STAFF REPORT

ACTION REQUIRED

Part of 55 Mill Street, Gooderham and Worts


Official Plan Amendment and Rezoning Application
06 189754 STE 28 OZ
Final Report

Date: August 19, 2008

To: Toronto and East York Community Council

From: Acting Director, Community Planning, Toronto and East York District

Wards: Ward 28 – Toronto Centre-Rosedale

Reference
06 189754 STE 28 OZ
Number:

SUMMARY

The applicant has appealed the Official Plan Amendment and rezoning application to the Ontario
Municipal Board (OMB) due to Council’s failure to make a decision within the time allotted by
the Planning Act. A pre-hearing conference was held on May 20, 2008 and a second pre-hearing
conference is scheduled for September 12, 2008. A hearing is set to commence on October 27,
2008.

Since the appeal the applicant has submitted


revised application to the City and advised the
Ontario Municipal Board at the May 20 pre-
hearing conference of the revised application.

The revised application seeks permission for


two high-rise residential buildings of 40 and 35
storeys, a four-storey commercial/office
building and retention of historic Rack Houses
“G” and “J”, all located to the south of Tank
House Lane; west of Cherry Street; north of the
TTR and CN Railway and east of Trinity Street
within Gooderham and Worts. The proposed
development will include up to 669 residential
units with permission for non-residential uses
(e.g. office and retail) in the four-storey

Staff report for action – Final Report – 55 Mill St 1


building and on the ground floor of the residential towers

This report seeks Council’s authorization for the City Solicitor and appropriate City staff to
attend the Ontario Municipal Board in support of the revised application, subject to a
recommendation requesting the Ontario Municipal Board withhold its Order until specified flood
protection measures are finalized, community benefits within Section 37 Agreement have been
agreed too and archaeological, heritage and servicing issues have been addressed..

RECOMMENDATIONS

The City Planning Division recommends that:

1. City Council authorize the City Solicitor and appropriate City staff to attend the Ontario
Municipal Board hearing in support of the revised application for an Official Plan
amendment and rezoning to permit the development of 40, 35 and four-storey buildings
as set out on the drawings date stamped as received by the City Planning Division on
June 23, 2008, subject to the conditions included in Recommendations 2, 3 and 4.

2. City Council authorize the City Solicitor to request the Ontario Municipal Board to
amend:

i. the Official Plan substantially in accordance with the draft Official Plan
Amendment attached as Attachment 6; and

ii. Zoning By-law 1994-0396 and 438-86 as required substantially in accordance


with the draft Zoning By-law Amendment attached as Attachment 7.

3. City Council authorize the City Solicitor and Chief Planner and Executive Director, City
Planning Division, to make such stylistic and technical changes to the draft Official Plan
Amendment and draft Zoning By-law Amendment as may be required to implement the
intent of this report.

4. City Council authorize the City Solicitor to request the Ontario Municipal Board to
withhold its Final Order approving the Official Plan Amendment and Zoning By-law
Amendment until it receives written confirmation from the City Solicitor that the
following conditions set out in (i), (ii) and (iii) below have been satisfied:

i. Flood Protection

a. the landform feature currently being constructed for the Province by the
Ontario Realty Corporation is completed such that the measures relating to
floodplain protection in a special policy area (“SPA”) in the applicable
Official Plan are no longer necessary in relation to these lands, all to the
satisfaction of the Toronto and Region Conservation Authority and the
Provincial Ministries having jurisdiction over such matters; and

b. the applicable Official Plan has been amended to remove the SPA
designation for the western portion of the Lower Don Area. OR

Staff report for action – Final Report – 55 Mill St 2


c. in lieu of (a) and (b) above, the applicant has obtained the permission of
the relevant Provincial Ministries to permit the amendment of the
applicable Official Plan and to permit residential uses within the SPA
(prior to completion of the landform feature).

ii. Servicing Matters

The applicant address the following servicing issues to the satisfaction of the
Executive Director, Technical Services Division:

a. provide a water demand analysis with recent hydrant testing to


demonstrate that the existing municipal infrastructure can support this
development;

b. provide detailed calculations for the sanitary sewer to demonstrate that the
existing municipal infrastructure can support this development;

c. because the City’s Wet Weather Flow Management Guidelines with respect
to the 100-year level of protection for stormwater quantity has not been
addressed, the applicant shall provide documentation from the Toronto and
Region Conservation Authority that quantity control is not required. The
applicant shall provide documentation showing compensation protection for
storms above the two-year; and

d. provide all calculations with respect to stormwater quantity control.

iii. Section 37 Agreement

The applicant enter into an agreement under Section 37 of the Planning Act to
amend the existing Section 37 Agreement for Gooderham and Worts, satisfactory
to the Chief Planner and Executive Director, City Planning Division, and the City
Solicitor, such agreement be registered on title to the lands in a manner
satisfactory to the City Solicitor, to secure the following facilities, services and
matters:

Heritage & Archaeology:

a. provision of a detailed Conservation Plan, prepared by a qualified heritage


architect to the satisfaction of the Manager of Heritage Preservation
Services, to include: documentation through photographs of the as-found
condition of Rack Houses "G" and "J" including photographs of the
interior roof structure and racking system, Building 63 (Paint Shop), and
Building 74 (Case Goods Warehouse), all as pertaining to the Reasons for
Identification; detailed descriptions/specification for all proposed heritage
conservation work including measures to be taken to protect all heritage
structures within an area adjacent to the development site during
construction; an exterior lighting and signage plan; and an estimate of
costs for the implementation of the Conservation Plan;

Staff report for action – Final Report – 55 Mill St 3


b. provide a Letter of Credit in a form and an amount satisfactory to the
Manager of Heritage Preservation Services, to secure the work identified
in the Conservation Plan;

c. provide a detailed landscape plan including all at and above-grade outdoor


amenity space that is proposed as part of the development, to the
satisfaction of the Manager of Heritage Preservation Services;

d. provide building permit drawings to the satisfaction of the Manager of


Heritage Preservation Services;

e. prior to the release of the Letter of Credit, the applicant is to complete the
heritage conservation work to the satisfaction of the Manager of Heritage
Preservation Services;

f. retain a consultant archaeologist, licensed by the Province’s Ministry of


Culture, to provide an update to the materials cited in the existing Section
37 Agreement for Gooderham and Worts, being Report No. 1 "Aboriginal
and Early European Settlement" and Report No. 6 "Industrial Heritage
Assessment of the Heritage Master Plan” which together constituted a
Stage 1 Archaeological Assessment in accordance with the Archaeological
Assessment Technical Guidelines, 1993, Ministry of Culture. This Stage
1 Archaeological Assessment update is to be in accordance with the Final
Draft - Standards and Guidelines for Consulting Archaeologists,
September 2006, Ministry of Culture such that:

i. the consultant archaeologist shall submit any recommendations for Stages 2 - 4


mitigation strategies, should the archaeological assessment proceed beyond a
Stage 1 Assessment, to the City Planning Division (Heritage Preservation
Services) to be approved prior to commencement of the site mitigation and any
construction activities, including excavation, for the development;

ii. the consultant archaeologist shall submit a copy of the relevant assessment
report(s) to City Planning Division (Heritage Preservation Services) in both hard
copy format and as an Acrobat PDF file;

iii. prior to the issuing of any building permits including an excavation permit, the
City Planning Division (Heritage Preservation Services) and the Ministry of
Culture (Heritage Operations Unit), shall confirm in writing that all
archaeological licensing and technical review requirements have been satisfied;
and

iv. prior to the release of the Letter of Credit, the applicant shall incorporate into the
development, through preservation and interpretation or through commemoration
and exhibition development, any significant archaeological resources and findings
on site to the satisfaction of the City Planning Division (Heritage Preservation
Services).

Staff report for action – Final Report – 55 Mill St 4


Community Benefit:

a. provide, prior to the issuance of the first above grade building permit, an
indexed financial contribution to the City in the amount of $1,000,000
(minimum) to be used for capital improvements for the Yonge Center for
the Performing Arts, Toronto Artscape’s facilities at Gooderham and
Worts and neighbourhood streetscape beyond the site to the satisfaction of
Chief Planner and Executive Director, City Planning Division.

