Federal Register / Vol. 71, No.

61 / Thursday, March 30, 2006 / Notices 16135

Quantico compressor station with a DEPARTMENT OF ENERGY Comment Date: 5 p.m. Eastern Time
6,000 nominal HP turbine engine/ on March 30, 2006.
compressor unit. In the September 11, Federal Energy Regulatory
Magalie R. Salas,
2003 application, Dominion proposed to Commission
Secretary.
refurbish and install the units from
[FR Doc. E6–4655 Filed 3–29–06; 8:45 am]
Dominion’s existing Crayne compressor [Docket No. CP04–365–002]
BILLING CODE 6717–01–P
station, at Mockingbird Hill and
Quantico. After refurbishing, the units Dominion Transmission, Inc.; Notice of
have the nameplate HP ratings of 5,800 Proposed Changes in FERC Gas Tariff
DEPARTMENT OF ENERGY
HP and 6,100 HP, respectively. March 24, 2006.
Dominion does not request an increase Federal Energy Regulatory
Take notice that on March 22, 2006, Commission
in capacity, or any other certificated Dominion Transmission, Inc. (DTI)
level. The units were placed in service tendered for filing as part of its FERC [Docket No. OR06–6–000 and Enbridge
on November 1, 2004. Gas Tariff, Third Revised Volume No. 1, Offshore Facilities, LLC]
Any questions regarding the the following tariff sheets, to become
Notice of Petition for Declaratory Order
application are to be directed to effective the later of April 1, 2006, or the
Matthew R. Bley, Manager, Gas commencement date of incremental March 24, 2006.
Transmission Certificates, Dominion storage services offered as part of its Take notice that on March 17, 2006,
Transmission, Inc., 120 Tredegar Street, Northeast Storage Project: Enbridge Offshore Facilities, LLC
Richmond, Virginia 23219; phone Fifth Revised Sheet No. 36 (Enbridge) filed in Docket No. OR06–6–
number (804) 819–2877. First Revised Sheet No. 36A 000, a petition for declaratory order,
Any person wishing to obtain legal Original Sheet No. 41 pursuant to Rule 207(a)(2) of the
Sheet Nos. 42–99 Commission’s Rules of Practice and
status by becoming a party to the
Procedure (18 CFR 385.207(a)(2)).
proceedings for this project should, on The proposed changes would increase Enbridge requests that the Commission
or before the below listed comment revenues from jurisdictional issue an expedited decision on this
date, file with the Federal Energy incremental storage service by petition no later than mid-June 2006.
Regulatory Commission, 888 First approximately $2 million based on the Enbridge states that it is planning to
Street, NE., Washington, DC 20426, a 12-month period ending March 31, construct a 20-inch diameter, 26-mile
motion to intervene in accordance with 2007, as adjusted. crude oil pipeline Enbridge Oil Pipeline
the requirements of the Commission’s Any person desiring to protest this from production facilities servicing the
Rules of Practice and Procedure (18 CFR filing must file in accordance with Rule Neptune oil field in the Atwater Valley
385.214 or 385.211) and the Regulations 211 of the Commission’s Rules of area approximately 170 miles south of
under the NGA (18 CFR 157.10). A Practice and Procedure (18 CFR New Orleans, Louisiana in the
person obtaining party status will be 385.211). Protests to this filing will be deepwater Gulf of Mexico, to Caesar Oil
placed on the service list maintained by considered by the Commission in Pipeline. Enbridge Oil Pipeline is
the Secretary of the Commission and determining the appropriate action to be expected to commence service in 2007.
will receive copies of all documents taken, but will not serve to make Enbridge Oil Pipeline will also be
filed by the applicant and by all other protestants parties to the proceeding. available to serve fields to be developed
parties. A party must submit 14 copies Such protests must be filed on or before in the future in the western Atwater
of filings made with the Commission the date as indicated below. Anyone Valley and eastern Green Canyon areas.
filing a protest must serve a copy of that Enbridge states that the Enbridge Oil
and must mail a copy to the applicant
document on all the parties to the Pipeline will function in effect as an
and to every other party in the extension of Caesar Oil Pipeline. The
proceeding.
proceeding. Only parties to the Commission has approved contract
proceeding can ask for court review of The Commission encourages
electronic submission of protests in lieu carriage on Caesar Oil Pipeline,1 and
Commission orders in the proceeding. Caesar Oil Pipeline has entered into
of paper using the ‘‘eFiling’’ link at
Motions to intervene, protests and http://www.ferc.gov. Persons unable to transportation agreements with
comments may be filed electronically file electronically should submit an producers in the Neptune Field under
via the Internet in lieu of paper, see, 18 original and 14 copies of the protest to which Caesar Oil Pipeline has agreed to
CFR 385.2001 (a)(1)(iii) and the the Federal Energy Regulatory transport up to 60,000 barrels of oil per
instructions on the Commission’s Web Commission, 888 First Street, NE., day from the Neptune Field on contract
site under the ‘‘e-Filing’’ link. The Washington, DC 20426. carriage terms. Enbridge asserts that if
Commission strongly encourages those shippers and others who may ship
This filing is accessible on-line at on Enbridge Oil Pipeline in the future
electronic filings. http://www.ferc.gov, using the are to be assured that they can take
Comment Date: 5 p.m. Eastern Time ‘‘eLibrary’’ link and is available for advantage of their full contract rights to
on April 12, 2006. review in the Commission’s Public ship on Caesar Oil Pipeline, they must
Reference Room in Washington, DC. also be able to contract for rights to ship
Magalie R. Salas, There is an ‘‘eSubscription’’ link on the on Enbridge Oil Pipeline. Without such
Secretary. Web site that enables subscribers to complementary contractual rights to
[FR Doc. E6–4594 Filed 3–29–06; 8:45 am] receive e-mail notification when a
cprice-sewell on PROD1PC66 with NOTICES

