado principalmente
usando la norma tcnica E-060 de Concreto Armado y E.070 de Albailera, adems de la E-
090 de Estructuras Metlicas.

10.2 CONCEPCIN ESTRUCTURAL

ADMINISTRACIN Y TPICO:

La sub-estructura o cimentacin ha sido planteada en base a zapatas aisladas conectadas
por vigas de cimentacin. En lugar de sobrecimiento tenemos una losa de concreto armado
de 175 Kg/cm2 de 10 cm de espesor, sobre la cual descansan todos nuestros muros para
evitar el contacto directo con el suelo.

El sistema estructural predominante es el de albailera confinada. La losa de entrepiso de la
estructura es losa aligerada de 25cm de peralte que le dan consistencia a la hiptesis de losa
con diafragma rgido. El concreto predominante es de 210 Kg/cm2.

SS.HH:

Se utiliz la misma concepcin estructural que en el edificio de administracin.


BAR-TERRAZA:

La sub-estructura o cimentacin fue diseada bajo la misma concepcin que las anteriores.

El sistema estructural predominante son prticos de concreto armado. La losa de entrepiso de
la estructura es losa aligerada de 25cm de peralte que le dan consistencia a la hiptesis de
losa con diafragma rgido.



25


La estructura es de un piso con dos niveles distintos de techo terminado. El concreto
predominante es de 210 Kg/cm2.

GIMNASIO:

La sub-estructura o cimentacin fue diseada bajo la misma concepcin que las anteriores.

El sistema estructural predominante son prticos de concreto armado con diafragma rgido,
cuyo peralte es de 25 cm.

La estructura es de un piso con tres niveles distintos de techo terminado. El concreto
predominante es de 280 Kg/cm2.

RESTAURANTE:

La sub-estructura es una losa de cimentacin de 50cm de profundidad, confinada
perimetralmente por vigas de cimentacin del mismo peralte.

El sistema estructural predominante es albailera confinada con diafragma rgido, cuyo
peralte es de 25 cm.

La estructura es de un piso con dos niveles distintos de techo terminado. El concreto
predominante es de 210 Kg/cm2.

SALA DE EXPOSICIN:

La sub-estructura est conformada por zapatas aisladas conectadas por vigas de
cimentacin. Se har uso de una losa armada de 175 Kg/cm2 como piso para aislar el suelo y
los muros.

El sistema estructural predominante es albailera confinada con diafragma rgido, cuyo
peralte es de 25 cm.

La estructura es de un piso con dos niveles distintos de techo terminado. El concreto
predominante es de 210 Kg/cm2.

VESTUARIO:

La sub-estructura est conformada igual que la sala de exposicin.

El sistema estructural predominante es albailera confinada con diafragma rgido, cuyo
peralte es de 25 cm.




26

La estructura es de un piso. El concreto predominante es de 210 Kg/cm2.

CUARTO DE MQUINAS:

La sub-estructura es una losa de cimentacin de 30cm de profundidad. El nivel de fondo de
zanja est a -3.10m respecto del terreno natural.

El sistema estructural predominante es dual. Cuenta con una losa maciza de 20 cm de
espesor.

La estructura es de un nivel. El concreto predominante es de 210 Kg/cm2.





INGRESO Y BOLETERA:

La sub-estructura est conformada por zapatas aisladas conectadas por vigas de
cimentacin. Se har uso de una losa armada de 175 Kg/cm2 como piso para aislar el suelo y
los muros.

El sistema estructural de la edificacin ser analizado en dos partes: la boletera, que est
conformado principalmente por prticos de concreto armado; y el arco, que es una estructura
metlica.

La boletera es de un piso con un espesor de losa de 25cm. El concreto predominante es de
210 Kg/cm2.


10.3 ANLISIS ESTRUCTURAL

10.3.1 Cargas.

Las cargas de diseo empleadas son debido al peso propio, a la carga viva y la carga por
efectos ssmicos.

CARGAS VERTICALES

Para la carga muerta se han considerado los siguientes pesos especficos:

Peso Especfico del concreto armado = 2400 kg/m3
Peso Especfico de muros albailera = 1800 kg/m3




27

Para la carga viva se consideran los siguientes valores:

Azotea=100kg/m2

CARGA SISMICA

Espectro de respuesta de aceleracin de
Diseo segn Norma E-030 = ZUSCg/R

Donde los parmetros ssmicos permanecen iguales para todos excepto el R:

Z= 0.4
U=1.0
S=1.4
Tp=0.9 seg
g= 9.81 m/seg
C = 2.5

Administracin y tpico: R = 3 (Albailera confinada)
SS.HH.: R = 3 (Albailera confinada)
Bar terraza: R = 8 (Concreto armado)
Gimnasio: R = 8 (Concreto armado)
Restaurante: R = 3 (Albailera confinada)
Sala de exposicin: R = 3 (Albailera confinada)
Vestuario: R = 3 (Albailera confinada)
Cuarto de mquinas: R = 7 (Dual)
Boletera: R = 8 (Concreto armado)
R = 9.5 (Acero)

10.3.2 Modelos.

Trabajamos en esencia con prticos de concreto armado o albailera confinada, diafragma
rgido y todos los apoyos fijos al suelo.

Las fuerzas de los sismos son del tipo inercial y proporcional a su peso, por lo que es
necesario precisar la cantidad y distribucin de las masas en la estructura.

10.4 RESULTADOS

10.4.1 Periodos de Vibracin de la estructura.-

ADMINISTRACIN Y TPICO:




28

Modo 2: Tx = 0.383 s
Modo 1: Ty = 0.399 s

SS.HH.:

Modo 2: Tx = 0.337 s
Modo 1: Ty = 0.363 s

BAR TERRAZA:

Modo 2: Tx = 0.215 s
Modo 1: Ty = 0.211 s

GIMNASIO:

Modo 2: Tx = 0.401 s
Modo 1: Ty = 0.302 s



RESTAURANTE:

Modo 2: Tx = 0.179 s
Modo 1: Ty = 0.170 s

SALA DE EXPOSICIN:

Modo 2: Tx = 0.159 s
Modo 1: Ty = 0.150 s

VESTUARIO:

Modo 2: Tx = 0.454 s
Modo 1: Ty = 0.465 s

CUARTO DE MQUINAS:

Modo 2: Tx = 0.029 s
Modo 1: Ty = 0.029 s

BOLETERA:

Modo 2: Tx = 0.870 s
Modo 1: Ty = 0.845 s



29




10.4.2 Desplazamientos de la Estructura.-


ADMINISTRACION
Story Item Load DriftX DriftY Item Load DzX DzY
STORY1 Max Drift X SXX 0.000317 Max Dz X SXX 0.000634
STORY1 Max Drift Y SXX 0.000118 Max Dz Y SXX 0.000236
STORY1 Max Drift X SYY 0.000404 Max Dz X SYY 0.000808
STORY1 Max Drift Y SYY 0.001013 Max Dz Y SYY 0.002026


TOPICO
Story Item Load DriftX DriftY Item Load DzX DzY
STORY1 Max Drift X SXX 0.000491 Max Dz X SXX 0.000982
STORY1 Max Drift Y SXX 0.000491 Max Dz Y SXX 0.000982
STORY1 Max Drift X SYY 0.000778 Max Dz X SYY 0.001556
STORY1 Max Drift Y SYY 0.001306 Max Dz Y SYY 0.002612

BAO A Y B
Story Item Load DriftX DriftY Item Load DzX DzY
STORY1 SXX Max Max Drift X 0.000352 Max Dz X SXX 0.000704
STORY1 SXX Max Max Drift Y 8.30E-05 Max Dz Y SXX 0.000166
STORY1 SYY Max Max Drift X 1.40E-05 Max Dz X SYY 0.000028
STORY1 SYY Max Max Drift Y 0.000292 Max Dz Y SYY 0.000584

BAO C
Story Item Load DriftX DriftY Item Load DzX DzY
STORY1 Max Drift X SXX 0.002224 Max Dz X SXX 0.004448
STORY1 Max Drift Y SXX 0.000973 Max Dz Y SXX 0.001946
STORY1 Max Drift X SYY 0.000069 Max Dz X SYY 0.000138
STORY1 Max Drift Y SYY 0.001242 Max Dz Y SYY 0.002484

BAO D - PISCINAS
Story Item Load DriftX DriftY Item Load DzX DzY
STORY1 SXX Max Max Drift X 0.000339 Max Dz X SXX 0.000678
STORY1 SXX Max Max Drift Y 1.80E-05 Max Dz Y SXX 0.000036



30

STORY1 SYY Max Max Drift X 0.00026 Max Dz X SYY 0.00052
STORY1 SYY Max Max Drift Y 0.001304 Max Dz Y SYY 0.002608

BAO E - ANFITEATRO
Story Item Load DriftX DriftY Item Load DzX DzY
STORY1 Max Drift X SXX 0.000476 Max Dz X SXX 0.000952
STORY1 Max Drift Y SXX 0.000668 Max Dz Y SXX 0.001336
STORY1 Max Drift X SYY 0.000097 Max Dz X SYY 0.000194
STORY1 Max Drift Y SYY 0.001893 Max Dz Y SYY 0.003786

VESTUARIO
Story Item Load DriftX DriftY Item Load DzX DzY
Story1 Max Drift X SX Max 0.000324 Max Dz X SXX 0.000648
Story1 Max Drift Y SX Max 0.000129 Max Dz Y SXX 0.000258
Story1 Max Drift X SY Max 5.70E-05 Max Dz X SYY 0.000114
Story1 Max Drift Y SY Max 0.000168 Max Dz Y SYY 0.000336

BAR TERRAZA
Story Item DriftX DriftY Item Load DzX DzY
STORY2 Max Drift X 0.0014 Max Dz X SISMO 0.0013
STORY2 Max Drift Y 0.0008 Max Dz Y SISMO 0.0008
STORY1 Max Drift X 0.006 Max Dz X SISMO 0.0011
STORY1 Max Drift Y 0.006 Max Dz Y SISMO 0.0006




GIMNASIO
Story Item DriftX DriftY Item Load DzX DzY
STORY3 Max Drift X 0.007106 Max Dz X SXX 0.014212
STORY3 Max Drift Y 0.004347 Max Dz Y SXX 0.008694
STORY3 Max Drift X 0.001372 Max Dz X SYY 0.002744
STORY3 Max Drift Y 0.000987 Max Dz Y SYY 0.001974
STORY2 Max Drift X 0.010086 Max Dz X SXX 0.020172
STORY2 Max Drift Y 0.00476 Max Dz Y SXX 0.00952
STORY2 Max Drift X 0.001039 Max Dz X SYY 0.002078
STORY2 Max Drift Y 0.000643 Max Dz Y SYY 0.001286
STORY1 Max Drift X 0.00786 Max Dz Y SYY 0.01572
STORY1 Max Drift Y 0.003757 Max Dz Y SYY 0.007514



31

STORY1 Max Drift X 0.000809 Max Dz Y SYY 0.001618
STORY1 Max Drift Y 0.000497 Max Dz Y SYY 0.000994