Development Matters:

The following development matters shall be addressed during the site plan
approval process for the development. These matters are not characterized as
community benefits, but are secured using the legal mechanism provided under
Section 37 of the Planning Act.

a. a reserved area within the proposed ''Ribbon'' building at the terminus of


Trinity Street for a future pedestrian connection that may be constructed to
link Gooderham and Worts to the Lower Donlands and Lake Ontario, to
the satisfaction of the Chief Planner and Executive Director, City Planning
Division;

b. reasonable commercial efforts to obtain LEED certification of the


development and provide documentation respecting the certification
process for the development to the City;

c. implementation of the submitted Green Development Standard Checklist


date stamped as received by the City Planning Division on June 20, 2007,
and prior to condominium registration provide documentation respecting
its implementation to the City;

d. exterior building materials to be used in the construction of the buildings,


to the satisfaction of the Chief Planner and Executive Director, City
Planning Division, acting reasonably;

e. requirements to incorporate wind mitigation measures and noise


mitigation measures, as required, to the satisfaction of the Chief Planner
and Executive Director, City Planning Division;

f. railway mitigation measures including a crash wall / berm in accordance


with GO Transit requirements;

g. improvements/upgrades to municipal infrastructure, if required, to service


the development to the satisfaction of the Executive Director, Technical
Services Division;

h. direct that the local capital improvement portion of the cash-in-lieu of


parkland payment made pursuant to Section 42 of the Planning Act with
respect to the development be directed to improvements to Parliament
Square Park on the west side of Parliament Street at Mill Street; and
Staff report for action – Final Report – 55 Mill St 5
5. City Council advise the applicant that it is required in accordance with Section 41 of the
Planning Act or Section 114 of the City of Toronto Act, 2006, as applicable, to enter into
a site plan approval process to resolve outstanding technical issues and provide
supporting material including:

a. a detailed wind study;

b. a detailed noise study;

c. a phasing and parking relocation schedule; and

d. GO Transit information regarding crash wall/berm, fencing, servicing review of


proposed alterations to the existing drainage pattern.

6. City Council authorizes City officials to take all necessary steps, including the execution
of agreements and documents, to give effect to the above-noted recommendations.

Financial Impact
The recommendations in this report have no financial impact.

ISSUE BACKGROUND

1994 Planning Framework

In 1994, the former City of Toronto Council approved Official Plan Amendment 2 to the King-
Parliament Part II Official Plan and passed Zoning By-law 1994-0396 to implement a specific
planning framework for the Gooderham and Worts site.

The 1994 planning approval permits a 210,000 square metre mixed use redevelopment of the
Gooderham and Worts site. This includes the retention and adaptive re-use of a majority of the
heritage buildings and construction of new buildings for residential, commercial and modern
industrial uses. As part of the planning approvals, heritage easement agreements were registered
to secure the preservation, renovation and re-use of the heritage buildings. As well, public
benefits were secured related to public art, non-profit arts, affordable housing, daycare and
heritage site interpretation.

The planning framework identifies five districts within Gooderham and Worts: Trinity Street
Heritage District, Southern Open Space District, Cherry Street Commercial District, Parliament
Street Residential District, and Mill Street Residential District. Each sub-area has specific
development permissions (e.g. land use, building height, massing and density) and design
guidelines.

Between 1997 and 2000, four residential condominium developments at 70 and 80 Mill Street,
southeast corner of Mill Street and Parliament Street and 39 Parliament Street were completed
under the planning framework.

In 2003, Toronto City Council approved amendments to the 1994 planning framework to
reconfigure the public benefits package to provide a better fit with the arts and culture vision for
the site promoted by the then new owners (current applicant).
Staff report for action – Final Report – 55 Mill St 6
Original Proposal

On November 7, 2006, the applicant submitted an Official Plan and rezoning application to
permit two high-rise (40 and 48 storeys) residential buildings with commercial uses on the
ground floor, incorporating two historic rack houses, and a three-to-four-storey non-residential
building. The proposal had 54,634 square metres of residential gross floor area and 14,505
square metres of non-residential gross floor area resulting in a density of 4.63 times the area of
the site.

City Planning’s Preliminary Report on the proposal is available on the City’s website at:
www.toronto.ca/legdocs/mmis/2007/te/bgrd/backgroundfile-1214.pdf

Ontario Municipal Board Appeal


On September 21, 2007 Distillery SE Development Corp. appealed Council’s failure to make a
decision within the time allotted by the Planning Act. City Planning Staff continue to work with
the applicant to resolve outstanding issues.

Revised Proposal

On June 23, 2008, the applicant submitted a revised application in response to community
consultation and discussions with City Planning staff. The main change was a reduction of the
building height of the residential towers to 40 and 35 storeys. The revised proposal includes the
following built form elements:

a) the west tower, located south of Tank House Lane, consists of:

- a total of 40 storeys, in the middle of the site, with a 5-storey podium projecting
south from Tank House Lane having a total height of 126 metres (136 metres to
top of mechanical);
- a residential gross floor area of 27,662 square metres;
- a non-residential gross floor area of 1,017 square metres; and
- 358 residential units consisting of 202 one-bedroom units (56%) and 156 two-
bedroom units (44%).

b) the east tower, located along Cherry Street south of Tank House Lane, consists of:

- a total of 35 storeys with a 2-storey podium over Rack House “G” and “J” having a
total height of 112 metres (122 metres to top of mechanical);
- a residential gross floor area of 25,145 square metres;
- a non-residential gross floor area of 1,854 square metres; and
- 311 residential units consisting of 143 one-bedroom units (46%) and 168 two-
bedroom units (54%).

c) the ‘‘Ribbon’’ building, located along the south side of the property adjacent to the
TTR/CN Railway lands, consists of:

- a four-storey office building at Cherry Street tapering to three storeys going west
towards Trinity Street, with commercial uses on the ground floor;
- a non-residential gross floor area of 11,884 square metres; and
Staff report for action – Final Report – 55 Mill St 7
- loading and garbage collection facilities for the entire property having direct
access off Cherry Street.

Attachments 1 and 2 show the revised proposal’s site plan and elevations.

A total of 1,977 square metres of indoor residential amenity space and 1,560 square metres of
outdoor amenity space are being proposed within the ‘Ribbon’ building to serve the
development. A combination of outdoor amenity space and green infrastructure is proposed on
the roof of the ‘Ribbon’ building while the roofs of the three-storey and five-storey podium
buildings are proposed to accommodate green infrastructure only. The outdoor amenity space
includes an outdoor pool on top of the ‘Ribbon’ building. Amenity space will also be provided
within the proposed residential towers.

The proposal includes 320 residential bicycle spaces and 60 visitor bicycle spaces.

A total of 1,011 automobile parking spaces are provided with a breakdown of 567 residential
parking spaces and 444 visitor parking spaces. The proposed parking garage will be located
under all three buildings with direct access from Cherry Street and a proposed entrance off
Parliament Street underneath the ‘Ribbon’ building. Five loading spaces are proposed consisting
of one Type “G”, two Type “B”, and two Type “C”.

The proposal’s overall gross floor area is 67,561 square metres representing a density of 4.5
times the area of the lot. See the Application Data Sheet in Attachment 5 for additional details.

Gooderham and Worts and Development Site

Gooderham and Worts is located between Parliament Street and Cherry Street, from Mill Street
to the rail corridor at the south end of the property. The 5.5 hectare (13 acre) site contains a
collection of nineteenth century industrial buildings constructed between 1856 and 1927.

The development site occupies the south-eastern quadrant of Gooderham and Worts and includes
a piece of property extending westerly parallel to the rail corridor. In October 2006 the
Committee of Adjustment granted Consent Application No. B0095/06TEY to sever the
development site from the adjacent lands.

The development site is approximately 1.5 hectares (3.68 acres) with frontage on Cherry Street
and contains (see Attachment 8):

(i) Rack House “J” (also known as Building 65) – a heritage designated one-storey
building at the corner of Cherry Street and Tank House Lane;
(ii) Rack House “G” (also known as Building 64) – a heritage designated one-storey
building fronting Tank House Lane immediately to the west of Rack House “J”;
(iii) Rack House “M” (also known as Building 75) – an eight-storey building with
rooftop billboard signage fronting Tank House Lane immediately to the west of
Rack House “G”; and
(iv) surface parking and open space along the southern portion of the property
adjacent to the rail corridor.

