You are on page 1of 2

Federal Register / Vol. 71, No.

155 / Friday, August 11, 2006 / Notices 46245

Signed in Washington, DC, this 7th day of ADAMS or who encounter problems in the premerger shareholders of CEG, Inc.,
August 2006. accessing the documents located in will own the remaining approximately
Erica R. Cantor, ADAMS should contact the NRC’s PDR 40 percent. In addition, the CEG, Inc.,
Director, Division of Trade Adjustment Reference staff at 1–800–397–4209, Board of Directors will be composed of
Assistance. extension 301–415–4737, or by e-mail to fifteen members, nine of whom will be
[FR Doc. E6–13177 Filed 8–10–06; 8:45 am] pdr@nrc.gov. named by FPL Group, and six of whom
BILLING CODE 4510–30–P A copy of the license renewal will be named by the current CEG, Inc.
application for the James A. FitzPatrick Approval of the indirect transfer of
Nuclear Power Plant, is also available to the facility operating licenses was
NUCLEAR REGULATORY local residents near the James A. requested by FPL pursuant to 10 CFR
COMMISSION FitzPatrick Nuclear Power Plant at the 50.80. Notice of the request for approval
Penfield Library (Selective Depository), and an opportunity for a hearing was
[Docket No. 50–333] Reference and Documents Department, published in the Federal Register on
State University of New York, Oswego, February 22, 2006 (71 FR 9170). No
Entergy Nuclear Operations, Inc.; New York 13126. comments or petitions to intervene were
Notice of Receipt and Availability of received.
Application for Renewal of James A. Dated at Rockville, Maryland, this 7th day
of August 2006.
Pursuant to 10 CFR 50.80, no license,
FitzPatrick Nuclear Power Plant or any right thereunder, shall be
(Facility Operating License No. Dpr–59) For the Nuclear Regulatory Commission.
transferred, directly or indirectly,
for an Additional 20-Year Period Pao-Tsin Kuo, through transfer of control of the
Deputy Director, Division of License Renewal, license, unless the Commission shall
The U.S. Nuclear Regulatory Office of Nuclear Reactor Regulation. give its consent in writing. Upon review
Commission (NRC or Commission) has [FR Doc. E6–13124 Filed 8–10–06; 8:45 am] of the information in the application by
received an application, dated July 31, BILLING CODE 7590–01–P FPL and other information before the
2006, from Entergy Nuclear Operations,
Commission, the NRC staff concludes
Inc., filed pursuant to Section 104(b)
that the proposed merger and resulting
(Operating License No. DPR–59) of the NUCLEAR REGULATORY indirect transfer of control of the
Atomic Energy Act of 1954, as amended, COMMISSION licenses will not affect the qualifications
and Title 10 of the Code of Federal
[Docket Nos. 50–250 and 50–251; License of FPL as a holder of the facility
Regulations Part 54 (10 CFR Part 54), to
Nos. Dpr–31 And Dpr–41] licenses, and that the indirect transfer of
renew the operating license for the
control of the license as held by FPL, is
James A. FitzPatrick Nuclear Power In the Matter of Florida Power and otherwise consistent with applicable
Plant. Renewal of the license would Light Company; (Turkey Point Plant, provisions of law, regulations, and
authorize the applicant to operate the Unit Nos. 3 And 4); Order Approving orders issued by the Commission
facility for an additional 20-year period Application Regarding Corporate pursuant thereto.
beyond the period specified in the Merger The findings set forth above are
current operating license. The current supported by a safety evaluation dated
operating license for the James A. I
August 3, 2006.
FitzPatrick Nuclear Power Plant (DPR– Florida Power and Light Company
59) expires on October 17, 2014. The (FPL or the licensee) is the holder of the III
James A. FitzPatrick Nuclear Power Facility Operating Licenses, Nos. DPR– Accordingly, pursuant to Sections
Plant is a boiling-water reactor designed 31 and DPR–41, which authorize the 161b, 161i, 161o, and 184 of the Atomic
by General Electric. The unit is located possession, use, and operation of the Energy Act of 1954, as amended (the
near the town of Lycoming, New York. Turkey Point Plant, Units 3 and 4 (the Act), 42 U.S.C. 2201(b), 2201(i), 2201(o),
The acceptability of the tendered facility). FPL is licensed by the U.S. and 2234; and 10 CFR 50.80, It is hereby
application for docketing, and other Nuclear Regulatory Commission (NRC ordered that the application regarding
matters including an opportunity to or Commission) to operate the facility. the proposed merger and indirect
request a hearing, will be the subject of The facility is located at the licensee’s license transfer is approved, subject to
subsequent Federal Register notices. site in Miami-Dade County, Florida. the following conditions:
Copies of the application are available (1) FPL shall provide the Director of
for public inspection at the II the Office of Nuclear Reactor Regulation
Commission’s Public Document Room By application dated January 20, 2006 a copy of any application, at the time it
(PDR), located at One White Flint North, (the application), FPL requested that the is filed, to transfer (excluding grants of
11555 Rockville Pike (first floor), NRC, pursuant to 10 CFR 50.80, consent security interests or liens) from FPL to
Rockville, Maryland, 20582 or to the proposed indirect transfer of its parent, or to any other affiliated
electronically from the NRC’s control of the licenses for the facility. company, facilities for the production,
Agencywide Documents Access and According to the application filed by transmission, or distribution of electric
Management System (ADAMS) Public FPL, the facility is wholly owned by energy having a depreciated book value
Electronic Reading Room under FPL. exceeding ten percent (10%) of FPL’s
Accession Number ML062160486. The As stated in the application, in net utility plant, as recorded on its
ADAMS Public Electronic Reading connection with the proposed merger of books of accounts.
Room is accessible from the NRC Web FPL’s parent company, FPL Group, Inc. (2) Should the proposed merger not be
site at http://www.nrc.gov/reading-rm/ (FPL Group), and Constellation Energy completed within one year from the
hsrobinson on PROD1PC67 with NOTICES1

