You are on page 1of 6

Reliability Approach to ADTRAN

Value Engineering of CD3 EPP belt drive System

1
Reliability Expertise

Theoretical Reliability Prediction using Standard Calculation


Estimate methods (like MIL-HDBK-217, IEC-62380) using ITEM TOOL KIT

Analysis DFMEA using IQRM tool

Performing Product Hardening tests


Environmental
ESS
HALT & HASP
Practical Testing EMI/EMC
Conducted Immunity test of various pulses (Fast Transient, Surge etc.,)
Radiated immunity
Safety

Debugging Reliability failures in bench as well as chamber


Designing product considering reliability
Value Add Selection of components
Electrical & Enclosure Design considering Reliability
Documentation and Report Generation

11 July 2008
Reliability Infrastructure

Make: ACS
Chamber Model: CH250C ES
No of chamber: 1, Possible Expansion up to 5

Product Designers with experienced knowledge in debugging


Low cost Test Engineers
Available Resources Program Manager
Logistic person to handle shipments

Multi channel Oscilloscopes


Logic Analyzers
Test & Debug Multi-meters with Thermocouples to probe internal Product temperatures
Infrastructure External Power Supplies
Wide range of Micro-controller IDE tools
Laptops

Chiller
Isolation Transformer
Others UPS (Hired) backup for EUT
Generator backup with 30 minutes Restart time
Access Controlled Room

11 July 2008
Partner’s Infrastructure

-TCS (Goa) Chamber


-STQC Labs Chambers (ETDC and ERTL Labs)
-External Vendor Chambers

11 July 2008
Key Challenges

- Power shutdown
- Failures, Iterations and Fixes are usually longer cycle
- Lab availability is an external dependency
- Level of debugging support
- Repeatability of the failure events
- Managing Multiple products with lean & Thin approach
- Shipment delays

11 July 2008
Thank You

11 July 2008