RESTAURANTE
Story Item Load DriftX DriftY Item Load DzX DzY
STORY2 Max Drift X SXX 0.000132 Max Dz X SXX 0.000264
STORY2 Max Drift Y SXX 0.000008 Max Dz Y SXX 0.000016
STORY2 Max Drift X SYY 0.000051 Max Dz X SYY 0.000102
STORY2 Max Drift Y SYY 0.000181 Max Dz Y SYY 0.000362
STORY1 Max Drift X SXX 0.00007 Max Dz Y SYY 0.00014
STORY1 Max Drift Y SXX 0.000077 Max Dz Y SYY 0.000154
STORY1 Max Drift X SYY 0.000082 Max Dz Y SYY 0.000164
STORY1 Max Drift Y SYY 0.000095 Max Dz Y SYY 0.00019

SALA DE EXPOSICIONES
Story Item DriftX DriftY Item Load DzX DzY
STORY2 Max Drift X 0.000242 Max Dz X SXX 0.000484
STORY2 Max Drift Y 0.000285 Max Dz Y SXX 0.00057
STORY2 Max Drift X 0.000194 Max Dz X SYY 0.000388
STORY2 Max Drift Y 0.000216 Max Dz Y SYY 0.000432
STORY1 Max Drift X 0.000258 Max Dz Y SYY 0.000516
STORY1 Max Drift Y 0.000189 Max Dz Y SYY 0.000378
STORY1 Max Drift X 0.000121 Max Dz Y SYY 0.000242
STORY1 Max Drift Y 0.000134 Max Dz Y SYY 0.000268

CUARTO DE MQUINAS
Story Item DriftX DriftY Item Load DzX DzY
STORY1 Max Drift X 0.000298

Max Dz Y SXX 0.0009
STORY1 Max Drift Y

0.0001 Max Dz Y SXX 0.0003
STORY1 Max Drift X 0.000072

Max Dz Y SYY 0.0002
STORY1 Max Drift Y

0.00038 Max Dz Y SYY 0.0011




BOLETERA
Story Item DriftX DriftY Item Load DzX DzY
STORY2 Max Drift X 0.0008 Max Dz X SISMO 0.00203
STORY2 Max Drift Y 0.000643 Max Dz Y SISMO 5.89



32

STORY1 Max Drift X 0.0005 Max Dz X SISMO 1.5
STORY1 Max Drift Y 0.000497 Max Dz Y SISMO 4.98

ARCO METLICO
Story Item Load DzX DzY
STORY1 Max Dz X SXX 0.000092
STORY1 Max Dz Y SXX 0.000003599
STORY1 Max Dz X SYY 0.000072
STORY1 Max Dz Y SYY 0.000973

10.4.3 Participacin de Masa

ADMINISTRACIN Y TPICO:


T Lx Ly Lgz Mx My Hiptesis X(1) Hiptesis Y(1)
Modo 1 0.383 1 0 0 100 % 0 %
R = 3
A = 1.717 m/s
D = 6.39049 mm
R = 3
A = 1.717 m/s
D = 6.39049 mm
Modo 2 0.399 0 0.998 0.0629 0 % 99.97 %
R = 3
A = 1.717 m/s
D = 6.91234 mm
R = 3
A = 1.717 m/s
D = 6.91234 mm
Modo 3 0.319 0.0258 0.0246 1 0 % 0.03 %
R = 3
A = 1.717 m/s
D = 4.43847 mm
R = 3
A = 1.717 m/s
D = 4.43847 mm
Total

100 % 100 %


BAO A Y B:


T Lx Ly Lgz Mx My Hiptesis X(1) Hiptesis Y(1)
Modo 1 0.363 0.0024 0.9999 0.012 0 % 100 %
R = 3
A = 1.717 m/s
D = 5.72676 mm
R = 3
A = 1.717 m/s
D = 5.72676 mm
Modo 2 0.337 0.6964 0.0025 0.7176 91.5 % 0 %
R = 3
A = 1.717 m/s
D = 4.9404 mm
R = 3
A = 1.717 m/s
D = 4.9404 mm
Modo 3 0.287 0.0898 0.037 0.996 8.5 % 0 %
R = 3
A = 1.717 m/s
D = 3.58943 mm
R = 3
A = 1.717 m/s
D = 3.58943 mm
Total

100 % 100 %






33

BAO C:


T Lx Ly Lgz Mx My Hiptesis X(1) Hiptesis Y(1)
Modo 1 0.378 0.0002 1 0.0032 0 % 100 %
R = 3
A = 1.717 m/s
D = 6.21254 mm
R = 3
A = 1.717 m/s
D = 6.21254 mm
Modo 2 0.335 0.912 0.0003 0.4101 99.29 % 0 %
R = 3
A = 1.717 m/s
D = 4.8788 mm
R = 3
A = 1.717 m/s
D = 4.8788 mm
Modo 3 0.29 0.0159 0.0231 0.9999 0.71 % 0 %
R = 3
A = 1.717 m/s
D = 3.66758 mm
R = 3
A = 1.717 m/s
D = 3.66758 mm
Total

100 % 100 %


BAO D PISCINAS:


T Lx Ly Lgz Mx My Hiptesis X(1) Hiptesis Y(1)
Modo 1 0.323 1 0 0 100 % 0 %
R = 3
A = 1.717 m/s
D = 4.54676 mm
R = 3
A = 1.717 m/s
D = 4.54676 mm
Modo 2 0.328 0 0.9263 0.3767 0 % 98.38 %
R = 3
A = 1.717 m/s
D = 4.67994 mm
R = 3
A = 1.717 m/s
D = 4.67994 mm
Modo 3 0.269 0.021 0.0404 0.9992 0 % 1.62 %
R = 3
A = 1.717 m/s
D = 3.14414 mm
R = 3
A = 1.717 m/s
D = 3.14414 mm
Total

100 % 100 %


BAO E ANFITEATRO:


T Lx Ly Lgz Mx My Hiptesis X(1) Hiptesis Y(1)
Modo 1 0.357 1 0 0 100 % 0 %
R = 3
A = 1.717 m/s
D = 5.53211 mm
R = 3
A = 1.717 m/s
D = 5.53211 mm
Modo 2 0.371 0 0.9999 0.011 0 % 100 %
R = 3
A = 1.717 m/s
D = 5.9741 mm
R = 3
A = 1.717 m/s
D = 5.9741 mm
Modo 3 0.282 0.0073 0.034 1 0 % 0 %
R = 3
A = 1.717 m/s
D = 3.45122 mm
R = 3
A = 1.717 m/s
D = 3.45122 mm
Total

100 % 100 %







34




BAR TERRAZA:


T Lx Ly Lgz Mx My Hiptesis X(1) Hiptesis Y(1)
Modo 1 0.215 0.9981 0.0274 0.0548 99.35 % 0.08 %
R = 8
A = 1.717 m/s
D = 2.00581 mm
R = 8
A = 1.717 m/s
D = 2.00581 mm
Modo 2 0.211 0.0199 0.592 0.8057 0.1 % 85.61 %
R = 8
A = 1.717 m/s
D = 1.93379 mm
R = 8
A = 1.717 m/s
D = 1.93379 mm
Modo 3 0.162 0.0187 0.1302 0.9915 0 % 14.27 %
R = 8
A = 1.717 m/s
D = 1.14679 mm
R = 8
A = 1.717 m/s
D = 1.14679 mm
Modo 4 0.051 0.0196 0.0265 0.9995 0 % 0 %
R = 8
A = 1.717 m/s
D = 0.11357 mm
R = 8
A = 1.717 m/s
D = 0.11357 mm
Modo 5 0.048 0.9997 0.0011 0.0262 0.55 % 0 %
R = 8
A = 1.717 m/s
D = 0.10209 mm
R = 8
A = 1.717 m/s
D = 0.10209 mm
Modo 6 0.014 0.0001 0.4123 0.9111 0 % 0.04 %
R = 8
A = 1.717 m/s
D = 0.00829 mm
R = 8
A = 1.717 m/s
D = 0.00829 mm
Total

100 % 100 %


GIMNASIO:


T Lx Ly Lgz Mx My Hiptesis X(1) Hiptesis Y(1)
Modo 1 0.401 0.898 0.002 0.44 99.66 % 0 %
R = 8
A = 1.717 m/s
D = 6.97686 mm
R = 8
A = 1.717 m/s
D = 6.97686 mm
Modo 2 0.312 0.0151 0.0235 0.9997 0.06 % 7.4 %
R = 8
A = 1.717 m/s
D = 4.22178 mm
R = 8
A = 1.717 m/s
D = 4.22178 mm
Modo 3 0.302 0.0015 0.3517 0.9361 0 % 91.47 %
R = 8
A = 1.717 m/s
D = 3.967 mm
R = 8
A = 1.717 m/s
D = 3.967 mm
Total

99.72 % 98.87 %









35

RESTAURANTE:


T Lx Ly Lgz Mx My Hiptesis X(1) Hiptesis Y(1)
Modo 1 0.179 0.9983 0.0179 0.0549 98.82 % 0.03 %
R = 3
A = 4.578 m/s
D = 3.72408 mm
R = 3
A = 4.578 m/s
D = 3.72408 mm
Modo 2 0.17 0.0188 0.8776 0.479 0.05 % 99.04 %
R = 3
A = 4.578 m/s
D = 3.3614 mm
R = 3
A = 4.578 m/s
D = 3.3614 mm
Modo 3 0.14 0.0153 0.0085 0.9999 0.22 % 0.37 %
R = 3
A = 4.578 m/s
D = 2.27413 mm
R = 3
A = 4.578 m/s
D = 2.27413 mm
Total

99.09 % 99.44 %





SALA DE EXPOSICIN:


T Lx Ly Lgz Mx My Hiptesis X(1) Hiptesis Y(1)
Modo 1 0.159 0.827 0.0619 0.5588 98.75 % 0.56 %
R = 3
A = 4.578 m/s
D = 2.94448 mm
R = 3
A = 4.578 m/s
D = 2.94448 mm
Modo 2 0.15 0.0475 0.6005 0.7982 0.59 % 96.01 %
R = 3
A = 4.578 m/s
D = 2.61057 mm
R = 3
A = 4.578 m/s
D = 2.61057 mm
Modo 3 0.123 0.0042 0.0233 0.9997 0.05 % 3 %
R = 3
A = 4.578 m/s
D = 1.74757 mm
R = 3
A = 4.578 m/s
D = 1.74757 mm
Total

99.39 % 99.57 %


VESTUARIO:


T Lx Ly Lgz Mx My Hiptesis X(1) Hiptesis Y(1)
Modo 1 0.454 0.9717 0.0001 0.2363 99.95 % 0 %
R = 3
A = 1.717 m/s
D = 8.9636 mm
R = 3
A = 1.717 m/s
D = 8.9636 mm
Modo 2 0.465 0.0001 1 0.0064 0 % 100 %
R = 3
A = 1.717 m/s
D = 9.41368 mm
R = 3
A = 1.717 m/s
D = 9.41368 mm
Modo 3 0.393 0.006 0.0149 1 0.05 % 0 %
R = 3
A = 1.717 m/s
D = 6.7308 mm
R = 3
A = 1.717 m/s
D = 6.7308 mm
Total

100 % 100 %


CUARTO DE MAQUINAS:




36

Mode Period UX UY UZ SumUX SumUY SumUZ RX RY RZ
1 0.068373 0.0008 28.5383 0 0.0008 28.5383 0 28.5383 0.0008 0.0054
2 0.061788 37.8657 0.0006 0 37.8665 28.5388 0 0.0006 37.8657 0
3 0.033699 0.0002 0.4028 0 37.8667 28.9416 0 0.4028 0.0002 1.1546
4 0.03244 0.6924 0 0 38.5591 28.9416 0 0 0.6924 0
5 0.031739 0 0.0457 0 38.5591 28.9873 0 0.0457 0 0.3356
6 0.03067 0 0.1726 0 38.5591 29.1599 0 0.1726 0 0.0121
7 0.029735 0.7345 0 0 39.2936 29.1599 0 0 0.7345 0
8 0.029148 0.1881 0.0001 0 39.4817 29.1599 0 0.0001 0.1881 0
9 0.028902 0.0002 0.0701 0 39.4819 29.23 0 0.0701 0.0002 0.0015



BOLETERA:


T Lx Ly Lgz Mx My Hiptesis X(1) Hiptesis Y(1)
Modo 1 0.145 0 0.9993 0.0366 0 % 97.94 %
R = 8
A = 1.717 m/s
D = 0.92025 mm
R = 8
A = 1.717 m/s
D = 0.92025 mm
Modo 2 0.115 0.0012 0.0169 1 0 % 0 %
R = 8
A = 1.717 m/s
D = 0.57061 mm
R = 8
A = 1.717 m/s
D = 0.57061 mm
Modo 3 0.087 0.9993 0 0.0383 98.76 % 0 %
R = 8
A = 1.717 m/s
D = 0.32956 mm
R = 8
A = 1.717 m/s
D = 0.32956 mm
Total

98.76 % 97.94 %


ARCO METLICO:

TABLE: Modal Periods And Frequencies
OutputCase StepType StepNum Period Frequency CircFreq Eigenvalue
Text Text Unitless Sec Cyc/sec rad/sec rad2/sec2



37

MODAL Mode 1 0.104727 9.5486 59.996 3599.5
MODAL Mode 2 0.086954 11.5 72.259 5221.4
MODAL Mode 3 0.076 13.158 82.673 6834.8
MODAL Mode 4 0.054183 18.456 115.96 13447
MODAL Mode 5 0.048712 20.529 128.99 16638
MODAL Mode 6 0.041815 23.915 150.26 22579
MODAL Mode 7 0.041452 24.124 151.58 22975
MODAL Mode 8 0.035247 28.371 178.26 31776
MODAL Mode 9 0.032394 30.87 193.96 37620
MODAL Mode 10 0.030181 33.133 208.18 43339
MODAL Mode 11 0.029169 34.283 215.4 46399
MODAL Mode 12 0.025829 38.715 243.26 59174



10.4.4 Verificacin de la cortante mnima:


ADMINISTRACIN Y TPICO

Columna Planta
Dimensin
(cm)
Tramo
(m)
Psimos
Cumple
Nsd
(t)
Vsdx
(t)
Vrd1x
(t)
Vrd2x
(t)
Vsdy
(t)
Vrd1y
(t)
Vrd2y
(t)
CC1 CC2 Origen
C1 Losa 30x30 -1.20/2.60 6.74 -1.67 21.26 8.85 0.22 21.26 8.85 0.08 0.19 GS S
C2 Losa 30x30 -1.20/2.60 6.93 1.67 21.26 8.86 0.22 21.26 8.86 0.08 0.19 GS S
C3 Losa 30x30 -1.20/2.60 6.93 1.67 21.26 8.86 -0.22 21.26 8.86 0.08 0.19 GS S
C4 Losa 30x30 -1.20/2.60 6.74 -1.67 21.26 8.85 -0.22 21.26 8.85 0.08 0.19 GS S



38


BAO A Y B:

Columna Planta
Dimensin
(cm)
Tramo
(m)
Armaduras Estribos
H
(m)
Hpx
(m)
Hpy
(m)
Psimos Referencia
N
(t)
Mx
(tm)
My
(tm)
N
(t)
Mx
(tm)
My
(tm)
C1 Losa 30x30 -1.20/2.75 41/2" +21/2" +21/2" 3/8"c/19 cm 3.95 2.77 2.77
4.08 1.33 1.32 4.08 1.31 1.31
C2 Losa 30x30 -1.20/2.75 41/2" +21/2" +21/2" 3/8"c/19 cm 3.95 2.77 2.77
3.41 1.95 1.44 3.41 1.94 1.42
C3 Losa 30x30 -1.20/2.75 41/2" +21/2" +21/2" 3/8"c/19 cm 3.95 2.77 2.77
5.25 2.17 0.28 5.25 2.14 0.28
C4 Losa 30x30 -1.20/2.75 41/2" +21/2" +21/2" 3/8"c/19 cm 3.95 2.77 2.77
3.39 1.96 1.42 3.39 1.94 1.41
C5 Forjado 1 30x30 -1.20/2.75 41/2" +21/2" +21/2" 3/8"c/19 cm 3.95 2.77 2.77
3.92 0.03 2.87 3.92 0.03 2.84
C6 Forjado 1 30x30 -1.20/2.75 41/2" +21/2" +21/2" 3/8"c/19 cm 3.95 2.77 2.77
3.54 1.47 0.15 3.54 1.46 0.15
C7 Forjado 1 30x30 -1.20/2.75 41/2" +21/2" +21/2" 3/8"c/19 cm 3.95 2.77 2.77
3.29 1.47 0.17 3.29 1.46 0.17
C8 Forjado 1 30x30 -1.20/2.75 41/2" +21/2" +21/2" 3/8"c/19 cm 3.95 2.77 2.77
13.89 0.00 2.19 13.89 0.00 2.10











BAO C:

Column
a
Plant
a
Dimensi
n
(cm)
Tramo
(m)
Armaduras Estribos
H
(m)
Hpx
(m)
Hpy
(m)
Psimos Referencia
N
(t)
Mx
(tm
)
My
(tm
)
N
(t)
Mx
(tm
)
My
(tm
)
C1 Losa 30x30
-
1.00/2.60
41/2
"
+21/2
"
+21/2
"
3/8"c/19
cm
3.6
0
2.5
2
2.5
2
3.57 0.07 2.67 3.57 0.07 2.65
C2 Losa 30x30
-
1.00/2.60
41/2
"
+21/2
"
+21/2
"
3/8"c/19
cm
3.6
0
2.5
2
2.5
2
5.88 2.03 0.10 5.88 2.00 0.09
C3 Losa 30x30
-
1.00/2.60
41/2
"
+21/2
"
+21/2
"
3/8"c/19
cm
3.6
0
2.5
2
2.5
2
5.88 2.03 0.10 5.88 2.00 0.10



39

Column
a
Plant
a
Dimensi
n
(cm)
Tramo
(m)
Armaduras Estribos
H
(m)
Hpx
(m)
Hpy
(m)
Psimos Referencia
N
(t)
Mx
(tm
)
My
(tm
)
N
(t)
Mx
(tm
)
My
(tm
)
C4 Losa 30x30
-
1.00/2.60
41/2
"
+21/2
"
+21/2
"
3/8"c/19
cm
3.6
0
2.5
2
2.5
2
3.56 0.07 2.66 3.56 0.07 2.64
C5 Losa 30x30
-
1.00/2.60
41/2
"
+21/2
"
+21/2
"
3/8"c/19
cm
3.6
0
2.5
2
2.5
2
5.38 0.24 2.75 5.38 0.24 2.72
C6 Losa 30x30
-
1.00/2.60
41/2
"
+21/2
"
+21/2
"
3/8"c/19
cm
3.6
0
2.5
2
2.5
2
11.6
4
2.10 0.09
11.6
4
2.05 0.09
C7 Losa 30x30
-
1.00/2.60
41/2
"
+21/2
"
+21/2
"
3/8"c/19
cm
3.6
0
2.5
2
2.5
2
11.6
4
2.10 0.09
11.6
4
2.05 0.09
C8 Losa 30x30
-
1.00/2.60
41/2
"
+21/2
"
+21/2
"
3/8"c/19
cm
3.6
0
2.5
2
2.5
2
5.36 0.24 2.75 5.36 0.24 2.71
C9 Losa 30x30
-
1.00/2.60
41/2
"
+21/2
"
+21/2
"
3/8"c/19
cm
3.6
0
2.5
2
2.5
2
5.85 0.27 2.78 5.85 0.27 2.75
C10 Losa 30x30
-
1.00/2.60
41/2
"
+21/2
"
+21/2
"
3/8"c/19
cm
3.6
0
2.5
2
2.5
2
13.4
3
2.29 0.12
13.4
3
2.22 0.11
C11 Losa 30x30
-
1.00/2.60
41/2
"
+21/2
"
+21/2
"
3/8"c/19
cm
3.6
0
2.5
2
2.5
2
13.4
3
2.29 0.12
13.4
3
2.22 0.11
C12 Losa 30x30
-
1.00/2.60
41/2
"
+21/2
"
+21/2
"
3/8"c/19
cm
3.6
0
2.5
2
2.5
2
5.83 0.27 2.78 5.83 0.27 2.74
C13 Losa 30x30
-
1.00/2.60
41/2
"
+21/2
"
+21/2
"
3/8"c/19
cm
3.6
0
2.5
2
2.5
2
3.73 0.10 2.64 3.73 0.10 2.62
C14 Losa 30x30
-
1.00/2.60
41/2
"
+21/2
"
+21/2
"
3/8"c/19
cm
3.6
0
2.5
2
2.5
2
6.47 2.37 0.16 6.47 2.33 0.15
C15 Losa 30x30
-
1.00/2.60
41/2
"
+21/2
"
+21/2
"
3/8"c/19
cm
3.6
0
2.5
2
2.5
2
6.47 2.37 0.16 6.47 2.33 0.15
C16 Losa 30x30
-
1.00/2.60
41/2
"
+21/2
"
+21/2
"
3/8"c/19
cm
3.6
0
2.5
2
2.5
2
3.72 0.10 2.64 3.72 0.10 2.62











40


BAO D PISCINAS:

Columna Planta
Dimensin
(cm)
Tramo
(m)
Psimos
Cumple
Nsd
(t)
Vsdx
(t)
Vrd1x
(t)
Vrd2x
(t)
Vsdy
(t)
Vrd1y
(t)
Vrd2y
(t)
CC1 CC2 Origen
C1 Losa 30x30 -1.20/2.75 2.27 -0.68 21.26 8.73 0.08 21.26 8.73 0.03 0.08 GS S
C2 Losa 30x30 -1.20/2.75 2.27 -0.68 21.26 8.73 -0.08 21.26 8.73 0.03 0.08 GS S
C3 Losa 30x30 -1.20/2.75 5.85 -0.75 21.26 8.83 0.08 21.26 8.83 0.04 0.09 GS S
C4 Losa 30x30 -1.20/2.75 3.17 0.80 21.26 8.75 0.08 21.26 8.75 0.04 0.09 GS S
C5 Losa 30x30 -1.20/2.75 3.17 0.80 21.26 8.75 -0.08 21.26 8.75 0.04 0.09 GS S
C6 Losa 30x30 -1.20/2.75 5.85 -0.75 21.26 8.83 -0.08 21.26 8.83 0.04 0.09 GS S