Staff report for action – Final Report – 55 Mill St 8


Surrounding Area

The area surrounding Gooderham and Worts is varied. To the west is the St Lawrence
neighbourhood, a diverse mixed use area. To the east and northeast are the West Don Lands, a
30 hectare brownfield area undergoing redevelopment led by Waterfront Toronto. To the north
and northwest is the King-Parliament area which is undergoing significant commercial and
residential intensification and revitalization. To the south is a major rail corridor carrying
freight, VIA passenger and GO commuter traffic, and the Gardiner Expressway. Further south,
the East Bayfront area is undergoing a comprehensive planning exercise led by Waterfront
Toronto in preparation of this area’s redevelopment as part of Toronto’s waterfront revitalization
efforts.

Provincial Policy Statement and Provincial Plans

The Provincial Policy Statement (PPS) provides policy direction on matters of provincial interest
related to land use planning and development. The PPS sets the policy foundation for regulating
the development and use of land. The key objectives include: building strong communities, wise
use and management of resources, and protecting public health and safety. City Council’s
planning decisions are required to be consistent with the PPS.

The Growth Plan for the Greater Golden Horseshoe provides a framework for managing growth
in the Greater Golden Horseshoe including: directions for where and how to grow; the provision
of infrastructure to support growth; and protecting natural systems and cultivating a culture of
conservation. City Council’s planning decisions are required to conform, or not conflict, with
the Growth Plan.

City Planning staff have reviewed the proposed development for consistency with the PPS and
for conformity with the Growth Plan, as discussed in this report.

Official Plan

The site of this application is located within the “Downtown and Central Waterfront” area,
identified on Map 2 – Urban Structure and is designated as a Mixed Use Area on Map 18 – Land
Use Plan of the Toronto Official Plan.

In Chapter 2 of the Official Plan, Policy 2.2(2) provides that growth will be directed to the
Centres, Avenue, Employment Districts and the Downtown as shown on Map 2 and sets out a
number of other important policies including those in the “Downtown”, “Public Realm”,
“Heritage”, and “Built Form” sections of the Plan. This includes the built form policies for tall
buildings.

To assist with the implementation of these policies, the City has prepared a study, Design
Criteria for Review of Tall Building Proposals. The study provides key urban design criteria that
should be brought to bear in the evaluation of tall building applications. The proposal has been
reviewed against this study, as discussed later in this report.

Staff report for action – Final Report – 55 Mill St 9


King-Parliament Secondary Plan

The site is also located in the King-Parliament Secondary Plan.

Policy 15 of this Secondary Plan designates Gooderham and Worts as a Special Identity Area.
The policies encourage Gooderham and Worts as a vibrant mixed use area that is a focal point of
activity at the local, city and regional levels. Celebration of Gooderham and Worts significant
heritage resources is encouraged through the conservation, restoration and adaptive re-use of
heritage buildings, a high level of public use and access, a site interpretation program, and
compatible new development.

The site is located in the “Mixed Use Area 3” of the Gooderham and Worts Special Identity
Area. Non-residential employment generating uses such as offices, studios, light industrial and
institutional uses are permitted. The proposed residential component is not permitted.

The proposed ‘Ribbon’ building is designated “Parks and Open Space” within the Gooderham
and Worts Special Identity Area. As such, only open spaces and linkages of these sites are
permitted.

Zoning

The development site is split between two zoning districts - Cherry Street Commercial District
and Southern Open Space District - under site specific Zoning By-law 1994-0396 for
Gooderham and Worts.

The majority of the development site is zoned “Cherry Street Commercial District” which
permits up to 91,700 square metres of non-residential density. The current zoning contemplates
four new buildings:

(i) two 16-storey office buildings (up to 64 metres) at the southeast corner of the site
incorporating Rack House “J” and “G” into the base of the easterly tower;

(ii) a nine-storey office building (up to 37 metres) to the west of the 16-storey office
buildings (today, the four-storey Case Goods Warehouse, which was anticipated
to be demolished to permit the office building, has been refurbished and leased to
Artscape); and

(iii) a six-storey light industrial building (up to 28.5 metres) incorporating Tank
Houses 4, 9 and 10 into its base (today, the Young Centre for the Performing
Arts).

The proposed 40 and 35-storey buildings would replace the two buildings noted in item (i)
above.

The portion of the development site parallel to the rail corridor between Cherry Street and
Trinity Street is zoned “Southern Open Space District”. This area is intended to provide open
space, pedestrian access, parking and limited service and emergency vehicular access to the
Gooderham and Worts District. There is no building, density or height permissions for this area
and the proposed ‘Ribbon’ building will be located here.

Staff report for action – Final Report – 55 Mill St 10


In the former City of Toronto’s Zoning By-law 438-86, as amended, the underlying zoning for
the development site is “IC D2 N0.5”. This zoning category permits a limited range of industrial
and commercial uses to a maximum density of 2.0 times the area of the lot and a height of 23
metres.

Currently the applicant has permission to build the underground parking garage as well as the
commercial/retail and office uses provided that the buildings are constructed to flood proof
standards and conform to the existing zoning and Official Plan regulations for land use.

Section 37 Agreement

The existing Section 37 Agreement, as amended, for the Gooderham and Worts property secures
a number of public benefits including heritage, site interpretation centre, day care, public art and
requirement for public open space. The Agreement also secures various development
obligations such as rail protection, environment matters, as well as wind, noise and vibration
studies and mitigation. The agreement will be amended to include the additional requirements as
discussed and recommended in this report.

Site Plan Control

The proposed development is subject to site plan control. A site plan application has not been
submitted.

Reasons for Application

The application requires amendments to the King-Parliament Secondary Plan and Zoning By-law
1994-0396 (the site specific by-law for the Gooderham and Worts District). In general,
amendments are required to permit residential uses on the portion of the development site
designated "Mixed Use Area 3" of the Gooderham and Worts Special Identity Area, to permit
commercial uses on the portion of the site designated “Parks and Open Space Area”, and to
allow increased height and increase the cap on the maximum number of residential units. As
well, revisions are required to the existing Section 37 Agreement for Gooderham and Worts.

Community Consultation

City Planning staff’s Preliminary Report dated January 26, 2007 identified a potential
community engagement process for this application consisting of a community meeting on the
original proposal, a working group process, and further community consultation as required.
City Planning staff and the Ward Councillor have carried out this community engagement
process, as discussed below.

A community consultation meeting on the original proposal was held on April 4, 2007.
Approximately 50 members of the public attended the meeting. A range of comments were
received with some in favour of the proposal while others expressed concern with various
matters including the proposal’s tower heights, shadowing, density, land use, impact on heritage
resources and the view south on Trinity Street as well as the number of on-site parking spaces for
visitors and related traffic implications. At the conclusion of the meeting the Ward Councillor

Staff report for action – Final Report – 55 Mill St 11


recommended a working group process to explore possible changes to the application. City
Planning staff also received written comments after the community consultation meeting.

Working Group Process:

The purpose of a working group process is to assemble a group of representatives from area
stakeholders to facilitate community input on the application.

The Ward Councillor established a Working Group consisting of representatives from six
community stakeholders: the Gooderham and Worts Neighbourhood Association, the West Don
Lands Committee, representatives for the condominium boards for 80 and 70 Mill Street as well
as 39 Parliament Street, in addition to Waterfront Toronto. These representatives worked with
City Planning staff and the applicant’s team. This group met on eight occasions between May
and September 2007. Working Group sessions were open to the public and well attended.

As a result of the discussions during the Working Group process consensus was reached on some
issues, including:

- improvements to the proposal (as compared to the 1994 planning framework) in terms of:
retaining the three-dimensional integrity of Rack Houses “J” and “G”, keeping more of
the ground plane open including retention of the courtyard area (partially used by Mill
Street Brewery) to the west of Rack House “M”, and providing a larger courtyard area in
the southeast quadrant of Gooderham and Worts;
- relating the height of the proposed ‘‘Ribbon’’ building to the Case Goods building;
- ensuring that the proposed five-storey podium occupying the building footprint of Rack
House “M” (to be demolished) is of the same scale and massing as Rack House “M”, and
provides a brick façade;
- the importance of addressing sustainability by implementing the Green Development
Standard and seeking LEED certification;
- reducing tower heights (although consensus was not reached on appropriate height);
- protection of a future potential pedestrian connection from the terminus of Trinity Street
to the East Bayfront; and
- incorporating the development’s loading and garbage collection within the ‘‘Ribbon’’
building with access from Cherry Street only.

