Exhibit 2 to letter from Christy Todd and Megan Nelson, September 20, 2010

(Clean version of Exhibit 1)

NEW CONDITION: If (a) the City of Maple Valley does not appeal or challenge
the MPD Approval for the Villages MPD, (b) the City of Maple Valley does not
appeal or challenge the MPD Approval for the Lawson Hills MPD, (c) the City of
Maple Valley does not appeal or challenge the Development Agreement for the
Villages MPD, (d) the City of Maple Valley does not appeal or challenge the
Development Agreement for the Lawson Hills MPD, the Applicant shall provide the
following mitigation for the City of Maple Valley, which as to the identified
mitigation supercedes the mitigation projects listed for the City of Maple Valley in
Condition 18 above. For purposes of this condition, the percentage of the mitigation
project to be contributed by the Applicant to the City of Maple Valley is shown for
each project. All references to percentages constitute the combined contribution share
of the Villages and Lawson Hills projects.

Project A: Contribute 25.3 percent toward one additional southbound through lane on
SR 169 from SE 231st Street to Witte Road. Add a second eastbound to southbound
right-turn lane on SE Wax Road (double right turn lanes). Upgrade signal equipment
to be able to run the eastbound right turn phase with northbound protected left turn
phase at the same time.

Project B: Contribute 26.1 percent toward one additional southbound through lane on
SR 169 from SE Wax Road through the intersection at SR 169/Witte Road SE. The
curb lane will become a right turn lane. The southbound approach to this intersection
will be one right turn lane and two through lanes.

Project C: Contribute 66.6 percent toward a second northbound to westbound left-turn


lane (300 ft) on SR 169 and a second westbound to southbound left-turn lane (400 ft)
on SE 240th Street. Widen SE 240th Street west of SR 169 to add a second
westbound lane (500 ft).

Project E: Contribute 37.2 percent toward a second southbound lane on SR 169 from
Witte Road SE to SE 244th Street and a second northbound lane on SR 169 from
1,000 feet south of SE 240th Street to Witte Road SE.

Project F: Contribute 63.2 percent toward installation of a traffic signal at the


intersection of SR 169/SE 244th Street.

Project G: Contribute 50.8 percent toward a second southbound lane on SR 169 from
SE 244th Street to SE 264th Street. Construct a second northbound lane on SR 169
from SE 264th Street to 1,000 feet north of SE 264th Street.

Project H: Contribute 59 percent toward a second southbound lane on SR 169 from


south of SR 516 to SE 271st Street.
Project I: Contribute 54.6 percent toward a signal equipment upgrade at the
intersections of SR 169/SE 264th Street, SR 169/SR516, and SR 169/SE 271st Street
to be able to coordinate these three signals, and set the signal cycle length at 140
seconds.

Project J: Contribute 61.25 percent toward a second southbound lane on SR 169 from
SE 271st Street to SE 280th Street and a second northbound lane on SR 169 from
1,000 feet south of SE 271st Street to SE 271st Street.

Project K: Contribute 58.4 percent toward a second southbound lane on SR 169 from
SE 280th Street to Maple Valley’s south City limit.

Project L: Contribute 6.8 percent toward a new three-lane road (one eastbound and
two westbound lanes) on the SE 271st Street alignment between SR 169 and SR 516.
Add a second northbound to westbound left turn lane (200 ft) on SR 169 and a signal
at SR 516/SE 271st intersection.

Project W: Contribute 29.9 percent toward widening SR 516 to 4/5 lanes from 216th
Ave SE to the west City limits of Maple Valley. Add a second westbound lane on SR
516 to 1,000 feet east of 216th Ave SE.

Project X: Contribution 29.9 percent toward reconfiguration of the northbound


approach to SR 516/216th Ave SE to include one left-turn lane and one left and right-
turn share lane. Increase the left turn pocket length to 270 feet. Modify signal to
accommodate eastbound right-turn phase overlapping with northbound phase.

Project Y: Contribute 13.5 percent toward a second westbound lane on SE 240th


from 500 feet west of SR 169 (see Project C) to Witte Road if and when the City of
Maple Valley obtains all the remaining funding necessary for completion of Project Y
(except for the contribution of the Applicant).

Project Z: Contribute 13.5 percent toward a 2-to-3 lane extension of SE 240th Street
between Wax Road and Witte Road if and when the City of Maple Valley obtains all
the remaining funding necessary for completion of Project Z (except for the
contribution of the Applicant).