BAO E ANFITEATRO:

Columna Planta
Dimensin
(cm)
Tramo
(m)
Psimos
Cumple
Nsd
(t)
Vsdx
(t)
Vrd1x
(t)
Vrd2x
(t)
Vsdy
(t)
Vrd1y
(t)
Vrd2y
(t)
CC1 CC2 Origen
C1 Losa 30x30 0.00/3.75 3.77 -1.13 21.26 8.77 0.04 21.26 8.77 0.05 0.13 GS S
C2 Losa 30x30 0.00/3.75 3.77 -1.13 21.26 8.77 -0.04 21.26 8.77 0.05 0.13 GS S
C3 Losa 30x30 0.00/3.75 6.07 0.87 21.26 8.83 0.03 21.26 8.83 0.04 0.10 GS S
C4 Losa 30x30 0.00/3.75 3.75 1.13 21.26 8.77 0.05 21.26 8.77 0.05 0.13 GS S
C5 Losa 30x30 0.00/3.75 3.75 1.13 21.26 8.77 -0.05 21.26 8.77 0.05 0.13 GS S
C6 Losa 30x30 0.00/3.75 6.07 0.87 21.26 8.83 -0.03 21.26 8.83 0.04 0.10 GS S


BAR - TERRAZA:

Columna Planta
Dimensin
(cm)
Tramo
(m)
Psimos
Cumple
Nsd
(t)
Vsdx
(t)
Vrd1x
(t)
Vrd2x
(t)
Vsdy
(t)
Vrd1y
(t)
Vrd2y
(t)
CC1 CC2 Origen
C1
Losa 2 30x30 3.00/3.35 1.98 -0.16 21.26 8.72 -1.04 21.26 8.72 0.05 0.12 GS S

Losa 1 30x30 -0.50/2.75 4.83 -1.69 21.26 8.80 0.00 21.26 8.80 0.08 0.19 GS S
C11
Losa 1 30x30 -0.50/2.75 3.17 1.31 21.26 8.75 -0.04 21.26 8.75 0.06 0.15 GS S
C12
Losa 1 30x30 -0.50/2.75 3.13 1.32 21.26 8.75 -0.01 21.26 8.75 0.06 0.15 GS S
C13
Losa 2 30x30 3.00/3.35 2.09 -0.17 21.26 8.72 1.04 21.26 8.72 0.05 0.12 GS S

Losa 1 30x30 -0.50/2.75 4.94 -1.69 21.26 8.80 0.02 21.26 8.80 0.08 0.19 GS S



41

Columna Planta
Dimensin
(cm)
Tramo
(m)
Psimos
Cumple
Nsd
(t)
Vsdx
(t)
Vrd1x
(t)
Vrd2x
(t)
Vsdy
(t)
Vrd1y
(t)
Vrd2y
(t)
CC1 CC2 Origen
C14
Losa 2 30x30 3.00/3.35 -0.19 0.53 21.26 8.64 -0.09 21.26 8.64 0.03 0.06 GS S

Losa 1 30x30 -0.50/3.00 -0.09 0.53 21.26 8.65 -0.09 21.26 8.65 0.03 0.06 GS S
C15
Losa 2 30x30 3.00/3.35 -0.12 0.54 21.26 8.65 0.09 21.26 8.65 0.03 0.06 GS S

Losa 1 30x30 -0.50/3.00 -0.02 0.54 21.26 8.66 0.09 21.26 8.66 0.03 0.06 GS S



GIMNASIO:

Columna Planta
Dimensin
(cm)
Tramo
(m)
Armaduras Estribos
Psimos
Cumple
Nsd
(t)
Vsdx
(t)
Vrd1x
(t)
Vrd2x
(t)
Vsdy
(t)
Vrd1y
(t)
Vrd2y
(t)
CC1 CC2 Origen
C1 Losa 1 30x30 -1.20/2.60 41/2" +21/2" +21/2" 3/8"c/14 cm 18.83 -1.70 24.55 11.63 -0.00 24.55 11.63 0.07 0.15 GS S
C2 Losa 1 30x30 -1.20/2.60 41/2" +21/2" +21/2" 3/8"c/14 cm 18.63 -1.71 24.55 11.63 0.12 24.55 11.63 0.07 0.15 GS S
C3 Losa 3 30x60 3.40/4.00 45/8" +21/2" +61/2" 3/8"c/13 cm 5.87 -6.69 48.99 19.56 -2.44 52.34 24.80 0.14 0.36 GS S

Losa 2 30x60 3.00/3.40 45/8" +21/2" +61/2" 3/8"c/13 cm 6.21 -6.69 48.99 19.58 -2.44 52.34 24.81 0.14 0.36 GS S

Losa 1 30x60 -1.20/2.60 43/4" +23/4" +25/8" 3/8"c/13 cm 19.05 -4.55 48.61 19.85 0.36 52.15 25.16 0.09 0.23 GS S
C4 Losa 3 30x60 3.40/4.00 45/8" +21/2" +61/2" 3/8"c/13 cm 16.41 0.91 48.99 19.91 -11.50 52.34 25.17 0.22 0.46 GS S

Losa 2 30x60 3.00/3.40 45/8" +21/2" +61/2" 3/8"c/13 cm 16.97 0.91 48.99 19.93 -11.50 52.34 25.19 0.22 0.46 GS S

Losa 1 30x60 -1.20/2.60 45/8" +21/2" +61/2" 3/8"c/13 cm 34.70 1.44 48.99 20.51 7.04 52.34 25.81 0.14 0.28 GS S
C5 Losa 3 30x60 3.40/4.00 45/8" +21/2" +61/2" 3/8"c/13 cm 14.23 1.91 48.99 19.84 -11.34 52.34 25.09 0.22 0.46 GS S

Losa 2 30x60 3.00/3.40 45/8" +21/2" +61/2" 3/8"c/13 cm 14.57 1.91 48.99 19.85 -11.34 52.34 25.10 0.22 0.46 GS S

Losa 1 30x60 -1.20/2.60 45/8" +21/2" +61/2" 3/8"c/13 cm 35.50 1.35 48.99 20.54 7.62 52.34 25.84 0.15 0.30 GS S
C6 Losa 3 30x60 3.40/4.00 45/8" +21/2" +61/2" 3/8"c/13 cm 46.86 3.37 48.99 20.91 17.15 52.34 26.24 0.33 0.67 GS S

Losa 2 30x60 3.00/3.40 45/8" +21/2" +61/2" 3/8"c/13 cm 47.20 3.37 48.99 20.92 17.15 52.34 26.25 0.33 0.67 GS S

Losa 1 30x60 -1.20/2.60 45/8" +21/2" +61/2" 3/8"c/13 cm 60.78 0.47 48.99 21.37 -6.61 52.34 26.72 0.13 0.25 GS S
C7 Losa 1 30x30 -1.20/2.60 41/2" +21/2" +21/2" 3/8"c/14 cm 8.43 -1.59 24.55 11.29 0.34 24.55 11.29 0.07 0.14 GS S
C8 Losa 3 30x60 3.40/4.00 45/8" +21/2" +61/2" 3/8"c/13 cm 8.18 1.29 48.99 19.64 3.22 52.34 24.88 0.07 0.15 GS S
Losa 2 30x60 3.00/3.40 45/8" +21/2" +61/2" 3/8"c/13 cm 8.52 1.29 48.99 19.65 3.22 52.34 24.89 0.07 0.15 GS S

Losa 1 30x60 -1.20/2.60 43/4" +23/4" +25/8" 3/8"c/13 cm 21.30 1.11 48.61 19.92 6.93 52.15 25.24 0.13 0.28 GS S
C9 Losa 3 35x70 3.40/4.00 43/4" +23/4" +61/2" 3/8"c/14 cm 8.87 10.94 67.86 32.07 -1.98 71.68 29.64 0.16 0.35 GS S
Losa 2 35x70 0.83/2.90 43/4" +23/4" +61/2" 3/8"c/14 cm 16.66 -0.65 67.86 32.33 10.09 71.68 29.91 0.14 0.34 GS S

Losa 1 35x70 -1.20/0.83 43/4" +25/8" +43/4" 3/8"c/14 cm 18.25 -0.65 67.45 28.20 10.09 71.74 29.99 0.14 0.34 GS S
C10 Losa 3 30x60 3.40/4.00 41" + ... +63/4" 3/8"c/13 cm 16.09 -6.57 48.28 19.61 -20.53 51.85 24.92 0.42 0.89 GS S
Losa 2 30x60 0.88/3.00 41" + ... +63/4" 3/8"c/13 cm 36.51 -2.33 48.28 20.27 6.30 51.85 25.63 0.13 0.27 GS S

Losa 1 30x60 -1.20/0.88 41" +23/4" +43/4" 3/8"c/17 cm 37.71 -2.33 48.22 20.50 6.30 51.95 22.08 0.13 0.31 GS S
C11 Losa 3 35x70 3.40/4.00 41" +45/8" +41" 3/8"c/14 cm 15.31 -10.53 66.76 27.81 -22.70 71.60 29.83 0.35 0.85 GS S
Losa 2 35x70 0.88/3.00 41" +45/8" +41" 3/8"c/14 cm 46.02 -3.36 66.76 28.82 10.21 71.60 30.91 0.15 0.35 GS S

Losa 1 35x70 -1.20/0.88 41" +45/8" +41" 3/8"c/14 cm 47.65 -3.36 66.76 28.88 10.21 71.60 30.97 0.15 0.35 GS S
C12 Losa 3 35x70 3.40/4.00 43/4" +23/4" +61/2" 3/8"c/14 cm 47.75 11.18 67.86 33.37 27.49 71.68 31.01 0.42 0.95 GS S
Losa 2 35x70 0.85/2.95 43/4" +23/4" +61/2" 3/8"c/14 cm 58.34 -0.65 67.86 33.73 -8.00 71.68 31.39 0.11 0.26 GS S

Losa 1 35x70 -1.20/0.85 43/4" +23/4" +61/2" 3/8"c/14 cm 59.95 -0.65 67.86 33.78 -8.00 71.68 31.44 0.11 0.26 GS S
C13 Losa 2 30x60 0.83/2.90 45/8" +21/2" +61/2" 3/8"c/13 cm 5.57 -0.31 48.99 19.55 5.89 52.34 24.78 0.11 0.24 GS S

Losa 1 30x60 -1.20/0.83 43/4" +23/4" +21/2" 3/8"c/13 cm 6.74 -0.31 48.71 19.48 5.89 52.15 24.73 0.11 0.24 GS S
C14 Losa 2 30x60 0.88/3.00 45/8" + ... +65/8" 3/8"c/13 cm 24.95 3.01 48.81 20.12 -4.95 52.29 25.44 0.11 0.25 GS S



42

Columna Planta
Dimensin
(cm)
Tramo
(m)
Armaduras Estribos
Psimos
Cumple
Nsd
(t)
Vsdx
(t)
Vrd1x
(t)
Vrd2x
(t)
Vsdy
(t)
Vrd1y
(t)
Vrd2y
(t)
CC1 CC2 Origen