There were a number of items where consensus was not reached, including:

- the appropriateness of the proposed built form including massing and heights;
- the westerly extent of the proposed ‘‘Ribbon’’ building. The majority of community
stakeholders felt the ‘‘Ribbon’’ building should terminate before Trinity Street in order to
preserve the view corridor down Trinity Street and protect for a potential pedestrian
connection to the East Bayfront;
- the design of the ‘‘Ribbon’’ building, although it was acknowledged by the applicant’s
architect that detailed design work had not yet been done;
- the need for more employment-related uses and space in the proposal; and
- access to the development’s parking garage. Some community stakeholders felt that the
garage should only be accessed from Cherry Street, as opposed to the proposed Cherry
and Parliament Street access points, to minimize impacts on the Gooderham and Worts
and 39 Parliament Street.

Staff report for action – Final Report – 55 Mill St 12


Working Group members also recognized that some of the issues raised through the Working
Group process were site plan related matters. Accordingly, the Ward Councillor advised that a
stakeholder committee will be formed to review the future Site Plan Control application for the
proposal. The applicant is aware of this requirement.

While the Working Group process was not successful in achieving an overall consensus,
Working Group members are to be commended for their efforts to understand the issues, each
other’s positions and in providing valuable contributions to the discussion.

Further Consultation:

On June 23, 2008, the applicant formally amended their application in response to the Working
Group process and discussions with the City. Supporting studies and reports were also
submitted.

On July 10, 2008, a second community consultation meeting was held. Approximately 26 people
attended to review the revised proposal, asked questions of City Planning staff and the
applicant's team, and to provide feedback. In general comments were similar to the feedback
received at the first community meeting, noted above, and during the Working Group process.
Inquires were also made about the next steps in the planning process for the application.

Agency Circulation

The revised application including an updated driveway access study, updated servicing
information, wind analysis and updated drawings was circulated to agencies on June 25, 2008.
Responses received have been used to assist in evaluating the revised application, and to
formulate appropriate by-law standards and Section 37 agreement requirements.
City staff is continuing to work with the applicant in an effort to resolve outstanding technical
issues and community concerns.

COMMENTS

Land Use

Since City Council’s 1994 planning approvals, Gooderham and Worts has been gradually
undergoing a transition from its former industrial function to an area with a broad mix of land
uses. This proposal seeks permission for a mix of residential and non-residential uses; whereas,
only non-residential uses are permitted in “Mixed Use Area 3” of the Gooderham and Worts
Special Identify Area. As discussed below, City Planning staff have reviewed the applicable
planning policies to determine whether the introduction of residential uses is appropriate.

Growth Plan
The Province’s Growth Plan for the Greater Golden Horseshoe requires a municipality to
undertake a municipal comprehensive review prior to permitting a conversion of employment
lands to non-employment uses, when the lands are located outside downtown areas and
regeneration areas. Given that the site is located in the Downtown and Central Waterfront area
shown on Map 2, Urban Structure of the Official Plan, the conversion policy does not apply to
this application.

Staff report for action – Final Report – 55 Mill St 13


Provincial Policy Statement 2005
The PPS identifies a two-part test when considering an application to permit non-employment
uses on lands within employment areas: (a) whether the land is required for employment
purposes over the long term and (b) whether there is a need for the conversion.

Employment Districts shown on Map 2, Urban Structure, of the Official Plan will be protected
and promoted exclusively for economic activity and form part of the Plan’s long term growth
management and job intensification strategy. Lands shown as Employment Districts are needed
for employment purposes over the long term to accommodate part of the job growth projected to
2031 and to ensure the City’s fiscal health. The site is not part of, or on employment designated
lands adjacent to, an Employment District. In addition, certain lands in the City designated as
Mixed Use Areas permit only employment type uses, such as the site. These lands can also
accommodate part of the job growth projected to 2031 and ensure the City’s fiscal health.

Within “Mixed Use Area 3” of the Gooderham and Worts Special Identify Area new
development has introduced a significant amount of employment uses including: the Mill Street
Brewery; the Young Centre for the Performing Arts providing institutional and arts uses; and
small businesses and non-profit arts groups in the restored four-storey Case Goods Warehouse.
This proposal expands “Mixed Use Area 3” to include lands occupied by the proposed “Ribbon”
building, which will provide new commercial and office space for Gooderham and Worts.
Accordingly, that portion of the existing “Mixed Use Area 3” proposed for residential purposes
is not required exclusively for employment purposes.

With respect to the need to permit non-employment uses, a fundamental consideration in City
Planning’s assessment of the proposed mix of uses is the over-arching planning objectives to
preserve and restore Gooderham and Worts and to transform the area into an active, vibrant
mixed use area. The proposal will contribute toward these objectives by retaining a greater
portion of Rack House “G” and “J”, keeping more of the ground plane open and available for
courtyards and pedestrian linkages, and providing additional housing, compared to the 1994
planning approvals.

In addition, the proposed mix of uses will contribute towards the planning objective of
encouraging day and night time activity in Gooderham and Worts. With respect to the objective
of achieving a balance between non-residential and residential uses in the Gooderham and Worts
area, the proposal’s 14,755 square metres and 52,807 square metres of non-residential and
residential uses, respectively, will add to the area’s existing mix of uses representing
approximately 30% non-residential and 70% residential.

Based on the above considerations, the introduction of residential uses are appropriate and will
help to realize the overall planning objectives of the Gooderham and Worts Special Identity
Area. The change of land use on the existing “Parks and Open Space” to office and commercial
is also appropriate as it provides a buffer between the TTR/CN Railway and the Gardiner
Expressway and the site. The proposed ‘Ribbon’ building acts as visual buffer within the site
and within the Gooderham and Worts Distillery District. The open space requirement is
internalized in the form of an internal amenity and public open space in the proposed courtyards.

Lower Don Special Policy Area (SPA)

The site is within the Lower Don Special Policy Area. Special Policy Areas (SPAs) are areas
that exist in a historical floodplain where stringent control of development would result in
Staff report for action – Final Report – 55 Mill St 14
significant social and economic hardships to the community. Accordingly, development is
permitted subject to addressing flood protection requirements.

In November 2002 Council adopted the new Official Plan which identified ten SPAs throughout
Toronto including the Lower Don Special Policy Area. On March 17, 2003 the Official Plan was
modified and approved, in part, by the Ministry of Municipal Affairs and Housing. The Minister
withheld his decision on certain sections of the Official Plan including the Special Policy Areas
section. The City’s appeal to the Minister’s decision with respect to the SPA policies remains
outstanding pending the review of updated floodplain data and mapping, and the approval of
revised Official Plan policies by the Minister of Municipal Affairs and Housing, and the Minister
of Natural Resources.

Until the SPA policies for the new Official Plan come into effect for the Lower Don SPA, the
policies of the former City of Toronto Official Plan remain in force.

Section 2.58 of the former City of Toronto Official Plan states that further development on
developed floodplain lands may be permitted on the condition that it is flood protected to at least
the 1:350 year level. Section 2.68 requires all development in the Lower Don SPA to address the
flood protection in Section 2.58.

The site is also governed by the King-Parliament Secondary Plan, which identifies the property
as being within the Gooderham and Worts Special Identity Area. Section 8 of the Gooderham
and Worts Special Identity Area contains flood proofing requirements which are to be met by
applicants seeking zoning or site plan approvals. The section states:

"In passing Zoning By-laws or approving site plan applications to permit development
within the Gooderham and Worts Special Identity Area, site grading, building access and
egress, the design of access ramps to underground parking garages and the floor levels
within buildings will provide adequate flood proofing protection to at least the 1:350
regional flood level".

Provincial Policy Statement 2005

Under the Provincial Policy Statement (PPS), applications for development within SPAs that
propose a change to the site-specific policies (i.e. land use amendment) are permitted only upon
the joint approval of the Ministers of Natural Resources and Municipal Affairs and Housing.
This approval is contingent on the provision of studies which demonstrate that the proposed use
will satisfactorily meet provincial flood protection measures and reduce or eliminate the risks
associated with flooding.