adams.html. In addition, the application Group, Inc. (CEG, Inc.), FPL Group will date of issuance, this Order shall
is available on the NRC Web page at become a wholly owned subsidiary of become null and void, provided,
http://www.nrc.gov/reactors/operating/ CEG, Inc. At the closing of the merger, however, upon written application and
licensing/renewal/application.html. the former shareholders of FPL Group good cause shown, such date may, in
while the application is under review. will own approximately 60 percent of writing, be extended.
Persons who do not have access to the outstanding stock of CEG, Inc., and This Order is effective upon issuance.

VerDate Aug<31>2005 15:03 Aug 10, 2006 Jkt 208001 PO 00000 Frm 00062 Fmt 4703 Sfmt 4703 E:\FR\FM\11AUN1.SGM 11AUN1
46246 Federal Register / Vol. 71, No. 155 / Friday, August 11, 2006 / Notices

For further details with respect to this hold a 14.9 percent ownership interest is filed, to transfer (excluding grants of
Order, see the application dated January in St. Lucie Unit 2, but are not involved security interests or liens) from FPL to
20, 2006, and the safety evaluation in this action. its parent, or to any other affiliated
dated August 3, 2006, which are According to the application filed by company, facilities for the production,
available for public inspection at the FPL, St. Lucie Unit 1 is wholly owned transmission, or distribution of electric
Commission’s Public Document Room by FPL and St. Lucie Unit 2 is 85.1 energy having a depreciated book value
(PDR), located at One White Flint North, percent owned by FPL. exceeding ten percent (10%) of FPL’s
Public File Area 01 F21, 11555 As stated in the application, in net utility plant, as recorded on its
Rockville Pike (first floor), Rockville, connection with the proposed merger of books of accounts.
Maryland and accessible electronically FPL’s parent company, FPL Group, Inc. (2) Should the proposed merger not be
from the Agencywide Documents (FPL Group), and Constellation Energy completed within one year from the
Access and Management System Group, Inc. (CEG, Inc.), FPL Group will date of issuance, this Order shall
(ADAMS) Public Electronic Reading become a wholly owned subsidiary of become null and void, provided,
Room on the Internet at the NRC Web CEG, Inc. At the closing of the merger, however, upon written application and
site, http://www.nrc.gov/reading-rm/ the former shareholders of FPL Group good cause shown, such date may, in
adams.html. Persons who do not have will own approximately 60 percent of writing, be extended.
access to ADAMS or who encounter the outstanding stock of CEG, Inc., and This Order is effective upon issuance.
problems in accessing the documents the premerger shareholders of CEG, Inc., For further details with respect to this
located in ADAMS, should contact the will own the remaining approximately Order, see the application dated January
NRC PDR Reference staff by telephone 40 percent. In addition, the CEG, Inc., 20, 2006, and the safety evaluation
at 1–800–397–4209, 301–415–4737, or Board of Directors will be composed of dated August 3, 2006, which are
by e-mail to pdr@nrc.gov. fifteen members, nine of whom will be available for public inspection at the
named by FPL Group, and six of whom Commission’s Public Document Room
Dated at Rockville, Maryland this 3rd day
will be named by the current CEG, Inc. (PDR), located at One White Flint North,
of August 2006.
Approval of the indirect transfer of Public File Area 01 F21, 11555
For the Nuclear Regulatory Commission. the facility operating licenses was Rockville Pike (first floor), Rockville,
Catherine Haney, requested by FPL pursuant to 10 CFR Maryland and accessible electronically
Director, Division of Operating Reactor 50.80. Notice of the request for approval from the Agencywide Documents