Losa 1 30x60 -1.20/0.88 45/8" +25/8" +45/8" 3/8"c/17 cm 26.15 3.01 48.81 20.37 -4.95 52.29 21.82 0.11 0.27 GS S
C15 Losa 2 30x60 0.88/3.00 43/4" +23/4" +25/8" 3/8"c/13 cm 27.17 2.49 48.61 20.11 5.43 52.15 25.45 0.12 0.25 GS S
Losa 1 30x60 -1.20/0.88 43/4" +23/4" +25/8" 3/8"c/13 cm 27.17 2.49 48.61 20.11 5.43 52.15 25.45 0.12 0.25 GS S
C16 Losa 3 35x60 3.40/4.00 43/4" +23/4" +25/8" 3/8"c/11 cm 5.74 12.28 57.91 25.44 -9.77 60.84 29.02 0.27 0.59 GS S

Losa 2 35x60 0.85/2.95 43/4" +23/4" +25/8" 3/8"c/11 cm 13.04 0.70 57.91 25.68 6.33 60.84 29.27 0.10 0.22 GS S

Losa 1 35x60 -1.20/0.85 43/4" +23/4" +41/2" 3/8"c/15 cm 14.41 0.70 58.11 25.48 6.33 60.84 24.43 0.10 0.26 GS S
C17 Losa 3 30x60 3.40/4.00 45/8" +21/2" +61/2" 3/8"c/13 cm 7.44 -0.80 48.99 19.62 -3.75 52.34 24.85 0.07 0.16 GS S
Losa 2 30x60 3.00/3.40 45/8" +21/2" +61/2" 3/8"c/13 cm 7.77 -0.80 48.99 19.63 -3.75 52.34 24.86 0.07 0.16 GS S

Losa 1 30x60 -1.20/3.00 45/8" +21/2" +61/2" 3/8"c/13 cm 8.00 -0.80 48.99 19.63 -3.75 52.34 24.87 0.07 0.16 GS S
C18 Losa 3 60x30 3.40/4.00 41" +21"

3/8"c/13 cm 30.04 4.98 51.85 25.40 -3.20 47.93 19.92 0.12 0.25 GS S

Losa 2 60x30 3.00/3.40 41" +21"

3/8"c/13 cm 30.38 4.98 51.85 25.42 -3.20 47.93 19.93 0.12 0.25 GS S

Losa 1 60x30 -1.20/3.00 41" +21"

3/8"c/13 cm 30.60 4.98 51.85 25.42 -3.20 47.93 19.94 0.12 0.25 GS S
C19 Losa 3 60x30 3.40/4.00 41" +43/4" +23/4" 3/8"c/17 cm 26.48 5.05 51.95 21.69 -3.58 48.22 20.14 0.12 0.29 GS S
Losa 2 60x30 3.00/3.40 41" +43/4" +23/4" 3/8"c/17 cm 26.82 5.05 51.95 21.70 -3.58 48.22 20.15 0.12 0.29 GS S

Losa 1 60x30 -1.20/3.00 41" +43/4" +23/4" 3/8"c/17 cm 27.04 5.05 51.95 21.71 -3.58 48.22 20.15 0.12 0.29 GS S
C20 Losa 3 60x30 3.40/4.00 45/8" +61/2" +21/2" 3/8"c/13 cm 7.22 5.23 52.34 24.84 -0.69 48.99 19.61 0.10 0.21 GS S

Losa 2 60x30 3.00/3.40 45/8" +61/2" +21/2" 3/8"c/13 cm 7.56 5.23 52.34 24.85 -0.69 48.99 19.62 0.10 0.21 GS S

Losa 1 60x30 -1.20/3.00 43/4" +41/2" +21/2" 3/8"c/16 cm 7.78 5.23 52.24 21.90 -0.69 48.81 20.46 0.10 0.24 GS S
C21 Losa 3 30x60 3.40/4.00 43/4" +25/8" +43/4" 8c/12 cm 29.32 2.80 48.80 20.46 3.92 52.34 21.95 0.09 0.23 GS S

Losa 2 30x60 3.00/3.40 43/4" +25/8" +43/4" 8c/12 cm 29.66 2.80 48.80 20.48 3.92 52.34 21.96 0.09 0.22 GS S

Losa 1 30x60 -1.20/3.00 43/4" +25/8" +43/4" 8c/12 cm 29.88 2.80 48.80 20.48 3.92 52.34 21.97 0.09 0.22 GS S
C22 Losa 2 30x50 0.88/3.00 41/2" +21/2" +61/2" 3/8"c/14 cm 7.09 -1.10 40.92 17.46 2.91 43.14 19.60 0.07 0.16 GS S

Losa 1 30x50 -1.20/0.88 41/2" +21/2" +61/2" 3/8"c/14 cm 8.09 -1.10 40.92 17.49 2.91 43.14 19.63 0.07 0.16 GS S
C23 Losa 3 60x30 3.40/4.00 41" +63/4" +21" 3/8"c/13 cm 25.19 -2.19 51.85 25.23 18.30 48.28 19.91 0.38 0.92 GS S

Losa 2 60x30 0.85/2.95 41" +63/4" +21" 3/8"c/13 cm 48.25 10.65 51.85 26.04 -2.42 48.28 20.65 0.21 0.43 GS S

Losa 1 60x30 -1.20/0.85 41" +63/4" +21" 3/8"c/13 cm 49.43 10.65 51.85 26.08 -2.42 48.28 20.69 0.21 0.42 GS S
C24 Losa 3 30x60 3.40/4.00 43/4" +25/8" +43/4" 8c/12 cm 28.50 -3.81 48.80 20.44 0.38 52.34 21.92 0.08 0.19 GS S

Losa 2 30x60 3.00/3.40 43/4" +25/8" +43/4" 8c/12 cm 28.84 -3.81 48.80 20.45 0.38 52.34 21.93 0.08 0.19 GS S

Losa 1 30x60 -1.20/3.00 43/4" +25/8" +43/4" 8c/12 cm 29.06 -3.81 48.80 20.46 0.38 52.34 21.94 0.08 0.19 GS S
C25 Losa 3 60x30 3.40/4.00 41" +21"

3/8"c/13 cm 25.81 -5.60 51.85 25.26 -2.90 47.93 19.78 0.12 0.27 GS S

Losa 2 60x30 3.00/3.40 41" +21"

3/8"c/13 cm 26.14 -5.58 51.85 25.27 -2.90 47.93 19.79 0.12 0.27 GS S

Losa 1 60x30 -1.20/3.00 41" +21"

3/8"c/13 cm 26.36 -5.57 51.85 25.28 -2.90 47.93 19.80 0.12 0.26 GS S
C26 Losa 2 60x30 0.83/2.90 45/8" +61/2" +21/2" 3/8"c/13 cm 26.48 7.81 52.34 25.52 2.25 48.99 20.24 0.16 0.33 GS S

Losa 1 60x30 -1.20/0.83 41" +23/4" 3/8"c/13 cm 27.65 7.81 51.85 25.32 2.25 48.12 19.92 0.16 0.33 GS S

RESTAURANTE:

Pilar Planta
Dimensin
(cm)
Tramo
(m)
Armaduras Estribos
Psimos
Cumple
Nsd
(t)
Vsdx
(t)
Vrd1x
(t)
Vrd2x
(t)
Vsdy
(t)
Vrd1y
(t)
Vrd2y
(t)
CC1 CC2 Origen
C1 Losa 1 30x60 0.00/3.40 45/8" +21/2" +61/2" 3/8"c/17 cm -0.48 0.04 42.42 15.61 -3.13 45.33 19.66 0.07 0.16 GS S
C2 Losa 1 60x30 0.00/3.40 45/8" +61/2" +21/2" 3/8"c/17 cm 2.23 4.85 45.33 19.79 0.24 42.42 15.73 0.11 0.25 GS S
C3 Losa 1 60x30 0.00/3.40 45/8" +61/2" +21/2" 3/8"c/17 cm 1.44 -4.94 45.33 19.76 0.07 42.42 15.71 0.11 0.25 GS S
C4 Losa 1 60x30 0.00/3.35 45/8" +61/2" +21/2" 3/8"c/17 cm 3.82 -4.75 45.33 19.83 0.05 42.42 15.78 0.10 0.24 GS S
C5 Losa 1 60x30 0.00/3.40 45/8" +61/2" +21/2" 3/8"c/17 cm 5.30 -4.52 45.33 19.88 0.08 42.42 15.82 0.10 0.23 GS S
C6
Losa 11 30x60 0.00/3.40 45/8" +21/2" +61/2" 3/8"c/17 cm 0.37 0.35 42.42 15.68 -3.87 45.33 19.73 0.09 0.20 GS S



43

Pilar Planta
Dimensin
(cm)
Tramo
(m)
Armaduras Estribos
Psimos
Cumple
Nsd
(t)
Vsdx
(t)
Vrd1x
(t)
Vrd2x
(t)
Vsdy
(t)
Vrd1y
(t)
Vrd2y
(t)
CC1 CC2 Origen
C7
Losa 1 30x60 0.00/3.35 45/8" +21/2" +61/2" 3/8"c/17 cm 6.39 -0.58 42.42 15.85 4.16 45.33 19.91 0.09 0.21 GS S
C8
Losa 1 Dimetro:30 0.00/3.35 61/2" 3/8"c/20 cm 13.78 0.51 12.89 6.23 0.01 12.89 6.23 0.04 0.08 GS S
C9
Losa 1 Dimetro:30 0.00/3.35 61/2" 3/8"c/20 cm 6.16 0.04 12.89 6.02 -0.46 12.89 6.02 0.04 0.08 GS S
C10
Losa 1 Dimetro:30 0.00/3.35 61/2" 3/8"c/20 cm 14.22 -0.52 12.89 6.24 0.01 12.89 6.24 0.04 0.08 GS S
C11
Losa 1 30x60 0.00/3.35 45/8" +21/2" +61/2" 3/8"c/17 cm 6.41 0.46 42.42 15.85 4.97 45.33 19.91 0.11 0.25 GS S
C12
Losa 2 30x60 3.80/4.70 45/8" +21/2" +61/2" 3/8"c/17 cm 3.60 -3.13 42.42 15.77 -0.47 45.33 19.83 0.07 0.20 GS S

Losa 1 30x60 0.00/3.40 45/8" +21/2" +61/2" 3/8"c/17 cm 11.55 0.11 42.42 16.00 6.04 45.33 20.07 0.13 0.30 GS S
C13
Losa 2 60x30 3.80/4.85 45/8" +61/2" +21/2" 3/8"c/17 cm 3.94 6.19 45.33 19.84 0.75 42.42 15.78 0.14 0.32 GS S

Losa 1 60x30 0.00/3.40 45/8" +45/8" +21/2" 3/8"c/20 cm -0.80 6.90 45.33 17.83 -0.13 42.27 16.63 0.15 0.39 GS S
C14
Losa 2 60x30 3.80/4.65 45/8" +61/2" +21/2" 3/8"c/17 cm 5.60 6.02 45.33 19.89 2.34 42.42 15.83 0.14 0.34 GS S