At this time, the applicant has not submitted flood-related engineering studies to demonstrate that
the proposed development meets the policy requirements of the Official Plan and the PPS, nor
has a request been made to the Ministers to consider approving an amendment to the SPA-related
policies.

Flood Protection Landform

In 2006 the Ontario Realty Corporation, in cooperation with Waterfront Toronto, the City of
Toronto, and the Toronto and Region Conservation Authority (TRCA), commenced the
construction of flood remediation works to eliminate the flood risk associated with lands west of
Staff report for action – Final Report – 55 Mill St 15
the Don River in the Lower Don SPA. This undertaking includes the construction of a landform
feature east of the site that, when completed, in conjunction with the widening of the railway
bridge over the Don River (completed in 2007) will protect lands west of the Don River in the
Lower Don SPA from flooding associated with a Regional Storm Event. It is intended that upon
completion of the flood remediation works, the SPA designation for the western portion of the
Lower Don Area will no longer be required and may be removed from the Official Plan subject
to the joint approval of the Ministers of Natural Resources and Municipal Affairs and Housing.

TRCA advises that the flood remediation works are estimated to be functional by the end of 2009
at the earliest. Until the flood remediation works are complete the Lower Don SPA policies in
the former City of Toronto Official Plan remain in effect and are applicable to the proposal.

As a result, City Planning staff recommend that the OMB approve the proposed Official Plan and
Zoning By-law Amendments but withhold its final Order until such time as:

(i) the landform feature currently being constructed for the Province by the Ontario
Realty Corporation is completed such that the measures relating to floodplain
protection in a special policy area in the applicable Official Plan are no longer
necessary in relation to these lands, all to the satisfaction of the Toronto and
Region Conservation Authority and the Provincial Ministries having jurisdiction
over such matters; and

(ii) the applicable Official Plan has been amended to remove the SPA designation for
the western portion of the Lower Don Area; OR

(iii) in lieu of (i) and (ii) the applicant obtains the permission of the relevant Ministries
to permit the amendment of the applicable Official Plan and to permit residential
uses within the SPA (prior to completion of the landform feature).

Density

The development permission the applicant is seeking is 67,561 square metres consisting of
52,807 of residential gross floor area and 14,755 of non-residential gross floor area, which
represents a gross density of 4.5 times the area of the development site. The proposal’s
additional density above the underlying zoning permission is achieved in an acceptable built
form that can appropriately be accommodated on the site, as discussed below. The proposed
density is comparable to other developments within Goodherham and Worts including the Pure
Spirits building which has a height of 32 storeys and a density of 6.0 times the lot area.

Staff report for action – Final Report – 55 Mill St 16


Built Form
West Tower

The west tower is 40 storeys with a height of 126 metres plus 10 metres for mechanical. The
tower floor plate is approximately 650 square metres, which is below the tall buildings’ design
guideline maximum of 743. The west tower will be at the southern end of Rack House “M” (to
be demolished) 25 metres from the railway corridor and more than 25 metres from the other
residential tower. The proposal will consist of a 5-storey podium with below grade parking.

East Tower

The east tower is 35 storeys with a height of 112 metres plus 10 metres for mechanical. The
tower floor plate is approximately 743 square metres. The east tower will be at the edge of the
property abutting Cherry Street. The Rack House “J” exterior wall, which lies on the lot line of
Cherry Street, will be maintained. The proposal consists of a one-storey base building with a
two-storey podium above. The base building will retain the heritage scale, appearance, and
relationship to the street it has had since it was first constructed. Protection of Rack House “G”
and “J” during construction will be secured within the Section 37 Agreement.

Ribbon Building

The ‘Ribbon’ building is four storeys at Cherry Street tapering to three storeys west towards
Trinity Street. Amenity space for the development is located within the ‘Ribbon’ building. The
design of the building has not been developed and will be further reviewed during the site plan
control process. This Report recommends securing a reserved area within the proposed ''Ribbon''
building at the terminus of Trinity Street for a future pedestrian connection that may be
constructed to link Gooderham and Worts to the Lower Donlands. This was an important issue
discussed within the Working Group members.

The proposed towers have been reviewed using the City's Design Criteria for Review of Tall
Buildings, as highlighted below:

Design Criteria Proposal


Transition at the Scale of the Block The applicant has placed the taller of the
Place the taller building shaft on the site two towers (40 storeys) away from Cherry
and provide appropriate setback of the tall Street where it will limit its visual impact
building from the base in a manner that on the street or on neighbouring properties.
limits its visual impact on the street, open The 35-storey tower on the east side of the
space, and from neighbouring properties. property adjacent to Cherry Street is
setback above its podium.
Prominent Sites, Views and Vistas The proposal integrates the existing
Tall buildings on prominent sites will be heritage Rack House “G” and “J” into the
designed and organized to: design of the development.

Enhance the landmark site and integrate The applicant has arranged the building
with context. footprints and base of the development in
response to the surrounding area including
Provide an appropriate design that providing pedestrian connections through
Staff report for action – Final Report – 55 Mill St 17
Design Criteria Proposal
acknowledges the land shape and the development to other parts of
architectural context of the prominent site Gooderham and Worts.
area.
The distance between the two towers is
Provide a strong visual impact on the 28.3 metres to improve the visual impact
surrounding city. particularly looking east from Parliament
Street through Gooderham and Worts.
Building Placement and Orientation
Locate tall buildings parallel to the street. The east tower will be parallel to Cherry
Street above Rack House “G” and “J” with
Where the setbacks of the adjacent an appropriate setback from the new
buildings are the same, align the front building wall to the street edge (edge of
façade of the base building consistent with Rack House “J”).
the adjacent building façades.
The building foot print for the west tower
On corner sites, respect the appropriate parallels Tank House Lane and the adjacent
alignment and building setbacks of both TTR/CN railway.
streets and necessary transition to both
streets.

Site Servicing and Parking The proposal includes a four level


New development will be located and underground parking garage. The servicing
organize vehicle parking, vehicular access, and loading area will be located inside the
service areas and utilities to minimize their proposed ‘Ribbon’ building. The main
impact on the property and on surrounding access point is at the southeast quadrant of
properties. the site at Cherry Street.

City Planning Staff have also reviewed the development application against the
Gooderham and Worts Special Identity guidelines. The study provides urban design
guidelines when evaluating development within the Gooderham and Worts District.

Design Criteria Proposal

The siting of new buildings should The proposal protects and enhances Market
reinforce the existing geometry of lanes Lane, and provides a new pedestrian link
and courts. along the north edge of the ‘Ribbon’
building, a new courtyard internal to the
site and maintains the existing courtyard
(partially occupied by Mill Street brewery).

The new east tower will be parallel to


Cherry Street above heritage buildings
Rack House “G” and “J” with an
appropriate setback from the new building
wall to the street edge (edge of Rack House
“J”).

The west tower with a 5-storey podium


occupies the same footprint as the existing
Staff report for action – Final Report – 55 Mill St 18
Design Criteria Proposal
Rack House “M” and frames the new
courtyard internal within the site.

The proposed ‘Ribbon’ building is placed


at the foot of Trinity Street to shield the
area from the noise and visual impact of the
railway and Gardiner Expressway.

New buildings or multi-storey additions The east tower will use the existing Rack
to existing buildings should produce a House “G’ and “J” buildings as base with
strong base, body and cap to the an additional two-storey podium on top.
building mass. The tower component will be located on
the easterly side of Rack House “J”.

The “Ribbon” building matches the height


of the Case Goods building.

The west tower sits above a five-storey


podium.

The development has a brick base in


keeping with the predominant materials
along Tank House Lane.

New buildings should be highly The towers have been modulated to


articulated and modulated to minimize minimize the visual impacts within the site
the visual impacts of building bulk. and within the adjacent area. City Planning
staff have worked with the applicant to
increase the separation distance between
the towers in order to improve the visual
impact.

Heritage

A revised Heritage Impact Statement was submitted and reviewed by Heritage Preservation
Services staff as part of the applicant’s proposal to alter the existing Rack House “G” and “J”
buildings and the removal of Rack House “M”. The design guidelines and heritage easement
agreement state that a representative portion of the interior rack structure within Rack House “G”
should be retained to showcase its heritage features. As noted previously, Rack House “M” is
not protected by an easement and is permitted to be demolished under the 1994 planning
framework.

