You are on page 1of 2

2014-09-12

Report No.

September 12, 2014

Date

Little Pocket Tahoe Park Water


Land Park Water Replacement
Main Replacement Project
and Meter Project Z14010063
Z14010065

M
M

Th

0700

Shift Hours Start:

1730

Full

Part

Yes

No

Phase 1
Chargable Working Day:

Location & Description of Operation:


Phase 1
Piedmont - mainline

Sn

Stop:

Inspection Type

INSPECTOR'S DAILY REPORT FOR:

BID ITEM NO.

CONTROLLING OPERATION
8" Mainline

4b 8" DIP Furnish & Install

5b 8" GV Furnish & Install

Item #

Item #

Item #

##

Navajo

9.0

1.0

Gilbert Rameriz

Fore

Navajo

9.0

1.0

Miguel Gonzales

Lab

Navajo

9.0

1.0

Leonel Chavez

Lab

Navajo

9.0

1.0

Rogelio Ochoa

Lab

Navajo

9.0

1.0

Jose Larios

Lab

Navajo

9.0

1.0

Jesus Zavala

Lab

Navajo

9.0

1.0

Ramon Garcia

Lab

Navajo

9.0

1.0

Jonathan Guerra

Lab

Navajo

9.0

1.0

Dino Andreotti

Oper

Equipment
Number

Navajo

Description

QUANTITY

Broom

TEMPERATURE RANGE:
103

IDLE

DEG FROM

Labor

Name

Class

10.0

Laymor Mini-Broom

Navajo

111

Skidsteer

7.0

New Holland LS185

Navajo

121

Pickup

10.0

Chevy 3500 Utility Truck

Navajo

128

Truck

10.0

F550 Utility Truck w/ Saw

Navajo

132

Truck

10.0

6 CY Dump Truck F650

Navajo

136

Backhoe

10.0

CAT 430E Backhoe

Navajo

153

Truck

10.0

Welding Truck

Rental

Demo 4

Skidsteer

10.0

CAT 262E Bobcat

Demo 5

Excavator

10.0

JD 265 Excavator

Owner Oper

Trucking

8.0

Leal Trucking

Owner Oper

Trucking

6.5

Don Souza Trucking

Owner Oper

Trucking

5.0

Tim Reed Trucking

Erosion, Sediment and Pollution Control:

61

DEG TO:

LABOR

Item#

Company

Sunny

EQUIPMENT

7 Standard Fire Hydrant

3c 12" DIP Furnish & Install

Item #

WEATHER

Are BMP's adequatly implemented and maintained?

Yes

No

N/A

Yes

No

Yes

No

If no explain:

Surveying:
Materials Testing:

Were the assigned survey crews observed onsite today?


Are the assigned materials testing firm onsite today?

Mainline Information:

Excavate, bed, place, backfill & compact 8" DIP on Piedmont Drive from STA 17+15 to 14+35.
While excavating, crew bent 961 Piedmont gas service and immediately notified PG&E @ STA 17+25.
PG&E crews responded and reviewed pipe, PG&E issued Navajo a warning.
Installed 8" tee & 8" GV at STA 14+30 Piedmont

Filename: 8-25-14 LPTP

Filename: 8-25-14 LPTP