Losa 1 60x30 0.00/3.40 45/8" +45/8" +21/2" 3/8"c/20 cm 2.97 -7.20 45.33 18.02 -0.28 42.27 16.81 0.16 0.40 GS S
C15
Losa 2 30x60 3.80/4.85 45/8" +21/2" +61/2" 3/8"c/17 cm 2.91 3.33 42.42 15.75 0.38 45.33 19.81 0.08 0.21 GS S

Losa 1 30x60 0.00/3.35 45/8" +21/2" +61/2" 3/8"c/17 cm -0.45 -0.04 42.42 15.61 -6.50 45.33 19.66 0.14 0.33 GS S
C16
Losa 1 Dimetro:30 0.00/3.35 61/2" 3/8"c/20 cm 8.79 -0.52 12.89 6.09 -0.02 12.89 6.09 0.04 0.09 GS S
C17
Losa 1 30x60 0.00/3.35 45/8" +21/2" +61/2" 3/8"c/17 cm 5.18 0.33 42.42 15.82 -4.30 45.33 19.88 0.10 0.22 GS S
C18
Losa 2 30x60 3.80/4.70 45/8" +21/2" +61/2" 3/8"c/17 cm 1.88 0.01 42.42 15.72 -4.66 45.33 19.78 0.10 0.24 GS S

Losa 1 30x60 0.00/3.40 45/8" +21/2" +61/2" 3/8"c/17 cm 2.23 0.08 42.42 15.73 6.16 45.33 19.79 0.14 0.31 GS S
C19
Losa 2 30x60 3.80/4.85 45/8" +21/2" +61/2" 3/8"c/17 cm 3.02 0.88 42.42 15.76 3.78 45.33 19.81 0.09 0.20 GS S

Losa 1 30x60 0.00/3.40 45/8" +21/2" +61/2" 3/8"c/17 cm 3.82 -0.21 42.42 15.78 6.86 45.33 19.83 0.15 0.35 GS S
C20
Losa 1 30x30 0.00/3.40 41/2" +21/2" +21/2" 3/8"c/19 cm 0.88 -0.76 21.26 8.69 -0.01 21.26 8.69 0.04 0.09 GS S
C21
Losa 1 30x30 0.00/3.40 41/2" +21/2" +21/2" 3/8"c/19 cm 7.69 -0.78 21.26 8.88 -0.07 21.26 8.88 0.04 0.09 GS S
C22
Losa 1 60x30 0.00/3.40 45/8" +61/2" +21/2" 3/8"c/17 cm 5.26 3.76 45.33 19.88 0.13 42.42 15.82 0.08 0.19 GS S
C23
Losa 2 30x50 3.80/4.70 41/2" +21/2" +61/2" 3/8"c/19 cm 8.28 -5.27 35.44 13.84 -4.76 37.36 15.47 0.20 0.49 GS S

Losa 1 30x50 0.00/3.40 41/2" +21/2" +61/2" 3/8"c/19 cm 7.12 0.59 35.44 13.81 4.04 37.36 15.43 0.11 0.27 GS S
C25
Losa 2 30x60 3.80/4.70 45/8" +21/2" +61/2" 3/8"c/17 cm 0.39 -3.39 42.42 15.68 -1.45 45.33 19.73 0.09 0.23 GS S

Losa 1 30x60 0.00/3.40 45/8" +21/2" +61/2" 3/8"c/17 cm 3.94 -0.08 42.42 15.78 6.55 45.33 19.84 0.14 0.33 GS S
C26
Losa 1 30x30 0.00/3.40 41/2" +21/2" +21/2" 3/8"c/19 cm 6.04 -0.75 21.26 8.83 -0.03 21.26 8.83 0.04 0.09 GS S
C27
Losa 1 30x30 0.00/3.40 41/2" +21/2" +21/2" 3/8"c/19 cm 0.95 -0.79 21.26 8.69 -0.03 21.26 8.69 0.04 0.09 GS S
C28
Losa 1 30x60 0.00/3.40 45/8" +21/2" +61/2" 3/8"c/17 cm 5.30 0.10 42.42 15.82 4.85 45.33 19.88 0.11 0.24 GS S
C29
Losa 2 60x30 3.80/4.70 45/8" +61/2" +21/2" 3/8"c/17 cm 4.44 -1.88 45.33 19.85 -2.67 42.42 15.80 0.08 0.19 GS S

Losa 1 60x30 0.00/3.40 45/8" +61/2" +21/2" 3/8"c/17 cm 2.59 5.02 45.33 19.80 -0.02 42.42 15.74 0.11 0.25 GS S
C30
Losa 2 60x30 3.80/4.70 45/8" +61/2" +21/2" 3/8"c/17 cm 4.57 7.83 45.33 19.86 -0.33 42.42 15.80 0.17 0.39 GS S

Losa 1 60x30 0.00/3.40 45/8" +61/2" +21/2" 3/8"c/17 cm 9.79 -6.60 45.33 20.02 0.03 42.42 15.95 0.15 0.33 GS S
C31
Losa 2 60x30 3.80/4.85 45/8" +61/2" +21/2" 3/8"c/17 cm 2.86 3.23 45.33 19.80 0.22 42.42 15.75 0.07 0.16 GS S

Losa 1 60x30 0.00/3.40 45/8" +45/8" +21/2" 3/8"c/20 cm 2.27 -6.97 45.33 18.00 -0.09 42.27 16.79 0.15 0.39 GS S



44

Pilar Planta
Dimensin
(cm)
Tramo
(m)
Armaduras Estribos
Psimos
Cumple
Nsd
(t)
Vsdx
(t)
Vrd1x
(t)
Vrd2x
(t)
Vsdy
(t)
Vrd1y
(t)
Vrd2y
(t)
CC1 CC2 Origen
C32
Losa 1 60x30 0.00/3.40 45/8" +61/2" +21/2" 3/8"c/17 cm 4.39 -4.87 45.33 19.85 -0.14 42.42 15.79 0.11 0.25 GS S
C33
Losa 1 30x60 0.00/3.40 45/8" +21/2" +61/2" 3/8"c/17 cm -1.81 0.25 42.42 15.45 4.14 45.33 19.49 0.09 0.21 GS S
C34
Losa 2 30x60 3.80/4.65 45/8" +21/2" +61/2" 3/8"c/17 cm 14.50 0.41 42.42 16.08 -2.57 45.33 20.16 0.06 0.13 GS S

Losa 1 30x60 0.00/3.80 45/8" +21/2" +61/2" 3/8"c/17 cm 14.97 0.41 42.42 16.10 -2.57 45.33 20.17 0.06 0.13 GS S

SALA DE EXPOSICION:

Columna Planta
Dimensin
(cm)
Tramo
(m)
Armaduras Estribos
Psimos
Cumple
Nsd
(t)
Vsdx
(t)
Vrd1x
(t)
Vrd2x
(t)
Vsdy
(t)
Vrd1y
(t)
Vrd2y
(t)
CC1 CC2 Origen
C1
Losa 1 60x30 -0.50/2.60 41" +25/8" 3/8c/12 cm 7.18 -8.06 45.03 19.80 -0.17 42.01 15.71 0.18 0.41 GS S
C2
Losa 1 60x30 -0.50/2.60 41" +23/4" 3/8"c/17 cm 9.81 8.98 44.90 19.83 0.74 41.67 15.67 0.20 0.46 GS S
C4
Losa 1 60x30 -0.50/2.60 41" +25/8" 3/8c/12 cm 9.43 -8.22 45.03 19.86 0.45 42.01 15.78 0.18 0.41 GS S
C5
Losa 1 30x60 -0.50/2.60 43/4" +25/8" +25/8" 3/8c/12 cm 12.30 -1.75 42.35 15.98 -6.24 45.32 20.08 0.14 0.33 GS S
C6
Losa 1 60x30 -0.50/2.75 43/4" +25/8" +25/8" 3/8c/12 cm 27.30 8.50 45.32 20.54 -0.07 42.35 16.41 0.19 0.41 GS S
C7
Losa 1 Dimetro:30 -0.50/2.75 61/2" 3/8"c/20 cm 23.86 -0.80 12.89 6.51 -0.13 12.89 6.51 0.06 0.12 GS S
C8
Losa 1 30x60 -0.50/2.60 45/8" +21/2" +61/2" 3/8"c/17 cm 11.12 1.62 42.42 15.99 -5.42 45.33 20.06 0.13 0.29 GS S
C9
Losa 1 30x60 -0.50/2.60 41" + ... +25/8" 3/8c/12 cm 8.21 -2.21 42.01 15.74 6.19 45.03 19.83 0.15 0.34 GS S
C10
Losa 2 30x60 3.00/3.50 45/8" +21/2" +61/2" 3/8"c/17 cm 1.49 6.22 42.42 15.71 2.47 45.33 19.76 0.16 0.42 GS S

Losa 1 30x60 -0.50/2.50 41" + ... +25/8" 3/8c/12 cm 11.32 2.22 42.01 15.83 -9.52 45.03 19.92 0.22 0.50 GS S
C11
Losa 2 60x30 3.00/3.50 45/8" +61/2" +21/2" 3/8"c/17 cm 2.23 -8.21 45.33 19.79 -0.58 42.42 15.73 0.18 0.42 GS S

Losa 1 60x30 -0.50/2.70 43/4" +23/4" +23/4" 3/8"c/17 cm 8.21 8.82 45.16 19.89 -0.01 42.02 15.75 0.20 0.44 GS S
C12
Losa 2 30x60 3.00/3.50 45/8" +21/2" +61/2" 3/8"c/17 cm 2.46 2.08 42.42 15.74 -1.88 45.33 19.79 0.06 0.16 GS S

Losa 1 30x60 -0.50/2.60 45/8" +21/2" +61/2" 3/8"c/17 cm 3.29 0.58 42.42 15.76 6.09 45.33 19.82 0.14 0.31 GS S
C13
Losa 1 60x30 -0.50/2.60 43/4" +25/8" +23/4" 3/8c/12 cm 6.87 -7.45 45.28 19.90 -0.34 42.35 15.83 0.16 0.37 GS S
C15
Losa 2 30x60 3.00/3.50 45/8" +21/2" +61/2" 3/8"c/17 cm 1.60 2.86 42.42 15.71 -1.54 45.33 19.77 0.08 0.20 GS S

Losa 1 30x60 -0.50/2.50 43/4" +23/4" +45/8" 3/8"c/22 cm 12.36 2.15 42.14 16.17 -9.43 45.16 17.32 0.22 0.56 GS S
C17
Losa 2 30x60 3.00/3.50 45/8" +21/2" +61/2" 3/8"c/17 cm 0.94 0.14 42.42 15.70 -3.07 45.33 19.75 0.07 0.16 GS S



45

Columna Planta
Dimensin
(cm)
Tramo
(m)
Armaduras Estribos
Psimos
Cumple
Nsd
(t)
Vsdx
(t)
Vrd1x
(t)
Vrd2x
(t)
Vsdy
(t)
Vrd1y
(t)
Vrd2y
(t)
CC1 CC2 Origen