Heritage Preservation Services staff have reviewed the revised proposal and have recommended
approval of the alterations to the exiting heritage buildings in their report dated June 25, 2008 to
the Toronto Preservation Board. The report is available on-line at:
www.toronto.ca/legdocs/mmis/2008/pb/bgrd/backgroundfile-14571.pdf

Staff report for action – Final Report – 55 Mill St 19


At its July 17, 2008 meeting, Toronto Preservation Board adopted the report’s recommendations.
The applicant is required to retain certain heritage features within Rack Houses “G” and “J” and
recommendations to this Report have been added to secure this protection.

Archaeology
Heritage Preservation Services staff have requested an updated Stage 1 Archaeological
Assessment in order to address whether the site is free of any archaeological concerns. Previous
archaeological work completed at this site was very location specific and focussed upon areas of
soil disturbance. A Stage 1 Archaeological Assessment is required to map and define the
original shoreline and to examine the property for additional archaeological resources. Several
recommendations have been added to this Report requesting that the OMB defer its Final Order
until a Stage 1 Archaeological Assessment has been satisfactorily completed.

Shadow

The applicant has submitted a shadow study to demonstrate shadow impacts of the proposed
development at the spring, summer, fall and winter equinoxes. The resulting shadows can be
examined at three levels: the site, immediate public realm and surrounding properties.

Placement of the building mass to the south side of Tank House Lane results in limited shadow
impacts on existing residential properties on Mill Street particularly during the spring, summer
and fall equinoxes. Review of the study for September 21 (fall equinox) indicates that projected
shadows have a greater impact on vacant land on the north side of Mill Street west of Trinity
Street, and on the vacant land located on the east side of Cherry Street. Review of the study for
the winter equinox indicates shadow impact on the residential areas along Mill Street however;
this shadow impact would occur if the office towers were constructed in accordance with the
current zoning permissions on the site.

Generally the proposal’s placement of building mass on the site results in limited shadows
impacting existing residential development but cast a shadow on existing heritage buildings
within Gooderham and Worts and on the immediate public realm of Tank House Lane. Similar
to shadowing that would result from development under the 1994 planning framework.

Staff report for action – Final Report – 55 Mill St 20


Servicing
The applicant submitted an updated servicing study as part of the revised application. Technical
Services staff have reviewed the study and advised that the existing municipal infrastructure may
not be adequate to service this development and that the applicant may need to relocate an
existing sanitary sewer. Technical Services staff has requested a revised site servicing
assessment to address the servicing demand on the existing municipal infrastructure.
Accordingly, this Report recommends that the OMB defer its Final Order until the servicing
issues have been resolved.

Soil Remediation
The applicant is required to demonstrate that the lands are appropriate for their intended use
through the building permit process.

Wind

As part of the revised application, the applicant submitted a Qualitative Pedestrian Wind
Assessment dated June 10, 2008. The results of the study state that development is likely to
experience wind conditions over some areas such as the roof top terrace of the ‘‘Ribbon’’
building, the interior courtyard, and the sidewalk along the Cherry Street frontage. The
assessment was for general guidance only and more detailed work is needed to determine
whether mitigation measures are required. It is recommended that the Section 37 Agreement
secure the owner’s obligation to submit a detailed Wind Assessment and incorporate any
mitigation measures, as required, into the building and landscape design to the satisfaction of the
City.

Noise

The applicant is required to submit a noise study to address the impact that the adjacent CNR and
GO rail lines and other uses may have on this development. Mitigation measures, if required,
can include the introduction of double glazing of windows and implementation of noise barriers
etc. It is recommended that the Section 37 Agreement secure the owner’s obligation to submit a
detailed Noise Study and incorporate any mitigation measures, as required, into the building and
landscape design to the satisfaction of the City. The City may require the owner to retain a third
party reviewer at their expense.

Traffic Impact

Transportation Services and Transportation Planning staff have reviewed the submitted
Transportation Impact Assessment and additional material submitted in response to the City’s
feedback. City staff are satisfied that the site-generated traffic can be accommodated by the
existing area road network.

Access
Vehicular access will be provided by way of a ramp from Cherry Street leading to a four-level
below grade parking structure beneath the proposed towers and a two-level below grade structure
extending westerly beneath the ‘‘Ribbon’’ building. A second ramp is proposed at the west end
of the parking structure providing access to Parliament Street. Transportation Services staff have
Staff report for action – Final Report – 55 Mill St 21
requested a right-in/right-out onto Cherry Street in order to restrict access onto Cherry Street
given the future TTC streetcar line being finalized adjacent to this site. The applicant will be
responsible for the costs associated with the installation of a sign prohibiting left turns at the
Cherry Street access during the site plan control process.

Transportation Services staff has also requested that additional documentation be provided
including how two-way traffic will be accommodated on the Parliament Street ramp system.
This documentation can be provided during the site plan control process.

Parking

The applicant has proposed a total of 1,011 parking spaces, including 567 spaces for residents
and 444 spaces for commercial and visitors to be accommodated within the proposed
underground parking garage. This meets the requirements of the general Zoning By-law, which
calls for the provision of 606 parking spaces, consisting of 566 resident spaces and 40 visitor
spaces.

Given that the proposed parking supply replaces most of the existing 235 surface parking lot on
the south side of the site, the provision of a total of 444-commerical/residential visitor parking
spaces is acceptable.

Transportation Services staff has requested that the applicant provide information with respect to
the proposed phasing of the development, including how many of the existing 235 public parking
spaces in the southern parking lot will be available during construction, and how the parking
demands for existing Gooderham and Worts uses will be accommodated. A recommendation
has been added that, prior to final site plan approval, the applicant is to supply a phasing and
parking relocation schedule.

Bicycle Parking

The general Zoning By-law requires 200 bicycle parking spaces consisting of 160 resident
spaces and 40 visitor spaces for the proposal. The provision of additional resident bicycle spaces
is appropriate given the proposed number of residential dwelling units. This was also identified
at the community meetings and in the Working Group process.

In response to the aforementioned, the applicant has agreed to provide a minimum of 380 bicycle
parking spaces of which at least 320 spaces will be provided for residents and 60 visitor spaces.
The draft Zoning By-law amendment attached to this report includes provisions securing the
bicycle parking. Visitor bicycle spaces will be located in weather protected, at grade locations in
properly lighted locations. Exact locations will be secured during the site plan control process.

Staff report for action – Final Report – 55 Mill St 22


Residential Amenity Space
The general Zoning By-law requires two square metres of common outdoor and indoor
residential amenity space per unit which results in a requirement for 1,338 square metres of
indoor and 1,338 square metres of outdoor amenity space based on 669 units. The applicant has
proposed 1,977 square metres of indoor residential amenity space and 1,560 square metres of
outdoor amenity space. The applicant intends to construct a full service fitness centre all within
the ‘‘Ribbon’’ building. In addition outdoor amenity space is proposed for the units on top of
Rack House “G” and “J” and indoor amenity space is proposed within the residential towers.

GO Transit
GO Transit has requested a minimum residential building setback from the railway corridor
property line of 25 metres in conjunction with an appropriately designed crash wall. They have
also requested site plan conditions including: construction of the crash wall prior to any
residential occupancy, fencing, noise and vibration studies, servicing review of proposed
alterations to the existing drainage pattern affecting GO Transit property, as well as a
requirement for the applicant to enter into an agreement regarding the placement of building tie-
backs. The proposed residential units are placed at least 25 metres from the railway corridor and
the above noted issues will be secured in the Section 37 Agreement and addressed during the site
plan control process.

Open Space/Parkland

The Official Plan contains policies to ensure that Toronto's system of parks and open spaces are
maintained, enhanced and expanded. Map 8B of the Official Plan shows local parkland
provisions across the City. Given that the subject lands are currently industrial, there is no local
parkland provision level assigned to this area. However the immediate area to the north is an
area with the second highest parkland provision level with 1.56 to 2.99 hectares of local parkland
per 1,000 people.

Parks staff have advised that since the site is going from industrial to residential/commercial it is
subject to the alternate rate park levy. The parkland contribution that would apply to this site is
15% for the proposed residential 2% for the proposed commercial. The required parkland
dedication will be satisfied through cash-in-lieu as the site is encumbered with underground
parking and there is no appropriate location for a park on the site.