Licensing, Office of Nuclear Reactor and an opportunity for a hearing was Access and Management System
Regulation. published in the Federal Register on (ADAMS) Public Electronic Reading
[FR Doc. E6–13125 Filed 8–10–06; 8:45 am] February 22, 2006 (71 FR 9171). No Room on the Internet at the NRC Web
BILLING CODE 7590–01–P comments or petitions to intervene were site, http://www.nrc.gov/reading-rm/
received. adams.html. Persons who do not have
Pursuant to 10 CFR 50.80, no license, access to ADAMS or who encounter
NUCLEAR REGULATORY or any right thereunder, shall be problems in accessing the documents
COMMISSION transferred, directly or indirectly, located in ADAMS, should contact the
[Docket Nos. 50–335 and 50–389; License through transfer of control of the NRC PDR Reference staff by telephone
Nos. DPR–67 and NPF–16] license, unless the Commission shall at 1–800–397–4209, 301–415–4737, or
give its consent in writing. Upon review by e-mail to pdr@nrc.gov.
In the Matter of Florida Power And of the information in the application by
Dated at Rockville, Maryland this 3rd day
Light Company (St. Lucie Nuclear FPL and other information before the of August 2006.
Plant, Unit Nos. 1 and 2); Order Commission, the NRC staff concludes
For the Nuclear Regulatory Commission.
Approving Application Regarding that the proposed merger and resulting
Proposed Corporate Merger Catherine Haney,
indirect transfer of control of the
licenses will not affect the qualifications Director, Division of Operating Reactor
I Licensing, Office of Nuclear Reactor
of FPL as holder of the facility licenses,
Florida Power and Light Company Regulation.
and that the indirect transfer of control
(FPL or the licensee) exclusively holds [FR Doc. E6–13126 Filed 8–10–06; 8:45 am]
of the licenses as held by FPL, is
Facility Operating License No. DPR–67 otherwise consistent with applicable BILLING CODE 7590–01–P
and co-holds Facility Operating License provisions of law, regulations, and
No. NPF–16, which authorize the orders issued by the Commission
possession, use, and operation of the St. NUCLEAR REGULATORY
pursuant thereto.
Lucie Nuclear Plant, Units 1 and 2 (the The findings set forth above are COMMISSION
facility). FPL is licensed by the U.S. supported by a safety evaluation dated [Docket No. 50–331; License No. DPR–49]
Nuclear Regulatory Commission (NRC August 3, 2006.
or Commission) to operate the facility. In the Matter of Fpl Energy Duane
The facility is located at the licensee’s III Arnold, Llc; (Duane Arnold Energy
site in St. Lucie County, Florida. Accordingly, pursuant to sections Center); Order Approving Application
161b, 161i, 161o, and 184 of the Atomic Regarding Proposed Corporate Merger
II Energy Act of 1954, as amended (the
By application dated January 20, 2006 Act), 42 U.S.C. 2201(b), 2201(i), 2201(o), I
(the application), FPL requested that the and 2234; and 10 CFR 50.80, It is hereby FPL Energy Duane Arnold, LLC (FPL
NRC, pursuant to 10 CFR 50.80, consent ordered that the application regarding Energy Duane Arnold or the licensee) is
hsrobinson on PROD1PC67 with NOTICES1

to the proposed indirect transfer of the proposed merger and indirect a holder of Facility Operating License
control of the licenses to the extent license transfers is approved, subject to No. DPR–49, which authorizes the
currently held by FPL. The Orlando the following conditions: possession, use, and operation of the
Utilities Commission of the City of (1) FPL shall provide the Director of Duane Arnold Energy Center (the
Orlando, Florida, and the Florida the Office of Nuclear Reactor Regulation facility). FPL Energy Duane Arnold is
Municipal Power Agency collectively a copy of any application, at the time it licensed by the U.S. Nuclear Regulatory

VerDate Aug<31>2005 15:03 Aug 10, 2006 Jkt 208001 PO 00000 Frm 00063 Fmt 4703 Sfmt 4703 E:\FR\FM\11AUN1.SGM 11AUN1

You might also like