Losa 1 30x60 -0.50/3.00 45/8" +21/2" +61/2" 3/8"c/17 cm 1.14 0.14 42.42 15.70 -3.07 45.33 19.75 0.07 0.16 GS S
C18
Losa 2 30x60 3.00/3.50 45/8" +21/2" +61/2" 3/8"c/17 cm 0.69 -0.87 42.42 15.69 3.01 45.33 19.74 0.07 0.16 GS S

Losa 1 30x60 -0.50/3.00 45/8" +21/2" +61/2" 3/8"c/17 cm 0.97 -0.87 42.42 15.70 3.01 45.33 19.75 0.07 0.16 GS S
C19
Losa 2 60x30 3.00/3.50 45/8" +61/2" +21/2" 3/8"c/17 cm 2.14 -3.69 45.33 19.78 0.02 42.42 15.73 0.08 0.19 GS S

Losa 1 60x30 -0.50/3.00 45/8" +61/2" +21/2" 3/8"c/17 cm 2.42 -3.69 45.33 19.79 0.02 42.42 15.74 0.08 0.19 GS S
C20
Losa 2 30x60 3.00/3.50 45/8" +21/2" +61/2" 3/8"c/17 cm 2.99 0.60 42.42 15.75 -2.60 45.33 19.81 0.06 0.14 GS S

Losa 1 30x60 -0.50/3.00 45/8" +21/2" +61/2" 3/8"c/17 cm 3.27 0.60 42.42 15.76 -2.60 45.33 19.82 0.06 0.14 GS S

VESTUARIO:

Columna Planta
Dimensin
(cm)
Tramo
(m)
Psimos
Cumple
Nsd
(t)
Vsdx
(t)
Vrd1x
(t)
Vrd2x
(t)
Vsdy
(t)
Vrd1y
(t)
Vrd2y
(t)
CC1 CC2 Origen
C1 Losa 30x30 -1.00/2.55 3.71 0.01 21.18 8.73 1.86 21.18 8.73 0.09 0.21 GS S
C2 Losa 30x30 -1.00/2.55 9.27 0.05 21.18 8.89 2.08 21.18 8.89 0.10 0.23 GS S
C3 Losa 30x30 -1.00/2.55 10.35 0.02 21.18 8.92 2.18 21.18 8.92 0.10 0.24 GS S
C4 Losa 30x30 -1.00/2.55 11.82 0.06 21.18 8.96 2.61 21.14 8.94 0.12 0.29 GS S
C5 Losa 30x30 -1.00/2.55 11.81 -0.06 21.18 8.96 2.61 21.14 8.94 0.12 0.29 GS S
C6 Losa 30x30 -1.00/2.55 10.34 -0.02 21.18 8.92 2.19 21.18 8.92 0.10 0.24 GS S
C7 Losa 30x30 -1.00/2.55 9.28 -0.05 21.18 8.89 2.08 21.18 8.89 0.10 0.23 GS S
C8 Losa 30x30 -1.00/2.55 3.72 -0.01 21.18 8.73 1.86 21.18 8.73 0.09 0.21 GS S
C9 Losa 30x30 -1.00/2.60 4.48 -0.04 21.18 8.75 1.80 21.18 8.75 0.09 0.21 GS S
C10 Losa 30x30 -1.00/2.60 3.99 -0.07 21.18 8.74 -1.84 21.18 8.74 0.09 0.21 GS S
C11 Losa 30x30 -1.00/2.55 16.97 -2.13 21.13 8.88 -0.07 21.13 8.88 0.10 0.24 GS S
C12 Losa 30x30 -1.00/2.60 4.59 -1.84 21.14 8.74 -0.08 21.14 8.74 0.09 0.21 GS S
C13 Losa 30x30 -1.00/2.60 8.25 1.74 21.13 8.63 -0.09 21.13 8.63 0.08 0.20 GS S
C14 Losa 30x30 -1.00/2.60 8.23 -1.74 21.13 8.63 -0.08 21.13 8.63 0.08 0.20 GS S
C15 Losa 30x30 -1.00/2.60 4.58 1.84 21.14 8.74 -0.08 21.14 8.74 0.09 0.21 GS S
C16 Losa 30x30 -1.00/2.55 16.92 2.12 21.13 8.88 -0.07 21.13 8.88 0.10 0.24 GS S
C17 Losa 30x30 -1.00/2.55 7.17 -0.16 21.13 8.60 -2.18 21.22 8.63 0.10 0.25 GS S
C18 Losa 30x30 -1.00/2.60 3.99 0.07 21.18 8.74 -1.85 21.18 8.74 0.09 0.21 GS S
C19 Losa 30x30 -1.00/2.60 4.50 0.04 21.18 8.75 1.80 21.18 8.75 0.09 0.21 GS S
C20 Losa 30x30 -1.00/2.55 7.15 0.16 21.13 8.60 -2.17 21.22 8.63 0.10 0.25 GS S
C21 Losa 30x30 -1.00/2.55 12.60 0.03 21.26 9.02 1.84 21.26 9.02 0.09 0.20 GS S



46

Columna Planta
Dimensin
(cm)
Tramo
(m)
Psimos
Cumple
Nsd
(t)
Vsdx
(t)
Vrd1x
(t)
Vrd2x
(t)
Vsdy
(t)
Vrd1y
(t)
Vrd2y
(t)
CC1 CC2 Origen
C22 Losa 30x30 -1.00/2.55 20.96 -0.32 21.14 9.20 -1.99 21.18 9.22 0.10 0.22 GS S
C23 Losa 30x30 -1.00/2.55 19.70 0.16 21.13 8.95 -2.58 21.22 8.99 0.12 0.29 GS S
C24 Losa 30x30 -1.00/2.55 19.65 -0.16 21.13 8.95 -2.58 21.22 8.99 0.12 0.29 GS S
C25 Losa 30x30 -1.00/2.55 20.93 0.32 21.14 9.20 -1.99 21.18 9.22 0.10 0.22 GS S
C26 Losa 30x30 -1.00/2.55 12.61 -0.03 21.26 9.02 1.84 21.26 9.02 0.09 0.20 GS S
C27 Losa 30x30 -1.00/2.60 21.04 1.86 21.26 9.26 -0.00 21.26 9.26 0.09 0.20 GS S
C28 Losa 30x30 -1.00/2.60 21.03 -1.85 21.26 9.26 -0.00 21.26 9.26 0.09 0.20 GS S


BOLETERA:

Columna Planta
Dimensin
(cm)
Tramo
(m)
Armaduras Estribos
Psimos
Cumple
Nsd
(t)
Vsdx
(t)
Vrd1x
(t)
Vrd2x
(t)
Vsdy
(t)
Vrd1y
(t)
Vrd2y
(t)
CC1 CC2 Origen
C5
Losa 2 80x40 2.45/2.80 41" +45/8" +25/8" 3/8"c/20 cm 3.55 -4.35 81.51 34.63 -2.89 77.32 26.38 0.07 0.17 GS S

Losa 1 80x40 0.00/2.45 41" +45/8" +25/8" 3/8"c/20 cm 6.32 -4.36 81.51 34.71 -2.91 77.32 26.46 0.07 0.17 GS S
C6
Losa 2 80x40 2.45/2.80 41" +45/8" +25/8" 3/8"c/20 cm 11.06 -6.34 81.51 34.86 -0.04 77.32 26.60 0.08 0.18 GS S

Losa 1 80x40 0.00/2.45 41" +45/8" +25/8" 3/8"c/20 cm 11.41 -6.34 81.51 34.87 -0.04 77.32 26.61 0.08 0.18 GS S
C13
Losa 2 80x40 2.45/2.80 41" +45/8" +25/8" 3/8"c/20 cm 11.90 6.36 81.51 34.89 -0.04 77.32 26.62 0.08 0.18 GS S

Losa 1 80x40 0.00/2.45 41" +45/8" +25/8" 3/8"c/20 cm 12.25 6.36 81.51 34.90 -0.04 77.32 26.63 0.08 0.18 GS S
C14
Losa 2 80x40 2.45/2.80 41" +45/8" +25/8" 3/8"c/20 cm 3.17 4.55 81.51 34.62 -2.92 77.32 26.37 0.07 0.17 GS S

Losa 1 80x40 0.00/2.45 41" +45/8" +25/8" 3/8"c/20 cm 5.93 4.55 81.51 34.70 -2.94 77.32 26.45 0.07 0.17 GS S
C15
Losa 2 80x40 2.45/2.80 41" +45/8" +25/8" 3/8"c/20 cm 16.43 8.21 81.51 35.02 -0.04 77.32 26.75 0.10 0.23 GS S

Losa 1 80x40 0.00/2.20 41" +45/8" +25/8" 3/8"c/20 cm 19.44 -3.97 81.51 35.12 -0.05 77.32 26.84 0.05 0.11 GS S
C16
Losa 2 80x40 2.45/2.80 41" +45/8" +25/8" 3/8"c/20 cm 17.78 -7.76 81.51 35.07 -0.06 77.32 26.79 0.10 0.22 GS S

Losa 1 80x40 0.00/2.20 41" +45/8" +25/8" 3/8"c/20 cm 20.85 4.24 81.51 35.16 -0.03 77.32 26.88 0.05 0.12 GS S
C17
Losa 2 80x40 2.45/2.80 41" +45/8" +25/8" 3/8"c/20 cm 16.30 -4.39 81.51 35.02 0.05 77.32 26.75 0.05 0.13 GS S

Losa 1 80x40 0.00/2.20 41" +45/8" +25/8" 3/8"c/20 cm 19.39 3.98 81.51 35.12 0.05 77.32 26.84 0.05 0.11 GS S
C18
Losa 2 80x40 2.45/2.80 41" +45/8" +25/8" 3/8"c/20 cm 18.18 4.50 81.51 35.08 0.07 77.32 26.80 0.06 0.13 GS S

Losa 1 80x40 0.00/2.20 41" +45/8" +25/8" 3/8"c/20 cm 21.18 -3.71 81.51 35.17 0.03 77.32 26.89 0.05 0.11 GS S






47




11. INSTALACIONES SANITARIAS

GENERALIDADES
- SISTEMA DE AGUA FRA
ABASTECIMIENTO
El abastecimiento para el complejo recreativo municipal Alfonso Barrantes ser desde las redes
pblicas existentes y mediante una conexin domiciliaria de agua atendida desde la tubera de 4
ubicada en el ingreso principal .
ALMACENAMIENTO
Para el clculo del almacenamiento de agua se ha tomado como base las demandas que fija el
Reglamento Nacional de Edificaciones - Titulo III, Norma IS-010 (2.2 Dotaciones).
El total de las demandas llega a un volumen para 24 horas de 43m3;.

PRESURIZACION
Considerando que la demanda de agua para el complejo recreativo municipal Alfonso Barrantes es
de 200 GPM. Es que el sistema de presurizacin ser por medio de Bombas de Velocidad Variable y
Presin Constante.
El Sistema contempla 4 bombas que trabajaran de 0 a 50 GPM cada una, de modo tal que en forma
ascendente en nmero vayan cubriendo las necesidades del consumo de agua.

REDES DE DISTRIBUCION
Desde el sistema de presurizacin existe una red que forma un anillo para atender los diversos
puntos que requieran de suministro, esta red est calculada de modo tal que atiende con el gasto y la
presin necesaria a todos y cada uno de los servicios.