Toronto Green Development Standard

The Green Development Standard contains performance targets and guidelines that relate to site
and building design to promote better environmental sustainability of development in Toronto.
The Standard has 63 possible green development targets. Based on the applicant’s submission of
the Toronto Green Development Standard Checklist, the proposed development is intended to
achieve 50 targets. Some of the targets proposed to be met include:

Air

- Major entrance located within 200 metres of a transit stop; and


- Green Roof designed to meet the City’s performance criteria.

Staff report for action – Final Report – 55 Mill St 23


Energy

- New Construction, Building designed for a 40% improvement (objective) over the Model
National Energy Code; and
- Building oriented and designed to take advantage of passive solar heating and shading for
cooling.

Water

- On an annual loading basis, 80% of total suspended solids removed from all runoff
leaving the site; and
- Stormwater on-site retained to the same level of annual volume of overland runoff
allowable under pre-development conditions.

The applicant also intends to pursue LEED (Leadership in Energy and Environmental Design)
certification for the development and has agreed to provide documentation on key milestones
(e.g. application and registration) to the City. Requirements will be secured in the Section 37
Agreement.

Section 37
The Official Plan contains policies pertaining to the provision of community benefits for
increases in height and/or density pursuant to Section 37 of the Planning Act.

The proposal involves the introduction of residential land use permission and a significant
increase in building height. A public benefit in the form of a $1,000,000 contribution is
recommended. Part of this contribution will go towards capital improvements to existing
buildings for non-profit arts groups. As well, this contribution will be used for improvements to
adjacent local streetscaping beyond the site. The Ward Councillor agrees with the Section 37
community benefits.

The contribution is required prior to the issuance of an above-grade building permit for any
development on the site, and will be indexed annually based on the construction price index and
commencing with the by-laws coming into force. A Section 37 Agreement will be signed and
registered on title to secure the public benefit.

The following matters are also recommended to be secured in the Section 37 agreement as a
legal convenience to support development:

- reserved area within the proposed ''Ribbon'' building at the terminus of Trinity Street for a
future pedestrian connection that may be constructed to link Gooderham and Worts to the
Lower Donlands and Lake Ontario;
- improvements / upgrades to municipal infrastructure if required to service the
development;
- materials for the exterior of the development;
- heritage & archaeology studies and related matters;
- railway mitigation measures including a crash wall / berm in accordance with GO Transit
requirements;
- detailed wind and noise studies and incorporation of mitigation measures, if required,
into the development;
- implementation of the submitted Green Development Standard Checklist; and
Staff report for action – Final Report – 55 Mill St 24
- reasonable commercial efforts to obtain LEED certification for the development.
Development Charges

It is estimated that the development charges for this project will be $3,869,703. This is an
estimate. The actual charge is assessed and collected upon issuance of the building permit.

CONTACT
Michael Hynes, Senior Planner
Tel. No. 416-397-1761
Fax No. 416-392-1330
E-mail: mhynes@toronto.ca

SIGNATURE

____________________________

Raymond David, Acting Director


Community Planning, Toronto and East York District

(p:\ 2008\ Cluster B\ pln\ Teycc23103171045) - tm

ATTACHMENTS
Attachment 1: Site Plan
Attachment 2: Elevations
Attachment 3: Excerpt of General Zoning Map
Attachment 4: Excerpt of Land Use Map, Official Plan
Attachment 5: Application Data Sheet
Attachment 6: Draft Official Plan Amendment
Attachment 7: Draft Zoning By-law Amendment
Attachment 8: Heritage Buildings, Gooderham and Worts

Staff report for action – Final Report – 55 Mill St 25


Attachment 1: Site Plan

Staff report for action – Final Report – 55 Mill St 26


Attachment 2: Elevations – East/West

Staff report for action – Final Report – 55 Mill St 27


Elevations – North/South

Staff report for action – Final Report – 55 Mill St 28


Attachment 3: Excerpt of General Zoning

Staff report for action – Final Report – 55 Mill St 29


Attachment 4: Excerpt of Land Use Map, Official Plan

Staff report for action – Final Report – 55 Mill St 30


Attachment 5: Application Data Sheet

Application Type Official Plan Amendment & Application 06 189754 STE 28


Rezoning Number: OZ
Details OPA & Rezoning, Standard Application Date: November 7, 2006
Revised Date: June 23, 2008

Municipal Address: Part of 55 MILL ST (390 Cherry Street)


Location Description: Southeast quadrant of the Gooderham and Worts District.
Project Description: Proposed development with office & retail in a four- storey building; two
highrise towers (35 & 40-storey) with 669 dwelling units & four levels of
underground parking.
Applicant: Agent: Architect: Owner:
Goodmans LLP Architects Alliance Cityscape Holdings Inc
PLANNING CONTROLS
Official Plan Designation: Mixed Use Site Specific Provision: 94-0396, 749-03
Zoning: IC D2 N0.5 Historical Status: Y
Height Limit (m): 23 Site Plan Control Area: Y
PROJECT INFORMATION
Site Area (sq. m): 14921 Height: Storeys: 40 35 4/3
Frontage (m): 83.68 Metres: 136 122
(with mechanical)
Depth (m):
Total Ground Floor Area (sq. m): Total
Total Residential GFA (sq. m): 52807 Parking Spaces: 1011 – 567 residential
444 – commerical and
visitor
Total Non-Residential GFA (sq. m): 14754 Loading Docks 5
Total GFA (sq. m): 67561
Lot Coverage Ratio (%): 0
Floor Space Index: 4.53
DWELLING UNITS FLOOR AREA BREAKDOWN (upon project completion)
Tenure Type: Condo Above Below
Grade Grade
Rooms: Residential GFA (sq. m): 52,807
Bachelor: Retail GFA (sq. m): 7,622
1 Bedroom: 345 Office GFA (sq. m): 7,132
2 Bedroom: 324 Industrial GFA (sq. m):
3 + Bedroom: Institutional/Other GFA (sq. m): 0
Total Units: 669
CONTACT: PLANNER NAME: Michael Hynes, Senior Planner - Downtown Section
TELEPHONE: (416) 397-1761 mhynes@toronto.ca

Staff report for action – Final Report – 55 Mill St 31


Attachment 6: Draft Official Plan Amendment

CITY OF TORONTO

BY-LAW No. __-2008

To adopt Amendment No. 61 of the Official Plan


of the City of Toronto respecting the lands known municipally as formerly Part of 55 Mill
Street (390 Cherry Street)

WHEREAS authority is given to Council by the Planning Act, R.S.O. 1990, c.P. 13, as amended,
to pass this By-law; and

WHEREAS Council has provided adequate information to the public and has held at least one
public meeting in accordance with the Planning Act, and

WHEREAS the Council of the City of Toronto, at its meeting of September 24, 2008,,
determined to amend the Official Plan for the City of Toronto adopted by By-law No. 1082-
2002;

The Council of the City of Toronto HEREBY ENACTS as follows:

1. The text and maps attached hereto as Schedule ‘A’ are hereby adopted as Amendment No. 61
to the Official Plan of the City of Toronto.

ENACTED AND PASSED this __ day of __, A.D. 2008.

Deputy Mayor, ULLI S. WATKISS,


Deputy Mayor City Clerk

(Corporate Seal)

Staff report for action – Final Report – 55 Mill St 32


AMENDMENT NO. 61 TO THE OFFICIAL PLAN OF THE CITY OF TORONTO

Part of 55 Mill Street (390 Cherry Street)


Plan 108 PT Lots 2 to 12 RP 66R17818 PARTS 1-15, 20-26 RP 66R16795 PARTS 18-20
**GRID S2813

The Official Plan of the City of Toronto is amended as follows:

1. Map 15-1 (Map 1 of 3) of Site and Area Specific Policy No. 1 of Section 15 of Secondary
Plan No. 15, King-Parliament Secondary Plan of Chapter 6, Secondary Plans is deleted in
its entirety and replaced with the following map;

2. Sub-section 4.2 of Site and Area Specific Policy No. 1, Section 15 of Secondary Plan No.
15, King-Parliament Secondary Plan of Chapter 6, Secondary Plans is amended by
adding policy 3 as follows:

4.2.3 On the lands shown as “A” on Map 15-1 (Map 1 of 3) the following are
permitted:

(a) one residential building with a height of 112 metres (exclusive of


mechanical) having a maximum residential gross floor area of 28,000 square
metres and non-residential gross floor area of 1,100 square metres over
Rack Houses “G” and “J” identified respectively as Buildings No. 64 and 65
on Map 15-1 (Map 2 of 3) and in Appendix 2 and;

(b) one residential building with a height of 126 metres (exclusive of


mechanical) having a maximum residential gross floor area 26,000 square
metres and non-residential gross floor area of 1,900 square metres.