ship on Enbridge Oil Pipeline, shippers


BILLING CODE 6717–01–P document is added to a subscribed will be concerned about the possibility
docket(s). For assistance with any FERC that common-carrier type pro rata
Online service, please e-mail allocation might be required on
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call 1 Caesar Oil Pipeline, 102 FERC ¶ 61,339 at PP 1,

(202) 502–8659. 37–38 (2003).

VerDate Aug<31>2005 15:32 Mar 29, 2006 Jkt 208001 PO 00000 Frm 00023 Fmt 4703 Sfmt 4703 E:\FR\FM\30MRN1.SGM 30MRN1
16136 Federal Register / Vol. 71, No. 61 / Thursday, March 30, 2006 / Notices

Enbridge Oil Pipeline under the interventions in lieu of paper using the previously authorized locations; and
provisions of 43 U.S.C. 1334(e)–(f) ‘‘eFiling’’ link at http://www.ferc.gov. (iii) the elimination of a previously
(2004). This would create a mismatch Persons unable to file electronically authorized 30-inch diameter valve on
between the capacity for which shippers should submit an original and 14 copies Northwest’s existing 30-inch diameter
have contracted on Caesar Oil Pipeline of the protest or intervention to the mainline.
and the capacity to which they have Federal Energy Regulatory Commission, Any questions regarding this
access on Enbridge Oil Pipeline to 888 First Street, NE., Washington, DC application should be directed to Gary
transport their oil to Caesar Oil Pipeline. 20426. K. Kotter, Manager, Certificates and
Enbridge is concerned that in the This filing is accessible on-line at Tariffs-3C1, Northwest Pipeline
absence of the declaratory order that it http://www.ferc.gov, using the Corporation, P.O. Box 58900, Salt Lake
seeks, the potential for common-carrier ‘‘eLibrary’’ link and is available for City, Utah 84158–0900, at (801) 584–
type pro rata allocation on Enbridge Oil review in the Commission’s Public 7117 or fax (801) 584–7764.
Pipeline will (1) result in shippers Reference Room in Washington, DC. There are two ways to become
refusing to transport volumes on There is an ‘‘eSubscription’’ link on the involved in the Commission’s review of
Enbridge Oil Pipeline due to such Web site that enables subscribers to this project. First, any person wishing to
shippers’ concern that they will be receive e-mail notification when a obtain legal status by becoming a party
prevented from tendering their document is added to a subscribed to the proceedings for this project
contracted-for volumes to Caesar Oil docket(s). For assistance with any FERC should, on or before the comment date
Pipeline, and (2) encourage shippers to Online service, please e-mail stated below, file with the Federal
build their own isolated, duplicative FERCOnlineSupport@ferc.gov, or call Energy Regulatory Commission, 888
pipeline capacity as insurance against (866) 208–3676 (toll free). For TTY, call First Street, NE., Washington, DC 20426,
having to restrict production from their (202) 502–8659. a motion to intervene in accordance
fields as a result of prorationing on Comment Date: 5 p.m. eastern time on with the requirements of the
Enbridge Oil Pipeline. Enbridge April 13, 2006. Commission’s Rules of Practice and
maintains that such uncertainty and Procedure (18 CFR 385.214 or 385.211)
unnecessary expense would discourage Magalie R. Salas, and the Regulations under the NGA (18
development of oil production and Secretary. CFR 157.10). A person obtaining party
construction of efficient large-scale [FR Doc. E6–4645 Filed 3–29–06; 8:45 am] status will be placed on the service list
pipelines in the deepwater Gulf of BILLING CODE 6717–01–P maintained by the Secretary of the
Mexico. Commission and will receive copies of
Accordingly, Enbridge seeks the all documents filed by the applicant and
following: DEPARTMENT OF ENERGY by all other parties. A party must submit
