Professional Documents
Culture Documents
Development
report of CLC
Sargodha
TO: MR NADEEM ALAM BUTT
PROJECT DIRECTOR
Development report of CLC Sargodha
MEETINGS
Renovation
Three rooms two halls and half of the gallery is white washed. But half of
gallery, wash rooms and entry are still needed to be white washed.
Maintenance
Only one big hall needs some maintenance, while all rooms and hall is repaired.
Security
Security position of the place is increased by engaging the security guard of
GCET Mr Shezad. He frequently patrol hostel in evening and in night time to
guarantee the security. In day time our own guard Muhammad Khan is
available.
Development report of CLC Sargodha
Cleanliness
As we have no staff for cleanliness. Principal of GCET is requested in this
regard .He appoint one Sweeper which can clean the premises on demand. On
the other hand we still need funds for cleaning materials
Electricity
Separate Electric meter of three phase is still pending due to incomplete file.
Only one letter of load requirement signed by head of department is needed. I
mailed that letter to you earlier and request for consideration several times but I
still cannot get it.
Telephone
The first telephone bill of November is still unpaid due to technical problems of
Bank. While all next bills along with phone calls detail is mailed by me.
Internet
Letter for internet connection is send by mail but I get no response on it.
Garden
Boys Hostel Garden is maintained by planting proper grass. Ten roses are also
planted along with many seasonal plants
Electric polls
Three electric poles are present in the space allocated to CLC Sargodha which
can interrupt our building design. We have to ask WAPDA for alternative ways
for smooth construction of premises.
Playground equipments
Play ground equipments were uninstalled in away that they need special
technicalities for reinstalling in new place. So the first installer can be contacted
for there reinstallation.
Development report of CLC Sargodha
Expected members
With a start of only three sections i.e. I can ensure you up to four hundred
members.
Current services
BOOKS
Books are available but still in packing. Under the instruction of ADMIN
OFFICER they would not be opened until care taker came and opened it.
COMPUTERS
Computer can be sent to Sargodha by clearing the hall where the computer
section is developed.
1. Library
Library can easily be developed by taking cupboard from Commissioner
House. A letter to commissioner is for our stock taking is needed. Care
Taker is also needed for stock taking in this regard.
2. Computer section
Three phase meter is basic requirement for computer section and
secondly internet connection is needed to develop computer section.
3. Sport section / Hobbies section
Some sport goods can be changed into complete section
With the development of these sections we can make CLC Sargodha functional.
Soon I will provide you more information in this regard