3. Appendix 2 of Secondary Plan No. 15, King-Parliament Secondary Plan of Chapter 6,


Secondary Plans is amended by deleting building No. 75 (Rack House “M”).

Staff report for action – Final Report – 55 Mill St 33


Attachment 7: Draft Zoning By-law Amendment

CITY OF TORONTO
BY-LAW No. -2007
To amend the Zoning By-law No. 1994-0396 of the former City of Toronto with
respect to lands known as Part of 55 Mill (390 Cherry Street), known as Gooderham
and Worts Distillery Site.

WHEREAS the Ontario Municipal Board pursuant to its Order No. dated upon
hearing the appeal of Distillery SE Development Corp. determined to amend the former
City of Toronto By-law No. 1994-0396, as amended, with respect to lands municipally
known as Part of 55 Mill Street (390 Cherry Street).

THEREFORE the Ontario Municipal Board orders as follows:

1. The Maps appended to By-law No. 1994-0396 are amended as follows:

(a) Plan 1 is deleted, and replaced with Plan 1 attached hereto and forming
part of this by-law;

(b) Plan 3 is deleted, and replaced with Plan 3 attached hereto and forming
part of this by-law;

(c) Plan 3B is deleted, and replaced with Plan 3B attached hereto and forming
part of this by-law;

(d) Plan 4B is deleted, and replaced with Plan 4B attached hereto and forming
part of this by-law;

(e) Plan 5 is deleted, and replaced with Plan 5 attached hereto and forming
part of this by-law;

(f) Plan 6 is deleted, and replaced with Plan 6 attached hereto and forming
part of this by-law; and

2. Section 1 of By-law 1994-0396 is amended by deleting the words “Cherry Street


Commercial District” and replacing them with the words “Cherry Street Mixed
Use District”.

Staff report for action – Final Report – 55 Mill St 34


3. Section 4(1) (c) of By-law No. 1994-0396 is deleted in its entirety and replaced
with the following:

“Not more than 80,400 square metres is erected and used within the Cherry Street
Mixed Use District, of which,

(i) the total of the non-residential gross floor area and the residential gross
floor area erected and used on the lands shown as Parcel “A” on Plan 3B
shall not exceed 28,800 square metres, of which:

(a) a minimum of 1,100 square metres of non-residential gross floor


area shall be erected and used on Parcel “A” and shall only be
used for a retail store, office and accessory uses thereto;

(ii) the total of the non-residential gross floor area and the residential gross
floor area erected and used on the lands shown as Parcel “B” on Plan 3B
shall not exceed 27,100 square metres, of which:

(a) a minimum of 1,900 square metres of non-residential gross floor


area shall be erected and used on Parcel “B” and shall only be
used for a retail store, office and accessory uses thereto; and

(iii) the total of the non-residential gross floor area erected and used on the
lands shown as Parcel “C” on Plan 3B shall not exceed 12,000 square
metres.

4. Section 4(4) of By-law No. 1994-0396 is deleted in its entirety and replaced with
the following:

“Not more than 1,549 dwelling units are erected or used within the Gooderham
and Worts Special Identity Area, of which:

(a) Not more than 300 dwelling units are erected or used
within the Mill Street Residential District;

Staff report for action – Final Report – 55 Mill St 35


(b) Not more than 669 dwelling units are erected or used
within the Cherry Street Mixed Use District;

(c) Not less than 25% of the dwelling units erected or used
within the Area contain at least two bedrooms, provided
nothing in this provision shall require that this percentage
be met on a building by building basis;

(d) Not less than 55% of the dwelling units located in any
building used for the purposes of non-profit home equity
housing contain two or more bedrooms; and

(e) Not less than 25% of the dwelling units erected or used
within the Area comprise social housing, non-profit home
equity housing, or a combination thereof provided that this
requirement shall be deemed to be complied with if Section
5(6) (j) of this By-law is complied with.”

5. Section 4 (6) of By-law No. 1994-0396 is amended by the adding the following
subsection:

(i) Notwithstanding the above, the height on Parcels “A”, “B” and “C”, as
shown on Map 3B shall be inclusive of rooftop mechanical

6. Section 4(7)(a) of By-law 1994-0396 is deleted in its entirety.

7. Section 4(7)(d) (ii) of By-law 1994-0396 is amended by deleting the words


“Cherry Street Commercial District” and replacing them with the words
“Cherry Street Mixed Use District”.

8. Section 4(9) (c) of By-law 1994-0396 is deleted in its entirety and replaced by the
following:

“in the Cherry Mixed Use District, not less than 9 loading spaces-type B,
2 loading spaces-type C, 1 loading space- type G and a further loading
space of at least 182 square metres in area;”

9. Section 4(10)(c) of By-law 1994-0396 is amended by deleting the semi-colon and


the period at the end of the sentence and replacing them with semi-colon.

10. Section 4(10)(d) of By-law 1994-0396 is amended by deleting the semi-colon at


the end of the sentence and replacing it with “; and”.

11. Section 4(10) of By-law 1994-0396 is amended by adding thereto a new


paragraph (e) as follows:

Staff report for action – Final Report – 55 Mill St 36


“(e) within Area E identified on Plan 6, not less than 2 square metres
for each dwelling unit located within such area.”

12. Section 4(10) of By-law 1994-0396 is amended by changing the following words
“Areas A, B, C and D” to “Areas A, B, C, D and E”.

13. Section 4(11)(j) of By-law 1994-0396 is amended by deleting the words “Cherry
Street Commercial District” and replacing them with the words “Cherry Street
Mixed Use District”.

14 Section 4(13) of By-law 1994-0396 is amended by deleting the semi-colon and


the period at the end of the sentence and replacing them with semi-colon.

15. Section 4(14) of By-law 1994-0396 is amended by deleting the period at the
end of the sentence and replacing it with a semi-colon.

16. Section 4 of By-law 1994-0396 is amended by adding a new subsection (15) to


read as follows:

“(15) the bicycle parking spaces required in Section 4(13) of By-law No. 438-
86, as amended, shall apply to the Gooderham and Worts Special Identity
Area except that, despite the provisions of such Section 4(13):

(a) a minimum of 320 bicycle parking space – occupant shall be


provided and maintained within the Cherry Street Mixed Use
District for exclusive use of residents of residential gross floor area
in said district and in accordance with the following requirements:

(i) bicycle parking spaces shall be provided and maintained on


the ground floor of a building containing residential gross
floor area and the first level immediately below grade in
the parking garage; and

(ii) bicycle parking spaces shall not be combined with storage


lockers for dwelling units; and

(b) a minimum of 60 bicycle parking space – visitor are provided and


maintained only at grade and on the ground floor of a building
containing residential gross floor area.

17. Section 5 of By-law 1994-0396 is amended by deleting the following words ”and
the maximum height limits and the maximum non-residential gross floor area
permitted within Parcel “A” and Parcel “B” shown on Plan 4B within the Cherry
Street Commercial District”.

18. Section 5(2) of By-law 1994-0396 is deleted in its entirety.

Staff report for action – Final Report – 55 Mill St 37


19. Section 5(6)(c)(vi) of By-law 1994-0396 is amended by deleting the words
“Cherry Street Commercial District” and replacing them with the words “Cherry
Street Mixed Use District.

Staff report for action – Final Report – 55 Mill St 38


Staff report for action – Final Report – 55 Mill St 39
Staff report for action – Final Report – 55 Mill St 40
Staff report for action – Final Report – 55 Mill St 41
Staff report for action – Final Report – 55 Mill St 42
Staff report for action – Final Report – 55 Mill St 43
Staff report for action – Final Report – 55 Mill St 44
Attachment 8 – Existing Heritage Buildings

Staff report for action – Final Report – 55 Mill St 45