A Commission declaration that 14 copies of filings made with the
Enbridge Oil Pipeline will be authorized Federal Energy Regulatory Commission and must mail a copy to
to function as a contract carrier, hold on Commission the applicant and to every other party in
open season, enter into long-term [Docket No. CP05–32–002] the proceeding. Only parties to the
transportation contracts reflecting proceeding can ask for court review of
contract carriage principles, give those Northwest Pipeline Corporation; Notice Commission orders in the proceeding.
contracts precedence in allocating of Amendment However, a person does not have to
capacity, and contract for capacity that intervene in order to have comments
remains available after the open season March 23, 2006. considered. The second way to
closes on a first-come, first-served basis, Take notice that on March 16, 2006, participate is by filing with the
consistent with the Commission’s ruling Northwest Pipeline Corporation Secretary of the Commission, as soon as
in Caesar Oil Pipeline, 102 FERC (Northwest), 295 Chipeta Way, Salt Lake possible, an original and two copies of
¶ 61,339, at PP 1, 37 (2003). City, Utah 84158, filed in Docket No. comments in support of or in opposition
Any person desiring to intervene or to CP05–32–002, an application pursuant to this project. The Commission will
protest this filing must file in to sections 7(b) and (c) of the Natural consider these comments in
accordance with Rules 211 and 214 of Gas Act (NGA) to amend the certificate determining the appropriate action to be
the Commission’s Rules of Practice and of public convenience and necessity taken, but the filing of a comment alone
Procedure (18 CFR 385.211 and that was issued for its Capacity will not serve to make the filer a party
385.214). Protests will be considered by Replacement Project by Commission to the proceeding. The Commission’s
the Commission in determining the order dated September 13, 2005 in rules require that persons filing
appropriate action to be taken, but will Docket Nos. CP05–32–001 and CP05– comments in opposition to the project
not serve to make protestants parties to 32–001, all as more fully set forth in the provide copies of their protests only to
the proceeding. Any person wishing to request which is on file with the the party or parties directly involved in
become a party must file a notice of Commission and open to public the protest.
intervention or motion to intervene, as inspection. Persons who wish to comment only
appropriate. Such notices, motions, or Specifically, Northwest requests that on the environmental review of this
protests must be filed in accordance on the Commission authorize minor scope project should submit an original and
or before the date as indicated below. changes for its Capacity Replacement two copies of their comments to the
Anyone filing an intervention or protest Project, including: (i) Abandonment by Secretary of the Commission.
must serve a copy of that document on removal of three additional segments of Environmental commentors will be
the Applicant. Anyone filing an 26-inch diameter pipeline, totaling 0.20 placed on the Commission’s
cprice-sewell on PROD1PC66 with NOTICES

intervention or protest on or before the miles; (ii) abandonment of related environmental mailing list, will receive
intervention or protest date need not connection facilities at eight additional copies of the environmental documents,
serve motions to intervene or protests locations, elimination of such and will be notified of meetings
on persons other than the Applicant. abandonments at seven previously associated with the Commission’s
The Commission encourages authorized locations, and correction of environmental review process.
electronic submission of protests and the abandonment descriptions for two Environmental commentors will not be