48

SISTEMA DE RIEGO
Para el Sistema de Riego de las reas verdes del complejo se han considerado grifos para regar con
mangueras, los cuales se abastecen desde la red pblica.

SISTEMA DE DESAGUE DOMESTICO
Desde los pisos superiores de la edificacin se ha contemplado que los desages de los diferentes
servicios higinicos sean conducidos por gravedad hasta un punto tal que descarguen (Montante)
hacia las partes bajas, estas montantes irn en zonas que en lo posible no afecten a los locales
intermedios (se ha reducido al mximo la servidumbre de paso); al llegar al primer nivel, los desages
son conducidos a las redes generales a travs de conexiones (cajas de registro). Existiendo locales
de venta de comida es que en cada sector se ha considerado trampas de grasa para que se pueda
retirar stas y no afectar a la red de desages e independientemente cada aparato de los locales
deber contar con una trampa de grasa prefabricada.
Las redes generales conducirn los desages por gravedad mediante un colector de dimetro y
pendiente debido, de modo tal que permita una eficiente conduccin, hasta la conexin con la red
pblica en el punto indicado en los planos.
SISTEMA DE DESAGUE PLUVIAL
El acabado de pisos en estacionamientos, patios, corredores exteriores y otros seran diseados con
una pendiente para conducir el drenaje superficial de lluvias superficial.

12. instalaciones elctricas
1.1 Generalidades
El presente proyecto corresponde a las Redes Elctricas interiores con un suministro en
380 V proveniente de una subestacin proyectada que no es materia de desarrollo del
presente expediente.
El objeto de esta Memoria Descriptiva es dar una descripcin completa de la forma como
deben ejecutarse los trabajos, as como indicar los materiales a emplearse hasta la
terminacin de las instalaciones elctricas.
La mencin de fabricantes y/o modelos de equipos y materiales, se refiere nicamente a
standards de calidad pudindose reemplazar por equipos y/o materiales similares de otra
procedencia y que deber ser aprobado por el Propietario.



49

En caso de existir discrepancia, los planos prevalecen sobre la Memoria Descriptiva y
Especificaciones Tcnicas y estos sobre los presupuestos.

1.2 Alcances
El proyecto comprende el diseo, clculo y seleccin de los materiales y equipos
electromecnicos de los alimentadores, de las derivaciones como son los circuitos de
Alumbrado, tomacorriente; los circuitos de fuerza de la instalacin electromecnica de
electrobombas y del sistema de puesta a tierra.
Los circuitos estn proyectados para un sistema de tensin 380/220 V.

1.3 Descripcin de las instalaciones
Las caractersticas bsicas que muestran el presente proyecto son:

1.4 Sistema Elctrico
La energa elctrica provendr de una subestacin de media tensin proyectada y la cual
suministrar un nivel de tensin trifsico en 380V.
El sistema elctrico de interiores comprende la instalacin de tuberas, cajas de pase,
cajas de salida de alumbrado, cajas de salida de tomacorriente, cajas de salida de
fuerza, cajas de salida para telfono, interruptores, tomacorrientes y tableros.
Este sistema elctrico de interiores comprende:

1.5 Tablero general y de distribucin
Todos los tableros sern del tipo metlico de caractersticas indicadas en los planos.

1.6 Red de Alimentadores
Se ha proyectado una instalacin elctrica interior de tipo empotrado.
El conductor alimentador se ha dimensionado para la mxima demanda de potencia
obtenida en el rea correspondiente ms un 25% de reserva.



50


1.7 Red de Alumbrado y Tomacorrientes
En esta red se ha proyectado tambin conductores empotrados con capacidad para
satisfacer demandas segn el C.N.E. para escuelas

1.8 Sistemas Auxiliares
Este sistema comprende el cableado e instalacin de salidas hacia voz o data.
En general los circuitos derivados irn empotrados en piso o pared

1.9 Sistemas de puesta a Tierra
Se ha previsto pozos a tierra indicado en planos.

1.10 Circuito de Puesta a Tierra
El circuito de puesta a tierra ser instalado a los circuitos elctricos.

1.11 Caractersticas del sistema de Puesta a Tierra
Los pozos de tierra estarn ubicados en el jardn interior, cumpliendo de antemano las
normas y pruebas tcnicas que se requieren para el sistema.
El sistema de puesta a tierra consistir de pozo de puesta a tierra de una profundidad
2.40m en donde estar el electrodo de cobre clavado en una tierra mezclada con una
dosis de bentonita colocada compactadamente en el pozo y protegidos por una tapa de
concreto.
Para puesta a tierra de equipos en 380/220V se tendr un sistema de puesta a tierra,
con una resistencia que ser igual o menor a 25 ohmios.

1.12 Mxima Demanda de Potencia
El proyecto considera una mxima demanda de 170 KW y para solicitar a la
concesionaria una carga de 155 KW



51


1.13 Bases de Clculo
Las normas aplicables a las cuales se ha ceido la instalacin interna, son aquellos
emitidos por el Cdigo Nacional de Electricidad
Parmetros considerados:
Mxima Cada de Tensin (interior) 2.5 %
Factor de Potencia de la carga 0.9 inductivo

1.14 Financiamiento
La ejecucin de este proyecto ser ntegramente financiado por el interesado.


12. Instalaciones elctricas
1.15 Generalidades
El presente proyecto corresponde a las Redes Elctricas interiores con un suministro en
380 V proveniente de una subestacin proyectada que no es materia de desarrollo del
presente expediente.
El objeto de esta Memoria Descriptiva es dar una descripcin completa de la forma como
deben ejecutarse los trabajos, as como indicar los materiales a emplearse hasta la
terminacin de las instalaciones elctricas.
La mencin de fabricantes y/o modelos de equipos y materiales, se refiere nicamente a
standards de calidad pudindose reemplazar por equipos y/o materiales similares de otra
procedencia y que deber ser aprobado por el Propietario.
En caso de existir discrepancia, los planos prevalecen sobre la Memoria Descriptiva y
Especificaciones Tcnicas y estos sobre los presupuestos.
1.16 Alcances
El proyecto comprende el diseo, clculo y seleccin de los materiales y equipos
electromecnicos de los alimentadores, de las derivaciones como son los circuitos de



52

Alumbrado, tomacorriente; los circuitos de fuerza de la instalacin electromecnica de
electrobombas y del sistema de puesta a tierra.
Los circuitos estn proyectados para un sistema de tensin 380/220 V.

1.17 Descripcin de las instalaciones
Las caractersticas bsicas que muestran el presente proyecto son:

1.18 Sistema Elctrico
La energa elctrica provendr de una subestacin de media tensin proyectada y la cual
suministrar un nivel de tensin trifsico en 380V.
El sistema elctrico de interiores comprende la instalacin de tuberas, cajas de pase,
cajas de salida de alumbrado, cajas de salida de tomacorriente, cajas de salida de
fuerza, cajas de salida para telfono, interruptores, tomacorrientes y tableros.
Este sistema elctrico de interiores comprende:

1.19 Tablero general y de distribucin
Todos los tableros sern del tipo metlico de caractersticas indicadas en los planos.

1.20 Red de Alimentadores
Se ha proyectado una instalacin elctrica interior de tipo empotrado.
El conductor alimentador se ha dimensionado para la mxima demanda de potencia
obtenida en el rea correspondiente ms un 25% de reserva.

1.21 Red de Alumbrado y Tomacorrientes
En esta red se ha proyectado tambin conductores empotrados con capacidad para
satisfacer demandas segn el C.N.E. para escuelas




53

1.22 Sistemas Auxiliares
Este sistema comprende el cableado e instalacin de salidas hacia voz o data.
En general los circuitos derivados irn empotrados en piso o pared
1.23 Sistemas de puesta a Tierra
Se ha previsto pozos a tierra indicado en planos.
1.24 Circuito de Puesta a Tierra
El circuito de puesta a tierra ser instalado a los circuitos elctricos.
1.25 Caractersticas del sistema de Puesta a Tierra
Los pozos de tierra estarn ubicados en el jardn interior, cumpliendo de antemano las
normas y pruebas tcnicas que se requieren para el sistema.
El sistema de puesta a tierra consistir de pozo de puesta a tierra de una profundidad
2.40m en donde estar el electrodo de cobre clavado en una tierra mezclada con una
dosis de bentonita colocada compactadamente en el pozo y protegidos por una tapa de
concreto.
Para puesta a tierra de equipos en 380/220V se tendr un sistema de puesta a tierra,
con una resistencia que ser igual o menor a 25 ohmios.
1.26 Mxima Demanda de Potencia
El proyecto considera una mxima demanda de 170 KW y para solicitar a la
concesionaria una carga de 155 KW
1.27 Bases de Clculo
Las normas aplicables a las cuales se ha ceido la instalacin interna, son aquellos
emitidos por el Cdigo Nacional de Electricidad
Parmetros considerados:
Mxima Cada de Tensin (interior) 2.5 %
Factor de Potencia de la carga 0.9 inductivo
1.28 Financiamiento
La ejecucin de este proyecto ser ntegramente financiado por el interesado.




54

PROYECTO: CREACION DEL COMPLEJO RECREATIVO MUNICIPAL ALFONSO BARRANTES DE HUAYCAN, DISTRITO DE ATE LIMA - LIMA
CLIENTE: MUNICIPALIDAD DE ATE
LUGAR: LIMA - LIMA - ATE FECHA: MAYO 2014
1 OBRAS PRELIMINARES 4,248,263.50
2 OBRAS EXTERIORES 1,629,871.54
3 INGRESO Y BOLETERA 488,193.89
4 ADMINISTRACION 92,851.86
5 TPICO 92,851.86
6 BAOS A 162,663.18
7 BAO C 156,061.32
8 PISCINAS 2,836,820.11
9 VESTUARIO 629,684.29
10 RESTAURANTE 634,207.73
11 BAO B 88,112.21
12 ANFITEATRO 3,150,861.14
13 SALA DE EXPOSICIONES 1,437,906.01
14 CANCHA DE GRASS SINTETICO 433,323.59
15 CANCHAS MULTIDEPORTIVAS 714,184.13
16 GIMNASIO 1,861,038.84
17 CUARTO DE MQUINAS 957,530.92
18 REA DE JUEGOS PARA NIOS 188,575.55
19 ESTACIONAMIENTO 361,524.61
20 CISTERNA 490,843.85
21 INSTALACIONES SANITARIAS 176,705.01
22 INSTALACIONES ELECTRICAS 10,550.52
20,842,625.66
2,084,262.57
2,084,262.57
25,011,150.79
4,502,007.14
29,513,157.93
885,394.74
1,180,526.32
295,131.58
31,874,210.57
PRESUPUESTO
SUB-TOTAL
EXPEDIENTE TCNICO
SUPERVISIN
LIQUIDACIN
COSTO DIRECTO
GASTOS GENERALES (10%)
UTILIDAD (10%)
TOTAL INVERSIN
IGV (18%)
PBO
13. PRESUPUESTOS Y METRADOS



























55

14. Valor referencial de ejecucin de obra


15. Plazo de ejecucin